THE PROVISION OF PIPELINE INSTALLATION

SERVICES

SMG1 FLOWLINE PROJECT

JSA
CONTRACT N°……………………………………………………………….. Rev: 0
Page: 1 of 7

JOB SAFETY ANALYSIS (JSA)


Location: Person in charge: Date:
Work activity (Job): Road crossing
Work team:
Potential accidents or hazards associated with Recommendations to eliminate or reduce potential hazards
Sequence of basic job steps
each step associated with each step
1. Permitting work  Work condition not safe  PTW system
 Procedures and tasks not clear  All necessary permissions and  Tool Box Talk
 Lack of supervisory authorization shall be obtained from the  Inspection
 Miscommunication relevant Authorities concerned before Certificates
 Not correct PPE worn starting any work.
 Equipment not inspected and certified  HSE team to assess continuously the
conditions of work in the assigned area
 Toolbox talks
 Competency of personnel and supervisory
for the activity
 Define hierarchy and reporting flowcharts
 Define proper PPE to be used for the work
 Check inspection certificates of equipment
for the job.

2. Mobilization and Driving  Collision with other vehicles.  Travel at suitable speed for the surface  Trainings
 Overturning vehicle with driving off road. conditions and respect speed limits.  Certifications
 Driving fatigue  In-field journey Management Plan
 Drivers to receive a course in Desert
defensive driving prior to mobilization to
project location
THE PROVISION OF PIPELINE INSTALLATION
SERVICES

SMG1 FLOWLINE PROJECT

JSA
CONTRACT N°……………………………………………………………….. Rev: 0
Page: 2 of 7

 The use of mobile phones (including hands


free) is not permitted whilst the vehicle is
in motion
 Seatbelt On all the time driving
3. Site Preparation  collusion with other gear and vehicle  Communicate the deviation drawing and  Trained First
 Blocked road without adequate traffic signs notify staff onsite aiders onsite
 unmaintained deviation (bypass) road  Define the adequate traffic signs (arrow  Emergency
 Traffic accident deviation, speed limit, stop, blocked road) Response Plan
 Traffic signs bad placed/defined  Block the road with adequate barriers  Traffic laws
(with red fence) and signals
 Proper placement of signs
 Restrict the work area.
 TBT in place
 Adequate PPE for all personnel
 Appropriate layout and maintenance of the
road deviation

4. Checking equipment  Punch point / hand injuries  Smart grip / 3 points of contact when  Trained First
 Personnel Injury climbing onto machines aiders onsite
 Falling from machine  Use containment cans/ plastic covers to  Emergency
 Slipping from ladder prevent spills Response Plan
 Diesel / oil spill  Wear dust mask when cleaning air filter  Ambulance ready
 Electric shock  Adequate equipment, certified will be used to intervene in case
 Breathing dust from filters  Competent persons will perform the job of emergency
 Waring must be done only after turning off  Evacuation car on
the power and confirming there is no work site covering
electricity toprevent electrification. POB working in
 Equipment check list should be made for the area.
all new equipment coming to site
 Ensure the respiratory equipment such as
THE PROVISION OF PIPELINE INSTALLATION
SERVICES

SMG1 FLOWLINE PROJECT

JSA
CONTRACT N°……………………………………………………………….. Rev: 0
Page: 3 of 7

air line hose pressure regulator, filter is


free from defect.
 Weekly equipment check list should be
made and kept at engine
 Wear proper PPE
 Use proper ladders / steps to go on top
5. Excavation  Damaged buried facilities  Dedicated team for the manual digging  Trained First
 Person fall in the trench  Provide locate documentation (as-built, aiders onsite
 Dust goes in respiratory system maps, drawing…) to ensure that the  Emergency
 Mishandled or poorly placed material locations of all buriedfacilities have been Response Plan
 Excavated material or other objects falling on determined.  Ambulance ready
workers  Ensure that copies of locate to intervene in case
 Personnel hit by excavator or wheel loader documentationare on site at all times of emergency
 Mobile equipment incident due to unstable during the grounddisturbance.  Evacuation car on
adjacent structures  Install stakes and warning tape around work site covering
 Workers go down in the trench while trenching trench POB working in
 Back injury when working with shovel under  Ground personnel to wear high visibility the area.
bad posture jackets
 Personnel trip / falling hazards due to  Inspect trenches at the start of each day.
excavated material  Remove debris and excavated soil near
 Excavator tilting due to bad ground stability excavation site
(mud, sand…)  Wear respiratory mask if working
downwind
 Place excavated material at safe distance
from the trench
 Never walk under and beside excavator
loader, wheel loader or machines
 Be aware of nearby vehicles and mobile
equipment causing soil to vibrate
 Do not go down in the trench while
THE PROVISION OF PIPELINE INSTALLATION
SERVICES

