SL.

NO DATE MATERIAL DESCRIPTION QTY

1 1/1/2019 OIL FILTER ELEMENT(75KW) 2

2 2/1/2019 1" NRV BOOSTER 2

3 3/1/2019 OIL FILTER ELEMENT(75KW) 2

4 6/1/2019 PRESSURE GAUGE , RANGE -: 0 TO 250 KG/CM^2 2

5 16/01/2019 TEMP TX 0-800DegC 2

6 16/01/2019 DUPLEX THERMOCOUPLE, 600MM, K- TYPE 2

7 14/01/2019 OIL FILTER ELEMENT(45KW) 2

8 17/01/2019 THERMOWELL, LENGTH -: 1000MM 2


PRESSURE GAUGE , RANGE -:0 TO 4 KG/CM^2, DIAL
9 21/1/2019 SIZE -: 150MM, GLYCERINE FILLED,MAKE -: 2
GENERAL
10 23/12/019 DUPLEX THERMOCOUPLE, 1000MM, K- TYPE 2

11 1/2/2019 1" NRV BOOSTER 2

12 1/2/2019 1" HOSE PIPE 2

13 3/2/2019 DUPLEX THERMOCOUPLE, 350MM, K- TYPE, 2

14 3/3/2019 DUPLEX THERMOCOUPLE, 400MM, K- TYPE, 2

15 3/4/2019 ONE PAIR CABLE LAYING FROM FIELD INST TO TI JB 180 MTR

16 5/2/2019 POWER CYLINDER 1

17 6/2/2019 POWER CYLINDER 1

18 6/2/2019 1" NRV BOOSTER 1

19 6/2/2019 1" HOSE PIPE 1

20 17/02/2019 THERMOWELL, LENGTH -: 1000MM, SS -316 1

21 23/02/2019 PREFILTER FOR 45KW COMPr 1

22 23/02/2019 PREFILTER FOR 45KW COMPr 1

23 23/02/2019 PREFILTER FOR 75KW COMPr 1

24 23/02/2019 PREFILTER FOR 75KW COMPr 1


25 27/02/2019 THERMOWELL, 2800MM 2

26 27/02/2019 THERMOCOUPLE ,3000MM, SIMPLEX 2


THERMOCOUPLE CABLE 1PX1.5sqmm , TOTAL
27 27/02/2019 LENGTH CONSUMED - 40 MTR 40 MTR

28 5/3/2019 45KW COMPr SOLENOID VALVE KIT, MAKE - 1


ELGI,PART NO - B009405770014
29 9/3/2019 TWO LTR AIR LUBE UT SYNTHETIC FLUID 2 LTR

30 17/03/2019 DUPLEX THERMOCOUPLE, 1000MM, K- TYPE 1

31 17/03/2019 THERMOWELL, 1000MM, SS- 316 1


AC EXHAUST FAN V - BELT ,CONTINENTAL CONTI V
32 22/03/2019 A28 13X710 LI/740LD ENGINEERED IN GERMANY 2
ANTISTATIC ISO 1813 250620 8 K45
33 26/03/2019 WALKY TALKY SET, MAKE - TALK PRO, MODEL - H- 1
450A

34 26/03/2019 5/2 WAY POPPET VALVE (SOV), MAKE - AIRMAX, 1


MODEL - 2ARM SS-502-06
35 2/4/2019 SIEMENS SIPART PS2 HART POSITIONER 1

36 3/4/2019 PRESSURE GAUGE, RANGE - 0 TO 4 KG/CM^2 1


QUICK EXHAUST VALVE - 1/4", MODEL NO - AQEV-
37 4/4/2019 1-06, MAKE - AIRMAX 2
AIR LIMIT SWITCH, MAKE - JANATICS, MODEL NO -
38 4/4/2019 C7082, MAX PR - 10 BAR 2

39 6/4/2019 10 CHANNEL ELECTRONIC TIMER , MAKE - EAPL, 1


MODEL NO -
40 8/4/2019 PRESSURE GAUGE, RANGE - 0 TO 250 KG/CM^2, 1
DAIL SIZE - 200MM, CON - 1/2" NPT(M)
41 8/4/2019 PU TUBE 8MM 100 MTR

42 12/4/2019 COMPRESSOR OIL, MAKE - ELGI 6 LTR

43 12/4/2019 OIL FILTER ELEMENT ( ISSUED DIRECTLY FROM 2


STORE)
44 12/4/2019 COMPRESSOR OIL, MAKE - ELGI 3 LTR

45 13/04/2019 COMPRESSOR OIL, MAKE - ELGI 6 LTR

46 24/04/2019 TEMPRETURE GAUGE, RANGE - 0 TO 500DegC 1


BHARTIA LIMIT SWITCH AC15 AT 415V 0.8A DC13
47 25/04/2019 AT 240V 0.1A IS/IEC 60947-5-1 CM/L 9431981 1
IP67 CAT NO - NILLA-22 BCH ELECTRIC LIMITED
48 25/04/2019 1" NRV BOOSTER NEW 1

49 30/04/2019 AIR FILTER ELEMENT 1


50 7/5/2019 AUTO DRAIN VALVE 1/2" 1

51 7/5/2019 HOSE PIPE 1" 1


AC EXHAUST FAN V - BELT ,CONTINENTAL CONTI V
52 8/5/2019 A28 13X710 LI/740LD ENGINEERED IN GERMANY 2
ANTISTATIC ISO 1813 250620 8 K45
53 10/5/2019 SMART POSITIONER, MAKE - ABB 1

54 11/5/2019 1" HOSE PIPE 1

55 12/5/2019 AIR FILTER ELEMENT, ITEM NO - B005700770006 1

56 16/05/2019 8" DOME SEAL FOR AHS 1

57 17/05/2019 8" DOME SEAL FOR AHS 1

58 26/05/2019 BED THERMOWELL, 2800MM, 22MMX8MM, 1/2" 4


BSP( E ), SS -446, DRILLED BAR STOCK

59 26/05/2019 BED THERMOCOUPLE, 3000MM, DUPLEX, 6MM, 4


1/2" BSP( M), SS -446, K - TYPE
60 27/05/2019 1.5" NRV REPAIR KIT 2

61 29/05/2019 8" DOME SEAL FOR AHS 1

62 3/6/2019 AIR FILTER ELEMENT 1

63 3/6/2019 AIR FILTER ELEMENT 1

64 3/6/2019 PRE FILTER 1

65 3/6/2019 COMPRESSOR OIL, MAKE - ELGI 36 LTR

67 8/6/2019 DOUBLE ACTING SOV, MAKE - DUNCAN 4

68 8/6/2019 MALE CONNECTOR 1/2" - 12MM PUSH FITTING 16

69 8/6/2019 AIR FILTER REGULATOR 2 SET

70 8/6/2019 MALE CONNECTOR 1/4" - 8MM PUSH FITTING 20

71 19/06/2019 HOSE PIPE 1" 1


TEMPRETURE CONTROLLER, CR/AL, MAKE -
72 3/7/2019 THERMOTECH, MODEL - TIC -4000 1

73 3/7/2019 COMPRESSOR OIL, MAKE - ELGI 3 LTR

74 6/7/2019 1" HOSE PIPE , 1" MALE X 1" FEMALE 1

75 7/72019 DOME SEAL 8" 1


76 10/7/2019 DOME SEAL 8" 1
DUPLEX THERMOCOUPLE K - TYPE, LENGTH -
77 11/7/2019 1200MM 1

78 11/7/2019 THERMOWELL, LENGTH - 1000MM, SS - 446 1

79 11/7/2019 1" HOSE PIPE 1"(F) X 1"(M) 1

80 13/07/2019 AIR LIMIT SWITCH, MAKE - JANATICS, MODEL NO - 1


C7082, MAX PR - 10 BAR
81 16/07/2019 OIL FILTER ELEMENT 1

82 16/07/2019 1" HOSE PIPE 1

83 16/07/2019 COMPRESSOR OIL, MAKE - ELGI 1 LTR

84 22/07/2019 PRESSURE GAUGE , RANGE - 0 TO 7 KG/CM^2 2

85 25/07/2019 2" NRV REPAIR KIT 1

86 28/07/2019 1" HOSE PIPE 1"(F) X 1"(M) 1


AC EXHAUST FAN V - BELT ,CONTINENTAL CONTI V
87 31/07/2019 A28 13X710 LI/740LD ENGINEERED IN GERMANY 2
ANTISTATIC ISO 1813 250620 8 K45
88 4/8/2019 AUTO DRAIN VALVE 1/2" 1

89 10/8/2019 1.5" NRV REPAIR KIT 1

90 11/8/2019 1.5" NRV REPAIR KIT 3

91 14/08/2019 QUICK EXHAUST VALVE FOR CYLINDER - 1/2", 1


MAKE - AIRMAX
92 23/08/2019 DOME SEAL 8" 1

93 24/08/2019 DOME SEAL 8" 1

94 27/08/2019 1" HOSE PIPE 1"(F) X 1"(M) 1

95 27/08/2019 COMPRESSOR OIL, MAKE - ELGI 1 LTR

96 2/9/2019 8MM PU TUBE 50 MTR

97 16/09/2019 1" BALL VALVE 2

98 21/09/2019 DOME SEAL FOR 8" DOME VALVE 1

99 21/09/2019 DOME BUSH FOR 8" DOME VALVE 2

100 21/09/2019 V RING FOR 8" DOME VALVE 2


101 21/09/2019 O RING FOR 8" DOME VALVE 2

102 21/09/2019 DUST SEAL FOR 8" DOME VALVE 2

103 24/09/2019 DOME SEAL FOR 8" DOME VALVE 1

104 27/09/2019 1" HOSE PIPE 1"(F) X 1"(M) 1

105 27/09/2019 COMPRESSOR OIL, MAKE - ELGI 4 LTR

106 30/9/2019 1" NRV BOOSTER 1

107 1/10/2019 FLUE GAS ANALIZER 1

108 3/10/2019 1" NRV BOOSTER 1

109 3/10/2019 1" HOSE PIPE 1"(F) X 1"(M) 1

110 3/10/2019 1" X 6" GI NIPPLE 1

111 9/10/2019 DOME SEAL FOR 8" DOME VALVE 1

112 10/10/2019 1.5" NRV 1

113 15/10/2019 1" HOSE PIPE 1


DUPLEX THERMOCOUPLE K - TYPE, LENGTH -
114 17/10/2019 3000MM, SHEETH SS446 1

115 17/10/2019 THERMOWELL, LENGTH - 2800MM, SS -446, OD X 1


ID, (22 X 10)MM
116 20/10/2019 1" BOOSTING HOSE PIPE 1

117 20/10/2019 1" NRV BOOSTER 1

118 22/10/2019 1" HOSE PIPE 1

119 25/10/2019 1" BOOSTING HOSE PIPE

120 27/10/2019 V RING FOR 8" DOME VALVE 2

121 27/10/2019 DUST SEAL FOR 8" DOME VALVE 4

122 27/10/2019 O RING FOR 8" DOME VALVE 2

123 27/10/2019 BUSH FOR 8" DOME VALVE 2

124 27/10/2019 DOWEL PIN FOR 8" DOME VALVE 2

DUPLEX THERMOCOUPLE K - TYPE, LENGTH -


125 31/10/2019 1
1200MM
126 3/11/2019 BUSH FOR 8" DOME VALVE 1

127 3/11/2019 V RING FOR 8" DOME VALVE 2

128 3/11/2019 DUST SEAL FOR 8" DOME VALVE 2

129 3/11/2019 O RING FOR 8" DOME VALVE,6MM 2

130 8/11/2019 OIL FILTER ELEMENT FOR 75KW#2 2

131 8/11/2019 COMPRESSOR OIL, MAKE - ELGI 5LTR

132 8/11/2019 DOME SEAL FOR 8" DOME VALVE 1

133 12/11/2019 OIL FILTER ELEMENT FOR 75KW#1

134 12/11/2019 COMPRESSOR OIL, MAKE - ELGI

135 23/11/2019 PU TUBE 8MM 2MTR

136 23/11/2019 PU TUBE NRV 1/4"(F) 1

137 23/11/2019 AIR FILTER REGULATOR 1

138 23/11/2019 PUSH FITTING 8MM / 1/4"(M) 4


DUPLEX THERMOCOUPLE K - TYPE, LENGTH -
139 25/11/2019 1200MM 1

140 25/11/2019 THERMOWELL, LENGTH - 1000MM, SS - 446 1

141 25/11/2019 M- SEAL 1PKT

142 27/11/2019 DOME SEAL FOR 8" DOME VALVE 1

143 28/11/2019 AIR FILTER REGULATOR 1

144 30/11/2019 DOME SEAL FOR 8" DOME VALVE 1

145 3/12/2019 1" BOOSTING HOSE PIPE 1


AC EXHAUST FAN V - BELT ,CONTINENTAL CONTI V
146 6/12/2019 A28 13X710 LI/740LD ENGINEERED IN GERMANY 2
ANTISTATIC ISO 1813 250620 8 K45
147 14/12/2019 DOME SEAL FOR 8" DOME VALVE 1
3/4" AIR RECEIVER TANK BRASS SAFETY
148 18/12/2019 VALVE,PRESSURE SETTING - 7.5 KG/CM^2 1
ELGI, NEURON III CONTROLLER ,RATED I/P -
149 19/12/2019 24VAC,50/60HZ,10W MAX,RATED LOCAL - 250 1
VAC,10A
150 20/12/2019 0- 50 KG/CM^2, ONE I/L PRESSURE TX, MAKE- 1
ROSEMOUNT, SERIAL NO - 08553116
151 20/12/2019 PRESSURE GAUGE,RANGE- 0- 60KG/CM^2, MAKE - 1
SIEMENS
152 20/12/2019 DOME SEAL FOR 8" DOME VALVE 1

153 21/12/2019 DOME SEAL FOR 8" DOME VALVE 1

154 22/12/2019 BUSH FOR 8" DOME VALVE 2

155 22/12/2019 V RING FOR 8" DOME VALVE 2

156 22/12/2019 DUST SEAL FOR 8" DOME VALVE 4

157 22/12/2019 O RING FOR 8" DOME VALVE,6MM 200MM

158 22/12/2019 SPACER RING FOR 8" DOME VALVE 2

159 23/12/2019 1" NRV REPAIR KIT 1

160 23/12/2019 1.5" NRV REPAIR KIT 1

161 23/12/2019 EXPANSION BELLOW FOR DOME VALVE ASSEMBLY 1

162 24/12/2019 DUPLEX THERMOCOUPLE K - TYPE, LENGTH - 1


1200MM
163 24/12/2019 THERMOWELL, LENGTH - 1000MM, SS - 446 1

164 25/12/2019 BUSH FOR 8" DOME VALVE 2

165 25/12/2019 V RING FOR 8" DOME VALVE 2

166 25/12/2019 DUST SEAL FOR 8" DOME VALVE 3

167 25/12/2019 O RING FOR 8" DOME VALVE,6MM 200MM

168 25/12/2019 SPACER RING FOR 8" DOME VALVE 2

169 1/1/2020 DOME INSERT SEAL 1

170 6/1/2020 OIL TAG LUBRICATOR 1

171 6/1/2020 1/2" BALL VALVE 1

172 6/1/2020 1/2" NIPPLE ,L- 150MM 1

173 6/1/2020 1/2" BALL VALVE 1

174 6/1/2020 1/2" NIPPLE ,L- 150MM 1

175 6/1/2020 1" NRV REPAIR KIT 1


176 7/1/2020 PRESSURE GAUGE, RANGE - 0- 250KG/CM^2,DIAL 1
SIZE- 200MM, CONN - 1/2" NPT(M)
177 8/1/2020 DUPLEX THERMOCOUPLE ,LENGTH - 350MM 1

