Professional Documents
Culture Documents
7.1.1.4 For drilling operations, wellhead outlets should not be employed for choke or kill lines. API RP 53 chapter 6.6.2
7.4.3.10 For flexi ble l ine s, co nsul t the man ufacturer' s g uid eli nes on w orkin g min imum API R P 5 3 chap te r
b end ra di us to e nsure p rope r l eng th determi natio n and sa fe worki ng 10 .2 .1 .h .2
co nfigu ratio n.
7.4.3.11 For articu lated lin e assemb lie s, con sult with the ma nufacture r's w ritte n API R P 5 3 chap te r
sp ecifica ti ons to de te rmine the d egre e of rela ti ve moveme nt a llo wab le b etwee n 10 .2 .1 .h .3
e nd po in ts.
7.4.3.12 All lines should be firmly anchored to prevent excessive whip or vibration. API RP 53 chapter 10.2.1.I
7.4.3.13 The kill line should not be used as a fill-up line during normal drilling operations. API RP 53 chapter 10.2.2
7.9.9 Control System for surface BOP stacks.
7.9.9.1 The e leme nts of the BOP control syste m n ormal ly incl ude : a. Sto rage (re servo ir) API RP 53 chapter 12.1.a-f
e qui pmen t for sup plyi ng amp le con tro l fl uid to the p umpi ng system. b . Pu mpin g
systems for pressu rizin g the con tro l fl uid . c. Accu mula tor bottles for sto ring
p ressuri zed the co ntrol flui d. d . Hyd raul ic control ma ni fo ld for regu latin g th e
co ntrol flui d pre ssure an d dire cti ng the p owe r flu id flow to op erate the system
fun cti ons (BOPs and ch oke an d kill va lve s). e. Remo te co ntrol pa nel s fo r
o pera ti ng the h ydrau lic con tro l mani fo ld from remo te l ocatio ns. f. H ydrau lic
co ntrol flui d.
7.11.1.8 Func tion te sts. Fu nctio n te sts may or may no t in clud e pre ssure tests. Functio n definition. API RP 53 chapter 17.3.1
tests shou ld b e altern ated from th e dri lle r's p ane l and fro m mi ni-re mo te pan els, if
o n loca ti on . (Re fe r to wo rkshee ts in API RP 53 App end ix A). Actua ti on times
sh oul d be re corde d as a data b ase for eval uatin g tre nd s. (Re fe r to wo rkshee ts in
API RP 53 Ap pen dix A).
Pressure tests
7.11.1.9 Al l blo w-ou t pre ven ti on comp one nts tha t ma y b e expo sed to we ll pre ssure sho uld API RP 53 chapter 17.3.2.1
b e te ste d first to a lo w pressu re of 2 00 to 30 0 psi (1.38 to 2 .1 MPa ) a nd then to a
h igh p ressu re .
7.11.1.10 Whe n perfo rmi ng the l ow pre ssure test, do not app ly a hig her pre ssure a nd bl eed API RP 53 chapter 17.3.2.1
d own to the l ow test p ressure . The hi gh er pressu re coul d ini ti ate a sea l th at ma y
co ntinu e to seal a fter the pre ssure i s l owe red an d th erefore mi srepre sen ti ng a
l ow pre ssure con di ti on.
7.11.1.11 A stable low test pressure should be maintained for at least 5 minutes. API RP 53 chapter 17.3.2.1
7.11.1.12 The i nitia l hig h pre ssure test o n compo ne nts tha t cou ld be e xpo sed to wel l API RP 53 chapter 17.3.2.2
p ressure (BOP stack, ch oke man ifold , an d coke /ki ll li nes) sho uld b e to th e rated
w orkin g pressu re of th e ram BOPs or to th e rated w orkin g pressu re of the
w ell hea d th at th e sta ck i s i nstall ed on , w hich ever is lo wer.
7.11.1.13 Ini ti al pre ssure tests are de fi ned a s th ose tests tha t sho uld be pe rfo rmed on API RP 53 chapter 17.3.2.2
l ocatio n be fo re th e wel l is spud ded or before the e qui pmen t i s p ut i nto
o pera ti on al servi ce.
7.11.1.14 D iverter systems are typica lly pre ssure tested to a lo w pressu re onl y (re fe r to API API RP 53 chapter 17.3.2.2
R ecomme nde d Practice 64 ).
