Quality Standards for Structural Concrete
S.No Project Name ITEM
ASF T12 10mm/3 soot
T13 10mm/3 soot
T6 10mm/3 soot
1
T7 10mm/3 soot
Formwork
T3 10mm/3 soot
T4 10mm/3 soot
2 Cottages ‐ 10mm/3 soot
3 Shaes ‐ 10mm/3 soot
All
Projects
A At All levels Reinforcement ± 2"
of Kings
Group
❶ Instruction to CS
● All CS are obliged to follow the above mentioned Quality Standards
● All CS are responsible to get compliance of above mentioned standards from Contractors
❷ Instruction to Formwork Contractor
● All contractor are obliged to follow the above mentioned Standards
● If Gap between the Planks is greater than 10mm/3 soot, contractor MUST cover thoes gaps by Steel Strips
● if Gaps greater than 10mm/3 soot are found by QA/QC Engineer before pouring or found at the time of pouring
Contractor MUST Cover thoes gaps by steel strips otherwise 10% will be deducted from the Bill of the same formwork
❸ Instruction to Steel Contractor
● if the reinforcement is found greater than that mentioned in the drawing,
contractor will not be paid for that extra reinforcement
● if the reinforcement is found less than that of mentioned in the approved drawing, contractor is obliged
to replace the same otherwise 10% Deduction from the bill of the same will be made
● It is mandatory for each and every contractor to follow Structural drawing, changes can only be
done after written approval from QA/QC Department
● In case of Non Conformance 10% Deduction from the bill of the same slab/beam/column will be made
QA/QC &
Engineering Construction Contractor
Contractor Steel
Department Supervisor Formwork
Manager