You are on page 1of 33

Operating Manual

13 5/8″-10,000psi Ram BOP


Single Ram BOP P/N: RS11149
Double Ram BOP P/N: RS11148

Rongsheng Machinery Manufacture Ltd. Of


Huabei Oilfield, Hebei
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

Honorable clients:

This manual is provided for guidance of those who wish to install, operate, repair or
store this model BOP. The information in the manual covers structure, principle,
and specification of each part, spare part list and basic operation.

The following is BOP we offer for you

□13-5/8”*10000psi Single Ram BOP P/N:RS11149

Serial Number:

□ 13-5/8”*10000psi Double Ram BOP P/N:RS11148

Serial Number:

The above information should be well kept in order to get maintain service rapidly.
Please feel free to contact us if there are any problems during operation.

Rongsheng Machinery Manufacture Ltd. Of Huabei Oilfield, Hebei


Add:Renqiu city, Hebei province, P.R. China 062552

Tel: 86-317-2703142

86-317-2781172

86-317-2781173

86-317-2781252

Fax: 86-317-2723183

E-mail: rswmb@vip.sina.com

rjxgs@htxx.com.cn

Http://www.hbrs.com.cn

www.rs.hb.cnpc.com.cn

1
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

CATALOG
1. APPLICATION ..................................................................................................................................... 3

2. TECHNICAL PARAMETER ............................................................................................................... 3

2.1 RS RAM BOP .................................................................................................................................. 3


2.2 TECHNICAL PARAMETER OF RAM BOP............................................................................................ 5

3. WORKING PRINCIPLE...................................................................................................................... 7

3.1 W ORKING PRINCIPLE OF OPENING AND CLOSING OPERATION ....................................................... 7


3.2 W ELL PRESSURE PRINCIPLE OF SEALING........................................................................................ 7

4. STRUCTURE AND FEATURES OF MAIN PARTS ....................................................................... 8

4.1 STRUCTURE FEATURES ................................................................................................................... 8


4.2 PIPE RAM ASSEMBLY ........................................................................................................................ 9
4.3 SHEAR RAM ASSEMBLY ................................................................................................................. 10
4.4 RAM SHAFT SEAL STRUCTURE ....................................................................................................... 12
4.5 SECONDARY SEAL STRUCTURE ..................................................................................................... 13
4.6 LOCKING SHAFT SEAL STRUCTURE................................................................................................ 15
4.7 RAM MANUAL LOCKING MECHANISM .............................................................................................. 16
4.8 SEAL RING OF BONNET .................................................................................................................. 17

5. PART LIST ......................................................................................................................................... 20

5.1 PART LIST ....................................................................................................................................... 20

6. OPERATION AND CAUTIONS ....................................................................................................... 21

6.1 INSTALLATION ON THE WELLHEAD ................................................................................................. 21


6.2 OPERATION .................................................................................................................................... 23
6.3 CAUTION......................................................................................................................................... 26

7. MAINTENANCE ................................................................................................................................ 26

7.1 REPLACEMENT OF RAM AND RAM RUBBER ...................................................................... 26

7.2 REPLACE BONNET SEAL RING .............................................................................................. 27


7.3 BONNET HINGE BRACKET............................................................................................................... 27
7.4 REPAIR AND REPLACING FOR CYLINDER ....................................................................................... 27

8.PROPER STORAGE OF RUBBER PARTS .................................................................................. 29

9.TROUBLES AND SETTLEMENTS ................................................................................................. 30

APPENDIX NUT SPECIFICATION ..................................................................................................... 32

2
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

1. APPLICATION
Ram Bop is a key part of well-control equipment. It’s used for controlling
wellhead pressure during well drilling, workovering and testing, etc., effectively
preventing well blowout and realizing civilized and safe construction. It can be used
for the following:
☆ With proper pipe ram sealing the annular space between casing and drilling
string when there is pipe in the hole.
☆ With blind ram, completely sealing wellhead when there is no pipe in the
hole.
☆ When in emergent condition, the shear ram will cut off pipe in the well and
close wellhead.
☆ When the well head is closed, with killing manifold and choke manifold
connected to the spool and the outlet of the body doing mud circulating,
choking and releasing, well killing and well cleaning, etc..
☆ With killing manifold and choke manifold, effectively controlling bottom hole
pressure to achieve balance of bottom hole pressure.

2. TECHNICAL PARAMETER

2.1 RS Ram BOP

1)Model Indication

××× ××——××

Rated working pressure(MPa)

Bore size code

Product code
FZ- single ram BOP
2FZ- double ram BOP
3FZ- Three ram BOP

Bore size code sees the following list:

3
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

List 1 BORE SIZE CODE


Code Bore size Code Bore size
18 7 116 〃 48 18 3 4 〃
23 9〃 53 20 3 4 〃
28 11〃 54 21 1 4 〃
35 13 5 8 〃 68 26 3 4 〃
43 16 3 4 〃 76 30〃

Rated working pressure: six grade, sees the following list:

List 2 RATED WORKING PRESSURE GRADE

14MPa(2,000psi), 21MPa(3,000psi) 35MPa(5,000psi)


70MPa(10,000psi) 105MPa(15,000psi) 140 MPa(20,000psi)

2)Temperature grades of metal material

List 3 TEMPERATURE GRADES OF METAL MATERIAL

Temperature grade code Code of API Working temperature scope


T75 75 -59~121℃(-75~50℉)
T20 20 -29~121℃(-20~250 ℉)
T0 00 -18~121℃(0~250 ℉)

3)Temperature grades of non-metal material contacting well fluid:


Use two letters to indicate up and down limits:
Down limit (First place) Up limit (Second place)
A 15℉(-26℃) A 180℉(82℃)
B 0℉(-17.8℃) B 200℉(93℃)
C 10℉(-12.2℃) C 220℉(104℃)
D 20℉(-6.7℃) D 250℉(121℃)
For example AB means the temperature range is -26 ℃ ~ 93 ℃ . The
temperature grade will remark on the seals. Normally, the working temperature
grade of RS Company’s seals is BB.

4
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

2.2 Technical parameter of ram BOP

See the following list:

List 4 TECHNICAL PARAMETER OF RAM BOP


Item Single Ram BOP Double Ram BOP
Size 13 5/8”-10000psi 13 5/8”-10000psi
Top connection type Studded Flanged Studded Studded Flanged
Bottom connection type Flanged Flanged Flanged Studded Flanged
Weight (Kg) 11950 11270 12510
6445 7070

Height (mm) 960 1250 1485 1205 1775


Bore 346mm (13 5/8″)
Hydrostatic pressure testing 105MPa (15,000psi)
pressure
Rated working pressure 70MPa (10,000psi)
Hydraulic control system
31.5MPa(4,500psi)
strength working pressure
Hydraulic control system
21MPa(3,000psi)
rated working pressure
Recommended hydraulic
controlled operating 8.4~10 .5MPa(1,200~1,500psi)
pressure
Open one set of ram oil 30 L
volume
Close one set of ram oil 33 L
volume
Connection joint of hose NPT 1
Size of outlet 4 1/16″-10,000psi
Temperature grade T20(-29~121℃)
Ram size for fitting C.S.O.,2 3/8″,2 7/8″,3 1/2″, 4 1/2″, 5″,
5 1/2″, 6 5/8″, 7″, 7 5/8″, 9 5/8″, 10 3/4″
5″~5 1/2″variable,2 7/8″~5 1″variable,
shear ram
Note:
BOP design and manufacture are all meet API Spec 16A。
BOP provided can be used for H2S service and also meet NACE MR-01-75。

List 5 RAM SIZE FOR FITTING


Ram size for fitting C.S.O.,2 3/8″,2 7/8″,3 1/2″,4″,4 1/2″,
5 ″,5 1/2 ″, 6 5/8 ″ ,7 ″,5 ″~5 1/2″
variable

5
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

Figure 1 13 5/8”-10000psi Single Ram BOP

Figure 2 13 5/8”-10000psi Double Ram BOP

6
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

3. WORKING PRINCIPLE

3.1 Working Principle of opening and closing operation

Figure 3 Hydraulic pressure oil path figure while opening and closing ram

When pressure oil of hydraulic pressure system is pumped into the closing
cavity of left and right cylinder, it pushes the piston with the ram shaft and ram
assembly to move to the center along the orbit limited by the body ram chamber,
realizing well sealing. When pressure oil is pumped into the opening cavity of left
and right cylinder, it pushes the piston with the ram shaft and left and right ram
assembly to move away from the center, opening the wellhead. The ram switch is
controlled by the conversion valve of the hydraulic pressure system. Normally,
opening and closing operation can be accomplished in 3~5 seconds (but related to
the hydraulic control system state, pipe line specification and distance). (Sees
figure 3)

3.2 Well pressure principle of sealing

Ram BOP has four sealing parts in order to shut off the wellhead effectively.
The ram top seal and body seal; the ram front seal and pipe column, body and
sealing between the pipe and the ram front seal; sealing between the body and the
side door; sealing between the ram shaft and the side door. Procedure of the ram
sealing divided into two steps: First the ram shaft affected by hydraulic oil pushes
the ram front seal rubber to press the front part of sealing distorted. Over

7
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

compression between the top seal rubber and the body seals the top part and
accomplishes primary sealing. Second when there is pressure in the well, the well
pressure pushes the ram front seal front back part of the ram to extrude distoration
more deeply, at the same time, well pressure pushes the ram up against the body
seal face, thus making reliable sealing. This is called "well pressure assisting
sealing".

4. STRUCTURE AND FEATURES OF MAIN PARTS

4.1 Structure features

 Main pressure-bearing assemblies such as the body and the side door are cast
with alloy steel of high strength and high toughness and properly heat treated
before leaving the factory, the BOP is water pressure tested to ensure safety
during operating under working pressure.
 There are high supporting ribs and obligue plane for settling sand sloping to
the well hole at the bottom of the ram cavity of the body, desanding autoly
when opening and closing the ram, reducing friction of the ram. It is also
helpful for well pressure assisting ram seal.
 Using floating ram sealing can reduce the resistance force of opening and
closing the ram, wearing of the ram rubbers, prolonging the ram life and also
preventing rustiness between the body and the ram, accessible for changing.
 Hydraulic pipe is used with buried structure to avoid damaging the pipe during
installation, transporting and operating.
 Size of outer coupling conforms to API 16A specification.