178 8/1/2020 SPIGOT RING FOR 8" DOME VALVE ASSEMBLY 1

179 8/1/2020 8" DOME SEAL FOR AHS 1

180 8/1/2020 4MM O RING 400MM

181 9/1/2020 POWER CYLINDER 4"X 9" (R.NO - 1504) 1

182 18/1/2020 1" NRV REPAIR KIT 1

183 19/1/2020 8" DOME SEAL FOR AHS 1

DUPLEX THERMOCOUPLE K - TYPE, LENGTH -


184 19/1/2020 3000MM, SHEETH SS446 2

185 19/1/2020 THERMOWELL, LENGTH - 2800MM, SS -446, OD X 2


ID, (22 X 10)MM

186 23/1/2020 1" HOSE PIPE 1

187 24/1/2020 1" HOSE PIPE 1

188 24/1/2020 1" NRV REPAIR KIT 1

189 24/1/2020 POWER CYLINDER 4"X 9" (R.NO - 1504) 1

190 25/1/2020 1" HOSE PIPE 1

191 25/1/2020 1" NRV REPAIR KIT 1

192 30/1/2020 WALKY TALKY SET, MAKE - TALK PRO, MODEL - 350 1

BATTERY FOR WALKY TALKY SET, MAKE - TALK


193 30/1/2020 PRO, MODEL - 350 1

194 31/1/2020 DOME SEAL FOR 8" DOME VALVE 1

195 3/2/2020 DUPLEX THERMOCOUPLE K - TYPE, LENGTH - 1


1200MM,N.NO - 249

THERMOWELL, LENGTH - 1000MM, SS - 446, N.NO-


196 3/2/2020 1
249

197 7/2/2020 POWER CYLINDER 4"X 9" (N.NO - 246) 1

198 8/2/2020 DUPLEX THERMOCOUPLE K - TYPE, LENGTH - 1


3000MM, SHEETH SS816,N.NO - 166
199 9/2/2020 1" NRV REPAIR KIT, N.NO - 273 1
200 9/2/2020 2" NRV REPAIR KIT, N.NO - 274 1

201 13/2/2020 AIR LUBE OIL 5LTR

202 16/2/2020 DOME SEAL FOR 8" DOME VALVE 1

203 17/2/2020 TUBE SILENCER AMTE, MAKE - FESTO,CONN- G1/2 10

204 19/2/2020 DUPLEX THERMOCOUPLE K - TYPE, LENGTH - 1


3000MM
205 20/2/2020 DOME SEAL FOR 8" DOME VALVE 1

206 20/2/2020 PU TUBE 8MM 5MTR

207 21/2/2020 DOME SEAL FOR 8" DOME VALVE 1

208 26/2/2020 PU TUBE 6MM 3MTR

209 28/2/2020 SOLENOID VALVE KIT, 50/60HZ, FOR 45KW COMPr, 1


MAKE- ELGI, ITEM NO- B009405770014

210 2/3/2020 DOME SEAL FOR 8" DOME VALVE 1

211 3/3/2020 1" NRV REPAIR KIT 1

212 3/3/2020 1" HOSE PIPE 1

FLOW TX MOUNTED DM PLANT RAW WATER LINE


213 10/3/2020 DM - 501, RANGE SET - 0- 10000KG/CM^2, MAKE - 1
ROSEMOUNT

FLOW TX WITH MANIFOLD 3 WAY ,MAKE-


214 13/3/2010 ROSEMOUNT, RANGE SET - 0 - 5000MMWC 1

SQUARE EDGE ORIFICE FLANGE TAPPING, PIPE SIZE


214 13/3/2020 - 80(3") NB SCH- 40,DP- 0 TO 5000MMWC, FLOW 1
RATE - 15M^3/HR

SQUARE EDGE ORIFICE FLANGE TAPPING, PIPE SIZE


215 14/3/2020 - 100(4") NB SCH- 40,DP- 0 TO 5000MMWC, FLOW 1
RATE - 15M^3/HR

216 17/3/2020 1PX2RX1.5SQMM SIGNAL CABLE 50MTR

217 18/03/2020 1PX2RX1.5SQMM THERMOCOUPLE CABLE 80MTR

218 19/3/2020 1PX4RX1.5SQMM SIGNAL CABLE 104MTR


219 19/3/2020 1PX1RX1.5SQMM SIGNAL CABLE 26MTR

220 19/3/2020 BUSH FOR 8" DOME VALVE 1

221 19/3/2020 V RING FOR 8" DOME VALVE 1

222 19/3/2020 DUST SEAL FOR 8" DOME VALVE 2

223 19/3/2020 O RING FOR 8" DOME VALVE,6MM 100MM

224 19/3/2020 SPACER RING FOR 8" DOME VALVE 1

225 19/3/2020 DOME SEAL FOR 8" DOME VALVE 1

226 20/3/2020 1" NRV REPAIR KIT 1

227 5/4/2020 FD LINE DAMPER LIMIT SWITCH, MAKE - SIEMENS, 2


MODEL NO - 3SE3 100 - 0G, 10A,500VAC

228 6/4/2020 AIR REGULATOR , MAKE - AIRMAX, SPECI- 1/4", 2


(F+R) COMBINATION,FAJ - 2000, 0.5 TO 8KG/CM^2
229 6/4/2020 LIMIT SWITCH FOR BLEED VALVE 1

230 7/4/2020 SAFETY VALVE 1


DUPLEX THERMOCOUPLE K - TYPE, LENGTH -
231 12/4/2020 3000MM, SHEETH SS446 2
THERMOWELL, LENGTH - 2800MM, SS -446, OD X
232 12/4/2020 ID, (22 X 10)MM 2

233 13/04/2020 DUPLEX THERMOCOUPLE K - TYPE, LENGTH - 3


1200MM,N.NO - 249
234 14/04/2020 THERMOWELL, LENGTH - 1000MM, SS - 446, 3
REPAIRED ONE
DUPLEX THERMOCOUPLE K - TYPE, LENGTH -
235 30/04/2020 3000MM, SHEETH SS446 2

236 1/5/2020 DOME SEAL FOR 8" DOME VALVE 1

237 1/5/2020 1" HOSE PIPE 1

238 1/5/2020 1" NRV REPAIR KIT 1

239 2/5/2020 1PX3RX1.5SQMM CABLE LAYING FOR SPM & GAS 22MTR
ANALISER
240 7/5/2020 DOME SEAL FOR 8" DOME VALVE 1
QUICK EXHAUST VALVE FOR DOME SEAL , CONN-
241 10/5/2020 1/4" 1

