You are on page 1of 1

1 2 3 4 5

APPR
KEY NOTES

NAME
2' - 8" 13' - 0" 4 1 3 2
1 DRINKING FOUNTAIN, SEE DETAIL 1/A-805
A-809 A-809 A-809 A-809 2 CEILING PER PLAN
3 FINISH FLOOR, SEE 'IN' DWGS.
4 BASE AND UPPER CABINETS W/ADJUSTABLE SHELVES. SEE DETAILS
4 11 4 5 COUNTER FOR SEATING 2'-10" A.F.F.
6 (4) VENDING MACHINES, SHOWN FOR REFERENCE ONLY (N.I.C.) REFER TO FF&E

SOFFIT AT KITCHEN AND VENDING


DWGS
7 DOOR PER PLAN
5 8 ALUMINUM WINDOW PER PLAN

14"
2' - 8"
9 LADDER TO HATCH
10' - 0"

10' - 0"
MW REF 10 FLOOR MOP SINK W/HOT AND COLD WATER AND A HOSE CONNECTION
D 11 SOLID SURFACE COUNTERTOP AND STAINLESS STEEL KITCHEN SINK PER
D

8' - 0"

8' - 0"

1' - 6"
COFFEE MW PLUMBING
12 3-PART RECYCLING STATION, SEE DETAIL 9/A-809
ICE

REVISIONS
2' - 10"

2' - 10"

DESCRIPTION
3
3

3' - 0"
15' - 1"

SYM
6 2-PART WASTE/RECYCLE
7
18' - 2"

LOUNGE 2ND FLOOR - COUNTER BAR LOUNGE 2ND FLOOR


1/4" = 1'-0" A-501 2 1/4" = 1'-0" A-501 1

TO TOP OF ROOF DECK


+/- 6' - 5"
5
A-809
1 8 5

C C
2 9 SEAL
2 G.C. INFO
2

10' - 0"

10' - 0"

10' - 0"
12

9 10
7
3

2' - 10"
3 3 3

A/E INFO

APPROVED

DRINKING FOUNTAIN (TYP.) JAN 2ND FLOOR JAN 2ND FLOOR LOUNGE 2ND FLOOR FOR COMMANDER NAVFAC

1/4" = 1'-0" A-501 6 1/4" = 1'-0" A-501 5 1/4" = 1'-0" A-501 4 1/4" = 1'-0" A-501 3 ACTIVITY
DATE .

SATISFACTORY TO
DATE .
DES BH DRW CG CHK EC
PM / DM .
BRANCH MANAGER .
CHIEF ENG/ARCH .
BIM 360://219041 - P427 LCS Training Facility Phase II/BLDG P427-1389845-A.rvt

GENERAL NOTES FPE .


B B

NAVAL FACILITIES ENGINEERING COMMAND

JACKSONVILLE, FLORIDA
1. REFER TO DETAILS ON SHEET A-805 FOR ALL TYPICAL AND ACCESSIBLE FIXTURE

NAVAL FACILITIES ENGINEERING COMMAND - SOUTHEAST


MOUNTING HEIGHTS.

P427 LCS TRAINING FACILITY PHASE II


2. REFER TO TYPICAL BLOCKING DETAIL

INTERIOR ELEVATIONS
NAVAL STATION MAYPORT, FLORIDA
DEPARTMENT OF THE NAVY

IPT - PWD
A SCALE: AS NOTED
A
EPROJECT NO. 1389845
CONSTR. CONTR. NO.

N6945019D0907
GRAPHIC SCALE

NORTH
P427
1:55:33 PM
11/11/2019

NAVFAC DRAWING NO.

SHEET OF .
0' 2' 4' 8' 16'
Scale: 1/4" = 1'-0" (1:48) A-506
FINAL, BUILDING (DP-2) - 13 NOVEMBER 2019
1 2 3 4 5