JOB SUMMARY REPORT

Member Name Results Current Solution

Basement B1 Passed W8X18

Basement B2 Passed W8X18

Basement B3 Passed W8X18

Basement B4 Passed W8X18

Basement B5 Passed W8X18

4 piece(s) 1 3/4" x 9 1/4" 2.0E


Ground floor B1 Passed
Microllam LVL
2 piece(s) 2" x 6" Spruce-Pine-Fir
Ground floor B3 Passed
No. 1 / No. 2
4 piece(s) 2" x 10" Spruce-Pine-Fir
Ground floor B4 Passed
No. 1 / No. 2
1 piece(s) 2" x 8" Spruce-Pine-Fir
Ground floor B5 Passed
No. 1 / No. 2
3 piece(s) 2" x 10" Spruce-Pine-Fir
Ground floor B6 Passed
No. 1 / No. 2
3 piece(s) 2" x 8" Spruce-Pine-Fir
Ground floor B7 Passed
No. 1 / No. 2
1 piece(s) 2" x 6" Spruce-Pine-Fir
Ground floor B8 Passed
No. 1 / No. 2
3 piece(s) 1 3/4" x 14" 2.0E
Ground floor B9 Passed
Microllam LVL

Ground floor B10 Passed W10X26

Ground floor B11 Passed W8X10