SMG1 FLOWLINE PROJECT

JSA
CONTRACT N°……………………………………………………………….. Rev: 0
Page: 4 of 7

excavating the trench


 Wear correct safety boots and mind steps /
do not rush
 Check the stability of the ground below
the excavator
 Keep safe distance between the heavy
equipment and the trench edges (2m).
 Do not go down in the trench while
excavating
 Wear correct safety boots and mind steps /
do not rush
 Watch for venomous animals and wear
safety boots and leather gloves
 Avoid hand and fingers injuries.
 Safety signs in place.
 Goal posts to avoid collision with
overhead power lines.
 Banksman permantly presence in
mandatory.
 Area Underground utilities maps.
6. Pipe casing lowering in  Equipment / structure damage by Excavator/  Competent personnel shall be designated  Fire extinguishers
Side-boom when moving for the operation  Emergency
 Punch point / hand or finger injuries due to  All equipment inspected (daily internal Response Plan
releasing lifting pipe inspection, and 3th party inspection) and  Ambulance ready
 Person crushed against objects by Excavator/ confiscate any defective equipment to intervene in
Side-boom  Banksman to guide the engines movement case of emergency
 Person foot crush by Excavator/ Side-boom  Never stand under suspended loads  Evacuation car on
chain  Do not exceed the SWL of the Excavator/ work site covering
 Personnel injury/Death or structure damage by Side-boom POB working in
boom or rope  Have good communication / visibility with the area.
THE PROVISION OF PIPELINE INSTALLATION
SERVICES

SMG1 FLOWLINE PROJECT

JSA
CONTRACT N°……………………………………………………………….. Rev: 0
Page: 5 of 7

 Personnel injury or structure damage by the Excavator/ Side-boom operator


backload due to excavator rotation  Never insert hand / finger in between the
 Excavator/ Side-boom tilting due to bad ground pipe and slings
stability (mud, sand…)  Wear leather gloves and avoid punch
 falling load points
 Correct use of hand signals for lifting
 Trained First aiders onsite
 Adequate PPE for all personnel
7. Holiday test  Personnel injuries  Proper PPE must be worn  First Aid Kit
 Electrification/electrocution  TBT in place  Emergency
 Electrical sparks causing fire  Proper safety signs Response Plan
 Equipment damage by high voltage  Check the holiday detector, and substitute  Ambulance ready
if any damage (loose connection and to intervene in
frayed cables) case of emergency
 Only competent person must use the  Evacuation car on
holiday detector work site covering
 Ensure that supply is kept off during POB working in
intervention on the pipe the area.
 Personnel must use insulate adequate hand
gloves to protect from electricity shocks.
8. Coating/coating repairs  Worker insert his hand in the heating area  Inspect tools before use  First Aid Kit
 Torch applied accidentally to face  Watch for ground personnel while  Fire extinguishers
 Body or parts burned by the torch flame operating the heating machine  Emergency
 Compressed gas bottles explosion  Clear area from personnel before spotting Response Plan
 Fire catching to equipment the heater  MSDS
 Manual lifting / moving of gas bottles causing  Do not approach heater during operation,  Ambulance ready
back injuries, tripping hazards never insert hand in between heaters to intervene in
 Chemical contact with skin  Buddy system, have a working plan case of emergency
 Chemical contact with eyes according to flame direction  Evacuation car on
 Chemical pouring on the coverall or clothes  Wear face shield and leather gloves work site covering
THE PROVISION OF PIPELINE INSTALLATION
SERVICES

SMG1 FLOWLINE PROJECT

JSA
CONTRACT N°……………………………………………………………….. Rev: 0
Page: 6 of 7

 Chemical spill on the ground  Handle bottles correctly, keep fire away POB working in
 Fire catching chemicals from gas bottles the area
 Have fire extinguisher in place
 Team carrying loads over 25 Kg
 Keep gas bottles at standing position
 Wear chemical gloves / plastic gloves long
sleeves
 Wear face shield or safety goggles
 Rinse eyes immediately with fresh water
 Refer to MSDS for immediate actions
 Wear plastic coveralls / Tyvex coveralls
 Avoid spill of chemicals, proceed carefully
 Keep fire away from chemicals, never
smoke
 Warning signs in place
 Keep safe distance from trench
9. Cleaning &Housekeeping • Equipment and tools remain on site • Training for good work practices to be held on Plastic bags
•Slip trip and fall site waste bins
• Trash left in the work place • TBT in place before job, housekeeping issue to
be mentioned in all TBT
• After working day, team leader must ensure
cleaning, inspecting equipment and good
housekeeping.
• Waste management plan is in force during
project
• Waste to be removed in time as per
CONTRACTOR waste management plan

10. Working in ROW  Biological hazards such as reptiles  Use of proper PPE  Emergency
THE PROVISION OF PIPELINE INSTALLATION
SERVICES

SMG1 FLOWLINE PROJECT

JSA
CONTRACT N°……………………………………………………………….. Rev: 0
Page: 7 of 7

 Personal Fatigue / Heat stress  Insure periodic rest time for work force. response plan
 Personnel missing or lost in the desert  Dedicated rest area sun-shielded (medical
 Close supervision treatment +
 Personnel Protests
 Communication means ambulance)
 Assess the situation as quick as possible
and announcing the state of the emergency
(Emergency or Alert).
 At any security or terrorist threats call first
the ERT leader mentioned in emergency
contact list.