8
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

4.2 Pipe ram assembly

Figure 4 HF-type ram assembly

List 6: H-TYPE RAM ASSEMBLY PARTS LIST


Item 1 2 3
Ram
Description Top seal Face seal Body
assembly
Qty.
1 1 1
Ram size
全封 C.S.O 11148.09.01 11148.09.01.02 11148.09.01.03
2 3/8" 11148.09.09 11148.09.09.02 11148.09.09.03
2 7/8" 11148.09.02 11148.09.02.02 11148.09.02.03
3 1/2" 11148.09.03 11148.09.03.02 11148.09.03.03
4 1/2" 11148.09.04 11148.09.04.02 11148.09.04.03
5" 11148.09.05 11148.09.05.02 11148.09.05.03
5 1/2" 11148.09.06 11148.09.01.01 11148.09.06.02 11148.09.06.03
5- 5 1/2" 11148.09.10 11148.09.10.02 11148.09.10.03
6 5/8″ 11148.09.11 11148.09.11.02 11148.09.11.03
7" 11148.09.07 11148.09.07.02 11148.09.07.03
7 5/8" 11148.09.15 11148.09.15.02 11148.09.15.03
9 5/8" 11148.09.08 11148.09.08.02 11148.09.08.03
10 3/4" 11148.09.17 11148.09.17.02 11148.09.17.03
2 7/8"~5" 11148.09.18 11148.09.18.01 11148.09.18.02 11148.09.18.03

9
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

4.3 Shear Ram Assembly

Figure 5 Shear Ram Assembly

13 5/8”-10000psi Shear ram can cut pipe in the well and completely shuts off the
well. And It can also be used as normal C.S.O. ram. Shear ram can be installed
in the normal BOP.

10
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

List 7 Part List of Shear Ram Assembly

Item P/N Description Qty. Remark


1 11148.09.10.01.01 Upper Ram Body 1 Assembly
2 11148.09.10.01.11 Top seal 2 Sulfide
3 11148.09.10.01.02 Shear Blade-upper 1
4 11148.09.10.01.04 Back seal-shear blade 1 Sulfide
5 11148.09.10.01.03 Inner Hex. Screw 4
6 11148.09.10.01.05 Seal-upper shear 1 Sulfide
7 11148.09.10.01.06 Line-up pin 2
8 11148.09.10.01.10 Inner Hex. Screw M20 2
9 11148.09.10.01.09 Shear Blade-down 1
10 11148.09.10.01.08 Seal-down shear blade 1 Sulfide
11 11148.09.10.01.07 Down Ram Body 1

4.3.1 Assemble/disassemble 13 5/8*10000psi shear ram:

1) Assemble/disassemble upper ram block


Upper shear blade is connected upper ram block with four screws M27*3. Loose
the four screws, then take the upper shear blade and back seals out and replace
them.
Install back seal in the horizontal groove of upper ram block and seal for upper
shear blade on upper shear blade, the put upper shear blade on the upper ram
block, finally install top seal. When install the upper shear blade, it must be fixed
tightly against the upper shoulder of upper ram block and then fix fur screws
M27*3.
2) Assemble/disassemble down ram block
Lower shear blade is connected lower ram block with four screws M20. Loose the
four screws, then take the lower shear blade and seal out the replace them.
When install the upper shear blade, it must be fixed tightly against the upper
shoulder of upper ram block and then fix fur screws M20.

4.3.2 Shear ram specification

Working pressure of hydraulic operating system: 21MPa(3,000psi);

11
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

The shear ram can also be function as CSO ram for normal operation. The working
pressure of hydraulic control system is 8.4~10.5Mpa.

Shear capacity

Item Dia. Of Steel Normal Wt. Wt. Of Thickness of Shear


drill pipe grade (lb/ft) plain end drill pipe (in) close
(lb/ft) pressure
of
hydraulic
system
(Mpa)

1 5” G-105 19.5 17.93 0.362 ≥14

2 5” S-135 19.5 17.93 0.362 ≥16

Shear ram can be used to seal working pressure to Max. 10000psi.


4.3.3 Caution to use shear ram
▲ !The shear ram cannot resist H2S. If work in H2S environment, must be
careful;
▲ ! Inspect BOP in time after cutting drill pipe, including seals on the ram
inspection, fluid penetration inspection for shear blade and ram being
squeezed or not to affect open & close performance. Seal tests must
be done before this shear ram being used next time.
▲ ! To avoid cut tool joint on drill pipe during cutting drill pipe.

