ELECTRICAL MAINTENANCE

EARTH POINT RESISTANCE MEASUREMENT


ZONE :CGP-2 PLANT MONTH : JUNE - 2015
Sr. Earth Value Ok / Remark/
EQUIPMENT Date
No Point in Ω N. Ok Action
1 1 0.20 OK 26.06.15
2 2 0.12 OK 26.06.15
3 3 0.18 OK 26.06.15
4 4 0.30 OK 26.06.15
DTR-1 TRANSFORMER STRIP
5 5 0.48 OK 26.06.15
6 6 0.19 OK 26.06.15
7 7 0.38 OK 26.06.15
8 8 0.20 OK 26.06.15
9 1 0.22 OK 26.06.15
10 2 0.39 OK 26.06.15
11 3 0.41 OK 26.06.15
12 4 0.33 OK 26.06.15
DTR-2 TRANSFORMER STRIP
13 5 0.19 OK 26.06.15
14 6 0.27 OK 26.06.15
15 7 0.51 OK 26.06.15
16 8 0.42 OK 26.06.15
17 1 0.39 OK 26.06.15
18 2 0.19 OK 26.06.15
19 3 0.14 OK 26.06.15
20 4 0.47 OK 26.06.15
DTR-3 TRANSFORMER STRIP
21 5 0.27 OK 26.06.15
22 6 0.33 OK 26.06.15
23 7 0.29 OK 26.06.15
24 8 0.22 OK 26.06.15
25 1 0.51 OK 26.06.15
26 2 0.39 OK 26.06.15
27 3 0.41 OK 26.06.15
28 4 0.53 OK 26.06.15
DTR-4 TRANSFORMER STRIP
29 5 0.29 OK 26.06.15
30 6 0.18 OK 26.06.15
31 7 0.21 OK 26.06.15
32 8 0.27 OK 26.06.15
33 1 0.15 OK 26.06.15
34 2 0.19 OK 26.06.15
35 3 0.21 OK 26.06.15
36 4 0.27 OK 26.06.15
DTR-5 TRANSFORMER STRIP
37 5 0.23 OK 26.06.15
38 6 0.14 OK 26.06.15
39 7 0.30 OK 26.06.15
40 8 0.29 OK 26.06.15
41 1 0.21 OK 26.06.15
DTR-6 TRANSFORMER STRIP
42 2 0.27 OK 26.06.15

Prepared By: Checked By:

SYSTEM PROTECTION INDIAN OIL CORPORATION LIMITED


ELECTRICAL MAINTENANCE
EARTH POINT RESISTANCE MEASUREMENT
ZONE :CGP-2 PLANT MONTH : JUNE - 2015
Sr. Earth Value Ok / Remark/
EQUIPMENT Date
No Point in Ω N. Ok Action
43 3 0.23 OK 26.06.15
44 4 0.30 OK 26.06.15
45 5 0.29 OK 26.06.15
DTR-6 TRANSFORMER STRIP
46 6 0.18 OK 26.06.15
47 7 0.13 OK 26.06.15
48 8 0.17 OK 26.06.15
49 1 0.40 OK 30.06.15
TR-2 TRANSFORMER STRIP
50 2 0.31 OK 30.06.15
51 1 0.19 OK 30.06.15
52 2 0.21 OK 30.06.15
53 3 0.15 OK 30.06.15
54 GTR-4 TRANSFORMER STRIP 4 0.27 OK 30.06.15
55 5 0.30 OK 30.06.15
56 6 0.35 OK 30.06.15
57 7 0.21 OK 30.06.15
58 1 0.25 OK 30.06.15
59 2 0.22 OK 30.06.15
60 3 0.17 OK 30.06.15
61 GTR-5 TRANSFORMER STRIP 4 0.27 OK 30.06.15
62 5 0.61 OK 30.06.15
63 6 0.53 OK 30.06.15
64 7 0.39 OK 30.06.15
65 1 0,19 OK 30.06.15
66 2 0.21 OK 30.06.15
67 SAT-1 TRANSFORMER STRIP 3 0.25 OK 30.06.15
68 4 0.29 OK 30.06.15
69 5 0.18 OK 30.06.15
70 1 0.21 OK 30.06.15
71 2 0.25 OK 30.06.15
72 SAT-2 TRANSFORMER STRIP 3 0.31 OK 30.06.15
73 4 0.33 OK 30.06.15
74 5 0.34 OK 30.06.15
75 1 0.19 OK 30.06.15
76 2 0.17 OK 30.06.15
77 3 0.14 OK 30.06.15
78 4 0.21 OK 30.06.15
SAT-3 TRANSFORMER STRIP
79 5 0.23 OK 30.06.15
80 6 0.18 OK 30.06.15
81 7 0.21 OK 30.06.15
82 8 0.39 OK 30.06.15
83 1 0.41 OK 30.06.15
SAT-4 TRANSFORMER STRIP
84 2 0.28 OK 30.06.15

Prepared By: Checked By:

SYSTEM PROTECTION INDIAN OIL CORPORATION LIMITED


ELECTRICAL MAINTENANCE
EARTH POINT RESISTANCE MEASUREMENT
ZONE :CGP-2 PLANT MONTH : JUNE - 2015
Sr. Earth Value Ok / Remark /
EQUIPMENT Date
No Point in Ω N. Ok Action
85 3 0.18 OK 30.06.15
86 4 0.22 OK 30.06.15
87 5 0.29 OK 30.06.15
SAT-4 TRANSFORMER STRIP
88 6 0.27 OK 30.06.15
89 7 0.31 OK 30.06.15
90 8 0.33 OK 30.06.15
91 1 0.22 OK 01.07.15
92 2 0.25 OK 01.07.15
93 3 0.19 OK 01.07.15
94 4 0.27 OK 01.07.15
95 5 0.30 OK 01.07.15
96 GTR-6 TRANSFORMER STRIP 6 0.19 OK 01.07.15
97 7 0.21 OK 01.07.15
98 8 0.25 OK 01.07.15
99 9 0.17 OK 01.07.15
100 10 0.33 OK 01.07.15
101 11 0.41 OK 01.07.15
102 2117-V-05 INSTRUMENT AIR RECEIVER L 0.42 OK 02.07.15
103 FEEDER PILLAR FOR HIGH L 0.44 OK 02.07.15
----
104 MAST R 0.45 OK 02.07.15
105 L 0.32 OK 02.07.15
4-MOP-0601D MAIN OIL PUMP
106 PB 0.33 OK 02.07.15
107 L 0.36 OK 02.07.15
4-AOP-0601D AUXILIARY OIL PUMP
108 PB 0.31 OK 02.07.15
109 L 0.29 OK 02.07.15
110 2119-PM-001C BFP # 03 R 0.34 OK 02.07.15
111 PB 0.32 OK 02.07.15
112 L 0.21 OK 02.07.15
113 2119-PM-001B BFP # 02 R 0.25 OK 02.07.15
114 PB 0.28 OK 02.07.15
115 L 0.42 OK 02.07.15
116 2119-PM-001A BFP # 02 R 0.42 OK 02.07.15
117 PB 0.45 OK 02.07.15
118 WATER INJECTION SKID FOR 1 0.42 OK 02.07.15
DB-265
119 GT#5 2 0.47 OK 02.07.15
120 2119-PM-06 WATER WASH PUMP L 0.30 OK 02.07.15
121 2119-PM-07 DEMETERING PUMP L 0.27 OK 02.07.15
122 L 0.33 OK 02.07.15
123 2119-PM-12B CONDENSATE PUMP R 0.37 OK 02.07.15
124 PB 0.40 OK 02.07.15
125 L 0.39 OK 02.07.15
2119-PM-12A CONDENSATE PUMP
126 R 0.38 OK 02.07.15

Prepared By: Checked By:

