Part 3: Equipments / Tools to be used: Hand Tools, Electrical Tools, wheel barrows
Part 4: Contingency Plans. Standard PPE’s: First aid kit must be present at work site and the HSE personnel will be the first response in case of
emergency, ERPs & Emergency contact numbers to be in placed at job location
Part 5: JSA Review Process. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? In
case of any new hazard indentified by any of the working team member during the job, JSA review process should be carried on.
JSA No: JOB TITLE: Dismantling of existing concrete Structures , for the Construction of Foundation/Building
Step Describe Job Step Potential Hazards Hazard Controls
No
1 Dismantling of Existing Structures Involvement of unskilled labour Obtain relevant PTW prior to start the
(Concrete & Mechanical) by using Work started without obtaining PTW work & discuss hazards involved in the
Hand Tools/electrical tools activity with workforce
Manual handling
Excavation /trench collapse Ensure use of inspected & right tools for
the job
Use of damaged tools
Do not use hand tools with its loose
Electric shock handling
Skilled & trained personnel to operate
power tools
Electrical tools must be inspected
Take proper rest after specific intervals
Strictly Comply with No Permit No
Work strategy at site
Damaging to existing structures or Working area should be properly marked
underground utilities (Live electric Perform the works as per as built drawings
cable etc) description in defined area
All works should be carried out under close
supervision of Execution & HSE
Working near live areas Working areas should be clearly marked &
Personnel/equipment fall in trench hard barricaded
Sharp edges Restrict unauthorized personnel &
movement in live areas
Proper coordination with ARL Team
regarding all works
Use of proper PPE’s
Take care of trench adjacent collapse
Stack dismantled materials away from
adjacent
JSA No: JOB TITLE: Dismantling of existing concrete Structures , for the Construction of Foundation/Building
Step Describe Job Step Potential Hazards Hazard Controls
No
Stop work in case exposing of any
underground utilities & contact ARL
Personnel injury/slip , trip & fall Ensure the excavated area is properly
barricaded
Keep Access & walk ways always free
from obstructions
Maintain Good Housekeeping at site all the
time
First aid kit should be available at work
site for handling of any emergency
2 Working at Night Shift Hours Poor visibility at night hours Ensure proper lighting arrangement for late
night working hours
Vehicles/equipments hit with people, Careful movement of vehicles in night
equipment or structure hours
Place refection tapes at hard barriers,
structures
Banks men should worn high visibility
reflection vests
Slip , trip & fall No working should be allowed in poor
lighting conditions
Ensure proper housekeeping to avoid
tripping