You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12

KEY PLAN
FILLING DETAIL GREASE TRAP DETAIL DETAIL OF BASSERS

STOP
P
E A
L N
N
EO AP NO T
A A

N
STOP

VOL.=2.50m3
False sky

STOP

B B

M09-WW-25 NOTES

M09-WW-26
PLANT

BASS BASED OF WATER SERVED


Ø10MM @200MM
UP/DOWN

SANITARY
REGISTRATION DETAIL
C C

FOUNDATION

VENTILATION DOWN

RAIN WATER DOWN


Ø 110 mm
VENTILATION DOWN

BASS BASED OF WATER SERVED


DETAIL OF SUM OF
D
FLOOR FOR KITCHEN D

SANITARY FLOOR
M09-WW-25
Ø10MM @200MM

CAMERA FANGO

E E
M09-WW-26

WALLS
SECTION OF PIPE ON PLAN VIEW OF PIPE ON SECTION A
THE CONCRETE PARAPET THE CONCRETE PARAPET

Ø 110 mm
VENTILATION DOWN

BASS BASED OF WATER SERVED


100 mm
100 mm

F HASTING DETAIL CONNECTION BELOW F


FOUNDATION SLABS CONNECTION TO FINAL DOWNLOADS

PVC CLEANOUT
TEE WITH PLUG
INSTALLATION DETAIL INSTALLATION DETAIL
TOILET TYPE BASIN TYPE

900 mm
N. 8,50 AS BUILT
I.L. 7,90 RESPONSABLE DATE SIGN

G
N. 7,77 DPW G
200MM 2%

RPC

CGR

GENERAL NOTES REFERENCE DRAWINGS REVIEWS DESIGN RECORD SIGN DATE CONTRACT:
INST DETAIL SANIT. TYPE WASHBASIN
NUMBER DESCRIPTION REV. DESCRIPTION DA E D CED E E ED A ED
D CED B

The bases of the desing that will be taken into account for the calculation of the water systems of the Posorja project, in addition to A. ANDRADE 31/07/19
D-W-01-001-04 D W S R A B - G F 1 ISSUED FOR CLIENT APPROVAL 13/02/2019 DA AS JD
the bibliographies consulted. DE G E G EE
D-W-01-002-04 D W S R A B - F F 2 ISSUED FOR CLIENT APPROVAL 13/04/2019 DA AS JD
31/07/19 PROJECT: POSORJA MULTI- PURPOSE TERMINAL-BUILDING
1- DESING PARAMETERS OF INTERAGUA COMPANY. A. SANCHEZ
D-W-01-003-04 D W S R A B - S F 3 ISSUED FOR CLIENT APPROVAL 15/05/2019 AA AS JD WORKS
H 2- SANITARY INSTALLATIONS IN BUILDINGS, BY ING. GUSTAVO A. RUIZ M. AUGUST 2007. E E ED B H
AB AS BUILT 31/07/2019 AA AS JD DESCRIPTION:
3- ECUADORIAN CONSTRUCTION STANDAR DS NEC-11, CHAPTER 16 HYDRO-SANITARY NORMS THE WATER M. RODRÍGUEZ
31/07/19
4- MATERIAL TECHNICAL SPECIFICATIONS OF FOR SEWAGE INSTALLATIONS FOR DIFFERENT MANUFACTURERS IN TYPICAL GENERAL DETAILS FOR THE ADMINISTRATION
EC E G EE
ECUADOR BUILDING
31/07/19
J. DELGADO
C E D D
A A
H D A G C A E A A D C F DE A F A A D C E E F HE EF E E E H B ED H HE E E F D D E
A1 SHEET: REV.
31/07/19 DRAWING N°:
P. VELÁSQUEZ CA E OF

1 2 3 4 5 6 7 8 9 10 11 12

You might also like