4. Checking equipment Punch point / hand injuries Smart grip / 3 points of contact when Trained First
Personnel Injury climbing onto machines aiders onsite
Falling from machine Use containment cans/ plastic covers to Emergency
Slipping from ladder prevent spills Response Plan
Diesel / oil spill Wear dust mask when cleaning air filter Ambulance ready
Electric shock Adequate equipment, certified will be used to intervene in case
Breathing dust from filters Competent persons will perform the job of emergency
Waring must be done only after turning off Evacuation car on
the power and confirming there is no work site covering
electricity toprevent electrification. POB working in
Equipment check list should be made for the area.
all new equipment coming to site
Ensure the respiratory equipment such as
THE PROVISION OF PIPELINE INSTALLATION
SERVICES
JSA
CONTRACT N°……………………………………………………………….. Rev: 0
Page: 3 of 7
JSA
CONTRACT N°……………………………………………………………….. Rev: 0
Page: 4 of 7
JSA
CONTRACT N°……………………………………………………………….. Rev: 0
Page: 5 of 7
JSA
CONTRACT N°……………………………………………………………….. Rev: 0
Page: 6 of 7
Chemical spill on the ground Handle bottles correctly, keep fire away POB working in
Fire catching chemicals from gas bottles the area
Have fire extinguisher in place
Team carrying loads over 25 Kg
Keep gas bottles at standing position
Wear chemical gloves / plastic gloves long
sleeves
Wear face shield or safety goggles
Rinse eyes immediately with fresh water
Refer to MSDS for immediate actions
Wear plastic coveralls / Tyvex coveralls
Avoid spill of chemicals, proceed carefully
Keep fire away from chemicals, never
smoke
Warning signs in place
Keep safe distance from trench
9. Cleaning &Housekeeping • Equipment and tools remain on site • Training for good work practices to be held on Plastic bags
•Slip trip and fall site waste bins
• Trash left in the work place • TBT in place before job, housekeeping issue to
be mentioned in all TBT
• After working day, team leader must ensure
cleaning, inspecting equipment and good
housekeeping.
• Waste management plan is in force during
project
• Waste to be removed in time as per
CONTRACTOR waste management plan
10. Working in ROW Biological hazards such as reptiles Use of proper PPE Emergency
THE PROVISION OF PIPELINE INSTALLATION
SERVICES
JSA
CONTRACT N°……………………………………………………………….. Rev: 0
Page: 7 of 7
Personal Fatigue / Heat stress Insure periodic rest time for work force. response plan
Personnel missing or lost in the desert Dedicated rest area sun-shielded (medical
Close supervision treatment +
Personnel Protests
Communication means ambulance)
Assess the situation as quick as possible
and announcing the state of the emergency
(Emergency or Alert).
At any security or terrorist threats call first
the ERT leader mentioned in emergency
contact list.