You are on page 1of 13

Bidura House

357 Glebe Point Road


Glebe NSW 2037

(02) 9518 9373


info@rossengineers.com.au
ABN: 22 568 304 726 www.rossengineers.com.au

8/03/2023 Document # 23-1877-C1-A


Scaffold Studio
33/280 New Line Road
Dural NSW 2158

Certificate of Structural Design Adequacy


PROJECT ADDRESS: Parramatta Law Court – 6 George Street
Parramatta NSW 2150

PROJECT DESCRIPTION: Perimeter B-Class and A-Class Hoarding Access Scaffold - Layher

Ross Engineers hereby certify that we have reviewed the scaffolding design drawings provided by Scaffold
Studio as follows:

• Drawing no. 3870 Issue B pages 1 to 11 dated 06/03/2023

For the purpose of certifying the scaffold design.

Design Wind Speed

• Scaffolding, design life construction - design wind speed: 41 m/s

Scaffold Details

• Scaffold Height: 26 m to top working platform


• Access Scaffold duty Rating: Medium duty 450 kg/bay, 1 working platform
• B Class Hoarding duty rating: 10 kPA overhead protection
• Unfactored foundation leg load for project engineer to approve: 27.18 kN
• To be erected as modular scaffold in accordance with AS 4576 – Guidelines for Scaffolding
• Maximum lift height: 2 m
• Maximum bay length: 2.57 m
• The scaffold will be clad with high permeability shade cloth (120GPSM)
• Façade braced in every elevation, one set per three bays
• Reinforcing standard to be attached to main scaffold standard at maximum 1 m centres with CC clips
as per abovementioned drawing for B Class Hoarding bay
• Transom truss to be installed in both directions for B Class Hoarding bay
• Project Engineer is responsible for ensuring the relevant surfaces are capable of supporting the
imposed loads of the scaffold self-weight and live loads

ROSS E N G I N E E R S 8/03/2023
(02) 9518 9373 23-1877-C1-A
info@rossengineers.com.au Page 1 of 2
Ties

• Tie locations as per abovementioned scaffold plans


• M12 x 100 screw anchor into existing concrete slab
• Screw Anchors – must be able to support minimum loading of 6 kN in both direction of load
• Tied in accordance with AS 4576 – Guidelines for Scaffolding. Tie tubes may be connected only to
the inner face of the scaffold

Stretcher Stair

• Scaffold Height: 26 m to top access deck


• Duty Rating: 2.5 kPa per level over a maximum of 5 access decks
• Unfactored foundation leg load for project engineer to approve: 22.7 kN
• To be erected as modular scaffold in accordance with AS 4576 – Guidelines for Scaffolding
• Maximum lift height: 2 m
• Maximum bay length: 2.57 m
• The scaffold will be fully or partially clad with 30% chain wire and shade cloth (120GPSM)

Scaffold Conditions and Limitations

• The project engineer is responsible for ensuring the relevant surfaces are capable of supporting the
imposed loads of the scaffold self-weight and live loads.
• It is recommended the project manager, implements site controls such as:
1. Onsite management plan for emergency procedures is in place and check operation of wind
speed monitoring instruments.
2. Onsite wind monitoring plan in place, incorporating wind action levels and procedures for
evacuation the structure if design wind speeds are in danger of being exceeded.
3. Wind speeds and recommended actions are provided below for reference.
▪ Decks tied down and high permeability debris netting to be removed for wind speeds
exceeding 30 m/s (100 km/h)

Provided that the abovementioned conditions are met, we can confirm that the design drawings are in
accordance with the following codes:

• AS/NZS 1170.0:2002 – “Structural design actions – General principles”


• AS/NZS 1170.1:2002 – “Structural design actions – Permanent, imposed and other actions”
• AS/NZS 1170.2:2011 – “Structural design actions – Wind actions”
• AS/NZS 1576.1:2019 – “Scaffolding – General Requirements”
• AS/NZS 4576:1995 – “Guidelines for scaffolding”

Such that we can issue this Certificate of Structural Design Adequacy.

This certificate does not relieve the supplier or contractor of the responsibility of ensuring equipment is in
good order and repair free of corrosion, meets the requirements of Australian standards and code of
practice, and follows all precautions necessary in carrying out the works safely.

Reviewed by John Kantouros (Civil/Structural Engineer)


BEng (Civil) Hons, MIEAust CPEng NER 768626

ROSS E N G I N E E R S 8/03/2023
(02) 9518 9373 23-1877-C1-A
info@rossengineers.com.au Page 2 of 2
Capping

100mm
Capping to be installed A-Type Hoarding 17mm Plywood
(Min. 100mm)

A-Type

between ledgers
Hoarding

and transoms
45x90mm Timber to be used

max. 1.0m

vertically
as Stringer placed bottom, middle
and top of plywood sheet

Skirting
Skirting to be installed
(Min. 100mm)
17mm plywood to be installed

mm
100
to face of scaffold

GROUND 14G x 75mm


Ground level PEDESTRAIN LEVEL bugle screw to be used
PATHWAY through plywood into Stringer
TYPICAL SIDE VIEW
TYPICAL FACE VIEW
5907mm (Showing A-Type Hoarding details)
(Showing A-Type Hoarding details)

1353mm TYPICAL A-CLASS HOARDING DETAIL


General details only - refer to plans and sections for measurements
and site specific details
.80
2 . 07)x2


7+


+2.5


(2.07
9076

air


mm

g St

3 * La
12 le

→ p Pla

2385mm SCHEME TO BE CONSTRUCTED


nk Ste
Plankel 1.0m

Handrail Tube Steel 1.5m

USING GENUINE LAYHER


ing

MATERIAL
x 0.3

1946mm

1946mm
0m


LIFTING

AREA

4330mm
e Steel 1.5m
Handrail Tub

BUTRUSS BUTRUSS BUTRUSS



2377mm → → → 2377mm 2446mm
BAY BAY BAY →
2.57 x 1.40 STAIR

19588mm

PLYWOOD HOARDING
300mm

DENOTES CLEAR
PEDESTRIAN ACCESS
SCAFFOLD FOOTPRINT ON GROUND FLOOR WITH PEDESTRIAN ACCESS
SCALE 1:100
SCAFFOLD SCAFFOLD
CONTINUES CONTINUES
17mm PLYWOOD AND PLASTIC TO BE INSTALLED
ON-TOP OF STEEL DECK FOR DUST AND
DEBRIS PROTECTION

2.07m PLANKS
SPIGOT FOR
REINFORCED HIGH PERMEABILITY U-SECTION
MESH TO BE INSTALLED

48mm STEEL TUBE TO BE


ATTACHED TO STANDARD EVERY
1.0m VERTICALLY TO ACT AS
REINFORCING STANDARD

DIAGONAL BRACING
2.07m U-LATTICE
PEDESTRIAN BEAM
ACCESS

LEDGERS INSTALLED
EVERY 1.0m
VERTICALLY
1353mm
BOXED SET-UP PEDESTRIAN SET-UP
2.80

1.09 10 kPa SCAFFOLD DETAILS


07)x

→ m
0m SCALE 1:100
.

28.0 7m
2

0
+

28.0
48mm STEEL TUBE TO BE
57


2.5
ATTACHED TO STANDARD EVERY

7+2.

1.09 1.0m VERTICALLY TO ACT AS


0

m
.

→ m
air (2

REINFORCING STANDARD
m
0
28.0
2.07
St

C
2 leg

08 SCHEME TO BE CONSTRUCTED
0m
3 * La

1.09
m
0m
28.0 m

USING GENUINE LAYHER


p Pla

28.0

1.40
0.73

m
0m
28.0 m

nk Ste
1

Plankel 1.0m

MATERIAL
1.40
Handrail Tube Steel 1.5m
0.73

m
m

ing

3.00 m 3.00 m 3.00 m 3.00 m 3.00 m 3.00 m 3.00 m


0.73

1.40
x 0.3

m
0m

2.07m

2.07m

2.07m

2.07m

2.07m

2.07m

2.07m
0m

10kPa → 10kPa
→ 10kPa
→ 10kPa
→ 10kPa
→ 10kPa
→ 10kPa

m

OVERHEAD OVERHEAD OVERHEAD OVERHEAD OVERHEAD OVERHEAD OVERHEAD



28.0

PROTECTION PROTECTION PROTECTION PROTECTION PROTECTION PROTECTION PROTECTION


2.07

2.57m 1.40m 2.57m 2.57m 2.57m 2.57m 2.57m


Handrail Tub
e Steel 1.5m
5.00 m 5.00 m 5.00 m 2.07m PLANKS
←m
28.00
2.07m

2.07m

BUTRUSS BUTRUSS 2.07m BUTRUSS


PLAN BRACING
→ → →
BAY BAY BAY →
1.40m 2.57m 2.57m
2.57 x 1.40 STAIR

DIAGONAL BRACING
09
B

08
A
300mm

SCAFFOLD LAYOUT - GROUND FLOOR


SCALE 1:100
1353mm
.80
7)x2

1.09
m

→ m
2.0

0m
28.0 7m

0
INSIDE LEG OF PERIMETER SCAFFOLD
.57+

28.0

2.5
SCAFFOLD TO BE SCAFFOLD TO BE TO BE BUILT OFF B-CLASS HOARDING

2

BUILT THROUGH
+

BUILT THROUGH
7

1.09
0

m AWNING
.

AWNING
→ m
air (2

m
0

2 B/H/UP
28.0
2.07
g St

C
08 3 B/H/UP SCHEME TO BE CONSTRUCTED
0m
3 * La
12 le

1.09
m
0m

USING GENUINE LAYHER


28.0 m
p Pla

28.0

1.40
0.73

0m
m
.3
0m

x0
28.0 m

nk Ste

g
MATERIAL
Plankel 1.0m

nkin .5m
1.40
PlaSteel 2
Handrail Tube Steel 1.5m
0.73

m
m

nk
ing

P la
28.00 m 28.00 m 28.00 m 28.00 m 28.00 m 28.00 m Lap 28.00 m
28.00 m
0.73

1.09m

1.09m

1.09m

1.09m

1.09m

1.09m 1.40m

1.09m

1.09m
1.40 1*
DOUBLE
x 0.3

m → → → → → → → →
.00 m

STANDARD TO
0m

2.57m 1.40m 2.57m 2.57m 2.57m 2.57m →1.09m


1.09m
.5m

→ → → → → →
m

10m VERTICALLY
l1

28.00 m

tee
2.07

eS
Ha 28

ON OUTSIDE LEG
ub


lT
rai
nd

5.00 m 5.00 m 5.00 m 2.57m


←m
28.00
2.07m

2.07m

BUTRUSS BUTRUSS 2.07m BUTRUSS


PLAN BRACING → → →
SPREADER BEAM
BAY BAY BAY →
1.40m 2.57m 2.57m AS PER ENGINEER
2.57 x 1.40 STAIR TOWER B-UP
DIAGONAL BRACING
09
B

08
A
OUTSIDE LEG OF PERIMETER SCAFFOLD
TO BE BUILT OFF TRUSS
TRANSOM USING U-TRANSOM SPIGOT

SCAFFOLD LAYOUT - LEVEL 1


SCALE 1:100
2.80

1.09
07)x

m
→ m
0m
.

