EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN

HINDUSTAN PETROLEUM CORPORATION LIMITED,


KADAPA NEW IRD

1 RECOMMENDATIONS

Based on findings of HAZOP study in the form of HAZOP worksheets of KADAPA


PETROLEUM DEPOT, the aroused recommendations are listed in worksheets. However,
these are also summarized below as specific recommendations. Some other general
recommendations are listed under “General Recommendation” heading.

1. Specific Recommendations:

S.N. Recommendations Reference


from Sheet
Table Receipt of MS/HSD/SKO/FO from Wagon Unloading gantry to Storage
12 Tanks
1 Strict Visual Inspection of operations to be carried out 12.1.1
2 Calibration of the instruments to be carried out as per 12.1.1
schedule
3 Inspection & maintenance of valves / pipelines should be 12.1.2
carried out as per schedule
4 High pressure trip must be integrated with Pump 12.1.3
5 Adhere to the SOP & SMP’s 13.3.1
Table Receipt of Ethanol from TT Gantry to Ethanol U/G Tank
13
6 Visual Inspection of operations to be carried out 13.1.1
7 Inspection & maintenance of valves / pipelines to be carried 13.1.1
out as per schedule
8 Adhere to the SOP & SMP’s 13.1.1
Table Dispatch of Products from Storage Tanks through Product Pumps
14
9 It is required to follow relevant OISD for maintenance of 14.1.1
Pumps, valves & pipelines.
10 Adhere to the SOP & SMP’s 14.1.1
11 Seal Flushing / quenching system for clogging must be 14.1.2
checked regularly
12 Fire protection system check should include in regular 14.2.1
checklist to ensure the healthiness of the system.
Table VRU Operation-I
15
13 Scrubber to be put on circulation with PCV601 spill back on. 15.1.1
14 Check at site to rectify the possible causes. 15.1.1
15 Adherence to SOP 15.1.1
16 Reduction at TT loading operation. 15.2.2
17 Close monitoring of parameters with respect to design. 15.2.2
18 Stack area to check for any spillage due to PSV opening. 15.3.2
19 Ensure adequate number of fire monitor/hydrant in stack 15.3.2

Revision No. 0 EC Chapter 1 /1


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

S.N. Recommendations Reference


from Sheet
area.
Table VRU Operation-II
16
20 Schedule Maintenance checklist should be follow up strictly for 16.1.1
healthiness of pump
21 Instrument interlocks simulation checklist should be follow up 16.1.1
strictly.
22 Adherence to SOP. 16.1.1
23 Field check for cause rectification. 16.1.2
24 High bed temperature safety interlocks should act. 16.2.2
Table VRU Operation-III
17
25 UCV045 and PC045 should include in safety interlocks. 17.1.1
26 PCV197 closer should incorporate with opening of UV196. 17.1.3
27 Vacuum pump should trip at PS064HH and TISA062HH. 17.1.3
28 Adherence to SOP 17.3.1
Table VRU Operation-IV
15
29 Operation to step up to increase the vapor recovery at first 18.1.3
two stages.
30 HV186 should float with stack directly if PC187/VP101 very 18.3.1
low and QT587 shows very very low HC content.
31 Adherence to SOP. 18.3.1

2. General Recommendations:

1. Strict supervision of Depot personnel during Loading of Petroleum products in


storage tanks, loading of tank trucks, blending of ethanol with MS during MS
TT Loading operation, should be carried out.

2. Any change/replacement /removal, addition etc in facility instrument /valve


/setting /cut off/trip /alarms setting must be ensured of safe operation and
updated in P&ID.

3. Integrity of instrumentation, facilities must be ensured periodically through


calibration and other verification measures.

4. In case of major change in process parameter /facility, risk analysis and


HAZOP study must be carries out.

5. Maintenance of pumps must be done as per OISD-STD 119.

6. Mechanical seal of pipeline, flange joints of valves should be regularly


monitored to prevent leakage.

Revision No. 0 EC Chapter 1 /2


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

7. Visual inspection of pipeline must be done regularly to locate leaks.


8. MSDS of petroleum products should be followed while handling & storage.

9. Earthing must be provided on the pipeline & storage tanks and should be
checked.

10. All the hydrant points should be easily accessible. All should be in working
condition. Maintenance of all fire fighting systems should be done on regular
basis as per schedule developed at Depot.

11. Back washing of strainer should be done in regular interval in order to avoid
chocking.

12. All Electrical Equipment & their installation should be as per OISD standard
137. All electrical fittings should be flame proof type.

Revision No. 0 EC Chapter 1 /3


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

APPENDIX – I: MATERIAL SAFETY DATA SHEET (MSDS)

Material Safety Data Sheet (MSDS) For MS

A. Identification

CAS No. : Not Available


Typical Composition : Blend of paraffin’s, napthenes, aromatics & olefins
Characteristics : Orange to bronze in appearance, Liquid with
perceptible odor, immiscible in water, Lighter than
water

B. Physical Properties

Specific Gravity : 0.72 (Range)


Boiling Point : 25°C to 225°C (Variable with season & location)
Flash Point : - 45°C
Auto Ignition Temp. : 280 to 429°C
Vapor Pressure : 0.35-1.05 Kgf/cm2 (max.) @ 37°C
Vapor Density : 3 to 4 (Range) (Air = 1)
Percent Volatile : 99+
Flammability Limits : Lower (LEL) = 1.4%; Upper (UEL) = 7.4%
Category : Class A (Flash Point <23°C)
Reactivity : On Exposure to Thermal Energy & Light, it is stable.
Incompatibility with strong oxidizers. Normal
Combustion forms CO2 & Water. Incomplete
Combustion can produce Carbon Monoxide (CO).
C. Fire/Explosion Hazards

This oil presents an extreme fire hazard. Liquid evaporates very quickly, even
at low temperatures, and forms vapor, which can catch fire & burn with
explosive violence. Invisible vapor is heavier than air & spreads along the
ground (that is why more susceptible to meet with an ignition source). It can
be set on fire by many sources such as pilot lights, welding unit, and spark
from electrical motors & switches. Heating can cause pressure rise with risk of
bursting & subsequent explosion.