242 10/5/2020 FLOW TX WITH MANIFOLD 3 WAY ,MAKE- 1


ROSEMOUNT, RANGE SET - 0 - 15000MMWC

243 15/05/2020 OIL FILLTER ELEMENT, PART NO - B004800770001 2


244 15/05/202 OIL TOP UP(LUBE OIL),PART NO - 000998068 6LTR

245 16/5/2020 OIL FILLTER ELEMENT, PART NO - B004800770001 2


AIR OIL SEPARATOR ELEMENT ,PART NO-
246 16/5/2020 B006700770027 1

247 16/5/2020 OIL TOP UP(LUBE OIL),PART NO - 000998068 28LTR

248 18/05/2020 1PX1RX1.5SQMM SIGNAL CABLE 61MTR

249 18/05/2020 7CX2RX1.5SQMM SIGNAL CABLE 20MTR

250 19/05/2020 1" HOSE PIPE 1

251 19/05/2020 1" NRV REPAIR KIT 1

252 20/05/2020 1" HOSE PIPE 1

253 20/05/2020 1" NRV REPAIR KIT 1

254 20/05/2020 DP TX, MAKE - ROSEMOUNT, RANGE - 0 TO 1


15000MMWC WITH MANIFOLD
255 22/05/2020 1" HOSE PIPE 1

256 22/05/2020 1" NRV REPAIR KIT 1

257 24/05/2020 1" NRV REPAIR KIT 2

258 24/05/2020 2" NRV REPAIR KIT 1

259 26/05/2020 PRESSURE GAUGE, RANGE - 0 TO 1


60KG/CM^2,MAKE - GENERAL, DAIL SIZE - 200MM
260 27/05/2020 1/8" NRV, MAKE - ELGI, PART NO- B004100170001 1

261 27/05/2020 1/8" NRV, MAKE - ELGI, PART NO- B004100170002 1

262 28/05/2020 DOME SEAL FOR 8" DOME VALVE 1

263 29/05/2020 O RING FOR 8" DOME VALVE,6MM 100MM

264 30/05/2020 PRE FILTER ELEMENT,MAKE - ELGI, ITEM NO- 2


B000606160002
PRE FILTER ELEMENT,MAKE - ELGI, ITEM NO-
265 30/05/2020 015400889 2

266 3/6/2020 DOME SEAL FOR 8" DOME VALVE 1

267 5/6/2020 SEAL KIT FOR 4" PNEUMATIC CYLINDER ,PART NO - 1


SKC 0410
268 7/6/2020 1" HOSE PIPE 1
269 7/6/2020 1" NRV REPAIR KIT 1
SIMPLEX THERMOCOUPLE K - TYPE, LENGTH -
270 8/6/2020 3000MM 1
SIMPLEX THERMOCOUPLE K - TYPE, LENGTH -
271 13/6/2020 1200MM 1

272 15/6/2020 DOME SEAL FOR 8" DOME VALVE 1

273 19/6/2020 DOME SEAL FOR 8" DOME VALVE 1

274 19/6/2020 QUINT MAKE POWER SUPPLY PHONIX CONTACT 1


PS/1AC/24VDC/20
275 19/6/2020 WALKY TALKY CHARGER, MAKE - TALK PRO 1

276 19/6/2020 WALKY TALKY SET, MAKE - TALK PRO 2

277 24/06/2020 TEMPERATURE TRANSMITTER, RANGE - 0 TO 1


800DegC, MAKE - EMERSION,

278 24/06/2020 1" HOSE PIPE 1

279 25/06/2020 1" NRV REPAIR KIT 1

280 30/06/2020 BUSH FOR 8" DOME VALVE 1

281 30/06/2020 V RING FOR 8" DOME VALVE 1

282 30/06/2020 DUST SEAL FOR 8" DOME VALVE 2

283 30/06/2020 O RING FOR 8" DOME VALVE,6MM 100MM

284 30/06/2020 SPACER RING FOR 8" DOME VALVE 1


DUPLEX THERMOCOUPLE K - TYPE, LENGTH -
285 1/7/2020 1200MM 1

286 1/7/2020 THERMOWELL, LENGTH - 1000MM, SS - 446 1

287 5/7/2020 10TX2R SIGNAL CABLE 36MTR

288 6/7/2020 2" NRV DIAPHARM 1

289 6/7/2020 1" NRV KIT 1

290 7/7/2020 8MM PNEUMATIC TUBE 9MTR

291 7/7/2020 STRAIGHT UNION PUSH FITTING 2

292 11/7/2020 THERMOCOUPLE , K- TYPE , 3000MM 1

293 13/07/2020 8" DOME SEAL FOR AHS 1


294 17/07/2020 1PX1RX1SQMM SIGNAL CABLE 82MTR
QUICK EXHAUST VALVE, AQEV- 4, 3/4",
295 17/07/2020 10KG/CM^2, MAKE - AIRMAX 1
PURPOSE AREA

DUE TO OIL FILTER CHANGE ALARM SERVICE AIR COMPr#1

TO REPLACE DAMAGED NRV WHRB ESP SLAVE

DUE TO OIL FILTER CHANGE ALARM SERVICE AIR COMPr#2

TO REPLACE MALFUNCTIONING ONE WITH NEW ONE WHRB#1&2 HP DOSING


DISCHARGE LINE
TO REPLACE PRDS DUMP STEAM TEMP TX DEAREATOR PRDS
TO REPLACE PRDS DUMP STEAM TEMP DEAREATOR PRDS
TX( THERMOCOUPLE, TT)
DUE TO OIL FILTER CHANGE ALARM INST AIR COMPr#2
PREVIOUSLY BOTH THERMOCOUPLE AS WELL AS
THERMOWELL WERE OF SAME LENGTH 1200MM AFBC#APH O/L TEMP ELEMENT

CHP AREA AFBC#CHP

WHRB#1 ABC I/L OLD THERMOCOUPLE REPLACEMENT WHRB#1 BOILER

AFBC#(ECO,APH) CONVEYING LINE AFBC BOILER

AFBC#(ECO,APH) CONVEYING LINE AFBC BOILER


WHRB#2,3&4 SOOTBLOWER LINE NEW WHRB SOOT BLOWER LINE
THERMOCOUPLE MOUNTING
WHRB#1 SOOTBLOWER LINE NEW THERMOCOUPLE WHRB SOOT BLOWER LINE
MOUNTING
CABLE LAYING DONE FOR NEW THERMOCOUPLE
MOUNTED ON THE SAME DAY SOOT BLOWER#1,2,3&4

TO TAKE IN LINE WHRB#4 ECO AHS WHRB#3 ECO

TO TAKE IN LINE WHRB#3 ECO AHS WHRB#4 ECO

TO REPLACE DAMAGED NRV WHRB#3 ECO

TO REPLACE DAMAGED HOSE PIPE WHRB#3 ECO BOOSTER LINE

WHRB#4 ABC I/L OLD THERMOWELL REPLACEMENT WHRB#4

IAC#1 OLD PREFILTER REPLACEMENT IAC#1

IAC#2 OLD PREFILTER REPLACEMENT IAC#2

SAC#1 OLD PREFILTER REPLACEMENT SAC#1

SAC#1 OLD PREFILTER REPLACEMENT SAC#2


AFBC#COMP(1&2) TOP SIDE THERMOWELL AFBC BOILER
REPLACEMENT
AFBC#COMP(1&2) TOP SIDE THERMOWELL
REPLACEMENT AFBC BOILER
TO REPLACE BURN BRANCH CABLE OF COMP# 1&2 (JB
TO TC) AFBC BOILER

FOR DRI 45KW COMPr SOLENOID KIT REPLACEMENT DRI SIDE

TO TOP UP OIL IN COMPr#45KW#1&2 COMPr#1&2

DUE TO WHRB#2 ABC I/L TEMP PROBLEM WHRB#2 BOILER

DUE TO WHRB#2 ABC I/L TEMP PROBLEM WHRB#2 BOILER

AC#1 EXHAUST FAN V - BELT REPLACEMENT CPP CONTROL ROOM

CONTROL ROOM TO FIELD COMMUNICATION CONTROL ROOM DESK

TO REPLACE FAULTED ONE WITH NEW ONE WHRB#1&2 ECO AHS


TO REPLACE WHRB#3 SOOT BLOWER CONTROL VALVE WHRB#3 BOILER
POSITIONER
HANDED TO NEW PROJECT PEOPLE(NEMAI) NEW PROJECT AREA

WHRB#1&2 ECO AHS INSTALLATION WORK WHRB#1&2 ECO AHS

WHRB#1&2 ECO AHS INSTALLATION WORK WHRB#1&2 ECO AHS

GIVEN TO DRI ELECTRICAL AHS DRI

USED I HP DOSING DISCHARGE PRESSURE LINE WHRB#1&2 HP DOSING

USED IN INSTALLATION OF NEW AHS WHRB#1&2 ECO AHS

DUE TO OIL LEVEL LOW OF AIR OIL SEPERATOR TANK COMPr#75KW#1

DUE TO OIL FILTER CHANGE ALARM COMPr#75KW#1

OIL NEED TO TOP UP WHEN FILTER ELEMENT CHANGE COMPr#75KW#1

DUE TO OIL LEVEL LOW OF AIR OIL SEPERATOR TANK COMPr#75KW#2

TO REPLACE DEFECTED GAUGE WITH NEW ONE WHRB#4 MAIN STEAM LINE
TO REPLACE BROKEN AND DEFECTED LIMIT SWITCH
WITH NEW ONE WHRB#4#LRSB#1

DUE TO AFBC#(ECO,APH) AHS OLD PIPE DAMAGED AFBC#(ECO,APH) AHS

TO CHANGE AIR FILTER COMPr#75KW#2


USED DUE TO STANNER DAMAGE INST AIR RECIEVER TANK

DUE TO LEAKAGE AFBC#ESP#FIELD#3 AHS

TO REPLACE DAMAGED ONE CONTROL ROOM AC#2

TO REPLACE MALFUNCTIONING ONE DEAREATOR BLEED PCV

TO REPLACE DAMAGED ONE AFBC#(ECO,APH) AHS

DUE TO AIR FILTER CHANGE ALARM COPMr#45KW#1

TO REPLACE DAMAGED SEAL WHRB#1#FIELD#2 AHS

TO REPLACE DAMAGED SEAL WHRB#4#FIELD#2 AHS


AFBC BOILER COMP#1
REPLACEMENT OF DAMAGED ONE TOP/BOTTOM & COMP#2
AFBCTOP/BOTTOM
BOILER COMP#1
REPLACEMENT OF DAMAGED ONE TOP/BOTTOM & COMP#2
TOP/BOTTOM
TO REPAIR OLD AND DAMAGED KIT WHRB#4# FIELD#1 AHS

TO REPLACE DAMAGED SEAL WHRB#3#ECO AHS

DUE TO AIR FILTER CHANGE ALARM COMPr#75KW#1

DUE TO AIR FILTER CHANGE ALARM COMPr#75KW#2

DUE TO PRE FILTER CHANGE ALARM COMPr#75KW#1

COMPLETE SERVICING DONE BY SERVICE ENGINEER COMPr#75KW#2


VISITED FROM ELGI
CONSUMED BY SMS SIDE GIVEN TO SMS SIDE

CONSUMED BY SMS SIDE GIVEN TO SMS SIDE

CONSUMED BY SMS SIDE GIVEN TO SMS SIDE

CONSUMED BY SMS SIDE GIVEN TO SMS SIDE

TO REPLACE DAMAGED ONE WHRB#2 SALVE AHS


USED INDM PLANT LAB MUFFIE
REPLACEMENT OF DEFECTED ONE WITH NEW ONE FURNACE

DUE TO OIL LEVEL LOW OF AIR OIL SEPERATOR TANK COMPr#75KW#2

TO REPLACE DAMAGED ONE WHRB#2 AHS MASTER SYSTEM

DUE TO SEAL DAMAGE AFBC# ESP#FIELD#1 AHS


DUE TO SEAL DAMAGE WHRB# ESP#FIELD#2 AHS

REPLACEMENT OF DAMAGED ONE WHRB#3 ABC I/L

REPLACEMENT OF DAMAGED ONE WHRB#3 ABC I/L

REPLACEMENT OF DAMAGED ONE WHRB#2 AHS

USED IN NEW DOME ASSEMBLY MOUNTING WHRB#2 AHS

DUE TO OIL FILTER CHANGE ALARM COMPr#45KW#2


OLD ONE FOUND DAMAGED AND CHANGED WITH
AFBC#ESP#FIELD#1 AHS
NEW ONE
OIL NEED TO TOP UP WHEN FILTER ELEMENT CHANGE COMPr#45KW#2
OLD ONE FOUND DAMAGED AND CHANGED WITH DM PLANT
NEW ONE

DUE TO NRV DIAPHRAGM DAMAGE AFBC# ESP#FIELD#1 AHS

REPLACEMENT OF DAMAGED ONE WHRB#2 AHS

TO REPLACE DAMAGED ONE CONTROL ROOM AC#1

USED DUE TO STANNER DAMAGE INST AIR RECIEVER TANK

DUE TO NRV DIAPHRAGM DAMAGE WHRB#2 AHS

DUE TO NRV DIAPHRAGM DAMAGE AFBC# ESP#FIELD#2 AHS

DUE TO NRV DIAPHRAGM DAMAGE AFBC# ESP#FIELD#1,2&3 AHS

SEAL FOUND DAMAGED AFBC APH AHS

SEAL FOUND DAMAGED WHRB#3# ESP#FIELD#3 AHS

REPLACEMENT OF DAMAGED ONE WHRB#2# ESP#FIELD#2 AHS

DUE TO OIL LEVEL LOW OF AIR OIL SEPERATOR TANK COMPr#75KW#2

WHRB#1# ESP#FIELD#1 AHS VESSEL JB AIR WHRB#1# ESP#FIELD#1 AHS


CONNECTION
USED IN WHRB#4#ECO BOOSTING LINE WHRB#4#ECO

REPLACEMENT OF DAMAGED ONE WHRB#4#ECO

TO REPLACED DAMAGED BUSH WHRB#4#ECO

TO REPLACE DAMAGED V RING WHRB#4#ECO


TO REPLACE DAMAGED O RING WHRB#4#ECO

TO REPLACE DAMAGED DUST SEAL WHRB#4#ECO

REPLACEMENT OF DAMAGED ONE WHRB#1#ESP#FIELD#2 AHS

DUE TO HOSE PIPE LEAKAGE WHRB#1# ESP#FIELD#2 AHS

DUE TO OIL LEVEL LOW OF AIR OIL SEPERATOR TANK COMPr#75KW#1(3LTR) &
75KW#2(1LTR)
REPLACEMENT OF DAMAGED ONE WHRB#2# ESP AHS

TO MONITER NOX,SOX,CO2 IN STACK AFBC STACK

REPLACEMENT OF DAMAGED ONE WHRB#2#FIELD#1#ESP AHS

DUE TO HOSE PIPE LEAKAGE WHRB#2#FIELD#1#ESP AHS

DUE TO CONVEYING HOSE PIPE MOUNTING NIPPLE WHRB#2#FIELD#1#ESP AHS


HUGE LEAKAGE
REPLACEMENT OF DAMAGED ONE WHRB#2#ESP#FIELD#1 AHS

REPLACEMENT OF DAMAGED ONE WHRB#2#ESP#FIELD#1 AHS

DUE TO HOSE PIPE LEAKAGE WHRB#2#ESP#FIELD#2 AHS


AFBC BOILER COMP#2
TO MEASURE BED TEMPERATURE TOP/BOTTOM
TO MEASURE BED TEMPERATURE AFBC BOILER COMP#2
TOP/BOTTOM
REPLACEMENT OF DAMAGED ONE WHRB#2#ESP#FIELD#2 AHS

