You are on page 1of 1

Key Plan

1 5 10 14

5
Z2 Z4 Z6
C
LEGEND: Cable Trench

Z1 Z3 Z5
SYMBOL DESCRIPTION
A

TO DOWN CONDUCTOR

Ground Floor
N

DETAIL-1
EDD
DETAIL-A
TYPICAL CONNECTION DETAIL FOR DOWN CONDUCTORS TO EARTH PIT EARTH ELECTRODE ARRANGEMENT. ROOF LEVEL
Cable Trench
3
SEE DRG No. E541

² ² ² ² ² ²

Cable Trench

B A

²
SITE ENTRANCE
²
²
Gravel Gravel
A B C

Gravel 3
Contol
Room

Path ROOF LEVEL


Kitchen

Path SEE DRG No. E541


Server Ambulent
Security
Room

2 W.C

MV3 ² MV2 MV1 CU-E41 CU-E42 CU-E43 CU-E34 CU-E35


CU-E21 CU-E22 CU-E23 CU-E14 CU-E15
1

MVA

FUEL TANK
Drawing Ref Numbers
M1A M1B M1C 4C 4A 4B 3A 3B 2A 2B 1A 1B
PHASE 2 PHASE 1 PHASE 1 PHASE 1 PHASE 1 PHASE 1 PHASE 2 PHASE 2 PHASE 3 PHASE 3 PHASE 4 PHASE 4
BAH052 Hamala Electrical Services Power
SITE EXIT One Line Diagrams.

· BAH052-KJB-E-SLD-611 MEDIUM VOLTAGE ONE LINE DIAGRAM

· BAH052-KJB-E-SLD-615 ( M1A )
GEN M1A DB GEN M1B DB GEN M1C DB GEN M4C DB GEN M4A DB GEN M4B DB GEN M3A DB GEN M3B DB GEN M2A DB GEN M2B DB GEN M1A DB GEN M1B DB · BAH052-KJB-E-SLD-617 ( M1C )
· BAH052-KJB-E-SLD-627 ( 1A )
MV SWITCHROOM 1B MV SWITCHROOM 1A · BAH052-KJB-E-SLD-625 ( 2A )
· BAH052-KJB-E-SLD-623 ( 3A )

Path MVB ² BARE COPPER LOCATED


· BAH052-KJB-E-SLD-621 ( 4A )

1500MM FROM FENCE


² ² ² ² ² ² · BAH052-KJB-E-SLD-628 ( 1B )
· BAH052-KJB-E-SLD-626 ( 2B )
· BAH052-KJB-E-SLD-624 ( 3B )
· BAH052-KJB-E-SLD-622 ( 4B )
A · BAH052-KJB-E-SLD-620 ( 4C )
² · BAH052-KJB-E-SLD-616 ( M1B )

CHILLER ELECTRICAL ROOM M1 CHILLER CATCHER ROOM 4C ELECTRICAL ROOM 3-4 ELECTRICAL ROOM 1-2
Site Stone PUMP HOUSE

²
AMCOP
Phase 1 BAH052 Hamala Electrical Services EPMS
XFMR/M1A XFMR/M1B XFMR/M1C XFMR/M4C XFMR/M4A XFMR/M4B XFMR/M3A XFMR/M3B XFMR/M2A XFMR/M2B XFMR/M1A XFMR/M1B ROOF LEVEL One Line Diagrams.
UPS 4B2 UPS 3A2
SEE DRG No. E541
· BAH052-KJB-E-SLD-612 EPMS ONE LINE MV DIAGRAM
² · BAH052-KJB-E-SLD-636 EPMS ONE LINE BACKBONE TOPOLOGY
PDP 4A PDP 4B USS M4B PDP 3A USS 3A
CORRIDOR
· BAH052-KJB-E-SLD-635 ( M1A )
UPS 4B1 UPS 3A1 · BAH052-KJB-E-SLD-634 ( M1C )
· BAH052-KJB-E-SLD-631 ( 4A )

B · BAH052-KJB-E-SLD-630 ( 4B )
· BAH052-KJB-E-SLD-632 ( 4C )
· BAH052-KJB-E-SLD-633 ( M1B )

CATCHER BATTERY ROOM BATTERY ROOM 4 BATTERY ROOM 3 BATTERY ROOM 2 BATTERY ROOM 1
BAH052 Hamala Electrical Services AMCOP
Interface Block Diagram.
· BAH052-KJB-E-SLD-656 AMCPOP EXTERNAL INTERFACE BLOCK
² DIAGRAM

BAH052 Hamala Electrical Services Earthing


B BOND ( FURSE BN105)
Schematics.
COPPER , 10mm BOLT SIZE
LIGHTNING PROTECTION ROOF LEVEL LIGHTNING PROTECTION ROOF LEVEL FOR BONDING 25mm x 3mm
· BAH052-KJB-E-EARTH-525 HAMALA ELECTRICAL SERVICES
SEE DRG No. E541 SEE DRG No. E541 TAPE TO STAIRS EARTHING SCHEMATIC MV-A1
STEEL STRUCTURE · BAH052-KJB-E-EARTH-526 HAMALA ELECTRICAL SERVICES
EARTHING SCHEMATIC MV-B1
Path
Phase 1 C

HR
FFL +0.00
1 FOR APPROVAL 04-02-2018
² BARE COPPER LOCATED
0 FOR APPROVAL 10-01-2018
1500MM FROM FENCE
No. DESCRIPTION DATE SIGN

CLIENT:

D
BAH52
AHU ROOM 1 AHU ROOM 1 MMR ROOM
B BOND ( FURSE BN105)
COPPER , 10mm BOLT SIZE
CONSULTANT
FOR BONDING 25mm x 3mm
Site Stone STORAGE TAPE TO STEEL STRUCTURE

Phase 1 ²

²
MECHANICAL ROOM

SPRINKLER ROOM

CONTRACTOR

Gravel E
² ² ² Member of the
KAR Group

Gravel
Path
² BARE COPPER LOCATED
1500MM FROM FENCE
MEP SUB CONTRACTOR:
Kartec Jones Bahrain
²

²
Electro-Mechanical Engineers & Contractors

1x95sq.mm INSULATED COPPER


EARTH CABLE LINK FROM POST ² ² BARE COPPER LOCATED
TO COUNTERPOISE 1500MM FROM FENCE ² Cu LSZH PVC LINK FROM BURIED BARE EARTH TO THE POST AND PROJECT STAGE
A 16mm² Cu LSZH PVC CABLE LINK FROM THE FENCE POST TO THE FENCE SHOP DRAWING
PANEL HORIZONTAL RAILS

²
Site Stone ² ² ² ² DRAWING TITLE BAH052_Hamala
Ground Floor
1500

Lightning Protection Layout


SCALE DESIGNED BY DRAWN BY
KJB POB
AS-SHOWN CHECKED BY APPROVED BY
GCM R.K

14a 14 13 12 11 10 9 8 7 6 5 4 3 2 1 DRAWING NO. REV.

BAH052-KJB-DWG-E-540 1