Inspection of ITP- I INR-
Steel Casing Welding CL05-2
CL-
Construction Site: Posorja multipurpose terminal-terminal works-
Part/Lot No.:
Section of Specs. : Drawing No.:
** Use the diagram to identify any Non-conform and locate the fail.
Total Length ____________
L1_______________ L2_______________ L3_______________ L4_______________
Inspections *
Date Does not
Work performed by: CHEC Sub-contr. : Conforms
conform
1 Identification number? Numb. ID
2 Steel Pipe Pile Diameter ___________
Acceptance Criteria
3 Thickness Inspection OK?
4 Measurement and thickness according with the specifications?
5 Circumference and Alignment of the Steel Pipe (Visual Check)
6 Free of bumps and damage?
7 Pile driving increments marked on
8
9
* Tick box as appropriate
The non-conformances found during the inspections have been remedied.
* Further checks to be stipulated by inspector.
Non-
conformances
Non-conformances
Description Date remedied?
yes no
1
2
3
4
Date: Date Date: Date:
Resp. execution: QC Inspector: Others: CGR: