PROJECT DESCRIPTION: Perimeter B-Class and A-Class Hoarding Access Scaffold - Layher
Ross Engineers hereby certify that we have reviewed the scaffolding design drawings provided by Scaffold
Studio as follows:
Scaffold Details
ROSS E N G I N E E R S 8/03/2023
(02) 9518 9373 23-1877-C1-A
info@rossengineers.com.au Page 1 of 2
Ties
Stretcher Stair
• The project engineer is responsible for ensuring the relevant surfaces are capable of supporting the
imposed loads of the scaffold self-weight and live loads.
• It is recommended the project manager, implements site controls such as:
1. Onsite management plan for emergency procedures is in place and check operation of wind
speed monitoring instruments.
2. Onsite wind monitoring plan in place, incorporating wind action levels and procedures for
evacuation the structure if design wind speeds are in danger of being exceeded.
3. Wind speeds and recommended actions are provided below for reference.
▪ Decks tied down and high permeability debris netting to be removed for wind speeds
exceeding 30 m/s (100 km/h)
Provided that the abovementioned conditions are met, we can confirm that the design drawings are in
accordance with the following codes:
This certificate does not relieve the supplier or contractor of the responsibility of ensuring equipment is in
good order and repair free of corrosion, meets the requirements of Australian standards and code of
practice, and follows all precautions necessary in carrying out the works safely.
ROSS E N G I N E E R S 8/03/2023
(02) 9518 9373 23-1877-C1-A
info@rossengineers.com.au Page 2 of 2
Capping
100mm
Capping to be installed A-Type Hoarding 17mm Plywood
(Min. 100mm)
A-Type
between ledgers
Hoarding
and transoms
45x90mm Timber to be used
max. 1.0m
vertically
as Stringer placed bottom, middle
and top of plywood sheet
Skirting
Skirting to be installed
(Min. 100mm)
17mm plywood to be installed
mm
100
to face of scaffold
→
7+
←
+2.5
→
(2.07
9076
air
→
mm
g St
3 * La
12 le
→ p Pla
MATERIAL
x 0.3
1946mm
1946mm
0m
→
LIFTING
→
AREA
4330mm
e Steel 1.5m
Handrail Tub
19588mm
PLYWOOD HOARDING
300mm
DENOTES CLEAR
PEDESTRIAN ACCESS
SCAFFOLD FOOTPRINT ON GROUND FLOOR WITH PEDESTRIAN ACCESS
SCALE 1:100
SCAFFOLD SCAFFOLD
CONTINUES CONTINUES
17mm PLYWOOD AND PLASTIC TO BE INSTALLED
ON-TOP OF STEEL DECK FOR DUST AND
DEBRIS PROTECTION
2.07m PLANKS
SPIGOT FOR
REINFORCED HIGH PERMEABILITY U-SECTION
MESH TO BE INSTALLED
DIAGONAL BRACING
2.07m U-LATTICE
PEDESTRIAN BEAM
ACCESS
LEDGERS INSTALLED
EVERY 1.0m
VERTICALLY
1353mm
BOXED SET-UP PEDESTRIAN SET-UP
2.80
→ m
0m SCALE 1:100
.
28.0 7m
2
0
+
28.0
48mm STEEL TUBE TO BE
57
←
2.5
ATTACHED TO STANDARD EVERY
→
7+2.
m
.
→ m
air (2
REINFORCING STANDARD
m
0
28.0
2.07
St
C
2 leg
08 SCHEME TO BE CONSTRUCTED
0m
3 * La
1.09
m
0m
28.0 m
28.0
→
1.40
0.73
m
0m
28.0 m
nk Ste
1
Plankel 1.0m
→
MATERIAL
1.40
Handrail Tube Steel 1.5m
0.73
m
m
ing
→
1.40
x 0.3
m
0m
2.07m
2.07m
2.07m
2.07m
2.07m
2.07m
2.07m
0m
10kPa → 10kPa
→ 10kPa
→ 10kPa
→ 10kPa
→ 10kPa
→ 10kPa
→
m
2.07m
DIAGONAL BRACING
09
B
08
A
300mm
1.09
m
→ m
2.0
0m
28.0 7m
0
INSIDE LEG OF PERIMETER SCAFFOLD
.57+
28.0
←
2.5
SCAFFOLD TO BE SCAFFOLD TO BE TO BE BUILT OFF B-CLASS HOARDING
→
2
BUILT THROUGH
+
BUILT THROUGH
7
1.09
0
m AWNING
.
AWNING
→ m
air (2
m
0
2 B/H/UP
28.0
2.07
g St
C
08 3 B/H/UP SCHEME TO BE CONSTRUCTED
0m
3 * La
12 le
1.09
m
0m
28.0
→
1.40
0.73
0m
m
.3
0m
x0
28.0 m
nk Ste
g
MATERIAL
Plankel 1.0m
→
nkin .5m
1.40
PlaSteel 2
Handrail Tube Steel 1.5m
0.73
m
m
nk
ing
→
P la
28.00 m 28.00 m 28.00 m 28.00 m 28.00 m 28.00 m Lap 28.00 m
28.00 m
0.73
1.09m
1.09m
1.09m
1.09m
1.09m
1.09m 1.40m
1.09m
1.09m
1.40 1*
DOUBLE
x 0.3
m → → → → → → → →
.00 m
STANDARD TO
0m
→ → → → → →
m
10m VERTICALLY
l1
28.00 m
→
tee
2.07
eS
Ha 28
ON OUTSIDE LEG
ub
→
lT
rai
nd
2.07m
08
A
OUTSIDE LEG OF PERIMETER SCAFFOLD
TO BE BUILT OFF TRUSS
TRANSOM USING U-TRANSOM SPIGOT
1.09
07)x
m
→ m
0m
.
28.0 7m
2
0
+
2 .0
7
←
2.5
8
+2.5
→
.07
1.09
m 2 B/H/UP FOR
→ m
air (2
ACCESS ONTO
m
0
BALCONY 2 B/H/UP
28.0
2.07
g St
C 3 B/H/UP
08
0m
3 * La
12 le
1.09
SCHEME TO BE CONSTRUCTED
m
0m
28.0 m
p Pla
28.0
→
1.40
0.73
m m
.30
0m
x0
USING GENUINE LAYHER
28.0 m
nk Ste
g
Plankel 1.0m
→
nkin .5m
1.40
PlaSteel 2
Handrail Tube Steel 1.5m
0.73
m
m
k
lan
MATERIAL
ing
→
P
28.00 m 28.00 m 28.00 m 28.00 m 28.00 m 28.00 m Lap 28.00 m
28.00 m
0.73
1.09m
1.09m
1.09m
1.09m
1.09m
1.09m 1.40m
1.09m
1.09m
1.40 1*
x0
m → → → → → → → →
.00 m
.30m
l1
28.00 m
→
tee
2.07
eS
Ha 28
ub
→
lT
rai
nd
2.57m
DOUBLE ←m
28.00
STANDARD TO →
10m VERTICALLY
ON OUTSIDE LEG 2.57 x 1.40 STAIR TOWER B-UP
09
B
08
A
SCAFFOLD TO BE
BUILT THROUGH
LOWER ROOF
1.09
.07)x
m
→ m
0m
28.0 7m
57+2
0
2 .0
←
2.5
8
→
2. +
2.07
1.09
m
→ m
(
2 B/H/UP FOR
0
Stair
2 B/H/UP
28.0
2.07
ACCESS ONTO
C 3 B/H/UP
BALCONY
g
08
0m
3 * La
e
1.09
m
0m
l
SCHEME TO BE CONSTRUCTED
28.0 m
p Pla
28.0
→
1.40
12
0.73
m m
.30
0m
x0
28.0 m
nk Ste
g
USING GENUINE LAYHER
Plankel 1.0m
→
nkin .5m
1.40
PlaSteel 2
Handrail Tube Steel 1.5m
0.73
m
m
nk
ing
→
1.09m
1.09m
1.09m
1.09m
1.09m
1.09m 1.40m
1.09m
1.09m
1.40 1*
x 0.3
m → → → → → → → →
.00 m
0m
l1
28.00 m
→
tee
2.07
eS
Ha 28
ub
→
lT
rai
nd
2.57m
←m
28.00
450mm
ALUMINIUM →
LATTICE BEAM - 2.57 x 1.40 STAIR TOWER B-UP
MAX. LIFT 150kg
09
B
08
A
* * * * * * * *
2 2 2
LIFTING
BAY
2 2 2
SCAFFOLD TIE TO BE
INSTALLED INTO FACE OF
CONCRETE SLAB
* * * * * * * *
ALUMINIUM
DIAGONAL BRACING LIFTING STAIR
BAY
23074mm
SCHEME TO BE CONSTRUCTED
* * * * * * * * USING GENUINE LAYHER
26295mm
MATERIAL
LIFTING
BAY
* * * * * * * *
PLAN BRACE
2.57m
U-LATTICE
BEAM
LIFTING
BAY * * *
A-CLASS HOARDING 2.07m PLANKS
2735mm
2735mm
2735mm
2000mm
* * * *
2 2 2
2 2 2
* * * *
DIAGONAL BRACING
23072mm
SCHEME TO BE CONSTRUCTED
STRETCHER STAIR 24293mm * * * * USING GENUINE LAYHER
MATERIAL
SCAFFOLD TIE TO BE
* * * * RAKER TIE FROM BUTRUSS
INSTALLED INTO FACE OF BAY TO PERIMETER SCAFFOLD
CONCRETE SLAB
2.07m U-LATTICE
BEAM
* * * *
3226mm
2688mm
PEDESTRIAN
ACCESS A-CLASS HOARDING
SCAFFOLD ELEVATION - WEST FROM
SOUTH
ELEVATION
SCALE 1:100
DIAGONAL BRACING
CONSTRUCTION STAIR
STRETCHER STAIR
SCAFFOLD TIE INTO
CONCRETE SLAB FACE
23103mm
SCHEME TO BE CONSTRUCTED
26297mm
26297mm
CONCRETE SLAB FACE
SPIGGOT FOR
U-SECTION
2.07m PLANKS
2.07m U-LATTICE
BEAM
LEDGERS INSTALLED
EVERY 1.0m
3187mm
VERTICALLY
48mm STEEL TUBE TO BE
SCAFFOLD SECTION A ATTACHED TO STANDARD EVERY
SCAFFOLD SECTION C
SCALE 1:100 1.0m VERTICALLY TO ACT AS
SCALE 1:100
REINFORCING STANDARD
2 2 2
2 2 2
23103mm
SCHEME TO BE CONSTRUCTED
USING GENUINE LAYHER
MATERIAL
10462mm
DOUBLE STANDARD ON OUTSIDE
LEG TO BE INSTALLED UP
TO A MIN. 10.0m VERTICALLY
SPIGGOT FOR
U-SECTION
2.07m PLANKS
2.07m U-LATTICE
BEAM
6197mm
ACCESS
REINFORCING STANDARD
SCHEME TO BE CONSTRUCTED
USING GENUINE LAYHER
MATERIAL
SCAFFOLD TO BE BUILT
THROUGH LOWER ROOF
LIFTING
BAY
PEDESTRIAN
ACCESS
PEDESTRIAN
ACCESS
SCAFFOLD TO BE BUILT
THROUGH LOWER ROOF
SCHEME TO BE CONSTRUCTED
USING GENUINE LAYHER
MATERIAL
PEDESTRIAN
ACCESS
PEDESTRIAN
ACCESS
PEDESTRIAN
ACCESS
SCAFFOLD PERSPECTIVE VIEW #2
N.T.S
LIFTING
BAY