4.4 Ram shaft seal structure

Seal system between bonnet and ram shaft are double directions seal,and seal
well pressure by W-combined seal ring,seal hydraulic control pressure by W-seal
ring. See figure 6.
List 8: RAM SHAFT SEAL STRUCTURE PARTS LIST
Item Part number Description Qty.
Retainer ring160 Retainer for hole
1 2
Press ring
2 11148.22 2
W-ring
3 11148.23 8

12
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

Press ring
4 11148.24 2
Support sealing sleeve
5 11148.25 2
6 145×5.3 O-ring 2
7 125×5.3 O-ring 2
Note:Quantity shown for one bonnet..

HYDRILIC OIL PRESSURE WELL PRESSURE

RAM SHAFT

Figure 6 Ram shaft seal structure

4.5 Secondary seal structure

The seal system between ram shaft and bonnet is divided to two parts. One part is
used to seal off well pressure, and another seal off control pressure. The
secondary seal system is between the two parts. Usually, the seal here is very
reliable because it has several different seal rings and O-ring in the middle. But
they occasionally would be damaged for some reason. In this case, when shut well,
there will be leaking. So we need the secondary seal system to treat it emergently.
During a well is shut off, if there is liquid flowing out from the seeing hole (at the
bottom part of the bonnet), indicating that the seal rings has been damaged and
we can know that the seal on well side or the seal on control side is damaged from
the liquid. At this time, immediately remove the plug of the grease injection pore,
install club-shaped in the pore, and then turn the screw clock wisely with an inner
hex wrench to inject the tightened plug, and inject the secondary seal grease
across the radial hole of the check valve and supporting seal sleeve in the circular

13
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

seam so as to achieve the seal remedy.


Caution to use secondary seal system:
To prevent the grease from being solidified after long time, we do not put grease in
BOP in factory. And while the BOP is not used, it is also without this grease. Only
before the BOP is used in site, put in the grease. And after a well is completed and
the BOP is inspected and repaired, take out and clean the grease.
Get special tool ready.
During working should often notice the following notice hole plug (on it there is little
hole) if there is liquid flowing out.
Don’t inject too much grease when seal ring is damaged. Proper inject quantity is
that there is no liquid flowing out. Because the secondary seal grease is more
frictional and with granule substance, it impairs the ram shaft when it returns.

Inspect BOP after secondary seal being used and clean it to avoid it drying in the
hole.
List 9: SECONDARY SEAL STRUCTURE PARTS LIST

Item P/N Description Qty.


1 NPT 1 Plug 1
11148.12
2 Press plug 1
11148.13
3 Secondary seal ester 1

4 Check valve 1
11148.14.00
5 Plug with hole 1
11148.21
ZG1/2″

14
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

Hydraulic oil pressure Well pressure

Figure 7 Secondary seal structure

4.6 Locking shaft seal structure


See figure 8

Figure 8 Locking shaft seal structure

List 10: LOCKING SHAFT SEAL STRUCTURE PARTS LIST

Item P/N Description Qty.


1 Retainer ring 95
Retainer ring 95 1
2 F751.14.21Thrust shaft sleeve 1
3 F751.14.20W-ring 3
4 F751.14.19Press ring 1
5 Dust protecting ring 1
F751.14.18
bracket
6 F751.14.17 Dust protecting ring 1
Note:Quantity shown for one locking shaft.

15
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

4.7 Ram manual locking mechanism


See product structure figure.

Figure 9 Open position

Figure 10 Close position

The ram lock assembly of this type of BOP is manual-lock. Manual lock system
closes and locks the ram by the manual wheel. It consists of locking shaft, ram
shaft, manual operating rod and hand wheel, etc.. Its application is to seal the well
for a long time, lock the rams in closing position after close the rams with hydraulic

16
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

system. At this time, the hydraulic pressure can be released. After closing the rams
with hydraulic pressure, turn the hand wheel to the right, drive the locking shaft
rotating through operating rod. Because the locking shaft shoulder presses against
the cylinder head, it cannot go back, thus it can only drive the ram shaft to move
toward the wellhead center and locking the rams. Manual-lock system can only
close the rams, but cannot open the rams. If you want to open the rams closed by
manual system, you must unlock the system to original position and then open the
ram with hydraulic pressure. It is the only method to open the rams. The operation
procedure is as following:
a. Turn the hand wheel to the left until dead end, then turn back 1/8-1/4 circle to
avoid the locking shaft from blocking at the unlocking position because of
temperature change.

b. Open the rams with hydraulic pressure.

List 11 Turning circles of locking shaft when manual lock


Item Ram size Turning circles of
locking shaft
1 CSO、Shear ram、pipe ram 23~24
2 Variable ram2 7/8"~5" 20~24

4.8 Seal ring of bonnet

Floating type pressure close structure is adopted on 13-5/8”*10000psi BOP bonnet,


see figure 11

Bonnet Body

Figure 11 Seal ring of bonnet

17
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

O-ring 3 seals bonnet and body, O-ring 4 seals frame of bonnet seal ring and
outside of bonnet seal ring channel. Rubber spring (consisting of two parts) is used
to set up pressure contact between bonnet seal ring and body to easy for initial
seal. This structure forms complete seal. When bonnet bears pressure, there is
clearance between it & body, its seal ring put against body surface as result of
bearing pressure to compensate this clearance. Therefore, large pre-tight force do
not need for bonnet bolt.

▲!Caution:Bonnet seal ring is directional and install it according to figure 11. Two
pieces rubber springs shall be put on two disconnect ional transversal groove on
frame end and this surface on the bottom of seal ring groove.
List 12 Bonnet seal ring part list

Item Description P/N Qty. Remark


Bonnet seal ring 11148.41.00 1
1 Frame 11148.41.01 1
2 Rubber spring 11148.41.03 2
3 O-ring 11148.41.02 1
4 O-ring 11148.41.02 1 Same as item

18
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

Figure 12 Assembly chart

19
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

head
5. PART LIST Left cylinder
18A 1 11148.01
head
5.1 Part List 19 Nut 16 11148.02
20 Bolt 16 11148.03
See figure 12. Locking shaft See list
21 2 sets
seal 10
List 13 Part list 22 Locking shaft 2 11148.19
Item Description Qty. Part number Notes 23 O –ring 4 325×7
1 Body (Single) 1 11149.01 Piston locking
24 2 11148.17
1A Body (Double) 1 11148.08 head
2 Gasket 1 BX155 25 O-ring 2 115×5.3
3 Blind flange 1 11148.27 26 O-ring 4 32.5×3.55
4 Bolt 8 11703. 07.04 27 Plug R1/2 11148.37
5 Nut 8 11704. 07 28 O-ring 4 32.5×3.55
6 Cone pin 2 F9301.32 29 Hinge bracket 4 11148.07
7 Ram assembly 2 See list 6 30 Locating pin 8 11148.06
8 Ram shaft 2 11148.10 31 Screw 8 11148.05
Seal ring, See list 32 Screw 16 M24×135
9 2 11148.41.00 33 O-ring 8 54.5×3.55
bonnet 12
10 Ram shaft seal 2 sets See list 8 34 O-ring 2 43.7×3.55
11 Secondary seal 2 sets See list 9 35 Screw 8 M16×40
12 Right bonnet 1 11148.11 36 Oil pipe bracket 2 F9301.30A
12A Left bonnet 1 11148.26 37 Plug MPT 1 2 F9301.29
13 Bolt, bonnet 16 11148.04 Manual control
38 2set
14 Cylinder 2 11148.21 assembly
15 Piston 2 11148.16
Seal ring, Notes: The quantity in the brackets is for one set of single
16 4 11148.15
piston ram BOP.
Item Description Qty. Part number Notes
17 Screw 4 M8×25
18 Right cylinder 1 11148.18
20
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

List 14 MAINTENANCE PACKAGE LIST


Item Description Qty. P/N Remarks
Ram shaft assy.
W-ring 8 11148.23
10 Press ring 2 11148.24
O-ring 2 145×5.3
O-ring 2 125×5.3
Locking shaft seal assy.
W-ring 3 F751.14.20
21 Press ring 1 F751.14.19
Dust-proof 1
F751.14.17
ring
Seal ring,
16 2 11148.15
piston
23 O-ring 2 325×7
25 O-ring 1 115×5.3
Include item
26 O-ring 4 32.5×3.55
28
33 O-ring 4 54.5×3.55
34 O-ring 1 43.7×3.55

Notes: One maintenance package is seals for one bonnet assembly.

6. OPERATION AND CAUTIONS

Read this section first before BOP installation. Structure, function and caution have
been introduced in above-mentioned chapters and this section for installation and
operation.

6.1 Installation on the wellhead

6.1 Preparing works before installation


(1) Check weather gaskets of wellhead flange and BOP flange is well or not and
surface of wellhead flange. Protruding is not allowed to exist.
(2) Check installed ram rubber sizes to see if it is compliance with drilling tool
sizes.
(3) Check weather pressure tests are qualified or not.

6.2 Installation
(1)After tests, every connection bolt is fixed once again avoiding unbalanced
distribution. See the tightening torque of flange bolt from list 15 or 16.

21
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

(2)Connect hydraulic hose and pay attention to “ open &close” mark on BOP
body.

(3)Fix manual control rod.

6.1.3 After Ram BOP installed on wellhead, inspect the following before

operation, to ensure its proper operation.


1) Check BOP is installed rightly or not: lifting ring of body should be installed on
the upside; manual locking device should be installed completely and well
fastened, and hang a plate where the hand wheel is to indicate the open and
close circles; everywhere the connecting bolt diagonal should be in turn
tightened equably.
2) Inspect oil pipes to see if they are in compliance with BOP switch direction,
provide 286~429psi control pressure to test each ram twice (open and close),
draining air from the pipes. If ram switch movement is not the same direction
as the mark on the hand rod of control platform, reverse the connection pipes.
3) Inspect manual-lock system to see if it is well connected, and if closing and
opening with the hand rod is fixable or not record hand wheel circle number
when closing well and mark it on hand-wheel. After finishing the tests, rotate
hand wheel left and make it unlocked, open ram with hydraulic pressure.
4) Wellhead equipments shall be pressure tested fully. Standards of test shall be
according to related well control specifications. After tests, every connection
bolt is fixed once again avoiding unbalanced distribution. See the tightening
torque of flange bolt from list 15 or 16.

List 15 RECOMMENDED TORQUE FOR DIFFERENT SIZES OF BOLTS AND


SCREWS (METRIC UNIT)
Size of Tightening Size of Tightening Size of Tightening
bolts and torque bolts and torque bolts and torque
screws N·m screws N·m screws N·m
M12 80 M33×3 1292 M52×3 5505
M16 153 M36×3 1737 M38×3 7892
M20 266 M39×3 2272 M64×3 10885
M22 424 M42×3 2910 M70×3 14549
M27 643 M45×3 3654 M76×3 18957
M30×3 930 M48×3 4516 M80×3 21565

22
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

List 16 RECOMMENDED TORQUES FOR DIFFERENT SIZES OF BOLTS AND


SCREWS (ENGLISH UNIT)
Size of Tightening Size of Tightenin Size of Tightening
bolts and torque bolts and g torque bolts and torque
screws N·m screws N·m screws N·m
1/2-13UNC 59 1 1/4-8UN 953 2-8UN 4060
5/8-11UNC 113 1 3/8-8UN 1281 2 1/4-8UN 5821
3/4-10UNC 196 1 1/2-8UN 1676 2 1/2-8UN 8028
7/8-9UNC 313 1 5/8-8UN 2146 2 3/4-8UN 10731
1-8UN 474 1 3/4-8UN 2695 3-8UN 13982
1 1/8-8UN 686 1 7/8-8UN 3331 3 1/4-8UN 17830

6.2 Operation

BOP operation must be charged by specialist and professional person.


Operators shall be familiar with BOP working principle, specifications and
process, and can also operate, repair, maintain and clear troubles.
1) When testing without string in hole, the max close pressure does not
exceed 429psi to prevent rubber from damage. When there is string in the
well pressure prohibit closing the blind ram.
2) Closing well for a long time, lock ram with locking system hand-control
locking situations shall be marked on control platform to prevent wrong
operation.
3) After reaching objective interval, the rams should be opened and closed
one time every day to see if they are flexible lock in normal condition. After
the drill string is pulled out of the well, blind ram open and close test is
needed. When there is string in hole, do not close blind ram.

6.2.1 Ram Seal Tests

Test media is plain water or drilling fluid. After pressure keeping steadily, begin to
account time.

(1)Tests for CSO & pipe ram

Test procedure:

Install BOP on the test platform and connect open & closed hydraulic hoses with

23
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

BOP. Connect lines from high-pressure tester to test platform or BOP outlets.

B. Put drill pipe inside BOP and make sure it connected with test platform reliable
during testing pipe ram to avoid being squeezed out from BOP. There is no drill
pipe inside BOP during CSO & shear rams.

C. Close ram with hydraulic operation pressure 1,200psi ~ 1,500psi and put
hydraulic operation handle on “close ram” opposition.

D. Raise well pressure to 200psi to 300ps and keep pressure for 10min,check
weather there is leak or not in seal parts.

F. Raise well pressure to 10,000psi and keep pressure for 10min,check weather
there is leak or not in seal parts.

G. Reduce well pressure to zero and open ram,check ram wearing and seal parts
weather there is no leak or not, record results.

Test variable ram with Max. size & Min. size drill pipe and test procedure same as
above. Close well by Variable ram through hydraulic operation not manual
operation.

(2)Locking structure tests

Close ram with hydrauic1 operation pressure 1200psi~1,500psi

Turn locking shaft clock –wise by manual and lock it

C. Reduce well pressure to zero and put hydraulic operation handle on “close ram”
opposition.

D. Raise well pressure to 200psi to 300ps and keep pressure for 10min,check
weather there is leak or not in seal parts.

E. Raise well pressure to Max. rated working pressure 10,000psi and keep
pressure for 10min,check weather there is leak or not in seal parts.

F. Reduce well pressure to zero and turn locking shaft anti clock-wise to unlock
position, then turn 1/8~1/4 circles clock-wise.

G. Open ram through hydraulic operation system,check ram wearing and seal
parts weather there is no leak or not, record results.

24
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

(3)Test procedure for shear ram:

A. Install BOP on the test platform and connect open & closed hydraulic hoses with
BOP. Connect lines from high-pressure tester to test platform or BOP outlets.

B. At least one sensor shall be installed on Open & closed and well pressure lines.
All sensors shall be connected with data collection system to form permanent
record.

C. Lift a drill pipe G-105 4ft long on the right top of BOP and put inside wellhead.
Buttress the drill pipe loosely under ram to avoid overly bending and cutting tool
joint during cutting drill pipe.

D. Set pressure of hydraulic control manifold to 21MPa(3,000psi), close ram and


cut drill pipe. Pressure at the point of drill pipe breaking down can be gotten from
the moment of cutting drill pipe.

E. Raise well pressure to 200psi to 300ps and keep pressure for 3 min,check
weather there is leak or not in seal parts.

F. Raise well pressure to 100,000psi and keep pressure for 3 min,check weather
there is leak or not in seal parts.

G. Reduce well pressure to zero and open ram,check ram wearing and seal parts
weather there is no leak or not, record results.

