You are on page 1of 3

JOB TITLE / AIM: Dismantling of existing concrete Structures , for the Construction of Foundation/Building

JSA DATE: 25-03-2014 JSA NO./ REVISION:


SUPERVISOR/ JSA LEADER: Jabir Khan SCRIBE: Hafeez Ullah Khan
PARTICIPANTS : M. Latif, Sohail Ahmed, Muhammad Aamir
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1. Dismantling of Existing Structure (Concrete & Mechanical)
2. Working at night shift hours

Part 3: Equipments / Tools to be used: Hand Tools, Electrical Tools, wheel barrows
Part 4: Contingency Plans. Standard PPE’s: First aid kit must be present at work site and the HSE personnel will be the first response in case of
emergency, ERPs & Emergency contact numbers to be in placed at job location

Part 5: JSA Review Process. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? In
case of any new hazard indentified by any of the working team member during the job, JSA review process should be carried on.
JSA No: JOB TITLE: Dismantling of existing concrete Structures , for the Construction of Foundation/Building
Step Describe Job Step Potential Hazards Hazard Controls
No
1 Dismantling of Existing Structures  Involvement of unskilled labour  Obtain relevant PTW prior to start the
(Concrete & Mechanical) by using  Work started without obtaining PTW work & discuss hazards involved in the
Hand Tools/electrical tools activity with workforce
 Manual handling
 Excavation /trench collapse  Ensure use of inspected & right tools for
the job
 Use of damaged tools
 Do not use hand tools with its loose
 Electric shock handling
 Skilled & trained personnel to operate
power tools
 Electrical tools must be inspected
 Take proper rest after specific intervals
 Strictly Comply with No Permit No
Work strategy at site
 Damaging to existing structures or  Working area should be properly marked
underground utilities (Live electric  Perform the works as per as built drawings
cable etc) description in defined area
 All works should be carried out under close
supervision of Execution & HSE
 Working near live areas  Working areas should be clearly marked &
 Personnel/equipment fall in trench hard barricaded
 Sharp edges  Restrict unauthorized personnel &
movement in live areas
 Proper coordination with ARL Team
regarding all works
 Use of proper PPE’s
 Take care of trench adjacent collapse
 Stack dismantled materials away from
adjacent
JSA No: JOB TITLE: Dismantling of existing concrete Structures , for the Construction of Foundation/Building
Step Describe Job Step Potential Hazards Hazard Controls
No
 Stop work in case exposing of any
underground utilities & contact ARL
 Personnel injury/slip , trip & fall  Ensure the excavated area is properly
barricaded
 Keep Access & walk ways always free
from obstructions
 Maintain Good Housekeeping at site all the
time
 First aid kit should be available at work
site for handling of any emergency
2 Working at Night Shift Hours  Poor visibility at night hours  Ensure proper lighting arrangement for late
night working hours
 Vehicles/equipments hit with people,  Careful movement of vehicles in night
equipment or structure hours
 Place refection tapes at hard barriers,
structures
 Banks men should worn high visibility
reflection vests
 Slip , trip & fall  No working should be allowed in poor
lighting conditions
 Ensure proper housekeeping to avoid
tripping

Prepared By: Hafeez Ullah Khan Approved By: _____________________