SYSTEM PROTECTION INDIAN OIL CORPORATION LIMITED


ELECTRICAL MAINTENANCE
EARTH POINT RESISTANCE MEASUREMENT
ZONE :CGP-2 PLANT MONTH : JUNE - 2015
Sr. Earth Value Ok / Remark /
EQUIPMENT Date
No Point in Ω N. Ok Action
127 2119-PM-12A CONDENSATE PUMP PB 0.41 OK 02.07.15
128 L 0.72 OK 02.07.15
129 2119-PM-11B HSD CONDENSATE PUMP R 0.69 OK 02.07.15
130 PB 0.79 OK 02.07.15
131 L 0.27 OK 02.07.15
132 2119-PM-11A HSD CONDENSATE PUMP R 0.22 OK 02.07.15
133 PB 0.25 OK 02.07.15
134 L 0.33 OK 02.07.15
135 2119-PM-13A NG CONDENSATE PUMP R 0.37 OK 02.07.15
136 PB 0.35 OK 02.07.15
137 L 0.42 OK 02.07.15
138 2119-PM-13B NG CONDENSATE PUMP R 0.45 OK 02.07.15
139 PB 0.49 OK 02.07.15
140 NG FINE FILTER SKID FOR L 0.32 OK 02.07.15
--
141 GT#5 R 0.29 OK 02.07.15
142 L 0.42 OK 02.07.15
143 2119-BM-553A DD SEAL AIR FAN – 1 R 0.39 OK 02.07.15
144 PB 0.45 OK 02.07.15
145 L 0.32 OK 02.07.15
146 2119-BM-553B DD SEAL AIR FAN – 2 R 0.39 OK 02.07.15
147 PB 0.36 OK 02.07.15
148 L 0.34 OK 02.07.15
GUILLOTINE DIVERTER SEAL
149 2119-BM-552B R 0.30 OK 02.07.15
AIR FAN – 1
150 PB 0.32 OK 02.07.15
151 L 0.41 OK 02.07.15
GUILLOTINE DIVERTER SEAL
152 2119-BM-552A R 0.39 OK 02.07.15
AIR FAN – 2
153 PB 0.43 OK 02.07.15
154 L 0.32 OK 02.07.15
155 2119-BM-554A AUGMENTING AIR FAN # 1 R 0.34 OK 02.07.15
156 PB 0.38 OK 02.07.15
157 L 0.51 OK 02.07.15
158 2119-BM-554B AUGMENTING AIR FAN # 2 R 0.49 OK 02.07.15
159 PB 0.47 OK 02.07.15
160 L 0.22 OK 02.07.15
161 2115-BM-555DC SCANNER FAN R 0.23 OK 02.07.15
162 PB 0.25 OK 02.07.15
163 L 0.51 OK 02.07.15
164 2115-BM-555AC SCANNER FAN R 0.43 OK 02.07.15
165 PB 0.64 OK 02.07.15
166 L 0.30 OK 02.07.15
DC LP – 6 ----
167 R 0.46 OK 02.07.15
168 PP – 7 ---- L 0.40 OK 02.07.15

Prepared By: Checked By:

SYSTEM PROTECTION INDIAN OIL CORPORATION LIMITED


ELECTRICAL MAINTENANCE
EARTH POINT RESISTANCE MEASUREMENT
ZONE :CGP-2 PLANT MONTH : JUNE - 2015
Sr. Earth Value Ok / Remark /
EQUIPMENT Date
No Point in Ω N. Ok Action
169 PP – 7 ---- R 0.42 OK 02.07.15
170 L 0.18 OK 02.07.15
171 2119-PM-002A EXPORT BFP PUMP R 0.22 OK 02.07.15
172 PB 0.27 OK 02.07.15
173 L 0.30 OK 02.07.15
174 2119-PM-002B EXPORT BFP PUMP R 0.36 OK 02.07.15
175 PB 0.31 OK 02.07.15
176 L 0.47 OK 02.07.15
177 2119-PM-002C EXPORT BFP PUMP R 0.48 OK 02.07.15
178 PB 0.52 OK 02.07.15
179 L 0.29 OK 02.07.15
180 2119-MXM-004 PUMP R 0.30 OK 02.07.15
181 PB 0.27 OK 02.07.15
182 L 0.32 OK 02.07.15
183 2119-PM-004B PUMP R 0.37 OK 02.07.15
184 PB 0.42 OK 02.07.15
185 L 0.41 OK 02.07.15
186 2119-PM-004A PUMP R 0.45 OK 02.07.15
187 PB 0.47 OK 02.07.15
188 L 0.51 OK 02.07.15
189 2119-PM-005A PUMP R 0.53 OK 02.07.15
190 PB 0.49 OK 02.07.15
191 L 0.20 OK 02.07.15
192 2119-PM-005B PUMP R 0.21 OK 02.07.15
193 PB 0.23 OK 02.07.15
195 L 0.27 OK 02.07.15
195 2119-MXM-005 PUMP R 0.34 OK 02.07.15
196 PB 0.38 OK 02.07.15
197 L 0.62 OK 02.07.15
DCLP – 4 ----
198 R 0.65 OK 02.07.15
199 L 0.63 OK 02.07.15
PP – 5 ----
200 R 0.46 OK 02.07.15
201 L 0.44 OK 02.07.15
LP – 8 ----
202 R 0.49 OK 02.07.15
203 L 0.60 OK 02.07.15
2119-BM-556B SEAL AIR FAN#2
204 R 0.62 OK 02.07.15
205 L 0.59 OK 02.07.15
2119-BM-556A SEAL AIR FAN#2
206 R 0.54 OK 02.07.15
207 L 0.42 OK 02.07.15
HRSG#5 STACK
208 R 0.47 OK 02.07.15
209 L 0.39 OK 02.07.15
2119-MXM-003 PUMP
210 R 0.33 OK 02.07.15

Prepared By: Checked By:

SYSTEM PROTECTION INDIAN OIL CORPORATION LIMITED


ELECTRICAL MAINTENANCE
EARTH POINT RESISTANCE MEASUREMENT
ZONE :CGP-2 PLANT MONTH : JUNE - 2015
Sr. Earth Value Ok / Remark /
EQUIPMENT Date
No Point in Ω N. Ok Action
211 2119-MXM-003 PUMP PB 0.36 OK 02.07.15
212 L 0.38 OK 02.07.15
213 2119-PM-003A PUMP R 0.32 OK 02.07.15
214 PB 0.40 OK 02.07.15
215 L 0.18 OK 02.07.15
216 2119-PM-003B PUMP R 0.15 OK 02.07.15
217 PB 0.20 OK 02.07.15
218 L 0.33 OK 02.07.15
219 2119-PM-003C PUMP R 0.37 OK 02.07.15
220 PB 0.40 OK 02.07.15
221 25 MICRON NEPHTHA FILTER L 0.45 OK 02.07.15
FILTER A/B
222 SKID R 0.49 OK 02.07.15
223 6 MICRON NEPHTHA FILTER L 0.22 OK 02.07.15
FILTER A/B
224 SKID R 0.28 OK 02.07.15
225 L 0.33 OK 02.07.15
FILTER A/B 25 MICRON HSD FILTER SKID
226 R 0.36 OK 02.07.15
227 L 0.42 OK 02.07.15
FILTER A/B 6 MICRON HSD FILTER SKID
228 R 0.39 OK 02.07.15
229 L 0.29 OK 02.07.15
LD – 10 ----
230 R 0.28 OK 02.07.15
231 L 0.32 OK 02.07.15
ELP – 6 ----
232 R 0.33 OK 02.07.15
233 L 0.27 OK 02.07.15
2119-PM-516A PUMP
234 R 0.25 OK 02.07.15
235 L 0.78 OK 02.07.15
236 2119-PM-516B PUMP R 0.74 OK 02.07.15
237 PB 0.80 OK 02.07.15
238 L 0.45 OK 02.07.15
239 2119-PM-501A 88-KT-1 R 0.48 OK 02.07.15
240 PB 0.49 OK 02.07.15
241 L 0.35 OK 02.07.15
242 2119-PM-501B 88-KT-2 R 0.39 OK 02.07.15
243 PB 0.42 OK 02.07.15
244 2119-PM-502A 88-VL-2 PB 0.25 OK 02.07.15
245 2119-PM-502B 88-VL-1 PB 0.29 OK 02.07.15
246 L 0.72 OK 02.07.15
247 2119-BM-517A DM PLANT # 1 R 0.74 OK 02.07.15
248 PB 0.79 OK 02.07.15
249 L 0.63 OK 02.07.15
250 2119-BM-517B DM PLANT # 2 R 0.66 OK 02.07.15
251 PB 0.65 OK 02.07.15
252 GT # 4 NG FINE FILTER L 0.28 OK 02.07.15