6.2.2 Tests for hydraulic control system

Rating operation pressure of hydraulic control system is 21MPa(3,000psi) and do


open & close tests. Test media is hydraulic oil.

Not install ram or put bonnet on open position. Caution: Not to extend ram shaft
contacting body and fix BOP on the ground to avoid leaning as result of center of
gravity excursion due to two side outlets open at same time.

B. Test close chamber,test pressure is 21MPa (3,000psi) and keeps pressure for
10min check weather there is no leak or not, record results.

C. Reduce hydraulic control pressure to zero.

D. Test open chamber,test pressure is 21MPa (3,000psi) and keeps pressure for
10min check weather there is no leak or not, record results.

25
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

E. Reduce hydraulic control pressure to zero.

6.3 Caution

 Prohibit releasing pressure by opening ram to prevent rubber from damage.


Before opening ram, check if the manual-lock system kept in unlocking
position each time. And after that, check if the ram remaining fully opened to
prevent ram from drilling tool bumping.
 Keep hydraulic oil clean.
 After usage of BOP ram opened fully for easy repair.
 Discharge water from BOP after pressure test and before storage. Put ram
in full open position and do rust-resisting treatment.

7. MAINTENANCE

BOP shall be cleared completely after every testing at site. Replace damaged parts
in time, anoint so as to prevent rust after cleaned ram chamber and ram of body,
(suggest to oil them by synthetic complex aluminium grease), and oil connecting
thread part by thread grease.

7.1 REPLACEMENT OF RAM AND RAM RUBBER


Ram rubber is the key part in a BOP. If damaged, BOP is useless in sealing
well. So it is very important to keep it well, and replace it in time if there is damage
in sealing surface.
Procedures of ram rubber replacement:
▲!Note: manual locking device should be unlocked.
1) Open the ram completely with hydraulic oil.
2) Remove bolts that retain the bonnet. Open bonnet and flatly pull ram
assembly out of the ram shaft tail. While taking out ram assembly, note to
protect the bonnet seal surface, ram and ram shaft from being knocked and
scratched.
3) While replacing ram rubber, first upwards prize top seal, then forward
dismount face seal, last replace new rubber. Assembling order is contrary
to disassembling.

26
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

▲!Caution: Face seal on variable ram is directional.

7.2 REPLACE BONNET SEAL RING

▲! Caution:Do not hammer frame of bonnet seal ring to avoid damage because
it is soft. Follow the procedure to disassemble bonnet seal ring.
(1) Put two screw M12 into frame of bonnet seal ring and then squeeze it from
seal ring groove.
(2) Replace O-ring and rubber spring in the back.
(3) Coat grease on frame surface of bonnet seal ring & groove and put the
frame inside the groove. Put two screw M12 through the hole on the frame
and tighten on the bonnet, then press the frame into the groove.
(4) Take two screws M12.
(5)Coat grease on the seal ring groove of frame outside end and put on O-ring.

7.3 Bonnet hinge bracket

Bonnet hinge bracket is either side door rotating shaft or hydraulic oil
passage. When seal ring damaged, there will be oil losing. At this moment, it is
necessary to disassembly the hinge bracket and checking steps as follows:

1) Ensure side door is fixed connection with the body.

2) Remove two dowel pins, and four connected bolts.(Note:structure of the


locating pin is separate, and it can be pulled out by M8 screw.
3) Remove hinge bracket from side door with gently hammering avoiding seal
side damage.
4) Check hinge bracket O-rings and replace all O-rings if possible. Verify seal
side intact, repair or replace them in time if existing damage.
5)When installation, coat lubricant on related surface, and insert side door
gently. Take care of the locating port, fit two dowel pins first, then four bolts.

7.4 Repair and replacing for cylinder

7.4.1 Procedure

For ram shaft seal, piston seal, locking shaft seal, if leaking oil, they shall be

27
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

repaired and checked as the following steps:

a) If ram is not opened fully, open the rams completely through hydraulic
pressure. If side door bolts are needed to put down, close side door. At
least put down two bolts at the cater-corner side door and open ram
through hydraulic pressure.
b) Put a clean basin under cylinder, to prevent oil from flowing on ground.
c) Remove cylinder cover studs and nuts. Screw off cylinder cover
locking shaft.
d) Drive out locking shaft from cylinder cover.
e) Remove cylinder.
f) Release fixed screw in piston locking cap (No.17)
g) Remove piston locking cap, and take down the piston.
h) Open side door, take off ram and pull out ram shaft.
i) Remove retainer, take out ram shaft sealing ring, and take down
locking shaft sealing ring in cylinder cover in the same way.

7.4.2 Checking after cylinder disassembly


(1) Inner wall of cylinder
When emerging vertical scratch in cylinder inner wall, it can not prevent leaking
oil even if change a new piston seal ring. It should be changed with a new cylinder.
At the same time, check piston related parts and find out scratching reasons and
solve the troubles. If scratch is shallow line or dotted, amend them with abrasive
paper and abrasive stick.
(2) Ram shaft and locking shaft-sealing surface
When there is scratch on sealing surface, use the same inspection and
treatment method as on cylinder. If coating peeling off, that will cause leakage. So
must change new parts.
(3) Seal ring.
Check sealing parts and O-rings to ensure no scratch. If there is, change them.
(4) Piston
When there is 0.2mm scratch on piston movement sealing surface, change it and it
is not allowed to emerge obvious scratch on other surfaces.

28
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

7.4.3 Cylinder assembly installation


Installation step are reversal disassembly steps of it. But note the following items.
(1) Check if there are burs and sharp edges on parts. If there is, get rid of them
to prevent seal ring from scratch, and keep parts clean.
(2) When setting seal ring, lubricate seal ring area and related area for easy
assembly.
(3) Take care lip seal rings' direction; ensure lip mouth against pressure side.

(4) Ensure seal ring passing through thread part smoothly.

⑸ Watch piston is put completely or not when fixing locking cap of piston. Piston
should contact rounding-off of ram shaft tightly. After turning locking cap tightly,
fixed it by formed punch and turning fixing screws.

8.PROPER STORAGE OF RUBBER PARTS


All rubber parts must be stored as following:
a) Store rubber parts in a dark place (temperature:0~25℃): Definitely do not
store rubber parts out-of-doors in direct sunlight and keep items stored
indoors away from windows and skylights to avoid sunlight.
b) Keep storage area as cool as possible. Never store rubber part near heaters,
radiators or other hot equipment.
c) Store these items away from high-voltage equipments. High-voltage
equipment frequently produces ozone which attacks rubber.
d) Store rubber parts in a relaxed position. For example, do not bend a rubber
part and force it into a small box. This accelerates aging in the stressed
(bent) area.
e) Rubber part should be checked periodically. If there is any problem in a
rubber part, it can not be used.
f) Usually the storage term is 2 years.

29
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

9.TROUBLES AND SETTLEMENTS


Item
Trouble phenomena Cause Settlements
No.
Fluids flow out from the a. Seal ring between the Change damaged seal
clearance between the body and side door is ring.
body and side door. damaged.
1
b. There is dust and Clear dust and repair
damage on the BOP body damaged parts.
and side door seal surface.
Ram movement BOP pipes are wrong Reverse BOP pipes.
direction is not connected in control
2
conformance with plate platform.
mark of control valve.
Hydraulic system is in There are foreign materials, Wash ram and side
3 order, but ram can not sand and mud on ram door.
closed fully. contact ends.
Well fluids flowing into Ram shaft seal ring Change damaged ram
cylinder, and there damaged, ram shaft shaft seal ring and
4
contains water in distortion or surface scratch. repair the damaged
cylinder oil. ram shaft.
BOP hydraulic part BOP cylinder, piston, Replace all seal rings
cannot hold pressure, locking shaft, oil tubing, and repair seal surface
and open and close the opening and closing bonnet or change new parts.
5
bonnet unhandy. piston rod seal ring
damaged, seal surface
scratched.
It cannot hold pressure Ram seal rubber damaged, Change ram rubber,
6 when ram closed. upper seal surface of the and repair seal
ram chamber damaged. surface.
Control pipe is in order, Ram plugged with sand and Clear sand and mud
but ram or bonnet can't mud. increase hydraulic
7
be opened with hydraulic control pressure.
pressure.
8 Piston moving speed is There is air in the cylinder. Open & close ram

30
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

not equably during ram several times to


moment discharge air.

Figure 13 13-5/8”*10000 BOP stack

31
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei

APPENDIX NUT SPECIFICATION

d S(㎜) M(㎜)
Wt.
P/N Metric English Metric Tolerance Metric Tolerance e(㎜)

Size Size
11706.01 M12 1/2 22 12 ±0.3 25.4 0.03
0
11706.02 M16 5/8 27 16 ±0.35 31.1 0.05
-0.21
11706.03 M20 3/4 30 19 34.6 0.07
11706.04 M22 7/8 36 22 41.6 0.1
11706.05 M24 1 41 25 ±0.42 47.3 0.19
0
11706.06 M27 41 28 47.3 0.19
-0.25
11706.07 M30X3 1 1/8 46 28 53.1 0.25
11706.08 M33X3 1 1/4 50 31 57.7 0.32
11706.09 M36X3 1 3/8 55 34 63.5 0.42
11706.10 M39X3 1 1/2 60 37 69.3 0.54
±0.5
11706.11 M42X3 1 5/8 65 41 75.1 0.7
0
11706.12 M45X3 1 3/4 68 44 78.5 0.8
-0.3
11706.13 M48X3 1 7/8 74 47 86.6 1.02
11706.14 M50X3 2 77 50 88.9 1.67
11706.15 M52X3 77 50 88.9 1.67
11706.16 M58X3 2 1/4 88 56 101.6 1.78
11706.17 M64X3 2 1/2 98 0 63 113.1 2.32
±0.6
11706.18 M70X3 2 3/4 105 -0.35 68 121.2 2.78
11706.19 M76X3 3 115 75 132.8 3.7
11706.20 M80X3 3 1/4 125 0 81 144.3 4.89
-0.4

32