You are on page 1of 1

1 2 3 4 5

APPR
NAME
1' - 1 3/4"
PLASTIC LAMINATE ON PLASTIC LAMINATE ON PLASTIC LAMINATE ON

1' - 1 3/4"
3/4" PLYWOOD 3/4" PLYWOOD 3/4" PLYWOOD
DOORS, DOORS, DOORS,
TOP AND BOTTOM TOP AND BOTTOM TOP AND BOTTOM
2' - 8"

(TYP) (TYP) PLASTIC LAMINATE ON 3/4"


(TYP)

2' - 8"
PLYWOOD DOORS,
D MELAMINE 3/4" SHELF MELAMINE 3/4" SHELF
TOP AND BOTTOM (TYP) D
ON ADJ. SHELF ON ADJ. SHELF
STANDARDS STANDARDS

REVISIONS

DESCRIPTION
1' - 0"

EQ.
BLOCKING AS REQUIRED. BLOCKING AS REQUIRED. PLASTIC LAMINATE ON
3/4" PLYWOOD

SYM
BLOCKING AS REQUIRED.

2 1/4"
1' - 0" 1' - 0"

3' - 0 1/4"
BLOCKING AS REQUIRED 4'' HIGH SOLID
SURFACE INTERGRAL
WALL FINISH (REFER COVE BACKSPLASH
TO FINISH SCHEDULE)
1' - 6"

1' - 6"

EQ.
7' - 0"

7' - 0"
4" SOLID

7' - 0"

7' - 0"
2' - 0" SURFACE 2' - 0" SINK
BACKSPLASH 2' - 0"
1' - 2" SQ. OPENING 6" PLASTIC LAMINATE ON
2' - 0"
3/4" PLYWOOD SOLID SURFACE
1 1/2"

SOLID SURFACE ON SOLID SURFACE ON COUNTERTOP (REFER


3/4" PLYWOOD. (REFER 3/4" PLYWOOD.
TO FINISH

"
(REFER

1_
TO FINISH SCHEDULE)

4"
2

4"

12 "
1_
SCHEDULE).

1
C C

2 1/4"
TO FINISH
1/2"

SCHEDULE).

"
1_
4" 2
SEAL

1_"
2
PLASTIC LAMINATE ON G.C. INFO

3/4" PLYWOOD DOOR

"
1_
5" 2
BLOCKING AS ICE MACHINE,
PLASTIC LAMINATE
RECYCLING /TRASH REQUIRED UNDERCABINET PER

"
1_
ON 3/4" PLYWOOD

5" 2
2' - 4"

BIN FF&E
2' - 6"

DRAWER FRONT
2' - 10"

2' - 4"
2' - 10"
3' - 0"
W/ 1/4" PLYWD
9-
BOTTOM W/ 3/4"

"
1_

2
---
PLYWD. DRAWER A/E INFO

BACK APPROVED

"
1_

2
1'-0
FOR COMMANDER NAVFAC
BASE (REFER TO DATE .
FINISH SCHEDULE) 4" BASE. (REFER TO ACTIVITY

FINISH SCHEDULE).
4" 3"
4"

SATISFACTORY TO

4"
BASE. (REFER TO DATE .

4"
FINISH SCHEDULE). DES BH DRW CG CHK EC
PM / DM .
.
MILLWORK SECTION MILLWORK SECTION MILLWORK SECTION MILLWORK SECTION
BRANCH MANAGER

CHIEF ENG/ARCH .
4 3 2 1
BIM 360://219041 - P427 LCS Training Facility Phase II/BLDG P427-1389845-A.rvt

1 1/2" = 1'-0" A-506 1 1/2" = 1'-0" A-506 1 1/2" = 1'-0" A-506 1 1/2" = 1'-0" A-506
FPE .
B B

NAVAL FACILITIES ENGINEERING COMMAND

JACKSONVILLE, FLORIDA
NAVAL FACILITIES ENGINEERING COMMAND - SOUTHEAST

P427 LCS TRAINING FACILITY PHASE II


2' - 0"

MILLWORK SECTIONS AND DETAILS


4"
MIRROR PER MIRROR PER 4" SOLID
SCHEDULE SCHEDULE SURFACE
BACKSPLASH

4"
2' - 0" 2' - 0"
4" HEIGHT SOLID 4" HEIGHT SOLID
SURFACE INTEGRAL SURFACE INTEGRAL

5 1/2" 1 1/2"
4"
4"

COVE BACKSPLASH COVE BACKSPLASH


1 1/2"5 1/2"

SOLID SURFACE

NAVAL STATION MAYPORT, FLORIDA


COUNTERTOP (REFER
SOLID SURFACE SOLID SURFACE TO FINISH SCHEDULE)
COUNTERTOP (REFER COUNTERTOP (REFER
TO FINISH TO FINISH STEEL SUPPORT BRACKET
SCHEDULE). SCHEDULE). REFER TO ELEVATIONS
FOR LOCATIONS

DEPARTMENT OF THE NAVY


3' - 6"
11"
11"

BLOCKING AT WALLS

3' - 2"
PLASTIC LAMINATE ON PLASTIC LAMINATE ON ANCHOR BOLT
20 GA STUDS AND BLOCKING REQUIRED WHERE WALL
2' - 10"
2' - 10"

HUNG CABINETS, COUNTERTOPS, AND OTHER 3/4" PLYWOOD 3/4" PLYWOOD


APPURTENANCES (SMARTBOARDS, TV'S, REMOVABLE PANEL REMOVABLE PANEL

IPT - PWD
MARKERBOARDS, ETC) OCCUR. OTHERWISE GAUGE TO
MEET PERFORMANCE OUTLINED IN THESE WALL TYPES.
1 7/8" 1 7/8" BLOCKING AS
A REFER TO M.E.P. SHEETS, AND ANY EQUIPMENT SHEETS
FOR LOCATION OF APPURTENANCES. SEE DETAIL FOR
8" 8"
REQUIRED SCALE: AS NOTED
A
BLOCKING. BASE (REFER TO EPROJECT NO. 1389845

1' - 4"
1' - 4"

FINISH SCHEDULE) CONSTR. CONTR. NO.

N6945019D0907
FLOOR FINISH (REFER TO

FINISH FLOOR AS
SCHEDULED
FINISH FLOOR AS
SCHEDULED
FINISH SCHEDULE)
P427
1:54:05 PM
11/11/2019

NAVFAC DRAWING NO.

BLOCKING AT WALLS MILLWORK SECTION MILLWORK SECTION MILLWORK SECTION SHEET OF .

1 1/2" = 1'-0" 8 1 1/2" = 1'-0" A-501 7 1 1/2" = 1'-0" A-501 6 1 1/2" = 1'-0" A-506 5 A-809
FINAL, BUILDING (DP-2) - 13 NOVEMBER 2019
1 2 3 4 5

You might also like