REQUIRED HAZARDCONTROLS
S.No SEQUENCE OF POTENTIAL Note: Use checklist to ensure Hazard Stop W
BASIC JOB STEPS HAZARDS control implementation, Tick OR write RESPONSIBILITY Trigg
"NA” (Not App1icable)

Page 2 of 7
1) Apply & obtain Work Slip trip and fall Safety site Induction/Toolbox to be
Permit conduct for all personnel involved
before commence work • Ensure responsible person aware & comply
To the requirements Contractor WPR /
• Work permit to be made known & Foreman /
understood by all workers and displayed Safety Officer/ YES /
at work designated area
• To comply with work related PPE before
Commence work.

2) General Planning Inadequate training, Sufficient skills to complete the required task correctly.
consultation, planning & Adequate consultation with relevant employees.
improvisation. Scaffolder/
Competent person& qualified persons allow scaffold Scaffolding
Task specific injuries due to erection. supervisor YES /
inexperience, inadequate Contractor WPR/
consultation or failure to provide Foreman/
appropriate equipment. Safety Officer
3) Delivery of scaffolding Injury from vehicle. ▪ Plan space and location requirements before
Materials to wok Injury unloading materials. materials arrive.
location by Injury stacking materials. ▪ Ensure delivery time has been pre-arranged.
Vehicle/Manually Materials blocking exits or ▪ Driver to wear PPE.
footpaths. ▪ Driver to ensure clear view is available or a spotter is
Moving materials over long in place while moving, reversing or unloading the Civil Engineer/
distances. vehicle. Contractor WPR/ YES /
Stacked materials falling ▪ Keep materials inside site boundaries. People must Safety Officer
not be forced off footpaths or on to roadways.
▪ Have materials delivered as close as possible to work
areas.
▪ Ensure materials are stacked safely and appropriately
braced ▪ Use barricades and traffic control as required.

4) Erection of base frames, Unsupported frames or standards Sole boards to be correct length for soft ground. Scaffolder/
standards and bracing. being erected at ground level Bracing or team member used to support first frames Scaffolding

Page 3 of 7
or standards. Base plates or screw jacks used under all supervisor
Frames or standards falls over frames and standards. Foundation to be level or screw Contractor WPR/ YES /
striking person erecting scaffold jacks to be used. Castor wheels locked and fitted Foreman/
or other person close to the work correctly. Safety Officer
area.
5) Erection of 2nd level Climbing unbraced scaffold No climbing unbraced scaffold.
frames, standards and during erection. 2 persons used to assist in scaffold erection. Foundation
bracing. to be level or screw jacks to be used.
Scaffold tips over causing fall. Scaffolder/
Scaffolding YES /
Base frames or standards not Scaffold to be built square with plan bracing installed. supervisor
adequately braced or supported. Sufficient and correctly fixed diagonal bracing. Contractor WPR/
Foreman/
Instability / collapse of scaffold Safety Officer
causing fall. General height of scaffold not to exceed 3 times the
base width unless out riggers are used or the scaffold is
Scaffold exceeds height to base tied to a secure structure.
ratio.
Warning signs to be installed to avoid access by others.
Scaffold topples over causing a
fall from height
6) Erection of working Strains, sprains or injuries such as 2 persons used to pass materials to higher lifts.
platforms & After back damage. Scaffolder/
completion of task Follow requirements of G.I. B.001 & Saudi Scaffolding YES /
dismantling platform Slip, trip &fall hazard. Aramco 5th Edition Construction Safety Manual supervisor
Vol. 2,11-2, Scaffolding. Contractor WPR/
Minor/Major injury to Foreman/
personnel/Property damage. Use safety harness when working near the roof edges, Safety Officer
during dismantling of scaffolds
and Dismantling activity should start from the top

Emergency Plan:
In case of any Emergency/ Accident Dial
Saudi Aramco Emergency Tel# 911

Page 4 of 7
Step backward off higher deck Working decks to be at same height.
causing fall from height.
7) Erection of edge Scaffold moves unexpectedly or 2 persons to assist in scaffold erection.
protection, ladder and tips over causing fall. Scaffolder/
toe boards. Scaffolding YES /
Fall from unprotected working Scaffold adequately braced to prevent movement supervisor
platform. whilst edge protection is fixed. Contractor WPR/
Foreman/
Handrail positioned not below 900mm and above Safety Officer
1100mm the working platform on all sides. Mid rail to
be installed.

Fall through ladder access hatch Hatch to be closed whilst working on deck.

Inappropriate access to working No climbing up or down the outside of the scaffold.


deck
Fall whilst gaining access to Ladder access to be installed.
working platform.
Ladder to be positioned internally for scaffold more
than 3 meters in height and at the appropriate angle
1:4 i.e. for every 4 metres in height 1 metre out from
the base.

Ladder to be secured at the top and bottom. Ladder to


project at least 1 metre above the working platform.
Ladder to access the working platform through a trap
door.
8) Working at Height Slip, trip & falls. Follow requirements of G.I. 8.001 & Saudi Aramco 5th
Edition Construction Safety Manual Vol. 2,11-2,
Minor/Major Injury to Scaffolding. Civil Engineer/
personnel/property damage. Contractor WPR/ YES /
Install guardrail system & toe boards. Foreman/
Safety harnesses are provided. Safety Officer/

Page 5 of 7
Competent & experienced high workers.
Suspend work during high wind / foul weather.
Adequate supervision by supervisor/Foreman.
9) Manual Handling Minor/Major injuries to Should manual handling be required minimum of two Scaffolder/Foreman
personnel/Property damage persons needed for heavier items, adopt correct Contractor
handling techniques. WPR/operatives YES /
Only lift what can easily be managed. Safety Officer
Access each item prior to lift and clear transit route to
ensure safe passage.
10) Working outside under Sunburn, Heatstroke/Stress Sufficient drinking water must be supplied around the Engineer/
sunlight site. Drinking water stations must be located near to Contractor WPR / YES /
the working areas. Foreman / Safety
Officer
Covered shelters also shall be provided to the workers
could rest at time intervals to minimize the effect of
heat.

Tool box talks must be conducted and information shall


be circulated to all workers to aware of heat effects and
ways to improve body resistance against heat.
If temperature is determined high for workers to resist
the management should consider adjustments on work
timings.
11) Getting or spreading COVID-19 Infection can be spread Daily body temperature checking prior to start the task. All site
coronavirus through to other workmen. Identify groups of workers who live together and group operatives/WPR/ YES /
workers living together them into a work unit – Identify groups of workers who Safety Officer
and/or travelling to Covid-19 infection on lungs travel to work together and group them into a work
work together/Working &leads to death. unit.
together closely without Discuss with workers who live and/or travel to work
maintenance 2 meter together to agree how to prevent the risks of spreading
safe distance. coronavirus.
Sure social distancing rules are followed.
Provide signage and ways to communicate to non-
employees what they need to do to maintain social

Page 6 of 7
distancing.
- Provide signage and ways to communicate to non-
employees what they need to do to maintain social
distancing.
12) Dismantling of Slip, trip &fall hazards Competent personnel only allow performing scaffolding Scaffolder/Foreman
scaffolding dismantling task. Contractor
Minor/Major injuries to Work at height task performing operatives must worn WPR/operatives YES /
personnel/Property damage safety harness. Safety Officer
Prior to start the dismantling platform has to clear &
free from obstruction.
Dismantling top to bottom.
Prior start the task area need to barricade &Safety
signage in place.
Authorized personnel only allow to entry at dismantling
zone.
All site working operatives with mandatory PPE’s
13) Housekeeping Ergonomic and Proper manual handling method need to be
Improper handling implemented
Method. Provide instruction for manual handling
During tool box meeting.
Sharp objects Use proper PPE (hand gloves and coverall) Contractor WPR /
Lack of information on Properly identify the types of waste and Electrical Foreman
Waste disposal. segregate accordingly before discarding / Safety Officer YES / N
Properly barricade the working area access
Obstruction on materials route at all lime.
at access way

Page 7 of 7