Prepared By: Checked By:

SYSTEM PROTECTION INDIAN OIL CORPORATION LIMITED


ELECTRICAL MAINTENANCE
EARTH POINT RESISTANCE MEASUREMENT
ZONE :CGP-2 PLANT MONTH : JUNE - 2015
Sr. Earth Value Ok / Remark /
EQUIPMENT Date
No Point in Ω N. Ok Action
253 GT # 4 NG FINE FILTER R 0.30 OK 02.07.15
254 L 0.41 OK 02.07.15
DIVERTER DAMPER SEAL AIR
255 2119-BM-453B R 0.47 OK 02.07.15
FAN – B
256 PB 0.45 OK 02.07.15
257 L 0.31 OK 02.07.15
DIVERTER DAMPER SEAL AIR
258 2119-BM-453A R 0.33 OK 02.07.15
FAN – A
259 PB 0.38 OK 02.07.15
260 L 0.29 OK 02.07.15
GUILLOTINE DIVERTER SEAL
261 2119-BM-452B R 0.27 OK 02.07.15
AIR FAN # 2
262 PB 0.31 OK 02.07.15
263 L 0.21 OK 02.07.15
GUILLOTINE DIVERTER SEAL
264 2119-BM-452A R 0.19 OK 02.07.15
AIR FAN # 1
265 PB 0.23 OK 02.07.15
266 L 0.14 OK 02.07.15
GT # 4 WATER INJECTION SKID
267 R 0.15 OK 02.07.15
268 L 0.18 OK 02.07.15
269 2119-BM-454A AUGMENTING AIR FAN – 1 R 0.22 OK 02.07.15
270 PB 0.22 OK 02.07.15
271 L 0.24 OK 02.07.15
272 2119-BM-454B AUGMENTING AIR FAN – 2 R 0.25 OK 02.07.15
273 PB 0.41 OK 02.07.15
274 L 0.47 OK 02.07.15
275 2119-BM-455A AC SCANNER AIR FAN R 0.45 OK 02.07.15
276 PB 0.43 OK 02.07.15
277 L 0.51 OK 02.07.15
278 2119-BM-455B DC SCANNER AIR FAN R 0.53 OK 02.07.15
279 PB 0.57 OK 02.07.15
280 L 0.31 OK 02.07.15
HRSG – 4 ----
281 R 0.37 OK 02.07.15
282 L 0.34 OK 02.07.15
PP – 6 ----
283 R 0.15 OK 02.07.15
284 L 0.18 OK 02.07.15
285 2119-BM-456A SEAL AIR FAN # 1 R 0.20 OK 02.07.15
286 PB 0.21 OK 02.07.15
287 L 0.27 OK 02.07.15
288 2119-BM-456B SEAL AIR FAN # 2 R 0.29 OK 02.07.15
289 PB 0.26 OK 02.07.15
290 L 0.32 OK 02.07.15
EBD TANK NR.2119-BM-456
291 R 0.35 OK 02.07.15
292 L 0.71 OK 02.07.15
HRSG # 4 STACK
293 R 0.73 OK 02.07.15
294 2119-PM-417A DM PUMP – 1 L 0.42 OK 02.07.15
Prepared By: Checked By:

SYSTEM PROTECTION INDIAN OIL CORPORATION LIMITED


ELECTRICAL MAINTENANCE
EARTH POINT RESISTANCE MEASUREMENT
ZONE :CGP-2 PLANT MONTH : JUNE - 2015
Sr. Earth Value Ok / Remark /
EQUIPMENT Date
No Point in Ω N. Ok Action
295 R 0.41 OK 02.07.15
2119-PM-417A DM PUMP – 1
296 PB 0.43 OK 02.07.15
297 L 0.51 OK 02.07.15
298 2119-PM-417B DM PUMP – 2 R 0.49 OK 02.07.15
299 PB 0.53 OK 02.07.15
300 FILTER A/B 25 MICRON FILTER SKID L 0.41 OK 02.07.15
301 FILTER A/B 6 MICRON FILTER SKID L 0.39 OK 02.07.15
302 FILTER A/B 25 MICRON FILTER SKID L 0.21 OK 02.07.15
303 FILTER A/B 6 MICRON FILTER SKID L 0.27 OK 02.07.15
304 L 0.25 OK 02.07.15
LP – 9 ----
305 R 0.27 OK 02.07.15
306 L 0.48 OK 02.07.15
ELP – 5 ----
307 R 0.46 OK 02.07.15
308 L 0.71 OK 02.07.15
2119-PM-416A PUMP
309 R 0.78 OK 02.07.15
310 L 0.91 OK 02.07.15
2119-PM-416A PUMP
311 R 0.89 OK 02.07.15
312 L 0.51 OK 02.07.15
313 2119-BM-401A 88-TK-1 R 0.57 OK 02.07.15
314 PB 0.47 OK 02.07.15
315 L 0.18 OK 02.07.15
316 2119-BM-401B 88-TK-2 R 0.21 OK 02.07.15
317 PB 0.19 OK 02.07.15
318 2119-BM-402A 88-VL-1 PB 0.27 OK 02.07.15
319 2119-BM-402B 88-VL-2 PB 0.30 OK 02.07.15
320 L 0.15 OK 02.07.15
SOOT BLOWERS
321 09 R 0.17 OK 02.07.15
HRSG#5, STACK
322 PB 0.18 OK 02.07.15
323 L 0.17 OK 02.07.15
SOOT BLOWERS
324 06 R 0.19 OK 02.07.15
HRSG#5, STACK
325 PB 0.21 OK 02.07.15
326 L 0.22 OK 02.07.15
SOOT BLOWERS
327 03 R 0.21 OK 02.07.15
HRSG#5, STACK
328 PB 0.24 OK 02.07.15
329 L 0.27 OK 02.07.15
SOOT BLOWERS
330 08 R 0.29 OK 02.07.15
HRSG#5, STACK
331 PB 0.31 OK 02.07.15
332 L 0.33 OK 02.07.15
SOOT BLOWERS
333 05 R 0.37 OK 02.07.15
HRSG#5, STACK
334 PB 0.35 OK 02.07.15
335 SOOT BLOWERS L 0.42 OK 02.07.15
02
336 HRSG#5, STACK R 0.42 OK 02.07.15

Prepared By: Checked By:

SYSTEM PROTECTION INDIAN OIL CORPORATION LIMITED


ELECTRICAL MAINTENANCE
EARTH POINT RESISTANCE MEASUREMENT
ZONE :CGP-2 PLANT MONTH : JUNE - 2015
Sr. Earth Value Ok / Remark /
EQUIPMENT Date
No Point in Ω N. Ok Action
337 02 SOOT BLOWERS PB 0.44 OK 02.07.15
338 L 0.51 OK 02.07.15
SOOT BLOWERS
339 01 R 0.49 OK 02.07.15
HRSG#5, STACK
340 PB 0.47 OK 02.07.15
341 L 0.21 OK 02.07.15
SOOT BLOWERS
342 04 R 0.22 OK 02.07.15
HRSG#5, STACK
343 PB 0.24 OK 02.07.15
344 L 0.15 OK 02.07.15
SOOT BLOWERS
345 07 R 0.13 OK 02.07.15
HRSG#5, STACK
346 PB 0.17 OK 02.07.15
347 L 0.21 OK 02.07.15
SOOT BLOWERS
348 09 R 0.27 OK 02.07.15
HRSG#4, STACK
349 PB 0.25 OK 02.07.15
350 L 0.71 OK 02.07.15
SOOT BLOWERS
351 06 R 0.75 OK 02.07.15
HRSG#4, STACK
352 PB 0.72 OK 02.07.15
353 SOOT BLOWERS L 0.34 OK 02.07.15
354 03 HRSG#4, STACK R 0.31 OK 02.07.15
355 PB 0.37 OK 02.07.15
356 L 0.25 OK 02.07.15
SOOT BLOWERS
357 08 R 0.21 OK 02.07.15
HRSG#4, STACK
358 PB 0.23 OK 02.07.15
359 L 0.55 OK 02.07.15
SOOT BLOWERS
360 05 R 0.52 OK 02.07.15
HRSG#4, STACK
361 PB 0.49 OK 02.07.15
362 L 0.39 OK 02.07.15
SOOT BLOWERS
363 02 R 0.37 OK 02.07.15
HRSG#4, STACK
364 PB 0.36 OK 02.07.15
365 L 0.21 OK 02.07.15
SOOT BLOWERS
366 07 R 0.21 OK 02.07.15
HRSG#4, STACK
367 PB 0.23 OK 02.07.15
368 L 0.12 OK 02.07.15
SOOT BLOWERS
369 04 R 0.15 OK 02.07.15
HRSG#4,STACK
370 PB 0.20 OK 02.07.15
371 L 0.21 OK 02.07.15
SOOT BLOWERS
372 01 R 0.27 OK 02.07.15
HRSG#4, STACK
373 PB 0.26 OK 02.07.15
374 L 0.27 OK 04.07.15
375 2119-BM-407A MIST ELIMINATOR R 0.29 OK 04.07.15
376 PB 0.25 OK 04.07.15
377 L 0.19 OK 04.07.15
2119-BM-407B MIST ELIMINATOR
378 R 0.14 OK 04.07.15

Prepared By: Checked By:

SYSTEM PROTECTION INDIAN OIL CORPORATION LIMITED


ELECTRICAL MAINTENANCE
EARTH POINT RESISTANCE MEASUREMENT
ZONE :CGP-2 PLANT MONTH : JUNE – 2015
Sr. Earth Value Ok / Remark /
EQUIPMENT Date
No Point in Ω N. Ok Action
379 2119-BM-407B MIST ELIMINATOR PB 0.16 OK 04.07.15
380 L 0.31 OK 04.07.15
381 2119-BM-403B ACC. COMPT. COOLER R 0.29 OK 04.07.15
382 PB 0.33 OK 04.07.15
383 L 0.28 OK 04.07.15
384 2119-BM-403A ACC. COMPT.COOLER R 0.27 OK 04.07.15
385 PB 0.28 OK 04.07.15
386 L 0.50 OK 04.07.15
387 2119-BM-404B TURB COMPT. COOLING FAN R 0.51 OK 04.07.15
388 PB 0.53 OK 04.07.15
389 L 0.47 OK 04.07.15
390 2119-BM-404A TURB COMPT. COOLING FAN R 1.20 N.OK 04.07.15
391 PB 0.75 OK 04.07.15
392 L 0.51 OK 04.07.15
392 2119-BM-406 NAPHTHA SCAVENGING FAN R 0.49 OK 04.07.15
394 PB 0.47 OK 04.07.15
395 L 0.20 OK 04.07.15
396 2119-BM-405B LG COMPT. COOLING FAN R 0.25 OK 04.07.15
397 PB 0.23 OK 04.07.15
398 L 0.81 OK 04.07.15
399 2119-BM-405A LG COMPT. COOLING FAN R 0.75 OK 04.07.15
400 PB 0.79 OK 04.07.15
401 L 0.11 OK 04.07.15
LP – 15 TRANSFORMER LIGHTING
402 R 0.14 OK 04.07.15
403 (AC)OFF BASE LUBE OIL L 0.17 OK 04.07.15
2119-PM-511
404 SYSTEM R 0.21 OK 04.07.15
405 L 0.20 OK 04.07.15
406 2119-BM-507A MIST ELIMINATOR R 0.18 OK 04.07.15
407 PB 0.22 OK 04.07.15
408 L 0.24 OK 04.07.15
409 2119-BM-507B MIST ELIMINATOR R 0.23 OK 04.07.15
410 PB 0.27 OK 04.07.15
411 L 0.51 OK 04.07.15
412 2119-BM-504B TURBO COMPT. COOLING FAN R 0.49 OK 04.07.15
413 PB 0.53 OK 04.07.15
414 L 0.15 OK 04.07.15
415 2119-BM-504A TURBO COMPT. COOLING FAN R 0.17 OK 04.07.15
416 PB 0.19 OK 04.07.15
417 L 0.20 OK 04.07.15
418 2119-BM-506A NAPHTHA SCAVENGING FAN R 0.22 OK 04.07.15
419 PB 0.21 OK 04.07.15
420 2119-BM-505A LG COMPT COOLING FAN L 0.24 OK 04.07.15

Prepared By: Checked By:

SYSTEM PROTECTION INDIAN OIL CORPORATION LIMITED


ELECTRICAL MAINTENANCE
EARTH POINT RESISTANCE MEASUREMENT
ZONE :CGP-2 PLANT MONTH : JUNE - 2015
Sr. Earth Value Ok / Remark /
EQUIPMENT Date
No Point in Ω N. Ok Action
421 R 0.25 OK 04.07.15
2119-BM-505A LG COMPT. COOLING FAN
422 PB 0.27 OK 04.07.15
423 L 0.31 OK 04.07.15
424 2119-BM-505B LG COMPT. COOLING FAN R 0.29 OK 04.07.15
425 PB 0.33 OK 04.07.15
426 L 0.39 OK 04.07.15
LP – 3 HT HALL
427 R 0.41 OK 04.07.15
428 L 0.43 OK 04.07.15
LP – 7 GT HALL
429 R 0.12 OK 04.07.15
430 L 0.15 OK 04.07.15
LP – 4 GT HALL
431 R 0.18 OK 04.07.15
432 L 0.21 OK 04.07.15
PP – 4 HT HALL
433 R 0.27 OK 04.07.15
434 L 0.26 OK 04.07.15
2119-PM-410 PUMP IN GAS TURBINE # 4
435 R 0.24 OK 04.07.15
436 L 0.21 OK 04.07.15
2119-PM-408 PUMP IN GAS TURBINE # 4
437 R 0.18 OK 04.07.15
438 L 0.23 OK 04.07.15
2119-PM-609 PUMP IN GAS TURBINE # 4
439 R 0.28 OK 04.07.15
440 L 0.19 OK 04.07.15
2119-PM-510 PUMP IN GAS TURBINE # 5
441 R 0.21 OK 04.07.15
442 2119-PM- L 0.31 OK 04.07.15
PUMP IN GAS TURBINE # 5
443 509(DC) R 0.27 OK 04.07.15
444 2119-PM- L 0.22 OK 04.07.15
PUMP IN GAS TURBINE # 5
445 508(AC) R 0.26 OK 04.07.15
446 L 0.31 OK 04.07.15
JB – 203 NR.GAS TURBINE # 5
447 R 0.35 OK 04.07.15
448 L 0.33 OK 04.07.15
JB – 202 NR.GAS TURBINE # 5
449 R 0.37 OK 04.07.15
450 JB – 77E NR.GAS TURBINE # 5 L 0.49 OK 04.07.15
451 TB # 20E NR.GAS TURBINE # 5 L 0.53 OK 04.07.15
452 JOB – 203 NR.GAS TURBINE # 4 L 0.20 OK 04.07.15
453 JB – 77E NR.GAS TURBINE # 4 L 0.12 OK 04.07.15
454 L 0.18 OK 04.07.15
JB – 85C GT # 6
455 R 0.30 OK 04.07.15
456 JB – 203 GT # 6 L 0.19 OK 04.07.15
457 L 0.22 OK 04.07.15
JB – 204 GT # 6
458 R 0.25 OK 04.07.15
459 JB – 20E GT # 6 L 0.27 OK 04.07.15
460 L 0.29 OK 04.07.15
461 2119-BM-605B GT # 6 R 0.33 OK 04.07.15
462 PB 0.31 OK 04.07.15

Prepared By: Checked By:

