5. Preparation
ation at top of tower before hoisting 吊装前的塔上准备
a. Attach the pulley 滑轮设置
b. Fix the mini Gin pole if required. 吊装支架安装
• Confirm all of waterproof points at the ports of antenna; filter and RRU. Also check all of the bolts
提升轮架
吊索及吊装点
间需用 U 型螺
栓固定
天线安装支架
侧视方向
将提升轮架插
入天线抱杆
天线抱杆末端
Through the cable into the BBU cabinet carefully, make sure do not damage the cable. 通过电缆
进入BBU机柜小心,确保不要损坏电缆 确保不要损坏电缆。
Install the patch panel into the BBU cabinet, terminate the fiber to the patch panel follow the
number label 1-8 8 at the fiber connectors
connectors. Terminate the DC conductor to the DC unit.
unit.安装配
线架到 BBU 柜, 按照光纤连接器标签 1-8 连接到光纤配线架。连接直流导线到直流供电单元 连接直流导线到直流供电单元
上。