You are on page 1of 2

Document No:

PM_3000_NF_SVR_ADP_NNA_QA_
00000X ADP Site Visit Report New Lim Project
Rev. 0

Template N° Template Date: 10-May-19 Template Owner:


PM_3000_NF_FRM_ADP_NNA_QA_000045 María Perez
Project Quality Manager
Rev. 0

Date of Visit: 2/28/2020


Employee Name: Creator MANUEL RIVERO RUIZ

Weather Conditions: Item Subcontractors Name Total Personal


Sunny/Claudy: 1 CONSORCIO NUEVO LIMATAMBO 114
Wind:
Precipitation:
Temperature.

Functional Group Category Areas Completed


QA/
QC Quality / Calidad

EN/MAEnvironment / Medioambiente
H&S Health&Safety / Seguridad&Salud
CONS.Construction / Construcción
Othe
r Other

Task Funtional Group Type of


No Category Review Description of Activity Location

1 H&S Inspection Nivelación de terreno. Sector 5

SITE ISSUES IDENTIFIED DURING THE VISIT YES NO Functional Group


Issue Owner Action Descrition of the Issue Category

En el sector 5 se observa trabajos de motoniveladora con iluminación deficiente (Observación repetitiva). Incumple el
No.01 Eduar Santamaría procedimiento NL_3000_CN_PRC_CNL_CCR_CS_000010 Rev. 1 Procedimiento para trabajos de rellenos (Consideraciones H&S
adicionales para trabajos nocturnos).

No.02

No.03

No.04

No.05

Página 1 de 2
Document No:
PM_3000_NF_SVR_ADP_NNA_QA_
00000X ADP Site Visit Report New Lim Project
Rev. 0

Template N° Template Date: 10-May-19 Template Owner:


PM_3000_NF_FRM_ADP_NNA_QA_000045 María Perez
Project Quality Manager
Rev. 0

Date of Visit: 2/28/2020


Employee Name: Creator MANUEL RIVERO RUIZ

ATTACHED ADDITIONAL SUPPORTING INFORMATION (E.g. Photos, reference drawings, specification, test Report, etc.)

Página 2 de 2