1. To inform the Project Manager and CS Ops before starting the work.

Negligence To ensure that the SIPP, PTP authorization and related permits
are completed before job initiation.
To identify the hazards and to capture the hazards in daily
PTP and to explain those hazardous condition to the Project
Manager and the CS Ops.

2. To identify the location of work to be done and to highlight the work area Inadequate Work To survey the work site with the GC Site Supervisor.
and the related jobs going to be done for the day to the CS Ops.
PRE-TASK PLANNING Area Assessment

3. To unload the tools, materials and equipments arrived from lorry and to Unauthorized If the unloading task taking a long period workers shall
mobilize in to the work area using trolley and supporting by manpower. Work / Traffic temporarily barricade the unloading spot with safety cone. To
COMPANY VENDOR : TIALOC (M) SDN. BHD. Obstruction have a full time spotter to control the traffic flow if necessary.
CONDUCTED BY : MUVEN ZAINOL
DATE CONDUCTED : Workers shall wear hand glove to prevent hand cut and injuries
SPECIFIC LOCATION : PG 16 WORKBENCH RELO Sharp Edges during the mobilization works.
JOB DESCRIPTION : MECHANICAL DEMO
AREAS OF FOCUS: Worker shall perform work with buddy system when lifting the
1) RETRACTABLE KNIFE Ergonomics long
4)materials
LOTO and ladders.
2) BARRICADING/HOUSE KEEPING
GC site team needs to inform Intel Security Dept. when
3) FALL PROTECTION Security Clearance moving 'IN' the materials through emergency doors.

Steps for Work Completion Area Hazards Actions


4. . To use double cup lifter to open the raise floor and access into the Ergonomics Only inspected and tagged item are allowed to use at site.
particular area. Ensure that do rotation on workers to perform the particular
Unprotected Edge task.
Ensure that buddy system been on site.
Trip and Slip Make sure to wear hand glove to open the raise floor
Ensure that cordon off the area and posted warning signage to
indicate the raise floor opening
To get the permission from the Area Owner to barricade the
work area.

5. To check and identify the LPOC for all the mechanical utilities which stated GC Supervisors need to verify the correct LPOC before start to
in LSP and close the valve accordingly ITP isolate the valve.
Inform to the CS Operation personal to isolate the valve
(done by cs) and LOTO

To wear hand glove and work with caution


Hand Injury
7. To dismantle the existing outgoing OFA brass fittings, IED copper conduits, Make sure the tools was disconnected before start to dismantle
5ee tubes, valves, regulators, gas sticks and supporting brackets accordingly Physical Hazard the utilities
using hand tools To comply proper PPE.
Ergonomic Make sure to work with buddy system.

*hand glove to be removed during any difficulties while handling small


screws, nuts, small objects and etc.

ACKNOWLEDGE SIGNATURE
No. Name Signature

FOREMAN

01.
02.
03.
04.
05.
06.
07.
08.

8. To slowly release the balance water at the LPOC using pail and shall be Slip & Fall Hazard Make sure immediately clear the spillage water with dry cloth
disposed at nearest restroom and cut the K-FLEX insulation using penknife To use normal penknife when cutting K-FLEX
Physical Hazard To comply proper PPE
9. To dismantle the existing outgoing PCW & PV and supporting brackets
accordingly using hand tools

10. To do housekeeping on the work area after job completion. Trip / Sip Hazard To use HEPA vacuum cleaner vacuum the debris and the
accumulated dust.

11. To mobilize in the work tools, materials and equipments to Temporary Physical Hazard To ensure proper mobilization with spotters controlling the
storage area from the work area. traffic flow in that mobilizing area.
To comply the safety helmet, safety boots and safety glass
usage while mobilizing the tools and materials.

TIALOC (M) SDN. BHD. 1


Signature Of Supervisor :
Name :

Signature Of EHS Supervisor :


Name :

Signature Of CM :
Name :

TIALOC (M) SDN. BHD. 2