SYSTEM PROTECTION INDIAN OIL CORPORATION LIMITED


ELECTRICAL MAINTENANCE
EARTH POINT RESISTANCE MEASUREMENT
ZONE :CGP-2 PLANT MONTH : JUNE - 2015
Sr. Earth Value Ok / Remark /
EQUIPMENT Date
No Point in Ω N. Ok Action
463 L 0.51 OK 04.07.15
464 2119-BM-605A GT # 6 R 0.49 OK 04.07.15
465 PB 0.47 OK 04.07.15
466 L 0.18 OK 04.07.15
467 2119-BM-604B GT # 6 R 0.15 OK 04.07.15
468 PB 0.20 OK 04.07.15
469 L 0.23 OK 04.07.15
470 2119-BM-604A GT # 6 R 0.27 OK 04.07.15
471 PB 0.25 OK 04.07.15
472 L 0.31 OK 04.07.15
473 2119-BM-602B GT # 6 R 0.40 OK 04.07.15
474 PB 0.37 OK 04.07.15
475 L 0.41 OK 04.07.15
476 2119-BM-602A GT # 6 R 0.44 OK 04.07.15
477 PB 0.44 OK 04.07.15
478 L 0.79 OK 04.07.15
JB – 130A GT # 6
479 R 0.65 OK 04.07.15
480 JB – 20B GT # 6 L 0.61 OK 04.07.15
481 L 0.39 OK 04.07.15
482 2119-BM-607A GT # 6 R 0.34 OK 04.07.15
483 PB 0.37 OK 04.07.15
484 L 0.25 OK 04.07.15
485 2119-BM-607B GT # 6 R 0.21 OK 04.07.15
486 PB 0.27 OK 04.07.15
487 L 0.31 OK 04.07.15
488 2119-BM-603A GT # 6 R 0.29 OK 04.07.15
489 PB 0.33 OK 04.07.15
490 L 0.47 OK 04.07.15
491 2119-BM-603B GT # 6 R 0.49 OK 04.07.15
492 PB 0.43 OK 04.07.15
493 MARSHALLING L 0.51 OK 04.07.15
ZONE-1 GT # 6
494 CABINET R 0.48 OK 04.07.15
495 L 0.31 OK 04.07.15
DCLP – 01 GT # 6
496 R 0.35 OK 04.07.15
497 L 0.29 OK 04.07.15
PP – 01 GT # 6
498 R 0.27 OK 04.07.15
499 L 0.41 OK 04.07.15
LP – 01 GT # 6
500 R 0.51 OK 04.07.15
501 L 0.57 OK 04.07.15
502 2117-KM-03 COOLING TOWER R 0.53 OK 04.07.15
503 PB 0.55 OK 04.07.15
504 2119-PM-617A DM PUMP # 1 L 0.30 OK 04.07.15

Prepared By: Checked By:

SYSTEM PROTECTION INDIAN OIL CORPORATION LIMITED


ELECTRICAL MAINTENANCE
EARTH POINT RESISTANCE MEASUREMENT
ZONE :CGP-2 PLANT MONTH : JUNE - 2015
Sr. Earth Value Ok / Remark /
EQUIPMENT Date
No Point in Ω N. Ok Action
505 R 0.28 OK 04.07.15
2119-PM-617A DM PUMP # 1
506 PB 0.27 OK 04.07.15
507 L 0.51 OK 04.07.15
508 2119-PM-617B DM PUMP # 2 R 0.49 OK 04.07.15
509 PB 0.53 OK 04.07.15
510 L 0.21 OK 04.07.15
JB-S-6-5025 NR.DM PUMP # 2
511 R 0.18 OK 04.07.15
512 L 0.14 OK 04.07.15
PLC-A-JB-S-5621 NR.DM PUMP # 2
513 R 0.18 OK 04.07.15
514 L 0.21 OK 04.07.15
JB-DD GT # 6
515 R 0.24 OK 04.07.15
516 L 0.51 OK 04.07.15
517 2119-BM-601B PUMP R 0.57 OK 04.07.15
518 PB 0.55 OK 04.07.15
519 L 0.53 OK 04.07.15
520 2119-BM-601A PUMP R 0.54 OK 04.07.15
521 PB 0.57 OK 04.07.15
522 L 0.81 OK 04.07.15
PLC-DJB-E-5620 GT # 6
523 R 0.89 OK 04.07.15
524 L 0.71 OK 04.07.15
A DD – SEAL AIR FAN GT#6
525 R 0.67 OK 04.07.15
526 L 0.41 OK 04.07.15
B DD – SEAL AIR FAN GT#6
527 R 0.47 OK 04.07.15
528 L 0.45 OK 04.07.15
A GD – SEAL AIR FAN GT#6
529 R 0.44 OK 04.07.15
530 L 0.51 OK 04.07.15
B GD – SEAL AIR FAN GT#6
531 R 0.55 OK 04.07.15
532 L 0.41 OK 04.07.15
SEAL AIR FAN DISCHARGE
533 2119-BM-656A R 0.47 OK 04.07.15
LINE
534 PB 0.44 OK 04.07.15
535 L 0.39 OK 04.07.15
SEAL AIR FAN DISCHARGE
536 2119-BM-656B R 0.18 OK 04.07.15
LINE
537 PB 0.27 OK 04.07.15
538 L 0.89 OK 04.07.15
539 2119-BM-654A AUGMENTING AIR FAN – 1 R 0.93 OK 04.07.15
540 PB 0.90 OK 04.07.15
541 L 0.52 OK 04.07.15
542 2119-BM-654B AUGMENTING AIR FAN – 1 R 0.55 OK 04.07.15
543 PB 0.54 OK 04.07.15
544 L 0.81 OK 04.07.15
2119-MXM-
545 PUMP R 0.85 OK 04.07.15
003A
546 PB 0.84 OK 04.07.15

Prepared By: Checked By:

SYSTEM PROTECTION INDIAN OIL CORPORATION LIMITED


ELECTRICAL MAINTENANCE
EARTH POINT RESISTANCE MEASUREMENT
ZONE :CGP-2 PLANT MONTH : JUNE - 2015
Sr. Earth Value Ok / Remark /
EQUIPMENT Date
No Point in Ω N. Ok Action
547 L 0.21 OK 06.07.15
548 2119-PM-003D HP DOSING PUMP – 1 R 0.24 OK 06.07.15
549 PB 0.27 OK 06.07.15
550 L 0.19 OK 06.07.15
551 2119-PM-003E HP DOSING PUMP – 2 R 0.15 OK 06.07.15
552 PB 0.21 OK 06.07.15
553 L 0.51 OK 06.07.15
PP – 02 GT # 6
554 R 0.53 OK 06.07.15
555 L 0.55 OK 06.07.15
LP – 02 GT # 6
556 R 0.57 OK 06.07.15
557 L 0.39 OK 06.07.15
DCDB - 02 GT # 6
558 R 0.42 OK 06.07.15
559 L 0.54 OK 06.07.15
LP – 03 GT # 6
560 R 0.53 OK 06.07.15
561 L 0.40 OK 06.07.15
2119-PM-615 GT # 6
562 R 0.40 OK 06.07.15
563 CO2 SYSTEM FOREIGN & LGB L 0.51 OK 06.07.15
----
564 (ZONE – 2) R 0.43 OK 06.07.15
565 L 0.19 OK 06.07.15
GT-6-T-02 DM MAKEUP WATER TANK
566 R 0.22 OK 06.07.15
567 L 0.81 OK 06.07.15
568 2119-PM-019-C MUH PUMP – 3 R 0.85 OK 06.07.15
569 PB 0.87 OK 06.07.15
570 L 0.27 OK 06.07.15
571 2119-PM-019-B MUH PUMP – 2 R 0.29 OK 06.07.15
572 PB 0.31 OK 06.07.15
573 L 0.12 OK 06.07.15
574 2119-PM-019A MUH PUMP – 1 R 0.15 OK 06.07.15
575 PB 0.19 OK 06.07.15
576 L 0.24 OK 06.07.15
577 2119-PM-001F BFP – 4 R 0.24 OK 06.07.15
578 PB 0.27 OK 06.07.15
579 L 0.39 OK 06.07.15
2119-MXM-
580 PUMP R 0.37 OK 06.07.15
0042
581 PB 0.41 OK 06.07.15
582 L 0.22 OK 06.07.15
2119-MXM-
583 PUMP R 0.20 OK 06.07.15
0041
584 PB 0.24 OK 06.07.15
585 L 0.19 OK 06.07.15
2119-PM-004D PUMP
586 PB 0.15 OK 06.07.15
587 L 0.27 OK 06.07.15
2119-PM-004C PUMP
588 PB 0.21 OK 06.07.15

Prepared By: Checked By:

SYSTEM PROTECTION INDIAN OIL CORPORATION LIMITED


ELECTRICAL MAINTENANCE
EARTH POINT RESISTANCE MEASUREMENT
ZONE :CGP-2 PLANT MONTH : JUNE - 2015
Sr. Earth Value Ok / Remark /
EQUIPMENT Date
No Point in Ω N. Ok Action
589 L 0.15 OK 06.07.15
2119-PM-005D PUMP
590 PB 0.19 OK 06.07.15
591 L 0.21 OK 06.07.15
2119-PM-005C PUMP
592 PB 0.18 OK 06.07.15
593 L 0.25 OK 06.07.15
2119-PM-005E PUMP
594 PB 0.23 OK 06.07.15
595 L 0.29 OK 06.07.15
2119-PM-005B PUMP
596 PB 0.29 OK 06.07.15
597 L 0.33 OK 06.07.15
2119-PM-005A PUMP
598 PB 0.37 OK 06.07.15
599 L 0.41 OK 06.07.15
600 2119-BM-655A AC SCANNER AIR FAN R 0.39 OK 06.07.15
601 PB 0.44 OK 06.07.15
602 L 0.51 OK 06.07.15
603 2119-BM-655B AC SCANNER AIR FAN R 0.47 OK 06.07.15
604 PB 0.49 OK 06.07.15
605 L 0.51 OK 06.07.15
JB-S-6-1011 NR. AC SCANNER AIR FAN
606 R 0.57 OK 06.07.15
607 L 0.39 OK 06.07.15
JB-S-6-1013 NR. AC SCANNER AIR FAN
608 R 0.43 OK 06.07.15
609 L 0.27 OK 06.07.15
JB-S-6-1010 GT # 6
610 R 0.31 OK 06.07.15
611 L 0.50 OK 06.07.15
JB-S-6-1005 GT # 6
612 R 0.47 OK 06.07.15
613 PLC-E-5500 GT # 6 L 0.51 OK 06.07.15
614 L 0.57 OK 06.07.15
JB-S-6-1009 GT # 6
615 R 0.59 OK 06.07.15
616 L 0.32 OK 06.07.15
JB-S-6-1006 GT # 6
617 R 0.37 OK 06.07.15
618 L 0.17 OK 06.07.15
JB-S-6-5004 GT # 6
619 R 0.12 OK 06.07.15
620 L 0.18 OK 06.07.15
JB-S-6-5002 GT # 6
621 R 0.15 OK 06.07.15
622 L 0.22 OK 06.07.15
JB-S-6-5007 GT # 6
623 R 0.25 OK 06.07.15
624 L 0.27 OK 06.07.15
625 2119-PM-017A PUMP – 1 R 0.29 OK 06.07.15
626 PB 0.30 OK 06.07.15
627 L 0.51 OK 06.07.15
628 2119-PM-017B PUMP – 2 R 0.55 OK 06.07.15
629 PB 0.53 OK 06.07.15
630 PP – 04 NR. PUMP – 1 L 0.52 OK 06.07.15

Prepared By: Checked By:

SYSTEM PROTECTION INDIAN OIL CORPORATION LIMITED


ELECTRICAL MAINTENANCE
EARTH POINT RESISTANCE MEASUREMENT
ZONE :CGP-2 PLANT MONTH : JUNE - 2015
Sr. Earth Value Ok / Remark /
EQUIPMENT Date
No Point in Ω N. Ok Action
631 PP – 04 NR. PUMP – 1 R 0.51 OK 06.07.15
632 L 0.57 OK 06.07.15
DC LP – 03 NR. PUMP – 1
633 R 0.52 OK 06.07.15
634 JB – 57 GT # 6 L 0.39 OK 06.07.15
635 L 0.31 OK 06.07.15
JB – 59 GT # 6
636 R 0.28 OK 06.07.15
637 L 0.53 OK 06.07.15
JB – 62 GT # 6
638 R 0.55 OK 06.07.15
639 L 0.21 OK 06.07.15
JB – 25 GT # 6
640 R 0.24 OK 06.07.15
641 L 0.39 OK 06.07.15
LP – 05 NR. PUMP – 1
642 R 0.32 OK 06.07.15
643 L 0.14 OK 06.07.15
JB – 48 GT # 6
644 R 0.13 OK 06.07.15
645 L 0.21 OK 06.07.15
JB – 49 GT # 6
646 R 0.23 OK 06.07.15
647 L 0.27 OK 06.07.15
JB - 50 GT # 6
648 R 0.29 OK 06.07.15
649 L 0.32 OK 06.07.15
JB – 72 GT # 6
650 R 0.30 OK 06.07.15
651 L 0.51 OK 06.07.15
JB – 67 GT # 6
652 R 0.47 OK 06.07.15
653 L 0.23 OK 06.07.15
JB – 26 GT # 6
654 R 0.27 OK 06.07.15
655 L 0.51 OK 06.07.15
JB - 27 GT # 6
656 R 0.54 OK 06.07.15
657 L 0.57 OK 06.07.15
JB - 28 GT # 6
658 R 0.53 OK 06.07.15
659 L 0.47 OK 06.07.15
JB – (?) NR. JB – 28, GT # 6
660 R 0.51 OK 06.07.15
661 L 0.53 OK 06.07.15
2119-HRSG-6-
662 MOTOR R 0.55 OK 06.07.15
SB-04
663 PB 0.54 OK 06.07.15
664 L 0.29 OK 06.07.15
2119-HRSG-6-
665 MOTOR R 0.27 OK 06.07.15
SB-08
666 PB 0.29 OK 06.07.15
667 L 0.31 OK 06.07.15
2119-HRSG-6-
668 MOTOR R 0.33 OK 06.07.15
SB-12
669 PB 0.37 OK 06.07.15
670 L 0.42 OK 06.07.15
2119-HRSG-6-
671 MOTOR R 0.44 OK 06.07.15
SB-03
672 PB 0.47 OK 06.07.15

Prepared By: Checked By:

SYSTEM PROTECTION INDIAN OIL CORPORATION LIMITED


ELECTRICAL MAINTENANCE
EARTH POINT RESISTANCE MEASUREMENT
ZONE :CGP-2 PLANT MONTH : JUNE – 2015
Sr. Earth Value Ok / Remark /
EQUIPMENT Date
No Point in Ω N. Ok Action
673 L 0.53 OK 06.07.15
2119-HRSG-6-
674 MOTOR R 0.51 OK 06.07.15
SB-07
675 PB 0.57 OK 06.07.15
676 L 0.50 OK 06.07.15
2119-HRSG-6-
677 MOTOR R 0.51 OK 06.07.15
SB-11
678 PB 0.47 OK 06.07.15
679 L 0.19 OK 06.07.15
JB – 73 GT # 6
680 R 0.21 OK 06.07.15
681 L 0.27 OK 06.07.15
JB – 74 GT # 6
682 R 0.23 OK 06.07.15
683 L 0.21 OK 06.07.15
JB – 29 GT # 6
684 R 0.24 OK 06.07.15
685 L 0.21 OK 06.07.15
JB – 30 GT # 6
686 R 0.22 OK 06.07.15
687 L 0.15 OK 06.07.15
JB – 69 GT # 6
688 R 0.13 OK 06.07.15
689 L 0.31 OK 06.07.15
JB-S-6-1019 GT # 6
690 R 0.27 OK 06.07.15
691 L 0.21 OK 06.07.15
JB – 31 GT # 6
692 R 0.18 OK 06.07.15
693 L 0.25 OK 06.07.15
JB – 80 GT # 6
694 R 0.23 OK 06.07.15
695 L 0.29 OK 06.07.15
JB – 67 GT # 6
696 R 0.29 OK 06.07.15
697 L 0.21 OK 06.07.15
2119-HRSG-6-
698 MOTOR R 0.24 OK 06.07.15
SB-02
699 PB 0.33 OK 06.07.15
700 L 0.21 OK 06.07.15
2119-HRSG-6-
701 MOTOR R 0.24 OK 06.07.15
SB-06
702 PB 0.27 OK 06.07.15
703 L 0.12 OK 06.07.15
2119-HRSG-6-
704 MOTOR R 0.15 OK 06.07.15
SB-10
705 PB 0.19 OK 06.07.15
706 L 0.20 OK 06.07.15
JB – 35 GT # 6
707 R 0.22 OK 06.07.15
708 L 0.23 OK 06.07.15
JB – 34 GT # 6
709 R 0.25 OK 06.07.15
710 L 0.21 OK 06.07.15
JB – 33 GT # 6
711 R 0.23 OK 06.07.15
712 L 0.18 OK 06.07.15
JB – 75 GT # 6
713 R 0.17 OK 06.07.15
714 JB – 71 GT # 6 L 0.29 OK 06.07.15

