You are on page 1of 1

The real production plan does not have many changes from the

intaial plan I followed the steps directly as is but the time


assumption wasnt accurate I changed the time for example in
step one from 5 sec to 3 sec, also I added 2 more steps to my
plan to my plan to explain more about the pie charts and
tables, and also I added one more chart to my design to explain
money spent and saved, and I calculated the yearly budget on
the both the money spent and saved.

You might also like