Negligence To ensure that the SIPP, PTP authorization and related permits
are completed before job initiation.
To identify the hazards and to capture the hazards in daily
PTP and to explain those hazardous condition to the Project
Manager and the CS Ops.
2. To identify the location of work to be done and to highlight the work area Inadequate Work To survey the work site with the GC Site Supervisor.
and the related jobs going to be done for the day to the CS Ops.
PRE-TASK PLANNING Area Assessment
3. To unload the tools, materials and equipments arrived from lorry and to Unauthorized If the unloading task taking a long period workers shall
mobilize in to the work area using trolley and supporting by manpower. Work / Traffic temporarily barricade the unloading spot with safety cone. To
COMPANY VENDOR : TIALOC (M) SDN. BHD. Obstruction have a full time spotter to control the traffic flow if necessary.
CONDUCTED BY : MUVEN ZAINOL
DATE CONDUCTED : Workers shall wear hand glove to prevent hand cut and injuries
SPECIFIC LOCATION : PG 16 WORKBENCH RELO Sharp Edges during the mobilization works.
JOB DESCRIPTION : MECHANICAL DEMO
AREAS OF FOCUS: Worker shall perform work with buddy system when lifting the
1) RETRACTABLE KNIFE Ergonomics long
4)materials
LOTO and ladders.
2) BARRICADING/HOUSE KEEPING
GC site team needs to inform Intel Security Dept. when
3) FALL PROTECTION Security Clearance moving 'IN' the materials through emergency doors.
5. To check and identify the LPOC for all the mechanical utilities which stated GC Supervisors need to verify the correct LPOC before start to
in LSP and close the valve accordingly ITP isolate the valve.
Inform to the CS Operation personal to isolate the valve
(done by cs) and LOTO
ACKNOWLEDGE SIGNATURE
No. Name Signature
FOREMAN
01.
02.
03.
04.
05.
06.
07.
08.
8. To slowly release the balance water at the LPOC using pail and shall be Slip & Fall Hazard Make sure immediately clear the spillage water with dry cloth
disposed at nearest restroom and cut the K-FLEX insulation using penknife To use normal penknife when cutting K-FLEX
Physical Hazard To comply proper PPE
9. To dismantle the existing outgoing PCW & PV and supporting brackets
accordingly using hand tools
10. To do housekeeping on the work area after job completion. Trip / Sip Hazard To use HEPA vacuum cleaner vacuum the debris and the
accumulated dust.
11. To mobilize in the work tools, materials and equipments to Temporary Physical Hazard To ensure proper mobilization with spotters controlling the
storage area from the work area. traffic flow in that mobilizing area.
To comply the safety helmet, safety boots and safety glass
usage while mobilizing the tools and materials.
Signature Of CM :
Name :