Prepared By: Checked By:

SYSTEM PROTECTION INDIAN OIL CORPORATION LIMITED


ELECTRICAL MAINTENANCE
EARTH POINT RESISTANCE MEASUREMENT
ZONE :CGP-2 PLANT MONTH : JUNE – 2015
Sr. Earth Value Ok / Remark /
EQUIPMENT Date
No Point in Ω N. Ok Action
715 JB – 71 GT # 6 R 0.27 OK 06.07.15
716 L 0.25 OK 06.07.15
JB – 65 GT # 6
717 R 0.23 OK 06.07.15
718 L 0.31 OK 06.07.15
JB – 32 GT # 6
719 R 0.30 OK 06.07.15
720 L 0.29 OK 06.07.15
2119-HRSG-6-
721 MOTOR R 0.33 OK 06.07.15
SB-01
722 PB 0.31 OK 06.07.15
723 L 0.47 OK 06.07.15
2119-HRSG-6-
724 MOTOR R 0.44 OK 06.07.15
SB-05
725 PB 0.51 OK 06.07.15
726 L 0.19 OK 06.07.15
2119-HRSG-6-
727 MOTOR R 0.14 OK 06.07.15
SB-09
728 PB 0.17 OK 06.07.15
729 L 0.21 OK 11.07.15
D – 106 DRYER
730 R 0.24 OK 11.07.15
731 L 0.17 OK 11.07.15
--- NR.D-106 (ON STRIP)
732 R 0.18 OK 11.07.15
733 L 0.33 OK 11.07.15
D – 105 DRYER
734 R 0.29 OK 11.07.15
735 L 0.15 OK 11.07.15
---- NR.D-105 (ON STRIP)
736 R 0.19 OK 11.07.15
737 L 0.21 OK 11.07.15
H1 – H2 ----
738 R 0.24 OK 11.07.15
739 L 0.15 OK 11.07.15
---- NR.H1 – H2
740 R 0.22 OK 11.07.15
741 L 0.17 OK 11.07.15
K – 101 E ----
742 R 0.21 OK 11.07.15
743 L 0.41 OK 11.07.15
K – 101 E AIR COMPRESSOR
744 R 0.43 OK 11.07.15
745 L 0.33 OK 11.07.15
K – 101 F ----
746 R 0.37 OK 11.07.15
747 L 0.15 OK 11.07.15
K – 101 F AIR COMPRESSOR
748 R 0.17 OK 11.07.15
749 L 0.42 OK 11.07.15
K - 101 G ----
750 R 0.45 OK 11.07.15
751 L 0.33 OK 11.07.15
K – 101 G AIR COMPRESSOR
752 R 0.32 OK 11.07.15
753 L 0.15 OK 11.07.15
K – 101 H ----
754 R 0.13 OK 11.07.15
755 L 0.21 OK 11.07.15
K – 101 H AIR COMPRESSOR
756 R 0.27 OK 11.07.15

Prepared By: Checked By:

SYSTEM PROTECTION INDIAN OIL CORPORATION LIMITED


ELECTRICAL MAINTENANCE
EARTH POINT RESISTANCE MEASUREMENT
ZONE :CGP-2 PLANT MONTH : JUNE – 2015
Sr. Earth Value Ok / Remark /
EQUIPMENT Date
No Point in Ω N. Ok Action
757 L 0.17 OK 11.07.15
LDB – 107 A JUNCTION BOX
758 R 0.19 OK 11.07.15
759 L 0.21 OK 11.07.15
05 FEEDER PILLAR
760 R 0.24 OK 11.07.15
761 L 0.27 OK 11.07.15
762 2119-PM-14A NG.FORWARDING PUMP R 0.31 OK 11.07.15
763 PB 0.25 OK 11.07.15
764 L 0.27 OK 11.07.15
765 2119-PM-14B NG.FORWARDING PUMP R 0.29 OK 11.07.15
766 PB 0.31 OK 11.07.15
767 L 0.15 OK 11.07.15
LP – 14 ----
768 R 0.13 OK 11.07.15
769 L 0.33 OK 11.07.15
770 2119-CENTM-5 MOTOR R 0.37 OK 11.07.15
771 PB 0.41 OK 11.07.15
772 L 0.17 OK 11.07.15
773 2119-CENTM-6 MOTOR R 0.19 OK 11.07.15
774 PB 0.22 OK 11.07.15
775 L 0.18 OK 11.07.15
776 2119-CENTM-8 MOTOR R 0.21 OK 11.07.15
777 PB 0.19 OK 11.07.15
778 L 0.18 OK 11.07.15
01 GAS DETECTOR
779 R 0.22 OK 11.07.15
780 L 0.20 OK 11.07.15
781 2119-CENTM-1 MOTOR R 0.11 OK 11.07.15
782 PB 0.08 OK 11.07.15
783 L 0.19 OK 11.07.15
784 2119-CENTM-2 MOTOR R 0.22 OK 11.07.15
785 PB 0.25 OK 11.07.15
786 L 0.31 OK 11.07.15
JUNCTION BOX NR.2119-CENTM-2
787 R 0.33 OK 11.07.15
788 L 0.37 OK 11.07.15
789 2119-CENTM-3 MOTOR R 0.39 OK 11.07.15
790 PB 0.41 OK 11.07.15
791 L 0.51 OK 11.07.15
792 2119-CENTM-4 MOTOR R 0.53 OK 11.07.15
793 PB 0.55 OK 11.07.15
794 L 0.41 OK 11.07.15
02 GAS DETECTOR
795 R 0.44 OK 11.07.15
796 L 0.21 OK 11.07.15
JUNCTION BOX NR.2119-PM-621A
797 R 0.23 OK 11.07.15
798 2119-PM-621A PUMP L 0.41 OK 11.07.15

Prepared By: Checked By:

SYSTEM PROTECTION INDIAN OIL CORPORATION LIMITED


ELECTRICAL MAINTANANCE
EARTH POINT RESISTANCE MEASUREMENT
ZONE :CGP-2 PLANT MONTH : JUNE – 2015
Sr. Earth Value Ok / Remark /
EQUIPMENT Date
No Point in Ω N. Ok Action
799 R 0.39 OK 11.07.15
2119-PM-621A PUMP
800 PB 0.39 OK 11.07.15
801 L 0.43 OK 11.07.15
802 2119-PM-621B PUMP R 0.44 OK 11.07.15
803 PB 0.47 OK 11.07.15
804 L 0.51 OK 11.07.15
805 2119-PM-421A MOTOR R 0.42 OK 11.07.15
806 PB 0.47 OK 11.07.15
807 L 0.18 OK 11.07.15
808 2119-PM-421B MOTOR R 0.21 OK 11.07.15
809 PB 0.23 OK 11.07.15
810 L 0.15 OK 11.07.15
811 2119-PM-521A MOTOR R 0.19 OK 11.07.15
812 PB 0.17 OK 11.07.15
813 L 0.19 OK 11.07.15
814 2119-PM-521B MOTOR R 0.21 OK 11.07.15
815 PB 0.23 OK 11.07.15
816 L 0.31 OK 11.07.15
817 2119-PM-16A MOTOR R 0.29 OK 11.07.15
818 PB 0.32 OK 11.07.15
819 L 0.23 OK 11.07.15
820 2119-PM-16B MOTOR R 0.28 OK 11.07.15
821 PB 0.25 OK 11.07.15
822 L 0.18 OK 11.07.15
823 2119-PM-16C MOTOR R 0.21 OK 11.07.15
824 PB 0.24 OK 11.07.15
825 L 0.16 OK 11.07.15
826 2119-PM-015A MOTOR R 0.18 OK 11.07.15
827 PB 0.19 OK 11.07.15
828 L 0.21 OK 11.07.15
829 2119-PM-015B MOTOR R 0.23 OK 11.07.15
830 PB 0.25 OK 11.07.15
831 1 0.12 OK 11.07.15
832 2 0.18 OK 11.07.15
2119-T-2764-A TANK NO: - 1 (NAPHTHA)
833 3 0.15 OK 11.07.15
834 4 0.17 OK 11.07.15
835 1 0.21 OK 11.07.15
836 2 0.24 OK 11.07.15
2119-T-2764-B TANK NO : - 2 (NAPHTHA)
837 3 0.27 OK 11.07.15
838 4 0.29 OK 11.07.15
839 2119-T-2763A TANK N0 : - 1 (HSD OIL) 1 0.21 OK 11.07.15
840 2119-T-2763B TANK N0 : - 2 (HSD OIL) 1 0.19 OK 11.07.15

Prepared By: Checked By:

SYSTEM PROTECTION INDIAN OIL CORPORATION LIMITED


ELECTRICAL MAINTANANCE
EARTH POINT RESISTANCE MEASUREMENT
ZONE :CGP-2 PLANT MONTH : JUNE – 2015
Sr. Earth Value Ok / Remark /
EQUIPMENT Date
No Point in Ω N. Ok Action
842 L 0.22 OK 20.07.15
843 2119-PM-020A PUMP – 1 R 0.20 OK 20.07.15
843 PB 0.33 OK 20.07.15
844 L 0.25 OK 20.07.15
845 2119-PM-020B PUMP – 1 R 0.18 OK 20.07.15
846 PB 0.29 OK 20.07.15
847 L 0.28 OK 20.07.15
848 2119-PM-020C PUMP – 1 R 0.33 OK 20.07.15
849 PB 0.37 OK 20.07.15
850 1 0.42 OK 20.07.15
CTFM – 1 PB
851 2 0.39 OK 20.07.15
852 1 0.33 OK 20.07.15
CTFM – 2 PB
853 2 0.36 OK 20.07.15
854 1 0.41 OK 20.07.15
CTFM – 3 PB
855 2 0.44 OK 20.07.15
856 1 0.51 OK 20.07.15
CTFM – 4 PB
857 2 0.52 OK 20.07.15
858 1 0.57 OK 20.07.15
CTFM – 5 PB
859 2 0.55 OK 20.07.15
860 1 0.18 OK 20.07.15
CTFM – 6 PB
861 2 0.21 OK 20.07.15
862 L 0.23 OK 06.08.15
HT SWBD - 101 ON PANEL STRIP
863 R 0.25 OK 06.08.15
864 L 0.28 OK 06.08.15
HT SWBD - 102 ON PANEL STRIP
865 R 0.25 OK 06.08.15
866 L 0.18 OK 06.08.15
HT SWBD - 103 ON PANEL STRIP
867 R 0.20 OK 06.08.15
868 L 0.20 OK 06.08.15
HT SWBD - 104 ON PANEL STRIP
869 R 0.25 OK 06.08.15
870 L 0.31 OK 06.08.15
MLDB - 02 ON PANEL STRIP
871 R 0.33 OK 06.08.15
872 L 0.18 OK 06.08.15
AC MLDB ON PANEL STRIP
873 R 0.21 OK 06.08.15
874 L 0.27 OK 06.08.15
DC MLDB - 2 ON PANEL STRIP
875 R 0.29 OK 06.08.15
876 L 0.13 OK 06.08.15
AC & VENT MCC ON PANEL STRIP
877 R 0.14 OK 06.08.15
878 FEEDER PILLER - L 0.20 OK 06.08.15
ON PANEL STRIP
879 1 R 0.20 OK 06.08.15
880 L 0.28 OK 06.08.15
DCDB 125V ON PANEL STRIP
881 R 0.25 OK 06.08.15
882 AC ELDB ON PANEL STRIP L 0.31 OK 06.08.15

Prepared By: Checked By:

SYSTEM PROTECTION INDIAN OIL CORPORATION LIMITED


ELECTRICAL MAINTANANCE
EARTH POINT RESISTANCE MEASUREMENT
ZONE :CGP-2 PLANT MONTH : JUNE – 2015
Sr. Earth Value Ok / Remark /
EQUIPMENT Date
No point in Ω N. Ok Action
883 AC ELDB ON PANEL STRIP R 0.30 OK 06.08.15
884 L 0.19 OK 06.08.15
GT MCC – 6 ON PANEL STRIP
885 R 0.15 OK 06.08.15
886 L 0.20 OK 06.08.15
PMCC – 2 ON PANEL STRIP
887 R 0.22 OK 06.08.15
888 L 0.18 OK 06.08.15
110V-DCDB ON PANEL STRIP
889 R 0.16 OK 06.08.15
890 L 0.19 OK 06.08.15
110V-DC ELDB ON PANEL STRIP
891 R 0.21 OK 06.08.15
892 L 0.28 OK 06.08.15
CGP – 2 PMCC ON PANEL STRIP
893 R 0.29 OK 06.08.15
894 L 0.41 OK 06.08.15
HRSG MCC – 6 ON PANEL STRIP
895 R 0.39 OK 06.08.15
896 L 0.20 OK 06.08.15
125V-DCDB ON PANEL STRIP
897 R 0.25 OK 06.08.15
898 L 0.20 OK 06.08.15
ASS BORD ON PANEL STRIP
899 R 0.24 OK 06.08.15
900 L 0.25 OK 06.08.15
125V-DCDB ON PANEL STRIP
901 R 0.23 OK 06.08.15
902 L 0.25 OK 06.08.15
6.6KV SWBD – 2 ON PANEL STRIP
903 R 0.25 OK 06.08.15
904 L 0.23 OK 06.08.15
6.6KV SWBD – 1 ON PANEL STRIP
905 R 0.28 OK 06.08.15
906 L 0.38 OK 06.08.15
110 V DCDB ON PANEL STRIP
907 R 0.35 OK 06.08.15
908 L 0.41 OK 06.08.15
HRSG-4 MCC ON PANEL STRIP
909 R 0.45 OK 06.08.15
910 L 0.51 OK 06.08.15
HRSG-5 MCC ON PANEL STRIP
911 R 0.49 OK 06.08.15
912 L 0.29 OK 06.08.15
GT – 4 MCC ON PANEL STRIP
913 R 0.28 OK 06.08.15
914 L 0.23 OK 06.08.15
GT – 5 MCC ON PANEL STRIP
915 R 0.22 OK 06.08.15
916 L 0.25 OK 06.08.15
BOP-MCC-6 ON PANEL STRIP
917 R 0.26 OK 06.08.15
918 L 0.22 OK 06.08.15
BOP-MCC ON PANEL STRIP
919 R 0.21 OK 06.08.15
920 L 0.25 OK 06.08.15
PMCC – 3 ON PANEL STRIP
921 R 0.29 OK 06.08.15
922 L 0.15 OK 06.08.15
PMCC – 1 ON PANEL STRIP
923 R 0.19 OK 06.08.15
924 PMCC – 2 ON PANEL STRIP L 0.20 OK 06.08.15