China Harbour Engineering Company Ltd.
POSORJA MULTI-PURPOSE TERMINAL-TERMINAL WORKS
Level Surface Record ITP-CL06
Date Slope As Per Site Bench Mark Staff Reading Height of Instrument
Layer CHAINAGE
DESIGN DESIGN Slope As Per Site Slope As Per Site
ELEVATION ELEVATION
Surveyed By: Sheet Prepared by:
SURFACES TOLERENCE IN SPECIFICATIONS
DESIGN LEVEL
CONSTRUCTION LEVEL
INSPECTION
DIFFERENCE
DESIGN LEVEL
CONSTRUCTION LEVEL
INSPECTION
DIFFERENCE
DESIGN LEVEL
CONSTRUCTION LEVEL
INSPECTION
DIFFERENCE
DESIGN LEVEL
CONSTRUCTION LEVEL
INSPECTION
DIFFERENCE
DESIGN LEVEL
CONSTRUCTION LEVEL
INSPECTION
DIFFERENCE
DESIGN LEVEL
CONSTRUCTION LEVEL
INSPECTION
DIFFERENCE
DESIGN LEVEL
CONSTRUCTION LEVEL
INSPECTION
DIFFERENCE
Survey by: Reviewed by: Approved by:
Signature: Signature: Signature:
Date: Date: Date: