Preface
The procedures included in this book are to be performed in conjunction with the
requirements and recommendations outlined in API specifications. Any repairs to the
equipment covered by this book should be done by an authorized GPE service
representative. GPE will not be responsible for the loss or expense resulting form any
failure of equipment or any damage to any property or death or any person resulting in
whole or in part form repairs performed by other than authorized GPE personnel. Such
unauthorized repairs shall also serve to terminate any contractual or other warranty, if
any, on the equipment and may also result in equipment no longer meeting applicable
requirements.
File copies of this manual are maintained. Revisions and /or additions well be made
as deemed necessary by GPE. The drawings in this book are not drawn to scale, but the
dimensions shown are accurate.
Table of contents
1、Application ....................................................................................... 3
3、General Features................................................................................................. 8
4、Operating Principle................................................................................................ 10
8、Operating pressure.............................................................................................. 15
10、Life-Times Description........................................................................................... 16
Page 2 of 18
GPE OIL MACHINERY CO.,LTD
1. Application
The ram blowout preventer is one of the key elements of the well control
system. It is mainly used to control the well head pressure during such
operations as drilling, servicing and oil testing to prevent any blow out hazard
effectively and ensure safe operations. Specifically, then 2FZ 18-70 dual ram
blowout preventer can perform the following operations:
1) With proper pipe ram sealing the annular space between casing and
2) With blind ram completely sealing well head when there is no pipe in the
hole.
3) When the well head is closed, with killing manifold and choke manifold
connected to the drilling spool and the outlet of the body doing mud
circulating, chocking and releasing, well killing and well cleaning etc.
Page 3 of 18
GPE OIL MACHINERY CO.,LTD
Type
Products code:
FZ—Hydraulic Single ram Blowout Preventer
2FZ—Hydraulic Double ram Blowout Preventer
3FZ—Hydraulic Triple ram Blowout Preventer
Please see the following table for the bore codes.
Page 4 of 18
GPE OIL MACHINERY CO.,LTD
Page 5 of 18
GPE OIL MACHINERY CO.,LTD
70MPa
Rated Working Pressure
3
10,000 psi
103.5MPa
Hydrostatic test pressure
4 15,000 psi
Page 6 of 18
GPE OIL MACHINERY CO.,LTD
PART LIST
No. NAME QTY MATERIAL
1 MANUAL OPERATION 4 ASSY
2 L0CKING SCREW 4 4140
3 NUT 32 4140
4 THREADED BOLT 32 4140
Page 7 of 18
GPE OIL MACHINERY CO.,LTD
Page 8 of 18
GPE OIL MACHINERY CO.,LTD
3. General Features:
The ram BOP is made up of body, intermediate flange, bonnet, piston,
hydro-cylinder, opening piston, closing piston, Ram Change-Cylinder, ram
assembly , locking housing and locking screw, tandem booster etc.
The connection of the upper and bottom of the BOP are API SPEC 6A latest
Edition /ISO10423 standardized connection. All parts that were reached the
drilling mud which is accordance with NACE-MR-0175 standard.
It is designed inside oil flowing, so it is easy to change the ram,
pressure-contain(body, intermediate flange) is forging, material property is
meeting to API 16A and NACE MR0175-2003 requirements, the sealing
between the intermediate flange and body is realized by seal ring-body and
metal-seal-carrier, Seal ring-body can easy to change. Metal-seal-carrier can not
the screw force of the bonnet bolt, the metal-sealing carrier fluctuate-sealing, it's
surface rubber sealing cling with intermediate flange & body when pressure
effect to the sealing carrier and come true seal. The sealing surface of the ram
cavity is treated with the chemical, so the hardness of the surface is heightened
and the wearing is energized, which avoids scratching the ram, and it also
enhances the sealing reliability. Piston, ram change/open and close and
operation piston bear cavity the bonnet weigh because the surfaces take the
anti-corrosion and anti-wearing treatment. Ram is long rotundity so the stress is
equality.
Page 9 of 18
GPE OIL MACHINERY CO.,LTD
4. Operating Principle
Connect the hydraulic control line to the open and closing oil port. When
close the ram, the hydraulic oil flow into the closing cavity of cylinder to push the
piston, so the ram is moving forward to the well center to unclasp the drill tools,
so the well is closed. When open the ram, the hydraulic oil flow into the opening
cavity of cylinder to push the piston, so the ram is moving forward to the well
center to unclasp the drill tools, so the well is opened.
Ram sealing packing and make up of top seal and packing .the sealing of
the drilling pipe is realized by the packer, the drilling pipe is closing to the sealing
surface with the hydraulic pressure. Top seal realizes the sealing on the top, and
the pressure helps the well to the closed, the element retrieves the original status
after the pressure is disappeared. A guide mechanism is designed in ram, rams
automatically center pipe in hole.
5. Major Usages:
BOP is designed for controlling the blowout during the drilling, the single and
double ram BOP match to the control system, they can used incorporate or
separately and it also can used with annular BOP.
Major tasks:
1. BOP can seal the annular space between the casing and drill pipe or
between the casing and tubing when the well is working.
2. The blind ram can seal the well when there is no drilling pipe in the well.
3. It can be used with the kill /chock manifold to control flow pressure and
balance the drilling pressure.
4. It can realize the well-killing; over-cleaning and other special operations
when the well is closed.
Page 10 of 18
GPE OIL MACHINERY CO.,LTD
Page 11 of 18
GPE OIL MACHINERY CO.,LTD
Note: When replace the ram ,the control pressure must be increased slowly form
zero and the pressure should be immediately stopped when the switch reaches to
position, if the control pressure is higher than 3.5MPa(500 psi), the oil-way of the BOP
must be checked and adjusted. It shall inspection and fixes it.
4. Trial Operation:
It shall test by well pressure after install and inspection.
The switch of the BOP on the console twice and check whether there is any
blocks (when there drilling tool s in the well, it is prohibit close the blind ram).
Page 12 of 18
GPE OIL MACHINERY CO.,LTD
5. Correct Operation:
Blind ram or pipe ram can seals the drilling tools which are the same size as the
ram to close the well when the well blowouts.
It's prohibit to discharge the pressure by opening the ram, which avoid damaging
the packing, once open the ram, check whether the locking device is in unlock
position.
It is prohibit closing the blind ram when there is drilling tool in the well.
Only is there serious leakage in the sealing location of the piston .the second
sealant is used. The amount of the seal no need too much, and just can stop the
leakage, once get the opportunity, change the sealing, immediately, it cannot always
depend on sealant to keep sealing.
After reach the purpose layer, open and close the ram pipe once a day to check
whether the switch is flexible. Once after drilling, check whether the blind ram is
flexible.
There should be one stock for the using ram and the accessory in field, once the
wing ram or accessory is damaged, it can be replaced in time.
In normal conditional, BOP is opening position as always.
All people shall be complying operation manual for use BOP.
6. Maintenance:
All the personal related to installation, operation and maintenance of BOP must
read the book.
It which has used in the field when the BOP is send to the pipe station. It should
be disassembled and cleaned. All parts should be cleaned, checked, repaired and
replaced.
The sequence of the inspection parts: locking assembly, piston, and bonnet seal.
Ram bore, BOP vertical bore, the clearance between the ram and ram cavity, plating
and welding parts, ram; body joint and outlet, major piston head, bonnet bolt;
blowhole and blind hole.
Page 13 of 18
GPE OIL MACHINERY CO.,LTD
Page 14 of 18
GPE OIL MACHINERY CO.,LTD
6、The Control oil flow is normal, but cannot open the ram by hydraulic pressure;
the causes and solutions follows:
Ram is blocked by mud and sand; clear mud and sand, and increase the control
pressure.
7、 There is leakage between the body and intermediate flange: the causes and
solutions follows:
a) Sealing rings of the open /close piston and housing are damaged; change the
damaged sealing ring.
b) The sealing rings between the open/close piston and intermediate flange are
damage; change the damaged sealing ring.
8、 The coating of the open /close piston is flaked when change the ram .the
causes and solutions follows:
Inspect sealing and other surfaces which contact with the open/close piston.
8. Operating Pressure:
The pressure of the open & close the ram is 8.4~10.5MPa , when change the
ram ,control pressure to open and close the bonnet is 2.1~3.5MPa (300~500 psi).
Page 15 of 18
GPE OIL MACHINERY CO.,LTD
3 、 Rubber sealing ring shall be packed with black plastic bag and the bag
should be closed.
4、 High-voltage equipment frequently produces ozone which attacks rubber. It
cannot be stocked with grease, chemistry product. Be sure that no electrical
machinery is near the rubber goods and that drafts will not carry the atmosphere from
electrical machinery to the area in which the rubber goods are stored.
5、 Rubber sealing should be stocked with out heavy items on it.
6 、 Normal rubber storage period is one-year time. Rubber part should be
checked periodically. If there is any problem in a rubber part, it cannot be used.
7、 Store rubber goods in a relaxed position. For example, do not hang O-rings
on nails, Where possible, do not keep assemblies in stock where the rubber goods
are stretched in order to assemble them on the part. On items where the rubber is
stressed. Periodic inspection should be employed to detect any signs of aging as
quickly as possible.
8、 Keep storage as dry as possible and remove any oil, grease or other foreign
material that may accidentally get on the rubber .
9、 Do not store the rubber goods on top shelves near galvanized roofs, there
are several reasons for this one is that heat is passed through galvanized roofing
and also there is some opinion that ozone may be generated is this area.
10、 If possible, store rubber goods in building of wooden construction and on
wooden shelves. Wood is believed to scavenge ozone quite effectively.
11、 If storage for extended periods is unavoidable. Sealed containers will aid
considerably; impervious surface coverings such as " seal-peel" or waxing will help.
12、 Ram assembly is made up of ram body, top seal and packing, all of the
surfaces should be treated with Albany grease.
Page 16 of 18
GPE OIL MACHINERY CO.,LTD
the drilling rod. If must move drilling rod, a accumulator must be added into the
hydraulic system.
After open the ram BOP, you must check if the rams open fully, to avoid
scratching ram.
Light hydraulic oil is the recommended operating fluid for type U preventers. Any
type except flue oil, which causes rubber seals to swell and deteriorate. The use of
water as an operating medium is satisfactory provided soluble oil is added to
prevent corrosion and antifreeze is added when necessary.
There is a secondary sealing mechanism in immediate flange, Packing plastic do
not loading during transports.
Lipped seal rings and O rings are used in seal positions in Ram BOP. The quality
of the sealing rings direct influence with the quality of BOP.
The connection of the upper of are API standardized Stud connection , the
connection of the lower of Ram BOP are API standardized flange connection. All The
ring gasket grooves are welding with stainless steel, the material organize is much
softer, it stand on land, it must add a plate isolated between the land. The upper
studded bore must add a plate isolated with rainwater. The thread of studded bore
has corrosives easily. It must coat thread oil to protect.
Page 18 of 18