Fire Fighting: Foam, carbon dioxide, dry chemical powder, halones or water
sprays/fog to be used.

D. Health Hazards

IDLH : 5000 ppm


TLV/TWA : 300 ppm
Target Organs : Respiratory system, Eyes, Skin.
Pathway : Inhalation, Ingestion, Skin & Eye contact.
Symptoms : Lightheadedness, drowsiness, irritation in eyes,
nose, skin, dermatitis.

E. First Aid

Revision No. 0 EC Chapter 1 /4


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Eye - If this chemical contacts the eyes, immediately wash the eyes with
large amount of water, occasionally lifting lower and upper lids. Get
medical attention immediately. Contact lenses should not be worn
when working with this chemical.

Skin - If this chemical contacts the skin, promptly wash the contaminated
skin with soap and water. If this chemical penetrates the clothing,
promptly remove the clothing and wash the skin with soap and
water. Get medical attention promptly.

Breath - If a person breathes large amounts of this chemical, move the


exposed person to fresh air at once. If breathing has stopped,
perform mouth- to mouth resuscitation. Keep the affected person
warm and at rest. Get medical attention as soon as possible.

Swallow - If this chemical has been swallowed, get medical attention


immediately. Do not make person vomit

Material Safety Data Sheet (MSDS) For SKO

A. Identification

CAS No. : 8008-20-6


Typical Composition : Blend of aromatics & olefins
Characteristics : Colorless liquid, insoluble in water, Lighter
than water

B. Physical Properties

Specific Gravity : 0.76 (Range)


Boiling Point : 180°C to 250°C (Variable with season &
location)
Flash Point : 21°C to 55°C
Auto Ignition Temp. : 254 °C
Vapor Density : 4.5 (Air = 1)
Category : Class B (23°C < F.P. > 65°C)
Reactivity : Stable under normal storage conditions.
Incomplete combustion can produce
Carbon Monoxide.

C. Fire/Explosion Hazards

This oil presents a moderate fire hazard. The vapor is invisible, heavier than
air and spreads along the ground. Heating can cause pressure rise with risk
of bursting and subsequent explosion

Fire Fighting: Foam, carbon dioxide, dry chemical powder, halones or water
sprays /fog to be used.

Revision No. 0 EC Chapter 1 /5


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

D. Health Hazards

IDLH : Not Available


TLV/TWA : 200 ppm
Target Organs : Eyes & Skin
Pathway : Inhalation, Ingestion, Skin & Eye contact
Symptoms : Irritation in skin, nose & eyes, headache.

E. First Aid

Eye - If this chemical contacts the eyes, immediately wash the eyes
with large amount of water, occasionally lifting lower and upper
lids. Get medical attention immediately. Contact lenses should
not be worn when working with this chemical.

Skin - If this chemical contacts the skin, promptly wash the


contaminated skin with soap and water. If this chemical
penetrates the clothing, promptly remove the clothing and wash
the skin with soap and water. Get medical attention promptly.

Breath - If a person breathes large amounts of this chemical, move the


exposed person to fresh air at once. If breathing has stopped,
perform mouth-to-mouth resuscitation. Keep the affected person
warm and at rest. Get medical attention as soon as possible.

Swallow - If this chemical has been swallowed, get medical attention


immediately. Do not make person vomit

Material Safety Data Sheet (MSDS) For HSD

A. Identification

CAS No. : Not Available


Typical Composition : Mixture of aromatics & olefins
Characteristics : Pale yellow oily liquid with odor, insoluble in
water

B. Physical Properties

Specific Gravity : 0.82 (Range)


Boiling Point : 225 to 300°C (Variable with season and location)
Flash Point : 55°C to 100°C
Auto Ignition Temp. : 277 °C
Flammability Limits : Lower (LEL): 1.3%; Upper (UEL): 6%
Category : Class B (23°C < F.P. > 65°C)
Reactivity : Stable under normal storage conditions.
Incomplete combustion can produce Carbon
Monoxide.
C. Fire/Explosion Hazards

Revision No. 0 EC Chapter 1 /6


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

This oil presents a moderate fire hazard. Heating can cause pressure rise with
risk of bursting and subsequent explosion. Can form explosive mixture with
air particularly in empty containers.

Fire Fighting: Foam, carbon dioxide, dry chemical powder, halones or water
sprays/ fog to be used.

D. Health Hazards

IDLH : Not Available


TLV/TWA : Not Available
Target Organs : Respiratory system, CNS
Pathway : By inhalation
Symptoms : Lightheadedness, drowsiness, irritation in
eyes, nose, skin, vomiting.

E. First Aid :

Eye - If this chemical contacts the eyes, immediately wash the eyes with
large amount of water, occasionally lifting lower and upper lids. Get
medical attention immediately. Contact lenses should not be worn
when working with this chemical.

Skin - If this chemical contacts the skin, promptly wash the contaminated
skin with soap and water. If this chemical penetrates the clothing,
promptly remove the clothing and wash the skin with soap and
water. Get medical attention promptly.

Breath - If a person breathes large amounts of this chemical, move the


exposed person to fresh air at once. If breathing has stopped,
perform mouth-to-mouth resuscitation. Keep the affected person
warm and at rest. Get medical attention as soon as possible.

Swallow - If this chemical has been swallowed, get medical attention


immediately. Do not make person vomit

Material Safety Data Sheet (MSDS) For Ethanol

A. Identification

CAS No. : 64-17-5


Typical Composition : Mixture of aromatics & olefins
Characteristics : Colorless liquid with Alcohol odor, soluble in water,
miscible with chloroform & ether
B. Physical Properties

Specific Gravity : 0.79


Boiling Point : 78.32°C
Flash Point : 13.0 (CC) 17.8°C (OC)
Auto Ignition Temp. : 422.7 °C
Flammability Limits : Lower (LEL): 3%; Upper (UEL) : 19%

Revision No. 0 EC Chapter 1 /7


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Category : Class A (F.P < 23°C.)


Reactivity : Stable under normal storage conditions. Reacts
violently with Acetyl bromide (Evolves hydrogen
bromide), Dichloromethane + Sulfuric Acid +Nitrate
or Nitrite, Disulfuryl. Tetrachlorisilane + water and
strong oxidents.

C. Fire/Explosion Hazards

Forms explosive products on reaction with ammonia + silver nitrate (forms


silver nitrite and silver fulminate)

Fire Fighting: Alcohol Foam, carbon dioxide, dry chemical powder, halones is
used.

D. Health Hazards

IDLH : Not Available


TLV/TWA : 1000 ppm
Target Organs : Respiratory system, Liver
Pathway : By inhalation, Ingestion, Eyes, Skin
Symptoms : Lightheadedness, drowsiness, irritation in eyes,
nose, throat, skin.

E. First Aid:

Eye - If this chemical contact the eyes, immediately wash the eyes with
large amount of water for 15 min, occasionally lifting lower and
upper lids. Get medical attention immediately. Contact lenses should
not be worn when working with this chemical.

Skin - If this chemical contacts the skin, promptly wash the contaminated
skin with soap and water. If this chemical penetrates the clothing,
promptly remove the clothing and wash the skin with soap and
water. Get medical attention promptly.

Breath - If a person breathes large amounts of this chemical, move the


exposed person to fresh air at once. If breathing has stopped,
perform mouth-to-mouth resuscitation. Keep the affected person
warm and at rest. Get medical attention as soon as possible.

Material Safety Data Sheet (MSDS) For FO

Identification

CAS No. : 68476


Typical Composition : A complex Mixture of hydrocarbon
Characteristics : Brown to black colour liquid with Characteristic
smell (Diesel like), insoluble in water.

B. Physical Properties

Revision No. 0 EC Chapter 1 /8


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Specific Gravity : 0.9


Boiling Point : 185 - 500°C
Flash Point : 66°C
Auto Ignition Temp. : 263 - 407°C
Flammability Limits : Lower (LEL): 1%; Upper (UEL) : 5%
Category : Class C (F.P > 65°C.)
Reactivity : Stable under normal storage conditions. Hazardous
on combustion, products are Carbon dioxide, Carbon
monoxide and sulphur dioxide.

D. Fire/Explosion Hazards

FO is a combustible liquid and flammable liquid.

Fire Fighting: Carbon dioxide, dry chemical powder, Aqueous Film coating
foam are used. Water spray to be used to cool containers if exposed to fire.

D. Health Hazards

IDLH : Not Available


TLV/TWA : 10 mg/cu.m (If H2S present)
Target Organs : Respiratory system
Pathway : By inhalation, Ingestion, Eyes, Skin
Symptoms : Lightheadedness, drowsiness, irritation in eyes,
nose, throat, skin, Spontaneous Vomiting.

E. First Aid:

Eye - If this chemical contact the eyes, immediately wash the eyes with
large amount of water for 15 min, occasionally lifting lower and
upper lids. Get medical attention immediately. Contact lenses should
not be worn when working with this chemical.

Skin - If this chemical contacts the skin, promptly wash the contaminated
skin with soap and water. If this chemical penetrates the clothing,
promptly remove the clothing and wash the skin with soap and
water. Get medical attention promptly.

Breath - If a person breathes large amounts of this chemical, move the


exposed person to fresh air at once. Keep the affected person warm
and at rest. Do not induce vomiting if ingested. Affected body parts
to be washed with water and soap. Wash eyes thoroughly with
water.

Revision No. 0 EC Chapter 1 /9


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 1

Introduction
(As per Clause No 1.0 of PNGRB Notification Dated 18th January 2010)

1.0 INTRODUCTION:

Revision No. 0 EC Chapter 1 /10


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Hindustan Petroleum Corporation Limited (HPCL) is a Government of India enterprise


operating in the Oil and Natural Gas sector which has been conferred with the Navratna
Status. Apart from various other innumerable recognitions, it also holds the distinction of
featuring in the prestigious Forbes 2000 and Global Fortune 500 lists and enjoys a
market share of 21.25% among PSUs in India.
In the past financial year, HPCL has recorded the highest ever profit after tax of ₹ 2,733
crores in the history of the corporation with an increase of around 58% compared to the
corresponding period last year. Our Market capitalization on year-on-year basis
increased by about ₹ 4,500 crores at the closing share price of ₹ 785.55 per share as on
March 31, 2016. This has been possible because of our robust performance in all spheres
including Refining, Marketing, Retail, Direct Sales, LPG, Aviation, Operations and
Distribution, Projects & Pipeline Group, LNG and other services.
HPCL has always taken pride in acknowledging the efforts of its workforce which have
resulted in setting a high industry benchmark in its core competencies. We at HPCL
believe that of all the resources our employees are the most vital ones. Towards fulfilling
its Mission- to be a fully integrated company in the hydrocarbons sector of exploration
and production, refining and marketing; focusing on enhancement of productivity,
quality and profitability; HPCL invites bright and dynamic professionals to join its team in
various disciplines.

HPCL's vast marketing network consists of 13 Zonal offices in major cities and 106
Regional Office facilitated by a Supply and Distribution infrastructure comprising of
Terminals, Pipeline networks, Aviation Service Stations, LPG Bottling Plants, Inland Relay
Depots & Retail Outlets, Lube and LPG Distributorships.

HPCL operates two major refineries at Mumbai and Vishakhapatnam producing a wide
variety of petroleum fuels & specialties, with a total refining capacity of 14.8 MMTPA.
HPCL holds an equity stake of 16.95% in Mangalore Refinery and Petrochemicals
Limited, a state-of-the-art refinery with a capacity of 15 MMTPA. The fourth refinery of 9
MMTPA set up by HMEL, a Joint Venture with Mittal Energy Investments Pvt. Ltd has also
commenced commercial operations at Bathinda, Punjab.
HPCL also owns and operates the largest Lube Refinery in India producing Lube Base Oils
of international standards, with a capacity of 428 TMT. This Lube Refinery accounts for
over 40% of the India's total Lube Base Oil production.

2.0 GEOGRAPHICAL LOCATION:

2.1 Location:

M/s Hindustan Petroleum Corporation Limited (HPCL) has one of its a bulk petroleum oil
Terminal & marketing division of Motor Spirit (MS), High Speed Diesel (HSD), Superior
Kerosene Oil (SKO), Ethanol, Furnace Oil (FO) and Lubes at Bakrapet village, Kadapa-
Rajampeth road, Kadapa, dist: Kadapa, Andhra Pradesh state.

2.2Geological Settings:

Revision No. 0 EC Chapter 1 /11


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

The area is surrounded on three sides by the Nallamala and Palkonda Hills lying on the
tectonic landscape between the Eastern and Western ghats with an altitude of around
312 meters above sea level.

2.3 Topography :

The plant is surrounded by vacant place and hilly area

2.4 Soil Profile:

The region is occupied by the Black and Red ferrous soils.

2.5 Hydro – Geological Settings:

Lithology: coarse-grained granite, granite gneiss and diorite with scattered dolerite
dykes
Formation: Oldest Rocks (Precambrian and Upper Crataceous to Lower Miocene periods)
Structural features & Texture: Medium to fine grained
Soil: Black and Red ferrous soils
Recharge: Moderate

2.6 Water Resources:

There are surface or subsurface water resources in this area. The ground water is
available at a depth ranging from 107m to 207m below ground level. For day to day
operations & Domestic purpose water is supplied by MADC.

2.7 Land Use:

Land is plain and surrounded by hills

3.0 DEMOGRAPHY DETAILS:

3.1 Demography:

The area is densely populated. The area has a total population of about 17718 persons
comprising of Bhakarapeth, Mandapalle, Kanumalapalle, Peddapalli and Nekanapuram
etc.

3.2 Socio – Economic Pattern:

The surrounding area of 6 sq. km has a total population of about 20,000. Total workers
population is about 40% of which male population is about 75% while female population
is about 25%.

4.0 METEROLOGICAL DATA:

Revision No. 0 EC Chapter 1 /12


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

4.1 Meteorological Data:


Maximum Temperature - 40.0o C
Minimum Temperature - 16.8o C
Maximum Rainfall - 5.2 mm
Maximum Relative Humidity - 84 %
Minimum Relative Humidity - 26 %
Wind Speed:
Maximum Mean - 5 Kmph
Minimum Mean - 10 Kmph
Predominant wind Direction - From East to West
Floods - Nil

4.2 Climate:

Kadapa has a tropical wet and dry climate characterised by year round high
temperatures. It has a record of reaching more than 50 degree Celsius Summers are
especially uncomfortable with hot and humid climate. During this time temperatures
range from a minimum of 34 °C and can rise up to a maximum of 40 °C. Temperatures
are range in the mid thirties during the day. Humidity is around 75% during the summer
months. Monsoon season brings substantial rain to the area. Kadapa gets rainfall from
both the South west monsoon as well as the North East Monsoon. June to October is
usually the monsoon. Winters are comparatively milder and the temperatures are lower
after the onset of the monsoons.

4.3 Wind:
WIND SPEED AND WIND DIRECTION

Average mean wind speed (Kmph)

Revision No. 0 EC Chapter 1 /13


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

4.4 Relative Humidity

The daily relative humidity values are observed to range between 26 - 84%.

4.5 Temperature:

(a) Maximum: 40 0C (b) Minimum: 16.8 0C (c) Average: 24.4 0C

4.6 Rainfall:
Monsoon season brings substantial rain to the area. Kadapa gets rainfall from both
the South west monsoon as well as the North East Monsoon. June to October is usually
the monsoon.

4.7 Wind Velocity / Directions:

Wind Speed

Annual Average: 2.33 m/s

Wind Speed in Kadappa, Andhra Pradesh, India

Wind Speed

Annual Average:

Revision No. 0 EC Chapter 1 /14


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Geographical Information
Latitude 14.245945
Longitude 78.563500

DETAILS OF OCCUPIER/MANAGER:

Occupier : Mr. R VENU MADHAV


DGM-RETAIL,KADAPA RO

Address Office : HPCL, CHENGALVA TOWER, KADAPA.


Phone Office : 08562338511
Mobile No. : 9441886323
Email id : rvmadhav@hpcl.in

Plant Manager : Mr. P.VENKATA RAO


CHIEF DEPOT MANAGER.

Address Office : HPCL, KADAPA NEW IRD


PEDDAPALLI VILLAGE
SIDHOUT MANDAL, KADAPA-516247

Revision No. 0 EC Chapter 1 /15


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Contact Details

Phone Office : 08562338500


Mobile No. : 7382158158
Email id : pothalavrao@hpcl.in

5.0 Description of Facilities and Process:

Kadapa terminal is receiving the petroleum products from HPCL Vijayawada & Chennai
POL Terminals through Railway Wagons. These petroleum products include Motor Spirit
(MS), High Speed Diesel (HSD), Superior Kerosene Oil (SKO) and Furnace Oil (FO).
Ethanol is received through truck tanker. Kadapa new Depot is an intermediate stock
point for feeding HPCL’s retail outlets (RO) in the Kadapa, Chitoor & Kurnool Districts
surrounding area to ensure there is no distruption in the feed from the terminals to the
ROs. The products are filled in the separate aboveground tanks and dispatched from the
terminal by road tankers. The existing storage terminal consists of 08 aboveground and
05 underground tanks

This Installation is functional since 2015 & operated in accordance with the provisions of
licenses consents granted by the Chief Controller of Explosives, Govt. of India. Director
of Industrial Safety & Health, Andhra Pradesh and Andhra Pradesh Pollution Control
Board as per the relevant statutory Acts and Rules of Govt. of India and Andhra Pradesh.
The installation has been designed, operated and maintained in accordance with the
statutory provisions and industry standards to ensure its safe and smooth functioning.
his installation at present has total storage capacity of Thirty four Thousand, six hundred
& twenty Kilo Liters (34,620 KL) of petroleum products like Motor Spirit, Kerosene, ,
High Speed Diesel, Ethanol, FO and slop.

5.1 Fire Protection Safety:

As the Petroleum Products are flammable and can catch fire if exposed to ignition,
facilities and Operations of the POL Products are designed and maintained to prevent any
incidence of fire. All internal electrical facilities are designed are Flame Proof to prevent
generation of spark. Inside the filling sheds floorings are covered with mastic flooring.
Tank Trucks are allowed to enter with spark arrestors only so that sparks do not come
out with exhaust from the trucks. Earthing system is provided to dissipate static
electrical charges to eliminate the chances of spark during product handling. Precautions
are taken during execution of maintenance and project works involving welding, cutting,
grinding or any other action that can generate spark.

The POL terminal takes adequate care and precautions in its Operations, however in an
unlikely event of fire plant is equipped with fire fighting facilities which includes DCP fire
extinguishers,Co2 fire extinguishers, sprinkler system with full fledged Hydrant system in
auto mode.

Revision No. 0 EC Chapter 1 /16


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Mock Fire Drills are conducted on regular basis to assess the preparedness of the
employees in handling situations of exigencies and regular training for the same is
imparted to them.

5.2 Facilities:

5.2.1 Storage tank details, quantity & storing method:


S. Product Flammabil Tank Size of Tank Storage Type of
N. Name ity Class No. Capacity Tank
Dia. Ht. in KL
(m) (m)
1 MS A
101-A 17 14 2800
2 MS A FRV
101-B 17 14 2800
3 MS A
102 3 M ф 10.5 70
4 ETHANOL A 103 3.5 M ф 10.5 100
5 ETHANOL A 104 3.5 M ф 10.5 100 U/G Tank
6 ETHANOL A 105 4.0 M 15.0 180
ф
7 ETHANOL A 106 4.0 M 15.0 180
ф
Total Storage Capacity of MS/ETHANOL in KL 6230

6 HSD B 201-A 29 13.5 8400


7 HSD B 201-B 29 13.5 8400
8 SKO B 202-A 14 9 1300 CRV
9 SKO B 202-B 14 9 1300
10 HSD B 203 3Mф 10.5 70
11 SKO B 204 3Mф 10.5 70 U/G TANK
12 Biodiesel B 205 3Mф 10.5 70
Total Storage Capacity of HSD/SKO in KL 19610

13 FO C 301-A 20.5 14 4390


CRV
14 FO C 301-B 20.5 14 4390

Total Storage Capacity of FO in KL 8780

Maximum inventory of POL product at Plant 34,620 KL

Revision No. 0 EC Chapter 1 /17


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

5.2.2 Pump facilities:

S. Pump No. Product Capacit Head Description Utility


N. y (LPM) (MLC)
1. U05676/1/12 FO 7200 60 Tank Wagon Unloading Working
Pumps
2. U05677/1/12 FO 7200 60 Tank Wagon Unloading Working
Pumps
3. U05678/1/12 FO 7200 60 Tank Wagon Unloading Standby
Pumps
4. 1376411007 SKO 6000 60 Tank Wagon Unloading Working
Pumps
5. 1376411008 SKO 6000 60 Tank Wagon Unloading Standby
Pumps
6. 1373311042 MS 6000 50 Tank Wagon Unloading Working
Pumps
7. 1373311040 MS 6000 50 Tank Wagon Unloading Working
Pumps
8. 1373311041 MS 6000 50 Tank Wagon Unloading Standby
Pumps
9. 1379511011 HSD 8000 60 Tank Wagon Unloading Working
Pumps
10. 1379511010 HSD 8000 60 Tank Wagon Unloading Working
Pumps
11. 1379511012 HSD 8000 60 Tank Wagon Unloading Standby
Pumps
12. 1373311037 HSD 5000 50 Tank Truck Loading Working
13. 1373311038 HSD 5000 50 Tank Truck Loading Working
14. 1373311039 HSD 5000 50 Tank Truck Loading Working
15. 5008 HSD 5000 50 Tank Truck Loading Standby
16. 5009 HSD 5000 50 Tank Truck Loading Standby
17. 5007 HSD 5000 50 Tank Truck Loading Standby
18. 1376111132 MS 3600 50 Tank Truck Loading Working
19. 1376111134 MS 3600 50 Tank Truck Loading Working
20. 1376111133 MS 3600 50 Tank Truck Loading Working
21. 5046 MS 3600 50 Tank Truck Loading Standby

Revision No. 0 EC Chapter 1 /18


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

S. Pump No. Product Capacit Head Description Utility


N. y (LPM) (MLC)
22. 5045 MS 3600 50 Tank Truck Loading Standby
23. 5044 MS 3600 50 Tank Truck Loading Standby
24. 1376111135 SKO 3600 50 Tank Truck Loading Working
25. 1376111136 SKO 3600 50 Tank Truck Loading Working
26. 5043 SKO 3600 50 Tank Truck Loading Standby
27. U05625/1/12 FO 7200 50 Tank Truck Loading Working
28. U05626/1/12 FO 7200 50 Tank Truck Loading Standby
29. 303 HSD 600 40 U/G Tank pump Working
30. 301 MS 600 40 U/G Tank pump Working
31. 302 SKO 600 40 U/G Tank pump Working
32. 305 ETHANOL 1200 50 U/G Tank pump Working
33. 306 ETHANOL 1200 50 U/G Tank pump Standby
34. 105 ETHANOL 1440 72 U/G Tank pump Working
35. 106 ETHANOL 1440 72 U/G Tank pump Working
36. 106 (A) ETHANOL 1440 72 U/G Tank pump Standby

5.2.3 Product Loading and Unloading

Kadapa terminal is receiving the petroleum products from HPCL Vijayawada POL &
Chennai POL terminal through railway wagon. Kadapa Terminal is an intermediate stock
point for feeding HPCL’s retail outlets (RO) in the Kadapa, Chitoor & Kurnool Districts
surrounding area to ensure there is no disruption in the feed from the terminals to the
ROs. These received POL products are stored in designated storage tanks and
distributions of these products are carried out by road tankers and wagons to different
consumers.

Terminal has TT loading and TW unloading facilities. TT Gantry has total sixteen bays
with latest arms for loading and unloading and two separate bays for FO. Product of
capacity of 18 MT gets loaded from here. The Installation normally receives MS, HSD,
SKO, FO and Ethanol products from HPCL Vijayawada POL & Chennai POL terminal
through railway wagon Mode of transportation and dispatch to the end consumers are
through road.