7.11.1.15 An nul ar BOPs, wi th a j oin t of dril l pip e insta lle d, ma y b e te ste d to th e te st API RP 53 chapter 17.3.2.2
p ressure a pp lie d to the ra m BOPs or to a mini mu m of 7 0 perce nt o f the a nnu lar
p reven te r w orkin g pre ssure, whi cheve r i s the l esser.
7.11.1.16 The l owe r ke lly val ves, kell y, kel ly cock, d rill p ipe sa fe ty val ves, insi de BOPs a nd API RP 53 chapter 17.3.2.2
top d rive sa fe ty val ves, sh oul d be tested w ith water pre ssure ap pli ed from be low
to a lo w pre ssure of 200 -300 p si (1.38 to 2.1 MPa) then to the ra te d worki ng
p ressure .
7.11.1.17 The re may be i nstance s w hen the a vai lab le BOP stack an d/or th e we llh ead h ave API RP 53 chapter 17.3.2.2
h igh er worki ng p ressure s tha n are req uire d for th e speci fi c w ell bore co ndi ti ons
d ue to eq uip ment avai lab ili ty. Speci al co ndi ti ons such a s the se sho uld b e
co vered i n the site-sp ecific we ll con tro l pressu re te st p rogra m.
7.11.1.18 Su bseq ue nt h igh p ressure tests on the w ell co ntrol comp one nts shou ld be to a API RP 53 chapter 17.3.2.3
p ressure g rea te r tha n th e maximu m a nticip ated su rfa ce pressu re, b ut n ot to
e xceed th e worki ng pre ssure of th e ram BOPs. The maxi mum antici pated
su rfa ce pressu re sho uld b e determi ned by th e ope rator base d on sp ecific
a nticip ated w ell co ndi ti ons.
7.11.1.19 An nul ar BOPs, wi th a j oin t of dril l pip e insta lle d, sh oul d be tested to a min imum API RP 53 chapter 17.3.2.3
o f 70 p erce nt o f thei r w orkin g pressu re or to th e te st pre ssure of the ram BOPs,
w hich ever is le ss. Su bseq uen t pre ssure tests are tests tha t sho uld be pe rfo rmed
a t id entifie d pe riod s d urin g dril lin g and compl etion a cti vity o n a wel l.
7.11.1.20 A stabl e hi gh test p ressure sh oul d be ma intai ned for at lea st 5 mi nutes. Wi th API RP 53 chapter 17.3.2.3
l arge r si ze ann ul ar BOPs some sma ll move ment typ ical ly con tin ue s w ithin the
l arge ru bbe r ma ss fo r p rolo nge d peri ods after pre ssure is ap pli ed. Th is pa cker
cre ep move ment sho uld b e consi dere d wh en mon itorin g th e pressu re test o f the
a nnu lar.
7.11.1.21 Pre ssure test o pera ti ons sh oul d be al te rnatel y co ntrol led from the vari ous con tro l API RP 53 chapter 17.3.2.3
statio ns.
7.11.1.22 The p ressure test performe d on h ydrau lic cha mbers of ann ul ar BOPs sho uld b e API RP 53 chapter 17.3.2.4
to at lea st 1,50 0 psi (1 0.3 MPa).
7.11.1.23 Ini ti al pre ssure tests on hyd raul ic chamb ers of ra m BOPs an d hydra uli call y API RP 53 chapter 17.3.2.4
o pera te d val ves shou ld be to the ma ximum op eratin g pressu re recomme nd ed by
the ma nu fa ctu rer.
7.11.1.24 The test should be run on both the opening and the closing chambers. API RP 53 chapter 17.3.2.4
7.11.1.25 Pressure should be stabilized for at least 5 minutes. API RP 53 chapter 17.3.2.4
7.11.1.26 Su bseq uen t pre ssure tests are typica lly pe rfo rmed on h ydra uli c ch ambe rs o nly API RP 53 chapter 17.3.2.4
b etwee n wel ls or whe n th e eq uip ment is reasse mble d.
7.11.1.27 The i nitia l pressu re te st on th e closi ng un it va lves, mani fo ld s, ga uge s, an d BOP API RP 53 chapter 17.3.2.5
h ydrau lic con tro l lin es shou ld b e to the ra te d worki ng p ressure o f the con tro l uni t.
7.11.1.28 Su bseq ue nt p ressure tests of cl osin g un it systems are typi call y p erformed API RP 53 chapter 17.3.2.5
fol low ing the disco nne cti on or rep air of an y o pera ti ng pre ssure con tain ment seal
i n th e closi ng u nit syste m, bu t li mited to th e affected comp one nt.
7.11.1.29 Pre ssure tests on the we ll con tro l equ ipme nt shou ld be co ndu cted at lea st: a. API RP 53 chapter 17.3.3
Pri or to sp ud o r u pon i nstall ation . b. Afte r the d iscon nectio n or rep air of any
p ressure co ntai nmen t sea l in the BOP sta ck, cho ke lin e, o r ch oke ma nifol d, b ut
l imited to the a ffected co mpon ent. c. No t to excee d 21 d ays.
7.11.1.30 Wel l control e qui pme nt sh oul d be pre ssure tested w ith water. Air shou ld b e API RP 53 chapter 17.3.5
re moved from the system be fo re te st pre ssure is a ppl ied . Co ntrol systems and
h ydrau lic cha mbe rs sh oul d be tested u sing cl ean co ntrol system fl uid s w ith
l ubri cate an d corrosi on ad ditive s for the in tend ed servi ce and o pe rating
temp erature s.
7.11.1.31 Pre ssure ga ug es and ch art re corde rs sh ou ld be u sed an d al l te sti ng resu lts API RP 53 chapter 17.3.6
re corde d. P re ssure me asure ments shou ld be ma de a t no t le ss tha n 25 p ercen t
n or more tha n 75 pe rcent of the fu ll pre ssure spa n of the gau ge.
7.11.1.32 The re sults of all BOP equ ipme nt p ressure and fun cti on tests sh al l be API RP 53 chapter 17.3.7
d ocume nted a nd in clud e, a s a mi nimu m, the testin g sequ ence , the l ow an d hig h
test pressu res, th e dura ti on of ea ch te st, and the re sults of th e respe cti ve
co mpon en t tests.
7.11.1.33 Pre ssure tests sh al l be pe rfo rmed wi th a p ressure chart record er or equ ival ent API RP 53 chapter 17.3.7
d ata acq uisi ti on system and si gne d by pu mp ope rator, co ntractor's tool p ushe r,
a nd op era ti ng comp any rep resen ta tive.
7.11.1.34 Pro ble ms o bserve d duri ng testin g and a ny action s ta ken to remed y the p rob lems API RP 53 chapter 17.3.7
sh oul d be do cumen ted.
7.11.1.35 Ma nufacture rs sh oul d be i nformed o f we ll con tro l equ ipme nt th at fai ls to p erform API RP 53 chapter 17.3.7
i n th e fi eld . (Re fe r to API Speci fi cation 1 6A).
General Testing Considerations
7.11.1.36 R ig crew s sh oul d be a lerted w hen p ressure te st op eratio ns are to be co ndu cte d API RP 53 chapter 17.3.8
a nd wh en testin g ope ration s a re un derw ay. Onl y n ecessa ry p erso nne l shou ld
re main i n th e test a rea.
7.11.1.37 Onl y p erson nel a uthori zed b y the w ell si te su pervi sor shou ld g o into the test a rea API RP 53 chapter 17.3.8
to in spect fo r l eaks wh en the e qui pmen t in volve d is un der pre ssure.
7.11.1.38 Tig hteni ng , rep air, or any othe r w ork is to b e do ne on ly afte r p ressu re has be en API RP 53 chapter 17.3.8
re lea sed a nd al l partie s h ave ag ree d th at the re is no po ssib ility of pressu re bei ng
trap ped .
7.11.1.39 Pressure should be released only through pressure-release lines. API RP 53 chapter 17.3.8
7.11.1.40 Al l lin es and co nne cti ons tha t are u sed in the te st pro cedu res shou ld b e API RP 53 chapter 17.3.8
a deq uatel y se cured .
7.11.1.41 Al l fi ttin g, co nne cti ons an d pi pin g used i n pressu re testing o pera ti ons sha ll h ave API RP 53 chapter 17.3.8
p ressure ra ti ngs gre ater th an the ma ximum an ti cipa te d te st p ressure .
7.11.1.42 Ve rify the typ e, p ressure ra ti ng, size, an d end co nne cti ons for ea ch pie ce of API RP 53 chapter 17.3.8
e qui pmen t to be tested , as d ocume nted by pe rmane nt ma rkin gs on the
e qui pmen t o r b y re cords that are tracea bl e to the e qui pmen t.
7.11.1.43 Whe n a BOP stack is te ste d on the w ell hea d, a proce dure sh oul d be a vail abl e to API RP 53 chapter 17.3.8
mo nitor pre ssure on the ca sin g shou ld the test p lu g lea k.
7.11.1.44 If the co ntrol system reg ula to r ci rcuit is equ ipp ed w ith hydro -pne umatic API RP 53 chapter 17.3.8
re gul ators, a backu p supp ly is recomme nde d to pil ot the re gul ators in ca se th e
ri g air sup ply is lo st.
7.11.1.45 Fun cti ona l te sts of th e con tro l syste m sh oul d incl ude a simul ated lo ss o f po wer to API RP 53 chapter 17.3.8
the co ntrol un it a nd to the con tro l pan el.
7.11.1.46 Ve rti cal stack ali gnme nt sh ou ld be ch ecked a nd flan ge b olt make-u p shou ld b e API RP 53 chapter 17.3.8
torq ued to pre scribe d ratin gs establ ishe d in API S peci fi cation 6 A.
7.11.1.47 If h ydrog en su lph ide b eari ng formatio ns are a nticip ated, manu facturer's API RP 53 chapter 17.3.8
ce rti fi cation fo r co mplia nce w ith NACE Stand ard MR0 17 5 shou ld be a vail abl e
a nd revi ewe d for wel l control e qui pmen t, as de scribe d in API R P 5 3 Sectio n 20.
7.8.3 Diverter System Surface BOP Installations
7.8.3.1 Al l dive rte r system comp on ents shal l be in specte d and tested to a sce rtain p rope r API RP 53 chapter 17.4.1
i nstall ation a nd fun cti oni ng. Simul ate lo ss o f rig a ir supp ly to the d ive rte r co ntrol
system an d de te rmine , effects, if any, on the d iverter system, ve nt l ine valve s,
a nd ba ckup su ppl y systems.
7.8.3.2 C heck an d verify th e prop er structural mo untin g of the ann ula r se ali ng de vice API RP 53 chapter 17.4.1.a
a ssembl y, an d, i f ap pli cab le, th at the i nsert packi ng e leme nt i s se cured i n pla ce.
7.8.3.3 For in sta lla ti ons u sing re mote ope rators, re cord h ydrau lic pre ssure an d air sup ply API RP 53 chapter 17.4.1.b
p ressure w ith th e accu mula to r ful ly charg ed a nd the con tro ls in the n ormal d rill ing
p ositio n.
7.8.3.4 Actua te th e dive rte r cl ose an d op en seq uen ce with dri ll pi pe o r test mand rel in API RP 53 chapter 17.4.1.c
the d iverte r to veri fy con tro l fu nction s, pro pe r e qui pmen t op eratin g seq uen ce and
i nterlo ck, if ap plic abl e, a nd reco rd respo nse time (s).
7.8.3.5 A pre ssure in tegri ty test [20 0 psi (1.38 MPa ) mini mu m] sh oul d be mad e on the API RP 53 chapter 17.4.1.d
d iverter system after each i nstall ation . The tests may be mad e on pa rts o f the
system or on i nd ivid ual co mpon ents of th e syste m sh oul d certain co mpon en ts of
the ca sing stri ng or rise r co mpon ents not sup port a compl ete syste m test.
7.8.3.6 Pu mp water o r d rilli ng flu id throu gh the di verter system at l ow pre ssure an d hig h API RP 53 chapter 17.4.1.e
flo w rates an d check ven t li ne(s) for returns. Examin e the en ti re syste m for le aks,
e xcessive vi bratio ns, and p rope r tie d own w hi le pu mpin g fl uid a t hi gh ra te s.
7.8.3.7 In col d clima te s, the d iverter ven t li nes sha ll b e protected from freezi ng. Possi ble API RP 53 chapter 17.4.1.f
me th ods in clu de flush ing w ith anti-free ze sol ution , dra ini ng, insu latio n, and h eat
traci ng.
7.11.2 Surface BOP stack equipment.
7.11.2.1 Unless restricted by height, the entire stack should be pressure tested as a unit. API RP 53 chapter 17.5.2
7.11.2.2 Annular BOPs should be tested with the smallest OD pipe to be used. API RP 53 chapter 17.5.3
7.11.2.3 Fixe d bore p ipe ra ms sh oul d be tested o nly on th e pip e OD si ze th at ma tch es the API RP 53 chapter 17.5.4
i nstall ed pi pe ram bl ocks.
7.11.2.4 Va riab le bo re rams shou ld be ini ti all y p ressure tested o n th e la rgest and sma lle st API RP 53 chapter 17.5.5
OD pi pe size s tha t may be u sed d urin g th e wel l ope ratio ns.
7.11.2.5 Bl ind ra m BOPs and b lin d she ar ram BOPs sho uld n ot b e tested wh en pi pe is in API RP 53 chapter 17.5.6
the stack.
7.11.2.6 The ca pab ili ty of th e she ar ram and ra m o pera to r sh ou ld be ve rified w ith th e BOP API RP 53 chapter 17.5.6
ma nufacture r for the pl an ned d rill strin g.
7.11.2.7 The sh ear ram an d preve nter de sign a nd/or metal lurg ical d ifferen ces amon g dril l API RP 53 chapter 17.5.6
p ipe ma nufacture rs ma y re qu ire hi gh clo sing p ressure s for she ar op eratio ns.
7.11.2.8 Pri or to testin g each ra m BOP, th e secon dary rod se als (e me rge ncy packo ff API RP 53 chapter 17.5.7
a ssembl ies) sho uld b e checke d to ensu re th e sea ls have n ot b een e ne rgize d.
7.11.1.9 Sh oul d th e ram shaft se al l eak du ring the test, th e seal sh all b e repa ired ra ther API RP 53 chapter 17.5.7
tha n ene rgizi ng the se cond ary packi ng.
7.11.1.10 R am BOPs eq uip ped w ith ram lock s sh oul d be pre ssure tested w ith ram locks in API RP 53 chapter 17.5.8
the cl osed p ositio n an d closi ng pre ssure bl ed to zero .
7.11.1.11 Manual locks either screw clockwise or counter-clockwise, to hold the rams closed. API RP 53 chapter 17.5.8
7.11.1.12 H and w hee ls shou ld be in pl ace an d th e th rea ds on the ram lo cking sh aft sh oul d API RP 53 chapter 17.5.8
b e in a con ditio n th at all ows the lo cks to be e asi ly ope rated.
7.11.1.13 The BOP el astomeri c co mpon ents th at ma y be exp osed to we ll flui ds sho uld b e API RP 53 chapter 17.5.9
ve rified b y th e BOP man ufacturer as ap pro pria te for the dri lli ng flui ds to be use d
a nd for the an ti cipa te d te mpera tures to whi ch expo sed.
7.11.1.14 C onsi dera ti on sho uld b e gi ven to th e te mpera ture an d fl uid co ndi ti ons d urin g wel l API RP 53 chapter 17.5.9
testin g and co mple ti on o pera ti ons.
7.11.1.15 Ma nufactu re rs' ma rking s for BOP e la sto meric comp one nts sh oul d incl ud e th e API RP 53 chapter 17.5.9.1
d urome te r h ard ness, gen eric type of comp oun d, d ate of ma nu fa ctu re, p art
n umbe r, an d op eratin g te mpera tu re ran ge of th e compo ne nt.
7.11.1.16 C onsi der rep laci ng critica l BOP el astome ri c co mpo nen ts on w ell co ntrol API RP 53 chapter 17.5.9.2
e qui pmen t that has b een o ut o f servi ce fo r si x (6 ) mo nths or lo nge r.
7.11.1.17 Fle xibl e choke a nd kil l lin es sho uld b e te ste d to th e same pre ssure, fre que ncy, API RP 53 chapter 17.5.10
a nd du ration a s the ram BOPs.
7.11.1.18 Ve rify tha t a p rope rly prech arge d surge bottle is or can b e instal led adj acen t to API RP 53 chapter 17.5.12
the a nn ula r p reven te r i f con ti nge ncy we ll con tro l proce dure s i nclu de strip pin g
o pera ti on s.
7.11.1.19 The d rill p ipe te st jo int and ca sing ra m test sub sh oul d be con stru cted of pip e API RP 53 chapter 17.5.12
tha t can withstan d th e te nsil e, co lla pse , an d intern al pre ssure s tha t wi ll be p lace d
o n th em du ring testin g ope ration s.
7.4.6 Chokes and choke manifolds for Surface BOP installations.
7.4.6.1 The ch oke man ifold u pstrea m o f an d incl udi ng the l ost h igh p ressure va lves API RP 53 chapter 17.6.1
(re fe r to API R P 5 3 fig ure 8 ) sh oul d be tested to the same p ressure a s the ram
7.4.6.2 BOPs.
The co nfig uratio n of p ipe s a nd va lves do wnstrea m o f the la st h igh p ressure va lve API RP 53 chapter 17.6.2
va ries from instal latio n to instal latio n. Ea ch con fi gura ti on sho uld b e verifie d for
me chan ical i nteg rity.
7.4.6.3 The valves and adjustable chokes should be operated to verify smooth operation. API RP 53 chapter 17.6.3
7.4.6.4 Ad justab le cho kes are n ot re qui red to be full se al ing d evice s. Pressu re te sti ng API RP 53 chapter 17.6.4
a gai nst a cl osed ch oke i s n ot re qui red.
7.4.6.5 The ri g main te na nce an d insp ection s ched ule sh oul d provi de for pe riod ic non - API RP 53 chapter 17.11.8
d estructive e xamin ation o f the mud /g as sep arator to verify pressu re inte grity.
Thi s e xamin ation may be pe rfo rmed by hyd rostatic, ultraso nic, or other
e xamin ation me thod s.
7.11.2 Accumulator system for Surface BOP installations
17.11.2.20 A ccumulator clos ing te st. Th e purp ose of th is test i s to veri fy that th e API RP 53 chapter 17.7.1
a ccumul ator syste m is prop erly size d to su ppo rt the flu id vol ume an d pressu re
re qui remen ts o f the BOPs o n th e rig u sing the fol low ing p roced ure ; (Re fe r to
sa mple w orkshe ets and e xampl es in API R P 5 3 Appe ndi x A).
17.11.2.21 A ccumulator clos ing te st procedure. a. Po sition a p rop erly size j oin t of dril l API R P 5 3 chap te r 17.7.1 a-
p ipe o r a te st man drel i n th e BOPs. b. Turn o ff th e pow er supp ly to all g
a ccumul ator cha rgin g pump s (a ir, e lectric, etc.) c. Reco rd the in itial a ccumul ator
p ressure . (The in itia l accumu lator pre ssure sho uld b e the de sign ed op era ti ng
p ressure o f the a ccumul ator.) Ma nifol d and ann ula r re gul ators shou ld b e set a t
the ma nu fa ctu rer's recomme nde d op eratin g pressu re fo r th e BOP stack. d.
Ind ivid ual ly close each ra m BOP (excep ti ng b lind or bli nd/she ar ram BOPs) an d
re cord the clo sin g ti me. To simu late clo sure of th e bl ind o r b lin d/shea r ra ms,
o pen o ne se t of th e pip e rams. Clo sing time s sh all me et the re spo nse time
stip ula te d in API RP 53 Sectio n 12 .3 .2 . e. Fun cti on the h ydrau lic op erated
va lve(s) an d reco rd th e ti me and vo lume re qu ired f. Clo se th e ann ula r B OP
a nd reco rd the clo sing time . g. Reco rd th e fina l accumu lator pre ssure. Th e fina l
a ccumul ator pres sure sha ll be e qua l to o r g rea te r tha n 200 p si (1.8 MPa) ab ove
p recha rge p ressure .
17.11.2.22 After each wel l, the w ell co ntrol eq uip ment sho uld b e clea ned , visu al ly insp ected, API RP 53 chapter 17.10.1
p reven ta tive mai ntena nce pe rfo rmed, an d pressu re te ste d be fo re instal latio n on
the n ext wel l.
17.11.2.23 The ma nufa ctu rer's te st pro ced ures, as prescri bed i n th eir in sta lla tion , op eratio n, API RP 53 chapter 17.10.1
a nd mai nten ance (IOM) ma nua l, sh oul d be fol low ed al ong w ith th e test
re commen datio ns of API RP 53 Tab le 1 . All l eaks an d malfun cti ons sh oul d be
co rrected pri or to pla cing the e qui pmen t i n service .
Visual inspection flexible choke and kill lines
17.11.2.24 A visu al exte rn al i nspe cti on of fl exib le cho ke an d kill l ine s thro ugh the entire API RP 53 chapter 17.10.2.a
l eng th o f the l ine sh oul d incl ude : a . Outer Jacket. Vi sual ly insp ect to e nsure tha t
the o uter ja cket i s i ntact to pro te ct the p olyme ric shea th u nde rne ath fro m tea ring
a nd be in g pun ctu red. Verify th at th e outer ja cket i s p rop erly attache d at b oth en d
fitting s. Ve ri fy tha t the en ti re surface o f the po lymeri c sh eath is pro tected. If any
d amag e is no ti ced on the o uter ja cket, veri fy that it w ill n ot b e de tri me ntal to the
p olyme ric shea th .
17.11.2.25 Termi natio n. R ecord a ny dama ge to the coa ti ng o n th e end -fi ttin g, a nd mo nitor API RP 53 chapter 17.10.2.b
p rogre ssion o f da mage . Faci litate rep air, if n ecessa ry.
17.11.2.26 C onn ector. Pa rti cula rly insp ect th e seal a rea of th e con nectors reco rdin g any API RP 53 chapter 17.10.2.c
d amag e and mo nitor pro gre ssion o f da mage .
Major inspections
17.11.2.27 After every 3 -5 years of service , the BOP sta ck, cho ke mani fo ld, and dive rte r API RP 53 chapter 17.10.3
co mpon en ts sho uld b e disa ssembl ed a nd in spected i n accord an ce with the
ma nufactu re r's gui del ine s.
17.11.2.28 El astomeri c co mpon en ts sho uld b e chan ge d out and su rfa ce fini shes sho uld b e API RP 53 chapter 17.10.3
e xamin ed for we ar and co rrosio n. C ritical d imen sion s sh ou ld be ch ecked a gai nst
the ma nu fa ctu rer's all owa ble w ea r l imits. Ind ivid ual co mpon ents can b e
i nspe cte d on a stag gere d sche dul e.
17.11.2.29 A full i nterna l and e xte rna l insp ection o f the fle xi bl e choke a nd kil l lin es shou ld b e API RP 53 chapter 17.10.3
p erformed i n accord ance w ith the eq uip ment manu fa cturer's gu ide lin es.
17.11.2.30 Ma nufacture r's i nstal latio n, o pera ti on, an d main te nan ce (IOM) manu als sho ul d API RP 53 chapter 17.11.1
b e avai lab le on the rig for all the BOP equ ipme nt instal led o n th e rig.
17.11.2.31 Stud s a nd n uts sh oul d be ch ecked for pro per size a nd g ra de . Usi ng the API RP 53 chapter 17.11.2
a ppro pria te lub rican t, to rque sh oul d be a ppl ied i n a criss-cross man ner to the
fla nge stu ds. Al l bol ts sho uld the n be re checke d fo r p rope r to rque a s p rescrib ed
i n API Sp ecifica ti on 6A. Wh en maki ng u p conn ection s, exce ssive force sh oul d
n ot b e req uire d to b ring the co nn ection s i nto ali gnme nt.
17.11.2.32 R ing g askets coa te d with a resi lie nt ma te rial su ch as rub ber or API RP 53 chapter 17.11.2
p olye tra fl uo re thyle ne (PTFE) sho uld n ot b e use d. D ue to th e limi te d amo unt of
d eformatio n wh ich a gro ove can ma ke in a ri ng as it is compre ssed du ring
i nstall ation , it is no t reco mmend ed to reuse ring g askets.
17.11.2.33 Whe n makin g up pro prie ta ry cl amp h ubb ed con nectio ns, th e manu fa ctu rer's API RP 53 chapter 17.11.2
re commen ded p roced ure sho ul d be foll owe d.
