Professional Documents
Culture Documents
Conditions which can result in a slip, trip or fall Drilling trajectory not interfering with
neighbour wells
Activities near objects that may move/fall Perform risk assessments during planning and
for any changes
Activities that could impact the environment Use MOC for any on the job systems / process/
equipment/ personnel changes .
DATE / TIME TBT Leader
Activities in an area with poor lighting Confirm all people are trained and competent
for the task.
Hazard / Hazard Effect Immediate Risk Risk Reduction Control Residual Risk
Task
Environmental Aspect / Impact Target Severity Prob. RPC Measures Severity Prob. RPC Accept
Cata- Fatal or perm. Potentially harms or adversely affects the general public and has the potential for
1
strophic
disabling injury / >$ 1,000,000 widespread public concern of Net Core operations. Can have serious economic 1 1 1 2 3 3
illness liability on the operation.
$200,000
Severe injury Potentially harms or adversely affects trained employees and the environment.
2 Critical
or illness
to $
Requires specialised expertise or resources for correction. 1 1 2 3 3 3
1,000,000
$10,000
Minor injury Presents limited harm to the environment and requires general expertise and
3 Marginal
or illness to resources for correction. 2 2 3 3 3 3
$200,000
No injury or Presents limited harm to the environment and requires minimum corrective
4 Negligible
illness
<$10,000
actions (CPI). 3 3 3 3 3 3
No injury or Presents limited harm to the environment and requires minimum corrective
4 Negligible
illness
<$10,000
actions (CPI). 3 3 3 3 3 3
Safety Meeting Attendance Sheet Date:
S/N Name Employee Present Signature Position / Job Role
aces available for visitor, this can be a duty of the engineers to ensure all names are on the sheet and is circulated for signatures. This is th
r what they are going to do. Each crew member to confirm they understand.
eting we will go to our stations, perform a radio check. Max. expected pump pressure
sweeps every 100ft. Finally pump 1.5 times well volume prior to POH.”
he needs improvement.
ulated for signatures. This is the confirmation of the headcount onsite.
e phones on location
Date Issued Rev. No. Summary of Key Revisions
10-Feb-15 3 Updated document references from B&C to HPS
27-Apr-16 3 Document reviewed and no changes required