BOOSTING LINE IN AHS WHRB#4#ESP#FIELD#1 AHS

REPLACEMENT OF DAMAGED ONE WHRB#1#ESP AHS

REPLACEMENT OF DAMAGED ONE WHRB#3#ESP#FIELD#3 AHS


USED FOR WHRB#2#ESP#FIELD#1 DOME ASSEMBLY WHRB#2#ESP#FIELD#1 AHS
REPAIR
USED FOR WHRB#2#ESP#FIELD#1 DOME ASSEMBLY WHRB#2#ESP#FIELD#1 AHS
REPAIR
USED FOR WHRB#2#ESP#FIELD#1 DOME ASSEMBLY
REPAIR WHRB#2#ESP#FIELD#1 AHS
USED FOR WHRB#2#ESP#FIELD#1 DOME ASSEMBLY
REPAIR WHRB#2#ESP#FIELD#1 AHS
USED FOR WHRB#2#ESP#FIELD#1 DOME ASSEMBLY WHRB#2#ESP#FIELD#1 AHS
REPAIR

REPLACEMENT OF DAMAGED ONE WHRB#1 ABC I/L


DUE TO REPLACE DAMAGED MATERIAL WHRB#4#FIELD#3 AHS

DUE TO REPLACE DAMAGED MATERIAL WHRB#4#FIELD#3 AHS

DUE TO REPLACE DAMAGED MATERIAL WHRB#4#FIELD#3 AHS

DUE TO REPLACE DAMAGED MATERIAL WHRB#4#FIELD#3 AHS

OIL FILTER CHANGE ALARM CAME COMPr#75KW#2

OIL NEED TO TOP UP WHEN FILTER ELEMENT CHANGE COMPr#75KW#2

TO REPLACE DAMAGED DOME SEAL WHRB#4#FIELD#2 AHS

OIL FILTER CHANGE ALARM CAME COMPr#75KW#1

OIL NEED TO TOP UP WHEN FILTER ELEMENT CHANGE COMPr#75KW#1

AHS BACK PRESSURE LINE MODIFICATION WORK WHRB#4#FIELD#1 AHS

AHS BACK PRESSURE LINE MODIFICATION WORK WHRB#4#FIELD#1 AHS

AHS BACK PRESSURE LINE MODIFICATION WORK WHRB#4#FIELD#1 AHS

AHS BACK PRESSURE LINE MODIFICATION WORK WHRB#4#FIELD#1 AHS

REPLACEMENT OF DAMAGED ONE WHRB#4 ABC I/L

REPLACEMENT OF DAMAGED ONE WHRB#4 ABC I/L

TO FIX AHS BOOSTING LINE LEAKAGE WHRB#2#SLAVE# BOOSTING LINE

TO REPLACE DAMAGED SEAL WHRB#1#ECO AHS


DUE TO WHRB#2 ESP AHS BACK PRESSURE LINE AFR WHRB#2 ESP AHS
DAMAGED
REPLACEMENT OF DAMAGED ONE WHRB#1#FIELF#1 ESP AHS

DUE TO HOSE PIPE LEAKAGE WHRB#1 ESP BOOSTING LINE

TO REPLACE DAMAGED ONE CONTROL ROOM AC#2

TO REPLACE DAMAGED ONE AFBC#ECO AHS

GIVEN TO DRI ELECTRICAL ON LOAN BASIS DRI AIR LINE NEW COMPRESSOR
REPLACEMENT OF OLD HMI CONTROLLER WITH NEW COMPr#75KW#1
ONE DUE TO MALFUNCTIONING OF OLD ONE
GIVEN TO DRI ELECTRICAL ON LOAN BASIS DRI AIR LINE NEW COMPRESSOR
GIVEN TO DRI ELECTRICAL ON LOAN BASIS DRI AIR LINE NEW COMPRESSOR

TO REPLACE DAMAGED ONE WHRB#3FIELD#2 AHS

TO REPLACE DAMAGED ONE AFBC#APH AHS

TO REPLACE DAMAGED ONE AFBC#APH AHS

TO REPLACE DAMAGED ONE AFBC#APH AHS

TO REPLACE DAMAGED ONE AFBC#APH AHS

TO REPLACE DAMAGED ONE AFBC#APH AHS

TO REPLACE DAMAGED ONE AFBC#APH AHS

TO REPLACE DAMAGED KIT WHRB#1 AHS BOOSTING LINE

TO REPLACE DAMAGED KIT WHRB#1 AHS

REPLACEMENT OF OLD DAMAGED EXPANSION BELLOW WHRB#1#FIELD#2 AHS

TO REPLACE DAMAGED ONE WHRB#2 BOILER I/L TEMP


ELEMENT
WHRB#2 BOILER I/L TEMP
TO REPLACE DAMAGED ONE ELEMENT

TO REPLACE DAMAGED ONE WHRB#1#FIELD#1 AHS

TO REPLACE DAMAGED ONE WHRB#1#FIELD#1 AHS

TO REPLACE DAMAGED ONE WHRB#1#FIELD#1 AHS

TO REPLACE DAMAGED ONE WHRB#1#FIELD#1 AHS

TO REPLACE DAMAGED ONE WHRB#1#FIELD#1 AHS

TO REPLACE DAMAGED ONE WHRB#2#FIELD#2 AHS

OPACITY METER ACTUATOR VALUE LUBRICATION AFBC STACK OPACITY METER

OPACITY METER INST AIR LINE ISOLATE PURPOSE AFBC STACK OPACITY METER

OPACITY METER INST AIR LINE ISOLATE PURPOSE AFBC STACK OPACITY METER

GAS ANALYSER ALL INST AND JB CLEANING PURPOSE AFBC STACK GAS ANALYSER

GAS ANALYSER ALL INST AND JB CLEANING PURPOSE AFBC STACK GAS ANALYSER

TO REPLACE DAMAGED ONE WHRB#3#FIELD#1 AHS


TO REPLACE DAMAGED ONE AFBC SUPER HEATER I/L LINE

TO REPLACE DAMAGED ONE AFBC MAIN STEAM LINE

TO REPLACE DAMAGED ONE WHRB#3#FIELD#3 AHS

TO REPLACE DAMAGED ONE WHRB#3#FIELD#3 AHS

TO REPLACE DAMAGED ONE WHRB#3#FIELD#3 AHS

TO REPLACE DAMAGED ONE WHRB#3#FIELD#1 AHS

TO REPLACE DAMAGED ONE WHRB#3#FIELD#3 AHS

REPLACEMENT OF DAMAGED OLD DOME WHRB#1#FIELD#1 AHS

AFBC BOILER COMP#3


REPLACEMENT OF OLD REPTURED THERMOWELL TOP/BOTTOM

TO REPLACE DAMAGED ONE AFBC BOILER COMP#3


TOP/BOTTOM

TO FIX AHS BOOSTING LINE LEAKAGE WHRB#2 ESP AHS

TO FIX AHS BOOSTING LINE LEAKAGE AFBC#FIELD#1 ESP AHS

REPLACEMENT OF DAMAGED NRV IN BOOSTING LINE AFBC#FIELD#1 ESP AHS

TO REPLACE DAMAGED ONE AFBC#FIELD#1 ESP AHS

TO FIX AHS BOOSTING LINE LEAKAGE WHRB#4#FIELD#1 AHS

REPLACEMENT OF DAMAGED NRV IN BOOSTING LINE WHRB#4#FIELD#1 AHS

HANDED OVER TO OPERATION PEOPLE CONTROL ROOM

REPLACEMENT OF OLD DEFECTIVE BATTERY CONTROL ROOM

TO REPLACE DAMAGED ONE AFBC#FIELD#1 ESP AHS

REPLACEMENT OF DAMAGED ONE WHRB#1 ABC I/L

REPLACEMENT OF DAMAGED ONE WHRB#1 ABC I/L

REPLACEMENT OF DAMAGED ONE WHRB#4#FIELD#3 AHS

REPLACEMENT OF OLD REPTURED THERMOWELL AFBC BOILER COMP#2 BOTTOM

REPLACEMENT OF DAMAGED NRV IN BOOSTING LINE WHRB#3#FIELD#1 AHS


REPLACEMENT OF DAMAGED NRV IN MAIN AFBC#FIELD#1 ESP AHS
CONVEYING LINE
DUE TO OIL LEVEL LOW OF AIR OIL SEPERATOR TANK COMPr#75KW#2