5.2.4 Fire Fighting Facilities:

S.N Equipment As per OISD Availability


. At Terminal
A. Fire Extinguishers

1 Lube Godown 1 No. 10 Kg DCP Extinguisher for 3 x 10 Kg


every 200 m2 or min. 2 Nos. in each DCP;2 X
Godown Whichever is Higher 4.5Kg CO2
type

Revision No. 0 EC Chapter 1 /19


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

S.N Equipment As per OISD Availability


. At Terminal
2 Lube Filling Shed 1 No. 10 Kg DCP Extinguisher for 200 Available
m2 or min. 2 Nos. in each shed
whichever is Higher
Pump House (Class A/B): 15 x 10 Kg
3 Up to 50 HP 1 No. 10 Kg DCP for 2 Pumps DCP;
Above 50-100 HP 1 No. 10 Kg DCP for Each Pumps 1 X 25 Kg
Beyond 100 HP 2 Nos. of 10 Kg or 1 No. of 25 Kg DCP DCP
for each Pump
8 x 10 Kg
DCP; 1 X 25
Kg DCP
4 Pump House (Class C): 1 No. 10 Kg DCP for every 4 Pumps up Available
Up to 50 HP to 50 HP
Above 50 HP 2 Nos. of 1 0 Kg DCP or 1 x 25 Kg DCP
for 4 Pumps
5 Tank Truck Loading & 1 No. 10 Kg DCP Extinguisher for each 16 x 10 Kg
Unloading Gantry for Bay + DCP; 2 x 75
POL/Special Products 1 No. 75 Kg DCP Extinguisher for Each Kg DCP
Gantry
6 Tank Wagon Loading & 1 No. of 10 Kg DCP Extinguisher for 38 x 10 Kg
Unloading Gantry/Siding every 30 m of Gantry/Siding + DCP; 2 x 75
1 No. 75 Kg DCP Extinguisher for Each Kg DCP; 2 X
Gantry/Siding 25 Kg & 1X
Sand Bucket
7 A/G Tank Farm 2 Nos. 10 Kg DCP Extinguisher for 18 x 10 Kg
each Tank + DCP; 16 X 25
4 Nos. 25 Kg Extinguishers for each Kg DCP
Tank Farm positioned at 4 corners.
(In Case of Adjoining Tank Farms the
No. of 25 Kg Extinguishers can be
reduced by 2 No. per Tank Farm)
8 U/G Tank Farm 2 No. 10 Kg DCP Extinguisher for Each 4 x 10 Kg
Tank Farm DCP; 1 X 25
Kg DCP.
9 Other pump Houses 1 No. 10 Kg DCP Extinguishers for 13 x 10 Kg
every two pumps or min. DCP
2 No. 10 Kg DCP Extinguisher for each
pump House whichever is Higher
10 Admin Building/Store 1 No. 10 Kg DCP Extinguisher for 6 x 10 Kg
House every 200 m2 or min. DCP; 4 x 2 Kg
2 Nos. 10 Kg DCP Extinguisher for CO2; 4 x 2.5
each floor of Building/Store s Kg Clean
whichever is Higher Agent
11 VRU Vapour recovery unit, design with all 2 x 10 Kg
safety aspects. DCP; 1 x 75
Kg CO2
12 Main Switch Room/Sub- 1 No. 4.5 Kg CO2 Extinguisher for Available
Station every 25 m2 +

Revision No. 0 EC Chapter 1 /20


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

S.N Equipment As per OISD Availability


. At Terminal
1 No. 9 Lit. Sand Bucket
13 Computer Room / Cabin 2 No. of 2 Kg CO2 or 2 Nos. of 2.5 Kg 1 x 10 Kg
Clean Agent Extinguisher per DCP; 4 x 2 Kg
Computer Room & CO2; 4 x 2.5
1 No. 2 Kg CO2 or 1 No. 1 Kg Clean Kg Clean
Agent Extinguisher per Cabin Agent
14 Security Cabin 1 No. 10 Kg DCP Extinguisher per 2 Kg DCP
Cabin
15 Canteen 1 No. 10 Kg DCP Extinguisher for 100 2 X 10 Kg
m2 DCP
16 Workshop 1 No. 10 Kg DCP Extinguisher & 1 X 10 Kg
1 No. 2 Kg CO2 Extinguisher DCP;
1 X 4.5 Kg
CO2
17 Laboratory 1 No. 10 Kg DCP Extinguisher & 2 X 10 Kg
1 No. 4.5 Kg CO2 Extinguisher DCP; 1X 4.5
Kg CO2
18 Oil Sample Storage 1 No. 10 Kg DCP Extinguisher per 100 Available
Room m2 or min.
1 No. 10 Kg DCP Extinguisher per
Room Whichever is Higher
19 Oil Water Separator/ETP 1 No. 75 Kg DCP & Available
2 No. 10 Kg DCP Extinguisher
20 Transformer 1 No. 10 Kg DCP Extinguisher per Available
Transformer
21 Accessories
1. Sand Scoops 4 in Nos. 4 in Nos.
2. Safety Helmets 1 no. per Person Available
3. Stretcher with 2 in Nos. Available
Blanket
4. First Aid Box 1 No. 05 nos
5. Rubber Hand Gloves 2 Pairs 05 pairs
6. Explosive Meter 1 No. Available
7. Fire Proximity Suit 1 Suit 02
8. Resuscitator 1 No. Available
9. Electric Siren 3 km 1 No. Available
Range
10. Hand Operated Siren 1 each at strategic locations 02 Nos.
11. Water jet Blankets 1 No. Available
12. Red/Green Flag for 2 Nos. in each colour Available
fire Drill
13. SCBA Set (30 min 1 set with spare cylinder Available
capacity)
14. PA System 1 No. 05

Revision No. 0 EC Chapter 1 /21


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

S.N Equipment As per OISD Availability


. At Terminal
15. Hose Box Between two Hydrant points 62 in No.
16. Fire Hose 2 Nos. per Hose Box 140
17. Jet Nozzle In each Hose Box 66 in Nos.
C. Wheeled fire fighting Equipment
22 Water/Foam Monitors Available
(Nos.) More than 2 Nos. of 1000 GPM each
For Installation having
aggregate capacity more
than 10,000 KL
1 No.
Foam Compound Trolley 2 Nos.
200/210 liters based on 3 Nos.
tank diameter
Up to 24 m dia. tank,
up to 24 to 30 m
diameter tanks,
above 30 m dia. tanks
23 Hoses 30% of the total No. of Hydrant Outlet Available
or minimum 10 Nos.
24 Nozzles Available
Jet Nozzles with branch At least 2 in Nos.
pipe At least 2 in Nos.
Fog nozzles At least 2 in Nos.
Universal Nozzles At least 2 in Nos.
Foam Branch Type At least 2 in Nos.
Water Curtain nozzle

5.2.5 PPE : Life Saving Equipment:

S. No. Name of PPE No. of PPE


1. Helmet 30
2. Safety Shoes 20
3. Safety Belt 60
4. Safety Goggles 10
5. FLP Torch 2
6. Stretcher 2
7. Compressed Air Breathing 1
Apparatus Set
8. Refill Cylinders for all 2
Breathing Apparatus Set
9. Breathing Apparatus Set 2
10. Gloves Electrical (11 KVA) 2
11. Cotton Hand Gloves 5
12. PVC Suit 2

Revision No. 0 EC Chapter 1 /22


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

S. No. Name of PPE No. of PPE


13. Fire Proximity Suit 1
14. Gum Boots 3

5.2.6 Water Source:

Municipal corporation water supply for domestic purpose.

CHAPTER – 2

Terms & Definitions


(As per Clause No 2.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /23


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Terms & Definitions (Clause No 2.0)

Terms & Definitions in this ERDMP document are same as given in PNGRB Act
& Regulations G.S.R. 39(E). Definitions are reproduced below:

Definitions.

(1) In this ERDMP document, unless the context otherwise requires

(a) “Act” means the Petroleum and Natural Gas Regulatory Board Act, 2006;

(b) ‘‘Board” means the Petroleum and Natural Gas Regulatory Board
established under sub-section (1) of section 3 of the Act;

(c) “boiling liquid expanding vapour explosion (BLEVE)” means the violent
rupture of a pressure vessel containing saturated liquid or vapour at a
temperature well above its atmospheric boiling point and the resulting flash
evaporation of a large fraction of the superheated liquid which produces a
large vapour cloud which burns in the form of a large rising fireball due to
ignition;

(d) “chief incident controller” means the person who assumes absolute
control of the unit and determines action necessary to control the emergency;

(e) “codes of practice” means the codes of practice for emergency response
and disaster management plan notified by the Board;

(f) “disaster” means an occurrence of such magnitude as to create a situation


in which the normal patterns of life within an industrial complex are suddenly
disrupted and in certain cases affecting the neighbourhood seriously with the
result that the people are plunged into helplessness and suffering and may

Revision No. 0 EC Chapter 1 /24


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

need food, shelter, clothing, medical attention protection and other life
sustaining requirements;

(g) “disaster management plan“ means a well-coordinated, comprehensive


response plan to contain loss of life, property, environment and provide speedy
and effective recovery by making the most effective use of available resources
in case of a disaster;

(h) “emergency” means a situation or scenario which has the potential to


cause serious danger to persons, environment or damage to property and
which tends to cause disruption inside or outside the premises and may
require the help of outside resources;

(i) “emergency response vehicle (ERV)” means a vehicle for handling


emergencies having necessary equipment meant for rescue and relief
operations and ERV can be put to use within installation, outside of installation
including road incident;
(j) “hazard” means an event related to the property of substance or
chemicals with a potential for human injury, damage to property, damage to
the environment, or some combination thereof;

(k) “incident” means an unplanned or unintended or intended event having


potential to cause damage to life, property and environment;

(l) “ incident record register” means a register containing complete


information pertaining to all incidents covering near miss, and all other
incidents leading to Level-I, Level-II and Level-III emergencies;

(m) “installation” means facilities, namely, gaseous product pipeline, liquid


Product pipeline, hydrocarbons processing installation, oil and natural gas ASFs
and commercial storage and transportation, hydrocarbons gas bottling
Installations including CNG, city gas distribution facilities and retail outlets;

(n) “ leak” means release or discharge of a dangerous chemicals or


substances or material into the environment;

(o) “Level-I emergency” means an emergency as defined under sub


regulation 6 (a);

(p) “Level-II emergency” means an emergency as defined under sub


regulation 6 (b);

(q) “Level-III emergency” means an emergency as defined under sub


regulation 6 (c);

Revision No. 0 EC Chapter 1 /25


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

(r) “Mutual aid association” means an industrial mutual aid association in


which participating industries as a community shall assist each other in case of
emergency. Mutual aid associations supplement a site’s emergency control
plan. Services of member industries shall be requested only when the
emergency threatens to exceed the capability of otherwise available resources;

(s) "occupier” of an installation means the person who has ultimate control
over the affairs of the installation;

(t) “Off-site emergency” means an emergency that takes place in an


installation and the effects of emergency extends beyond the premises or the
emergency created due to an incident, catastrophic incidents, natural
calamities, etc. It no longer remains the concern of the installation
management alone but also becomes a concern for the general public living
outside and to deal with such eventualities shall be the responsibilities of
district administration

(u) “Off site emergency plan” means a response plan to control and mitigate
the effects of catastrophic incidents in above ground installation (AGI) or
underground installations (UGI) or road transportation. This plan shall be
prepared by the district administration based on the data provided by the
installation(s), to make the most effective use of combined resources, i.e.
internal as well as external to minimize loss of life, property, environment and
to restore facilities at the earliest;

(v) “On site emergency” means an emergency that takes place in an


installation and the effects are confined to the Installation premise’s involving
only the people working inside the ASFs and to deal with such eventualities is
the responsibility of the occupier and is mandatory. It may also require help of
outside resources;

(w) “on site emergency plan” means a response plan to contain and minimize
the effects due to emergencies within the installations which have a potential
to cause damage to people and facilities within the installation premises;

(x) “risk” means the chance of a specific undesired event occurring within a
specified period or in specified circumstances and it may be either a frequency
or a probability of a specific undesired event taking place;

Revision No. 0 EC Chapter 1 /26


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

(y) “risk analysis” means the identification of undesired events that lead to
the materialization of a hazard, the analysis of the mechanisms by which these
undesired events could occur and, usually, the estimation of the extent,
magnitude, and likelihood of any harmful effects;

