You are on page 1of 1
INSTALLATION GUIDE — P.T. BRACE [TEMPLATE SET OUT] STEP 4 FORM DIMENSION 'X’ o | | eros | Rm 5 Sue aT = (Gone So hse Soo Sern Fave uste rape Ete Sarr wnt SLAIN A PLAN VIEW POSITIONING OF TEMPLATE DETAIL 5 di ut-REMN FR IL + \ ramon Mine at BME SHOE, psn sven sip 2 “Swmeur =~ HST en BOLT por vce use tan che / name sae FoRWNORK =———_STEEL PLATE WELDED E ar = Dom - mm weer i lie ot euce a0 wa — st0 WL POSITIONING OF HOLDING DOWN BOLTS [sn ce = 560 all 10 WL PRIOR TO POURING OF CONCRETE |__| soo FT BRACE — 740 Wl. — 760 WA INSTALLATION KIT SUPPLIED NTE: one vom Dom sno wa BRACE LOCATION OPTION 1 or ence sw wa STEP 3 evoveporow PUNE SPECIALLY DESIGNED HOLD DOWNS CAST INTO SLAS a \- posmON 100K WASHERS TO SDE OF BoTiow CHANNEL OW BOLTS (Gy Br Bace WSTLLATON KT) PT_BRACE TO SLAB CONN, DETAIL pu = FOR 90 x 35 FRAME [TPE

You might also like