The IPCR Form provides targets and measures for a Dredgeman Foreman's performance from July to December 2022. The major outputs include:
1) Designing compliant dredging projects and maintaining dredging equipment on schedule.
2) Properly logging daily dredging operations.
3) Completing other assigned tasks from the Supervisor with minor errors and within timelines.
The form is used to discuss and rate the Foreman's performance on attaining the targets.
The IPCR Form provides targets and measures for a Dredgeman Foreman's performance from July to December 2022. The major outputs include:
1) Designing compliant dredging projects and maintaining dredging equipment on schedule.
2) Properly logging daily dredging operations.
3) Completing other assigned tasks from the Supervisor with minor errors and within timelines.
The form is used to discuss and rate the Foreman's performance on attaining the targets.
The IPCR Form provides targets and measures for a Dredgeman Foreman's performance from July to December 2022. The major outputs include:
1) Designing compliant dredging projects and maintaining dredging equipment on schedule.
2) Properly logging daily dredging operations.
3) Completing other assigned tasks from the Supervisor with minor errors and within timelines.
The form is used to discuss and rate the Foreman's performance on attaining the targets.
INDIVIDUAL PERFORMANCE COMMITMENT AND REVIEW (IPCR)
I, _________________________________, Dredgeman Foreman, commit to deliver and agree to be rated on the attainment of the following targets in accordance with the indicated measures for the period of July to December 2022
Approved by: ______________________________
Signature of Ratee Signature: Position: Director IV Date prepared: ________________ Name: TORIBIO NOEl L. ILAO Office: Bureau of Equipment
MAJOR FINAL Rating
Success Indicator Actual Accomplishment Q E T Ave Remarks OUTPUT Design compliant Dredging operation executed with minor variance dredging project between the design profile and the waterway geometry after dredging, verified by way of a bathymetric survey Well-maintained dredge Preventive maintenance of dredge performed as scheduled based on the PM manual within the indicated time Any issue found during inspection and preventive maintenance reported to the Dredge Master immediately for appropriate action. Properly accomplished Activities pertaining to effective and non-effective daily dredging dredging time logged in the equipment logbook operations log with minor error Performed other duties 100% of other tasks given performed with minor assigned by Supervisor. error within the allowed time. TOTAL RATING FINAL AVERAGE RATING
Rater comments and Recommendations for the Development Purposes or Rewards/Promotion
The above rating has been discussed with:
Name and Signature Name and Signature Name and Signature of of Ratee: of Rater: MANUEL G. ABELLA Final Rater: ROQUITO L. CONSOLACION Position: Dredgeman Foreman (Job Order) Position: Dredgemaster III Position: Caretaker, Floating Equipment Division Date: Date: Date: