Calemard slitter preparedness plan for process proving with floating knife

Date of
S.no. Steps Activities Requirements Responsibility
completion
Status

Communication to
I Chennai plant
•Communication to Chennai plant to get the schedule and plan for trials. •Need to send the mail regarding the requirements and permission

• Trial will be planned with floating knife


• Input material verification • Input material should be as per the specification
• Conducting the trial with verified material • Material should be free from FM , wrinkle , fold, etc.
II Trials in Chennai
• Width study , cord distribution and EPI need to be verified.
• The working process parameters e.g. tension, centering system settings, etc.
data needs to be taken from chennai.

• Discussion with the projects about taking the trials • Input material from the same lot need to be taken from chennai
• Trials to be run with the floating knife • Projects have to set the parameters in the centering system, in case required,
III Trials in A.P. • Conducting the trial with the verified material. to optimize its working, taking chennai machine as a reference
• Width and cord distribution study to be done

Discussing the results


III and observations with •• Discussing
The results from both the plants will be compared
the observations and the correction plan to be made
• CFT meeting to be scheduled
CFT and tech. team

Process proving with • During the supplier visit all the issues to be raised, corrected and closed.
IV the floating knives
• Verified material to be kept ready right before the visit of the supplier