JOB SAFETY ANALISYS

No. : JSA-01/02/2023 Arranged : Revision


Project Name : VRV AC Unit Installation 1
Executor : Field Technician Checked : Budi Susanto / Project Director Location
Supervisor : Field Supervisors & Site Project
Approved

Work Order Associated risks Preventive Measures

1 Work area preparation 1.1 - 1.1.1 Use PPE equipment that does not have
electrical conductivity
1.1.2 Use work equipment with good insulation
1.1.3 Check the state of the working tool must be in
good condition
2 Pelaksanaan 2.1 Slipped / fell 2.1.1 Make sure the area is clean from objects that
might make it slip / fall
Outdoor AC unit Installation 2.1.2 Use Full Body Harness
Intdoor AC unit Installation 2.2 Got electric shocks 2.2.1 Carry out the LOTO (Lock Out Tag Out)
Procedure before carrying out the work
2.2.2 Check carefully. The point to be repaired, Give
a green label when it is safe from electricity
2.2.3 Before electricity is restored, give notification
to all workers
2.3 Crushed by ac unit 2.2.4 Use the safety shoes
Be careful during installation
Team work and good coordination
3 Scaffolding Installation 3.1 Pinched 3.1.1 Barricades prior installation of scaffolding
Fall from a height 3.1.2 Standard tools
Scaffolding collapsed 3.1.3 Good teamwork and supervision
3.1.4 Build scaffolding on level ground
3.1.5 Use full body harness for work with a height of
1.8 m
3.1.6 Use the rolling system if there are workers
who are starting to get tired
Cable Tray Installation 3.2 Slipped / tripped 3.2.1 Make sure the area is clean from objects that
ACP Support Panel Installation might make it slip / fall
Refrigerant Pipe Installation 3.2.2 Use full body harness
JOB SAFETY ANALISYS
ACP Panel Installation 3.2.3 Make sure all tools and materials are neatly
arranged after work
3.2.4 Make sure work tools are stored properly in a
box or tool bag so that retrieving tools is easy
3.2.5 Make sure the body is in a state and a safe
position
3.2.6 Make sure the area is clean from objects that
might make it slip / fall
3.3 Crushed by the tool / material thats being 3.3.1 Handle tools and materials with care
installed 3.3.2 Team work and good coordination
3.3.3 Make sure the area is clean from objects that
might make it slip / fall
Welding Work 3.4 Exposed material sharp 3.4.1 Prepare iron to be welded
Material dust sucked 3.4.2 Clean the metal to be welded
exposed to welding sparks 3.4.3 Gluing mass pliers
inhalation of welding fumes 3.4.4 Installation of electrodes
3.4.5 Turn on the welding machine and set up
amperage as needed
3.4.6 Product welding
3.4.7 Refrigerate product
3.4.8 Clean the product with a truck hammer
3.4.9 Move the welded product
3.4.10 Prepare iron to be welded

4 Withdrawal of AC Power Cable & AC Control 4.1 Falling, tripping, electrocuted 4.1.1 Use PPE
Cable 4.1.2 Be careful when pulling the cable
4.1.3 Team work and good coordination
4.1.4 Make sure it's in a secure channel, no wires
are damaged, leaked or peeled off
4.1.5 Marking the area being worked on
4.1.6 use special cable cutters
5 Refrigerant pipe pressure test & Power Control 5.1 Electrocution, high voltage electric shock 5.1.1 Use PPE
Cable Termination 5.1.2 Team work and good coordination
5.1.3 Make sure LOTO (Lock Out Tag Out) is properly
installed
5.1.4 Posting signs in the work area

6 Testing & Commissioning 6.1 Electrocution, high voltage electric shock 6.1.1 Use PPE
6.1.2 Team work and good coordination
JOB SAFETY ANALISYS
6.1.3 Performed according to SOP
6.1.4 Posting signs in the work area
6.1.5 Performed by a competent person
6.1.6 Barricade area
6.1.7 Make sure the cable connections are securely
attached
6.1.8 Do not touch the tool directly if it has started
running
7 Finishing & Tidying Work 7.1 Lost working tool and slipped 7.1.1 make sure the availability of work tools after
the testcomm work is complete
7.1.2 Recleaning area after testcomm complete