Tank capacity determination

The ultimate demand is used in demining storage capacity the ultimate is 644.4m 3 flow will be
throughout the day

Hour Time Demand Flow Cumulative Excess Excess


Cumulative (m3) flow (m3) demand supply
Demand
(m3)
0-1 12-1AM 15 4.0 12.81 12.81 8.81
1-2 1-2AM 15 8.0 12.81 25.62 17.62
2-3 2-3AM 15 12.0 12.81 38.43 26.43
3-4 3-4AM 20 17.3 12.81 51.24 33.94
4-5 4-5AM 25 24.0 12.81 64.05 40.05
5-6 5-6AM 40 34.67 12.81 76.86 42.19
6-7 5-6AM 80 56.02 12.81 89.67 33.65
7-8 7-8AM 120 88,02 12.81 102.4 14.46
8-9 8-9AM 180 136.02 12.81 115.29 120.73
9-10 9-10AM 220 194.72 12.81 128.1 66.62
10-11 10- 220 253.42 12.81 140.91 112.51
11AM
11-12 11- 150 293.42 12.81 153.72 139.7
12AM
12-13 12-1PM 100 320.42 12.81 166.59 153.59
13-14 1-2PM 80 341.42 12.81 179.34 162.08
14-15 2-3PM 60 357.42 12.81 192.15 165.27
15-16 3-4PM 110 386.82 12.81 204.96 181.86
16-17 4-5PM 150 426.82 12.81 217.77 209.05
17-18 5-6PM 180 474.82 12.81 230.58 244.24
18-19 6-7PM 180 522.82 12.81 243.39 279.43
19-20 7-8PM 160 565.52 12.81 256.20 312.32
20-21 8-9PM 140 602.92 12.81 269.01 333.91
21-22 9-10PM 80 624.27 12.81 281.82 342.45
22-23 10- 45 632.27 12.81 294.73 337.54
11PM
23-24 11- 15 640.27 12.81 304.54 332.73
12PM

Reservoir capacity=maximum excess+ maximum excess demand


Excess supply=cumulative flow – cumulative demand
Excess demand=cumulative demand-cumulative flow
Cumulative flow=cumulative demand+ excess supply
Cumulative demand =cumulative flow=excess demand
The design manual provides standard tank capacities are 10, 25, 50,100,150,200,300,500,800
and 1200m3. A tank of 100m3 is appropriate