REPLACEMENT OF DAMAGED ONE WHRB#3#FIELD#2 AHS

FIXED IN SOV EXHAUST AFBC ALL AHS DOME OPEN SOV

REPLACEMENT OF DAMAGED ONE AFBC BOILER COMP#1 BOTTOM

REPLACEMENT OF DAMAGED ONE WHRB#1#FIELD#2 AHS

TO REPLACE DAMAGE TUBE WHRB#1#FIELD#2 AHS

REPLACEMENT OF DAMAGED ONE WHRB#4 ECO AHS

OPACITY METER INST AIR LINE PURPOSE WHRB STACK

FOR DRI 45KW COMPr SOLENOID KIT REPLACEMENT DRI COMPr#45KW

REPLACEMENT OF DAMAGED ONE WHRB#1#FIELD#1 AHS

REPLACEMENT OF DAMAGED ONE WHRB#1#FIELD#1 AHS

REPLACEMENT OF DAMAGED ONE WHRB#1#ECO AHS

TO MEASURE FLOW OF RAW WATER DM PLANT

DM WATER TO DEARATOR FLOW MEASUREMENT DM PLANT

DM WATER FLOW DM TRANSFER PUMP DISCHARGE


LINE(3")

DM PLANT RAW WATER I/L LINE


RAW WATER FLOW (4")

REPLACEMENT OF BURN CABLE FOR AFBC TX DT- 306 & AFBC PA LINE FLOW
DT- 307

REPLACEMENT OF BURN CABLE FOR AFBC BED AFBC PA LINE AREA


COMP#1&2 BOTTOM(RHS) SIDE
REPLACEMENT OF BURN CABLE FOR AFBC ID FAN 1&2 AFBC ID FAN AREA
RPC DAMPER
REPLACEMENT OF BURN CABLE FOR AFBC ESP O/L AFBC ESP AREA
PRESSURE TX
TO REPLACE DAMAGED ONE AFBC#APH AHS

TO REPLACE DAMAGED ONE AFBC#APH AHS

TO REPLACE DAMAGED ONE AFBC#APH AHS

TO REPLACE DAMAGED ONE AFBC#APH AHS

TO REPLACE DAMAGED ONE AFBC#APH AHS

TO REPLACE DAMAGED ONE AFBC#APH AHS

TO REPLACE DAMAGED ONE WHRB#4#ESP#FIELD#1 AHS

TO REPLACE DAMAGED LIMIT SWITCH AFBC BED COMP#2 RHS FD LINE


DAMPER

TO REPLACE DAMAGED AIR REGULATOR AFBC BED COMP#2&3 RHS AIR


BLEED VALVE
TO REPLACE DAMAGED LIMIT SWITCH AFBC BED COMP#2 RHS AIR
BLEED VALVE
FOR SAFE OPERATION, SET POINT - 0 - 7KG/CM^2 INST AIR RECIEVER TANK
AFBC BOILER COMP#1
REPLACEMENT OF OLD REPTURED THERMOWELL TOP/BOTTOM
AFBC BOILER COMP#1
TO REPLACE DAMAGED ONE TOP/BOTTOM
REPLACEMENT OF DAMAGED ONE WHRB#2,3&4 ABC I/L

REPLACEMENT OF DAMAGED ONE WHRB#2,3&4 ABC I/L


AFBC BOILER COMP#2
REPLACEMENT OF DAMAGED ONE TOP/BOTTOM
TO REPLACE DAMAGED ONE AFBC#ESP#FIELD#1 AHS

TO REPLACE DAMAGED ONE WHRB#4#ESP#FIELD#1 AHS

TO REPLACE DAMAGED ONE WHRB#4#ESP#FIELD#1 AHS

REPLACEMENT OF BURN CABLE AFBC BIOLER

TO REPLACE DAMAGED ONE WHRB#4#ESP#FIELD#3 AHS

TO REPLACE DAMAGED ONE WHRB#1#ECO AHS

RAW WATER FLOW CPP RESERVER I/L RAW WATER


FLOW LINE(6")

DUE TO OIL FILTER CHANGE ALARM CAME INST COMPr#45KW#1&2


COMPr OIL FILTER OIL TOP UP INST COMPr#45KW#1&3

DUE TO OIL FILTER CHANGE ALARM CAME SERVICE COMPr#75KW#2

DUE TO AIR OIL SEPARATOR CHANGE ALARM CAME SERVICE COMPr#75KW#2


COMPr OIL FILTER AND AIR OIL SEPARATOR TANK OIL SERVICE COMPr#75KW#2
TOP UP
AFBC STACK NOX VALUE TRANSMISSION TO DCS AFBC ID RTD JB TO AFBC JB#2
FIN CLEANING PUMP VFD PANEL DO AND DI 75KW VFD TO DCS
CONNECTION
TO REPLACE DAMAGED ONE WHRB#3#ESP#FIELD#3 AHS

TO REPLACE DAMAGED ONE WHRB#3#ESP#FIELD#3 AHS

TO REPLACE DAMAGED ONE AFBC#ESP#FIELD#2 AHS

TO REPLACE DAMAGED ONE AFBC#ESP#FIELD#2 AHS

FIN CLEANING WATER TANK LEVEL MEASUREMENT ACC FAN AREA

TO REPLACE DAMAGED ONE WHRB#3#ESP#FIELD#2 AHS

TO REPLACE DAMAGED ONE WHRB#3#ESP#FIELD#2 AHS


AFBC#ESP#FIELD#1 BOTH
TO REPLACE DAMAGED ONE BOOSTER AHS
TO REPLACE DAMAGED ONE AFBC#ESP#FIELD#1 AIR LINE
MAIN NRV
TO MEASURE FIN CLEANING PUMP DISCHARGE FIN CLEANING PUMP DISCHARGE
PRESSURE LINE
DUE TO SCHEDULE TIME(5000 HR) REACHED SERVICE COMPr#75KW#1

DUE TO SCHEDULE TIME(5000 HR) REACHED SERVICE COMPr#75KW#2

TO REPLACE DAMAGED ONE WHRB#4#ESP#FIELD#1 AHS

TO REPLACE DAMAGED ONE AFBC#ESP3FIELD#2 AHS

TO REPLACE DAMAGED ONE SERVICE COMPr#75KW#1&2

TO REPLACE DAMAGED ONE INST COMPr#45KW#1&3

TO REPLACE DAMAGED ONE WHRB#3#ESP#FIELD#2 AHS

TO REPLACE MALFUNCTIONING ONE OPENED FROM WHRB#4#FIELD#1


ESP AHS
TO REPLACE DAMAGED ONE WHRB#1#ESP#FIELD#1 AHS
TO REPLACE DAMAGED ONE WHRB#1#ESP#FIELD#1 AHS
AFBC BOILER COMP#2 TOP TEMP
REPLACEMENT OF DAMAGED ONE ELEMENT