28.0 7m
2

0
+

2 .0
7


2.5
8
+2.5


.07

1.09
m 2 B/H/UP FOR
→ m
air (2

ACCESS ONTO
m
0

BALCONY 2 B/H/UP
28.0
2.07
g St

C 3 B/H/UP
08
0m
3 * La
12 le

1.09
SCHEME TO BE CONSTRUCTED
m
0m
28.0 m
p Pla

28.0

1.40
0.73

m m
.30
0m

x0
USING GENUINE LAYHER
28.0 m

nk Ste

g
Plankel 1.0m

nkin .5m
1.40
PlaSteel 2
Handrail Tube Steel 1.5m
0.73

m
m

k
lan
MATERIAL
ing

P
28.00 m 28.00 m 28.00 m 28.00 m 28.00 m 28.00 m Lap 28.00 m
28.00 m
0.73

1.09m

1.09m

1.09m

1.09m

1.09m

1.09m 1.40m

1.09m

1.09m
1.40 1*
x0

m → → → → → → → →
.00 m

.30m

2.57m 1.40m 2.57m 2.57m 2.57m 2.57m 1.09m1.09m


.5m
m

l1

28.00 m

tee
2.07

eS
Ha 28

ub


lT
rai
nd

2.57m
DOUBLE ←m
28.00

STANDARD TO →
10m VERTICALLY
ON OUTSIDE LEG 2.57 x 1.40 STAIR TOWER B-UP
09
B

08
A

SCAFFOLD TO BE
BUILT THROUGH
LOWER ROOF

SCAFFOLD LAYOUT - LEVEL 2


SCALE 1:100
2.80

1.09
.07)x

m
→ m
0m
28.0 7m
57+2

0
2 .0

2.5
8

2. +
2.07

1.09
m
→ m
(

2 B/H/UP FOR
0
Stair

2 B/H/UP
28.0
2.07

ACCESS ONTO
C 3 B/H/UP
BALCONY
g

08
0m
3 * La
e

1.09
m
0m
l

SCHEME TO BE CONSTRUCTED
28.0 m
p Pla

28.0

1.40
12

0.73

m m
.30
0m

x0
28.0 m

nk Ste

g
USING GENUINE LAYHER
Plankel 1.0m

nkin .5m
1.40
PlaSteel 2
Handrail Tube Steel 1.5m
0.73

m
m

nk
ing

28.00 m 28.00 m 28.00 m 28.00 m 28.00 m 28.00 m Lap


Pla 28.00 m
28.00 m MATERIAL
0.73

1.09m

1.09m

1.09m

1.09m

1.09m

1.09m 1.40m

1.09m

1.09m
1.40 1*
x 0.3

m → → → → → → → →
.00 m

0m

2.57m 1.40m 2.57m 2.57m 2.57m 2.57m 1.09m1.09m


.5m
m

l1

28.00 m

tee
2.07

eS
Ha 28

ub


lT
rai
nd

2.57m
←m
28.00
450mm
ALUMINIUM →
LATTICE BEAM - 2.57 x 1.40 STAIR TOWER B-UP
MAX. LIFT 150kg
09
B

08
A

SCAFFOLD LAYOUT - LEVEL 3 TO 5


SCALE 1:100
450mm NOTE:
ALUMINIUM
LATTICE BEAM - SCAFFOLD MESH NOT SHOWN IN
MAX. LIFT 150kg ELEVATION VIEW FOR CLARITY
LIFTING
BAY

* * * * * * * *
2 2 2

LIFTING
BAY
2 2 2

SCAFFOLD TIE TO BE
INSTALLED INTO FACE OF
CONCRETE SLAB

* * * * * * * *
ALUMINIUM
DIAGONAL BRACING LIFTING STAIR
BAY

23074mm
SCHEME TO BE CONSTRUCTED
* * * * * * * * USING GENUINE LAYHER
26295mm

MATERIAL

LIFTING
BAY

* * * * * * * *
PLAN BRACE

2.57m
U-LATTICE
BEAM
LIFTING
BAY * * *
A-CLASS HOARDING 2.07m PLANKS
2735mm

2735mm

2735mm

PEDESTRIAN PEDESTRIAN PEDESTRIAN


ACCESS ACCESS ACCESS SCAFFOLD ELEVATION - SOUTH
2398mm 2398mm 2398mm SCALE 1:100
NOTE: 450mm
SCAFFOLD MESH NOT SHOWN IN ALUMINIUM
ELEVATION VIEW FOR CLARITY LATTICE BEAM -
MAX. LIFT 150kg

2000mm
* * * *
2 2 2

2 2 2

* * * *
DIAGONAL BRACING

23072mm
SCHEME TO BE CONSTRUCTED
STRETCHER STAIR 24293mm * * * * USING GENUINE LAYHER
MATERIAL

SCAFFOLD TIE TO BE
* * * * RAKER TIE FROM BUTRUSS
INSTALLED INTO FACE OF BAY TO PERIMETER SCAFFOLD
CONCRETE SLAB

2.07m U-LATTICE
BEAM

* * * *

3226mm
2688mm

PEDESTRIAN
ACCESS A-CLASS HOARDING
SCAFFOLD ELEVATION - WEST FROM
SOUTH
ELEVATION
SCALE 1:100
DIAGONAL BRACING

CONSTRUCTION STAIR
STRETCHER STAIR
SCAFFOLD TIE INTO
CONCRETE SLAB FACE
23103mm

SCHEME TO BE CONSTRUCTED
26297mm

USING GENUINE LAYHER


MATERIAL
SCAFFOLD TIE INTO

26297mm
CONCRETE SLAB FACE

SPIGGOT FOR
U-SECTION
2.07m PLANKS

2.07m U-LATTICE
BEAM
LEDGERS INSTALLED
EVERY 1.0m
3187mm

VERTICALLY
48mm STEEL TUBE TO BE
SCAFFOLD SECTION A ATTACHED TO STANDARD EVERY
SCAFFOLD SECTION C
SCALE 1:100 1.0m VERTICALLY TO ACT AS
SCALE 1:100
REINFORCING STANDARD
2 2 2

2 2 2

23103mm
SCHEME TO BE CONSTRUCTED
USING GENUINE LAYHER
MATERIAL

SCAFFOLD TIE INTO


CONCRETE SLAB FACE

10462mm
DOUBLE STANDARD ON OUTSIDE
LEG TO BE INSTALLED UP
TO A MIN. 10.0m VERTICALLY
SPIGGOT FOR
U-SECTION
2.07m PLANKS

2.07m U-LATTICE
BEAM
6197mm

48mm STEEL TUBE TO BE


ATTACHED TO STANDARD EVERY
PEDESTRIAN
3187mm

1.0m VERTICALLY TO ACT AS


2704mm

ACCESS

REINFORCING STANDARD

1888mm SCAFFOLD SECTION B


SCALE 1:100
NOTE:
SCAFFOLD MESH AND A-CLASS
HOARDING NOT SHOWN IN PERSPECTIVE
VIEW FOR CLARITY

SCHEME TO BE CONSTRUCTED
USING GENUINE LAYHER
MATERIAL

SCAFFOLD TO BE BUILT
THROUGH LOWER ROOF

LIFTING
BAY

PEDESTRIAN
ACCESS

PEDESTRIAN
ACCESS

SCAFFOLD PERSPECTIVE VIEW #1 PEDESTRIAN


N.T.S ACCESS
NOTE:
SCAFFOLD MESH AND A-CLASS
HOARDING NOT SHOWN IN PERSPECTIVE
VIEW FOR CLARITY

SCAFFOLD TO BE BUILT
THROUGH LOWER ROOF

SCHEME TO BE CONSTRUCTED
USING GENUINE LAYHER
MATERIAL

PEDESTRIAN
ACCESS

PEDESTRIAN
ACCESS

PEDESTRIAN
ACCESS
SCAFFOLD PERSPECTIVE VIEW #2
N.T.S
LIFTING
BAY