You are on page 1of 14

Date

3/23/2020

3/24/2020

3/25/2020

3/26/2020

3/27/2020

3/28/2020

3/29/2020

3/30/2020

3/31/2020
4/1/2020

4/2/2020

4/3/2020

4/4/2020

4/5/2020

4/6/2020

4/7/2020

4/8/2020
4/9/2020

4/10/2020

4/11/2020

4/12/2020
4/13/2020

4/14/2020

4/15/2020
4/16/2020

4/17/2020

4/18/2020

4/19/2020

4/20/2020

4/21/2020

4/22/2020

4/23/2020

4/24/2020

4/25/2020

4/27/2020
4/28/2020
Work Description From
Assembly Checksheet Preparation
RFQ Checklist preparation
Project tracking sheet preparation
WFH meeting
2:00

Discussion of Splendour plus drawing with Vinay and sent for Approval.
Hero CFT meeting - On CAPA for NG Child parts and Assembly
WFH meeting

Hero CFT meeting - On CAPA for NG Child parts and Assembly


WFH meeting

Reviw of Assembly checksheet with CFT team.


Update Asebly checksheet as per Discussion in CFT.
BMW legal agreement and Q offer meeting
Update Q offer as per discussion in meeting.
Collect data from Relevent department for Q offer.
WFH meeting

RFQ from Suzuki Received.


Study the Inputs and raised the Query to marketing.
DVP sheet study from received from marketing.
Comment received from BMW om Q offer
WFH meeting

Update Q offer as per requirement of customer.


Discussed and Submit Q offer
Discussed and Submit Legal offer
Submit HF deluxe assembly details to Marketing.
WFH meeting

RFQ Sheet status sheet update


Project tracking sheet update
WFH meeting
WFH meeting
Checksheets review in meeting discussion
Blurr detection in K17/bcd
A107A mirror Design review meeting
Hero splendour plus review meeting and update
RFQ Status Sent

WFH meeting
BAL/NBAL Project Design review
Update & Submit BOM k17 b/ c d/ kt28/ r121h
RFQ Status Sent

Piaggio 3d cad received 1


BOM preparation of piaggio- 1
BOM preparation of Cargo R107E
Submit for the review.
WFH meeting
RFQ updates sent.

Piaggio 3d cad received 2


BOM preparation of piaggio- 2
Suzuki 3d cad received
BOM preparation of Suzuki tentative
WFH meeting
RFQ updates sent.

WFH meeting
Piaggio BOM update
Discussion with ME for Cycle time of mirror Assembly
update the Suzuki BOM and release to RFQ team
Discussion with Design team - BOM Suzuki
RFQ updates sent.

BOM Preparation of A107A Mirror Assembly


WFH meeting
RFQ updates sent.

A107A mirror Assembly design review


WFH meeting
RFQ updates sent.

Discussion with CD team for Stay rod material.


Comparison of stay material of customer suggested material and assume material.
WFH meeting
Submit the final BOM to RFQ team - Piaggio cm261901/02
RFQ updates sent.

Hero Splndour plus drawing Checking


Correction submit to design
Study the BMW feedback file
RFQ updates sent.
Check Texturing data for Hero Splendour plus

Drawing checked for Suzuki - all BOPs


Submit the

Power point training on Learning desk 3:00


Update the attendence sheet of mirror department 12:30
Recheck the hero Splendour plus drawing and corrections done.
WFH meeting 2:00

Hero Splendour Plus meeting - CFT 10:00


WFH meeting 2:00
Housing SIR comparison with actual part.- Benchmark with BAL Housing 12:30
Piaagio BOM review with Design team. WFH meeting
Discuss with Vinay and Drawing submit to Hero 11:30
Piaagio BOM review with Design team and update according to Suggetions 3:30
Hero SOR review with Design Team

Piaggio cm303404/05 e0 BOM Update 9:30


Piaggio cm303407/08 e0 BOM Update 10:30
Hero BOM preparation on Assemtion
Piaggio cm303404/05 e0 BOM Submit
Piaggio cm303407/08 e0 BOM Submit
WFH meeting

Hero BOM Review with design team


Update - Hero BOM Review with design team
DFMEA - K17B review
WFH meeting
VAVE meeting with Mirror team

BOM review meeting


IRVM RE60 BOM prepare
IRVM RE60 ORVM BPM prepare
WFH meeting

BOM review meeting 11:00


H105 BOM prepare and review 10:00
K10UG BOM Review
CT110X BOM review
KT27 BOM review
WFH meeting 2:00

B106G BOM review meeting

Plastic Material training 3:00


WFH meeting 2:00
BOM preparation KT17 9:00

New Tech Meeting


BOM review meeting 11:00
BOM KT17 Review with Devendra 4:00
DLP training 3:00
New Tech Meeting 2:00

IRVM RE60 BOM review 10:00


Benchmarking sheet Discussion 12:00
Moulding Processing training 13:00
BMW concern Points review and Update in Excel

BOM Preparation of IRVM 24/25


BMW Legal agrrement review meeting
BMW Q offer update
BOM Preparation of IRVM 30/29

BMW Q offer Preparation and update 9:30


BMW Review meeting on Legal agreement and Q offer. 2:00

BMW legal agreement review and Q offer update

BMW legal agreement update as per discussion.


Circulate data required for Q offer

Upfte Yamaha Plastic Material grade sheet and submit to Material team
Update quality offer - electrical data received from VEL.
To
5:00
1:00

3:00

11:30
3:30
13:00
WFH meeting
12:30
5:30

10:30
11:30
1:00
11:00

4:00
3:00
12:30

1:00
7:30
4:00
3:00

12:00
13:00
17:00

2:00
6:30

You might also like