REPLACEMENT OF DAMAGED ONE WHRB#4 ABC I/L TEMP ELEMENT

TO REPLACE DAMAGED ONE WHRB#2#ESP#FIELD#1 AHS

TO REPLACE DAMAGED ONE WHRB#ECO AHS

TO REPLACE MALFUNCTIONING ONE CONTROL ROOM TSP PANEL


HANDED TO OPERATION FIELD
TO REPLACE FAULTY ONE
STAFF
HANDED TO OPERATION FIELD
TO REPLACE FAULTY STAFF
TO REPLACE MALFUNCTIONING ONE WHRB-3 DSH O/L TEMP ELEMENT

TO REPLACE DAMAGED ONE WHRB#2#ESP#FIELD#1 AHS

TO REPLACE DAMAGED ONE WHRB#1#ESP#FIELD#2 AHS

TO REPLACE DAMAGED ONE AFBC#APH AHS

TO REPLACE DAMAGED ONE AFBC#APH AHS

TO REPLACE DAMAGED ONE AFBC#APH AHS

TO REPLACE DAMAGED ONE AFBC#APH AHS

TO REPLACE DAMAGED ONE AFBC#APH AHS

REPLACEMENT OF DAMAGED ONE WHRB#1 ABC I/L

REPLACEMENT OF DAMAGED ONE WHRB#1 ABC I/L

CHP PLC PANEL TO DCS DI PANEL CABLE LAYING DONE MCC ROOM
FOR FEEDBACK FROM CHP PLC TO DCS
TO REPLACE DAMAGED DIAPHARM AFBC#FIELD#1 ESP AHS

TO REPLACE DAMAGED ONE AFBC#FIELD#1 ESP AHS

TO REPLACE BACK PRESSUE LINE DAMAGED TUBE AFBC#FIELD#1 ESP AHS

TO FIX BACK PRESSUE LINE DAMAGED TUBE AFBC#FIELD#1 ESP AHS

TO REPLACE DAMAGED ONE AFBC#BED#COMP#2 BOTTOM


SIDE
TO REPLACE DAMAGED ONE WHRB#1#FIELD#2 ESP AHS
GAS ANALYSER MODBUS COMMUNICATION CABLE AFBC STACK
LAYING DONE FROM AFBC STACK TO AFBC JB#02
TO REPLACE MALFUNCTIONING ONE WITH NEW ONE WHRB#3#ECO AHS
REMARKS

DONE

DONE

DONE

DONE

REPLACEMENT DONE

REPLACEMENT DONE

DONE
REPLACEMENT DONE 1200MM
WITH 1000MMM

NEW MOUNTING

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

NEW MOUNTING

NEW MOUNTING

DONE

TAKEN IN LINE

TAKEN IN LINE

DONE

REPLACEMENT DONE

REPLACEMENT DONE

RUNNING HRS - 3137

RUNNING HRS - 2571

RUNNING HRS - 2501

RUNNING HRS - 3077


REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

HANDED TO DCS ENGINEER

REPLACEMENT DONE

REPLACEMENT DONE

NEW MOUNTING

INSTALLATION DONE

INSTALLATION DONE

GIVEN TO MR. ABU SAMAR

DEFECTED GAUGE REPLACED


WITH NEW ONE
JOB COMPLETED

WORK DONE
WORK DONE (AS SCREW OIL
TEMP GOING VERY HIGH >
112DegC)
WORK DONE

WORK DONE

JOB COMPLETED

WORK DONE

REPLACEMENT DONE

REPLACEMENT DONE
WORK DONE

REPLACEMENT DONE

REPLACEMENT DONE

WORK DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

DONE

DONE

SEVICING DONE

SEVICING DONE

REPLACEMENT DONE

SEVICING DONE
SMS COVEYOR PROJECT FROM
DRI PH TO FURNACE
SMS COVEYOR PROJECT FROM
DRI PH TO FURNACE
SMS COVEYOR PROJECT FROM
DRI PH TO FURNACE
SMS COVEYOR PROJECT FROM
DRI PH TO FURNACE
REPLACEMENT DONE

DONE

OIL TOP UP DONE

DONE

DONE
DONE

DONE

DONE

DONE

DONE

DONE

DONE

DONE

REPLACEMENT DONE

REPLACEMENT DONE

DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

OIL TOP UP DONE

DONE

DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE
REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

OIL TOP UP DONE

REPLACEMENT DONE
NEW SET ERECTION
COMMISSIONING DONE
REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

WORK DONE

REPLACEMENT DONE

REPLACEMENT DONE

WORK DONE

REPLACED WITH NEW ONE

REPLACED WITH NEW ONE

REPLACED WITH NEW ONE

REPLACED WITH NEW ONE

REPLACED WITH NEW ONE


REPLACEMENT DONE DUE TO
TEMP DIFFERENCE BETWEEN DRI
& CPP WAS 4DegC
REPLACED WITH NEW ONE

REPLACED WITH NEW ONE

REPLACED WITH NEW ONE

REPLACED WITH NEW ONE

REPLACEMENT DONE

OIL TOP UP DONE

REPLACEMENT DONE

REPLACEMENT DONE

OIL TOP UP DONE

WORK DONE

WORK DONE

WORK DONE

WORK DONE

WORK DONE

WORK DONE

WORK DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE
OLD ONE REPLACED WITH NEW
ONE
REPLACEMENT DONE

REPLACEMENT DONE

GIVEN TO MR INDRAJEET PATRA

REPLACEMENT DONE

GIVEN TO MR INDRAJEET PATRA


GIVEN TO MR INDRAJEET PATRA

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

JOB COMPLETED

JOB COMPLETED

JOB COMPLETED

JOB COMPLETED

JOB COMPLETED

REPLACEMENT DONE
REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

JOB COMPLETED

JOB COMPLETED

JOB COMPLETED

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

HANDED TO DCS ENGINEER

REPLACEMENT DONE

REPLACEMENT DONE

WORK DONE

WORK DONE

WORK DONE

REPLACEMENT DONE

REPLACEMENT DONE
REPLACEMENT DONE

TOP UP DONE

REPLACEMENT DONE

JOB COMPLETED

JOB COMPLETED

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

HANDED OVER TO DRI PEOPLE

HANDED TO MR. INDRAJEET


PATRA

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

NEW MOUNTING

NEW MOUNTING

NEW MOUNTING

NEW MOUNTING

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE
REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

NEW MOUNTING

REPLACEMENT DONE

REPLACEMENT DONE

WORK DONE

WORK DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

NEW MOUNTING

REPLACEMENT DONE
WORK DONE

REPLACEMENT DONE

REPLACEMENT DONE

WORK DONE

CABLE LAYING DONE

CABLE LAYING DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

ERECTION DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

INSTALLATION DONE
WORK DONE, RUNNING HRS -
1429
WORK DONE, RUNNING HRS -
8419
REPLACEMENT DONE

REPLACEMENT DONE

WORK DONE, RUNNING HRS FOR


1&2 - 1468,8454
WORK DONE, RUNNING HRS FOR
1&2 - 7003,6541

REPLACEMENT DONE
KEPT IN SAFE AND READY FOR
USE
REPLACEMENT DONE
REPLACEMENT DONE

REPLACEMENT DONE

WORK DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

HANDOVER DONE

HANDOVER DONE

WORK DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

WORK DONE

WORK DONE

WORK DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE

REPLACEMENT DONE
JOB COMPLETED

JOB COMPLETED