1. How do you perform a systematic flow assurance analysis for a typical subsea field development?
Explain in detail.
3. Explain in detail about the different design parameters to be considered during the development of a
subsea field layout.
4. Describe the pros and cons of single flow line for a subsea tie-back system.
5. Describe the pros and cons of dual flow lines for a subsea tie-back system.
6. Explain the difference between FPSOs and Fixed Jacket Platform for host processing facilities.
7. Explain the Joule-Thompson effect when restarting well production from cold conditions. Describe the
key technical issues with this phenomenon and suggest possible techniques to mitigate.
11. Describe general outline of a flow line design using PIPESIM software.
12. Describe and draw phase diagrams for the following fluids.
a. Black oil,
b. Volatile oil,
c. Retrograde gas,
d. Wet gas,
e. Dry gas