Access are the
roads major pre-construction
connecting activities
to the project site after
and various
infrastructure facilities areas.
Security.
Construction of offices, workman restroom, mosque, dining
Public Safety.
hall, workshops, stores, and other related facilities. The
portacabin / covered area for prayer shall be provided at
2 Pre Mobilization Inadequate training. 3 3 Medium 1 3 Low
locations, when there is no mosque / prayer room within 500
meters of working site.
Presence of other activities.
Construction of facilities for water supply system, electric power
No Welfare.
system and distribution arrangements, drainage and waste
disposal etc.
1 of 11
Risk Assessment
Project: Sweflah Bridge- Sweflah Valley
Location: Hail
Activity: GIRDER TRANSPORTATION AND INSTALLATION
Ref No: RAK-CS00-MST-000002
Using of signalman.
Safety training for safe use of strand jack will be conduct each
3 months.
Strand Jack Break Down
After removing any Cutting parts wire inspection will be carried
4 Using of strand jack Lowering Wire Cut 4 3 Medium 1 3 Low
out
Fall of cut pieces
All the wires will be greased to prevent fraction between the
wire and block
2 of 11
Risk Assessment
Project: Sweflah Bridge- Sweflah Valley
Location: Hail
Activity: GIRDER TRANSPORTATION AND INSTALLATION
Ref No: RAK-CS00-MST-000002
Training should be conduct for all the worker involve for safe
requirement for wire
Area to closed only cut
for machine
authorized person & ensure standby
man is positioned and visible
Work in charge and operatives are check all power tools before
operation
3 of 11
Risk Assessment
Project: Sweflah Bridge- Sweflah Valley
Location: Hail
Activity: GIRDER TRANSPORTATION AND INSTALLATION
Ref No: RAK-CS00-MST-000002
Lack of access and insufficient working platform Working platform shall be erected by trained and competent
7 Working at height 4 4 High person only. The gap between the two plank shall not exceed 1 4 Low
Personnel fall from platform more than 1”.
Fall of material form height Platform must be constructed with closed board and toe board.
4 of 11
Risk Assessment
Project: Sweflah Bridge- Sweflah Valley
Location: Hail
Activity: GIRDER TRANSPORTATION AND INSTALLATION
Ref No: RAK-CS00-MST-000002
5 of 11
Risk Assessment
Project: Sweflah Bridge- Sweflah Valley
Location: Hail
Activity: GIRDER TRANSPORTATION AND INSTALLATION
Ref No: RAK-CS00-MST-000002
9 Use of Portable Power Tools Defective Tools, personnel injury, electrocution, fire 4 3 Medium All electrical tools used in on sites operation must be grounded 1 3 Low
by connecting three wire cords unless power tool is UL
approved and has two prong cords.
Person shall not stand in line of fire while using power tools.
Drill bit, grinding disc of correct sizes and suitable for the job
shall be used.
6 of 11
Risk Assessment
Project: Sweflah Bridge- Sweflah Valley
Location: Hail
Activity: GIRDER TRANSPORTATION AND INSTALLATION
Ref No: RAK-CS00-MST-000002
Hold material firmly by using palm of the hand and root of the
finger.
7 of 11
Risk Assessment
Project: Sweflah Bridge- Sweflah Valley
Location: Hail
Activity: GIRDER TRANSPORTATION AND INSTALLATION
Ref No: RAK-CS00-MST-000002
Failure of lifting gears or crane and/or tilting. Lifting plan will be studied and prepared prior to starting
the lifting activities.
Overloading of the crane.
Ensure trained operator/riggers for lifting works.
Crane overturning.
Use competent lift supervisor and one assistant for
Tilting of suspended loads.
feedback.
12 Lifting/Offloading of material 4 4 High 2 4 Low
Spin of load / load colliding with existing structure.
Use tag lines to control the load to be lifted.
Moving crane hitting personnel during loading/unloading.
Ensure continuous communication and visibility between
Fall of material causing injury/death of personnel. signalman, supervisor and crane.
8 of 11
Risk Assessment
Project: Sweflah Bridge- Sweflah Valley
Location: Hail
Activity: GIRDER TRANSPORTATION AND INSTALLATION
Ref No: RAK-CS00-MST-000002
13 Traffic management & Diversion Collision of vehicles with the workforce 4 4 High 1 4 Low
Every precaution must be taken with regards to the placing of
Concrete Jersey barriers.
9 of 11
Risk Assessment
Project: Sweflah Bridge- Sweflah Valley
Location: Hail
Activity: GIRDER TRANSPORTATION AND INSTALLATION
Ref No: RAK-CS00-MST-000002
Slip, trip & fall Ensure all access is free from obstructions.
15 Housekeeping 3 3 Medium Special Toolbox meeting to be conducted by the HSE officer to 1 3 Low
Foreign Objects
all personnel to stay to away from Slip, trip & fall.
Dust
Ensure all access is free from obstructions.
10 of 11
Risk Assessment
Project: Sweflah Bridge- Sweflah Valley
Location: Hail
Activity: GIRDER TRANSPORTATION AND INSTALLATION
Ref No: RAK-CS00-MST-000002
Good housekeeping.
6 Site Activities Waste generation. 3 3 Medium 1 3 Low
Solid hazardous and non-hazardous waste shall be
immediately stored in temporary storage
11 of 11