JOB TITLE / AIM: Installation of corrugated sheets & Hard Barrication

JSA DATE 25-06-2014 JSA NO./ REVISION:


SUPERVISOR/ JSA LEADER: Jabir Khan SCRIBE: Touseef Abro
PARTICIPANTS : M.Kashif, Muhammad Aamir Muhammad Latif,
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1. Hard Barricading (for area preparation)
2. Installation of corrugated sheets
3. Working in live Areas

Part 3: Equipments / Tools to be used: Hand Tools


Part 4: Contingency Plans. Standard PPE’s: First aid kit must be present at work site and the HSE personnel will be the first response in case of
emergency, ERPs & Emergency contact numbers to be in placed at job location

Part 5:JSA Review Process. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? In
case of any new hazard indentified by any of the working team member during the job, JSA review process should be carried on.
JSA No: JOB TITLE: Installation of corrugated sheets & Hard Barrication
Step Describe Job Step Potential Hazards Hazard Controls
1 Hard Barricading (for area  Work without obtaining Permit  Obtain relevant permit before
preparation)  Manual handling commencing work
 Work in live area  Careful handling of materials
 Slip, trip & fall  Ensure use of appropriate PPE’s
 Ensure close safety supervision of all
work
 Avoid scattered materials at site
 Keep access clear from obstruction
 Do the only described job as
mentioned in permit
2 Installation of corrugated sheets  Mishandling  Careful handling of materials
 Sharp edges  Ensure Use of hand gloves (PPE’s)
 Hand injury  Stack the sheets properly
 Live equipments/lines  Avoid throwing of materials
 Slip , trip & fall  Avoid mishandling with live
equipments/lines/valves
 Maintain good housekeeping at site
 Place a weight/block on stacked
sheets to avoid scattering
3 Working in Live areas  Vehicles/equipments striking/hit with  Obtain relevant permit before commencing
Structure/live lines of any work
 Work in live area  Ensure vehicles/equipment movement only
 Unaware about hazards of live areas on designated/defined routes
 Traffic movement on authorized routes  Be highly careful while crossing over the
at plan site culverts/drains
 Damaged to underground utilities  Avoid sharp turnings of vehicles
JSA No: JOB TITLE: Installation of corrugated sheets & Hard Barrication
Step Describe Job Step Potential Hazards Hazard Controls
(Drains, Culverts, electrical cable ,pipe  Banks man should be at site while
lines etc) movement of vehicles/equipments
 Ensure use of appropriate PPE’s
 Ensure close safety supervision of all work
 Deliver TBT & awareness to all of
workforce about area/activity hazards
 Mishandling with live  Do not mishandle or operate any of live
instruments/valves equipment/valve in the area
 Movement of people in unauthorized  Unauthorized movement of workers to be
areas restricted in live areas
 Fumes of Hydrocarbons in live areas  Gas test to be performed in live areas
 Flammable ,toxic gases  Remove any of combustible material from
 Fire/explosion site
 Slip , trip & fall  Don’t switch off engine once started to
avoid sparking from battery terminals
 Maintain good housekeeping at site
 Don not left any vehicle/equipment/tool un
attendant in running condition

Prepared By: Hafeez Ullah Khan Approved By: _____________________