You are on page 1of 1

The IPCR Form

INDIVIDUAL PERFORMANCE COMMITMENT AND REVIEW (IPCR)


I, _________________________________, Dredgeman Foreman, commit to deliver and agree to be rated on the attainment of the following targets in
accordance with the indicated measures for the period of July to December 2022

Approved by: ______________________________


Signature of Ratee
Signature: Position: Director IV
Date prepared: ________________
Name: TORIBIO NOEl L. ILAO Office: Bureau of Equipment

MAJOR FINAL Rating


Success Indicator Actual Accomplishment Q E T Ave Remarks
OUTPUT
Design compliant Dredging operation executed with minor variance
dredging project between the design profile and the waterway
geometry after dredging, verified by way of a
bathymetric survey
Well-maintained dredge Preventive maintenance of dredge performed as
scheduled based on the PM manual within the
indicated time
Any issue found during inspection and preventive
maintenance reported to the Dredge Master
immediately for appropriate action.
Properly accomplished Activities pertaining to effective and non-effective
daily dredging dredging time logged in the equipment logbook
operations log with minor error
Performed other duties 100% of other tasks given performed with minor
assigned by Supervisor. error within the allowed time.
TOTAL RATING
FINAL AVERAGE RATING

Rater comments and Recommendations for the Development Purposes or Rewards/Promotion

The above rating has been discussed with:


Name and Signature Name and Signature Name and Signature of
of Ratee: of Rater: MANUEL G. ABELLA Final Rater: ROQUITO L. CONSOLACION
Position: Dredgeman Foreman (Job Order) Position: Dredgemaster III Position: Caretaker, Floating Equipment Division
Date: Date: Date:

You might also like