17.11.2.34 Sp are pa rts sh oul d be de sign ed for thei r i ntend ed use by ind ustry a ppro ved an d API RP 53 chapter 17.11.3
a ccepted practice s. Afte r sp are pa rt in stalla tion , the affected p ressure -contai nin g
e qui pmen t sh all b e pressu re te ste d. E lastome ric compo nen ts sha ll be sto red in a
ma nne r re commen de d by th e equ ipme nt manu fa ctu rer.
17.11.2.35 The o rigi nal e qui pmen t man ufacture r sh oul d be con sul te d rega rdin g repl aceme nt API RP 53 chapter 17.11.3
p arts. If rep lace ment parts are a cqui red from a non -orig ina l eq uip ment
ma nufacture r, the pa rts sh all b e equ ival ent to o r s upe rior to th e orig ina l
e qui pmen t an d fu lly tested , de sign ve rified , an d sup ported b y trace ab le
d ocume
17.11.2.36 Ma nua lsntation . ti ns contai nin g torq ue sp ecifica ti ons sho uld b e ava ila ble o n th e
or bu lle API RP 53 chapter 17.11.4
ri g. As stated i n API RP 53 se cti on 17 .11.2, to rque sp ecifica tion s a nd the
l ubri cant's coe ffici ent of frictio n sho uld b e consi dere d whe n troll ing fasten ers.
D evia ti ng from th e spe cified l ubri cant can a lter th e requ ired torq ue.
7.11.2.37 A pl ann ed ma inten ance system, with e qui pmen t id entifie d, tasks sp ecifie d, a nd API RP 53 chapter 17.12.1
the time i nterva ls betwe en tasks sta te d, shou ld be e mplo yed on each ri g.
R ecord s o f mai nten ance p erformed a nd re pai rs ma de sho uld b e main tain ed on
fil e at the rig site or rea dil y a vail abl e fo r the app lica ble BOP equ ipme nt.
7.11.2.38 C opi es of e qui pmen t man ufacture rs' pro du ct al erts o r e qui pmen t bu lle ti ns API RP 53 chapter 17.12.2
sh oul d be mai ntain ed a t the rig si te o r re adi ly avai lab le for the ap pli cabl e BOP
7.11.2.39 e qui
D rawipmen t. win g ram spa ce-ou t an d bore o f the BOP sta ck a nd a d rawi ng of th e
ng sho API RP 53 chapter 17.13.1
ch oke man ifol d show ing the p ressure ra ti ng o f the comp one nts shou ld be o n th e
ri g and ma inta ine d up to date. Re fe r to API R P 5 3 fi gure 1 9 for an exa mple
d rawi ng
7.11.2.40 A bil l of ma te rial sh oul d acco mp an y the e qui pmen t dra win gs to correctly id entify API RP 53 chapter 17.13.1
the e qui pmen t an d al low the p rocure ment of co rrect re pl aceme nt p arts.
7.11.2.41 C han ges to the BOP co ntrol system sho uld b e docu mented . A metho d shou ld be API RP 53 chapter 17.13.1
e sta bli shed to co ntrol the dra win gs, e nsu ring tha t up -to -date d ocume ntation i s
ma intai ned .
7.11.2.42 Eq uip ment reco rds such as API ma nufa ctu ring d ocume ntation , NAC E API RP 53 chapter 17.13.2
ce rti fi cation , a nd factory accep ta nce testin g repo rts sho uld b e retai ned . Where
re qui red, cop ies of th e manu fa ctu rer's eq uip ment da ta b ook an d th ird pa rty
ce rti fi cation sh ou ld be a vail abl e fo r re view .
7.11.2.43 A mai ntena nce a nd rep air hi sto rical fil e sho uld b e main ta ine d by seria l nu mber API RP 53 chapter 17.13.3
o n each majo r p iece o f eq uip ment. Th is fi le sho uld fol low the e qu ipme nt w hen i t
i s tran sfe rred. Equ ipme nt ma lfunctio ns or fa ilu res sho uld b e repo rte d in wri ti ng to
the e qu ipme nt ma nufacture r a s state d in API Sp ecifica ti on 1 6A.
7.11.2.44 Sh op testing a fter maj or in spectio n or equ ipme nt w eld repa irs shou ld b API RP 53 chapter 17.13.4