CTI ENGINEERING INTERNATIONAL CO., LTD.

THE CONSULTANCY SERVICES FOR THE CONSTRUCTION SUPERVISION OF THE FLOOD RISK MANAGEMENT PROJECT (FRIMP) FOR THE CAGAYAN RIVER, TAGOLOAN RIVER AND
IMUS RIVER (JICA LOAN AGREEMENT NO. PH-P253)

STRAIGHT LINE DIAGRAM (Bacoor Retarding Basin A)


Progress as of December 31, 2019

DRAINAGE SLUICE (1 X 1m RCBC)

Height Nunber of (l.m.)


Item
(m.) Layer 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 42 42 42 42 42 42 42 42 42 42
1
2
3

1.00
4
5
1
2
3

2.00
4
5
1
2
3

3.00
4
5
1
2
3

BACKFILL ABOUT STRUCTURE

4.00
4
5
1
2
3

5.00
4
5
1
2
3

6.00
4
5
1
2
3

7.00
4
5
1
2
3
8.00
4
5
1
2
3
9.00

4
5

LEGEND:
August 2016~ November 2019 December 2019

Prepared by: Noted by:

Lemuel Jake T. Tapec Arjine I. Ramirez


Project Inspector Structural Engineer