Servicing the month of

PREVENTIVE PLANNED KEMENTERIAN DALAM


MAINTENANCE NEGERI JOHOR APRIL
.............................

A Asset Details
Group Civil Blok : Kompleks
Location
Category Department :
Type FLOOR Date:
Job Completed
Serial No

B Task Description
No Description Freq Done Pass Fail Remarks
1 Inspect for leakages and repair immediately if necessary. M      
2 Inspect for cracks and repair if necessary. 3M N/A      
3 Inspect for defective finishes and repair or replace if necessary. 3M N/A      
4 Inspect for settlement, deflection and repair if necessary. 3M N/A      

If not done during the month, state (*) previous date and next schedule date (#)

C
Inspection Report / Remarks

GOOD NEED FURTHER INSPECTION REDO INSPECTION

Work to be done / components to be replace

1.

2.

NB: Please indicate spare parts / components required for this job

Serviced by : Checked by : Verified by :

____________________ ____________________ ____________________


( Civil Technician) ( Civil Supervisor) ( Verifier)

Name : Name : Name :

Date : Date : Date :


LAPORAN PENYELENGGARAAN BULANAN (KOMPLEKS)

Hari: Isnin
Tarikh: 22 / 4 / 2019
Lokasi: Kawasan lantai rooftop,Blok 5.
Tindakan: Pihak kami mengambil langkah dengan membuat penyelenggaraan serta pemeriksaan lantai
rooftop bagi memastikan lantai tidak pecah/rosak serta tiada halangan.

22. 4. 2019

Gambar menunjukkan lantai rooftop blok 5 yang tiada halangan dan tidak pecah/rosak

Laporan Disediakan Disemak Oleh

…………………………………… ……………………………
Syed Ahmad Azhar Bin S Md Zain Adam Bin Ramli
Penyelia Awam Verifier

Disahkan Oleh

…………………………..
Shahril Hizham Bin Reduan
Pengurus Fasiliti
Servicing the month of
PREVENTIVE PLANNED KEMENTERIAN DALAM
MAINTENANCE NEGERI JOHOR APRIL
.............................

A Asset Details
Group Civil Blok : Kuarters
Location
Category Department :
Type FLOOR Date:
Job Completed
Serial No

B Task Description
No Description Freq Done Pass Fail Remarks
1 Inspect for leakages and repair immediately if necessary. M      
2 Inspect for cracks and repair if necessary. 3M N/A      
3 Inspect for defective finishes and repair or replace if necessary. 3M N/A      
4 Inspect for settlement, deflection and repair if necessary. 3M N/A      

If not done during the month, state (*) previous date and next schedule date (#)

C
Inspection Report / Remarks

GOOD NEED FURTHER INSPECTION REDO INSPECTION

Work to be done / components to be replace

1.

2.

NB: Please indicate spare parts / components required for this job

Serviced by : Checked by : Verified by :

____________________ ____________________ ____________________


( Civil Technician) ( Civil Supervisor) ( Verifier)

Name : Name : Name :

Date : Date : Date :


LAPORAN PENYELENGGARAAN BULANAN (KUARTERS)

Hari: Isnin
Tarikh: 22 / 4 / 2019
Lokasi: Kawasan lantai kuarters.
Tindakan: Pihak kami mengambil langkah dengan membuat penyelenggaraan serta pemeriksaan lantai bagi
memastikan lantai tidak pecah/rosak serta tiada halangan.

22. 4. 2019

22. 4. 2019

Gambar menunjukkan lantai kawasan kuarters dalam keadaan baik dan tiada halangan

Laporan Disediakan Disemak Oleh

…………………………………… ……………………………
Syed Ahmad Azhar Bin S Md Zain Adam Bin Ramli
Penyelia Awam Verifier

Disahkan Oleh

…………………………..
Shahril Hizham Bin Reduan
Pengurus Fasiliti