(z) “risk assessment” means the quantitative evaluation of the likelihood of


undesired events and the likelihood of harm or damage being caused by them,
together with the value judgments made concerning the significance of the
results;

(aa) “Risk management” means the program that embraces all administrative
and operational programs that are designed to reduce the risk of emergencies
involving acutely hazardous materials. Such programs include, but are not
limited to, ensuring the design safety of new and existing equipment, standard
operating procedures, preventive maintenance, operator training, incident
investigation procedures, risk assessment for unit operations, emergency
planning, and internal and external procedures to ensure that these programs
are being executed as planned;

(ab) “Site incident controller” means the person who goes to the scene of the
emergency and supervises the actions necessary to overcome the emergency
at the site of the incident;

(ac) ‘Spill” means an unintended release or discharge of hydrocarbon or any


other dangerous liquid into the environment;

(ad) “transport emergency (TREM) card” means a card containing details


about the nature of hazards, protective devices, telephone numbers and
actions related to spillage, fire, first aid and other details of national and
international (UN) numbers or signage which is common in India and abroad;

(ae) “ unconfined vapour cloud explosion (UVCE)” means the formation of


vapour cloud due to release of significant quantity of liquefied hydrocarbons
into the atmosphere and its explosion due to ignition which may cause high
over pressure and low pressure that cause very heavy damage.

(2) Words and expressions used and not defined in these regulations, but
defined in the Act or rules or regulations made there under, shall have the

Revision No. 0 EC Chapter 1 /27


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

meanings respectively assigned to them in this Act or in the rules or


regulation, as the case may be.

2.1 Abbreviations:

API - American Petroleum Institute


ASME - American Society of Mechanical Engineering
ASTM - American Society for Testing and Material
ATF – Aviation Turbine Fuel
BLEVE - Boiling Liquid Expanding Vapour Explosion
CCTV- Closed Circuit Television
CIC - Chief Incident Controller
DFMD- Door Frame Metal Detector
DHO - District Health Officer
DG- Diesel Generator
DMI- Disaster Management Institute, Bhopal
DPT- Due for Pressure Testing
DV- Deluge Valve
ECC- Emergency Control Centre
ECO - Emergency Coordinating Officer
ERDMP - Emergency Response and Disaster Management Plan
ESD- Emergency Shut down
ERV - Emergency Response Vehicle
HAZCHEM - Hazardous Chemicals
HAZOP - Hazard & Operability Study
HHMD- Hand Held Metal Detector
HLA- High Level Alarm
HSD - High Speed Diesel

Revision No. 0 EC Chapter 1 /28


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

HSE - Health, Safety and Environment


LPG- Liquefied Petroleum Gas
LFL - Lower Flammability Limit (same as LEL – Lower Explosive Limit)
LOPA - Layers of Protection Approach
MAH- Major Accident Hazard installation
MCC- Motor Control Centre
MCP- Manual Call Point
MSDS- Material Safety Data Sheet
MSIHC- Manufacture Storage and Import of Hazardous Chemicals
MSV- Mounded Storage Vessel
NDMA - National Disaster Management Authority
NDRF - National Disaster Response Force

OIC - Officer In- Charge


OISD- Oil Industry Safety Directorate
PCV- Pressure Control Valve
PNGRB - Petroleum and Natural Gas Regulatory Board
QRA- Quantitative Risk Analysis
ROV- Remote Operated Valve
SDRF - State Disaster Response Force
SDV- Shut down valve
SIC - Site Incident Controller
SMPV- Static and Mobile Pressure Vessel
SRV- Safety Relief Valve
TREM - Transport Emergency Card
TRV- Thermal Relief Valve
TT- Tank Truck
TW- Tank Wagon
UVCE - Unconfined Vapour Cloud Explosion

Revision No. 0 EC Chapter 1 /29


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 3

Applicability
(As per Clause No 3.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /30


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Applicability (Clause No 3.0)

ERDMP is based upon PNGRB regulations G.S.R. 39(E) titled ‘Petroleum


and Natural Gas Regulatory Board (Codes of Practices for
Emergency Response and Disaster Management Plan (ERDMP)
Regulations, 2010’.

Clause No. 3 (b) of PNGRB regulations GSR 39 (E) is applicable for ERDMP of
HPCL POL terminal. Emergency Response and Disaster Management Plan
(ERDMP) describes the organizational structure, facilities, equipment, services
and infrastructure necessary to respond to the emergency situation which
could have on-site as well as off-site implications at Receipt, Storage &
Delivery points. Emergency Response Plan covers all emergencies relating to
Operation & Maintenance, personnel, properties including serious accidents,
explosions, floods, fire and bomb threat etc.

This plan also applies to those Governmental Agencies that are responsible for
emergency response within the immediate area surrounding the facilities and
those agencies, organizations, contractors, and facilities providing assistance
to plant in the event of an emergency. POL Plant shall maintain liaison with
concerned governmental agencies to ensure proper understanding and
interfaces regarding aspects of notification, responsibilities of personnel and
resources of state and local agencies to be deployed in case of actual
emergency situation.

Revision No. 0 EC Chapter 1 /31


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 4

Scope and Intent


(As per Clause No 4.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /32


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Scope and Intent (Clause No 4.0)

Scope.

The Scope covers-

(i) The identification of emergencies;


(ii) The mitigation measures to reduce and eliminate the risk or disaster;
(iii) The preparedness plans and actions when disaster or emergencies
occur;
(iv) The responses that mobilize the necessary emergency services including
responders like fire service, police service, medical service, ambulance,
Government as well as Non-Governmental agencies;
(v) The post disaster recovery with aim to restore the affected area to its
original conditions;

Intent.

(a) Intent of this Emergency Response and Disaster Management Plan


(ERDMP) document is to formulate action plan for all necessary functions
that are required to be carried out towards preparedness, response &
management of emergencies. It describes the emergency response
organization, the resources available (internal as well as external) and
specific response actions required for various types of emergencies that
could occur in HPCL white oil terminal, Kadapa.

(b) ERDMP is not just to use as reference material for training.

(c) Objectives of Emergency Response and Disaster Management


Plan (ERDMP) are:

Revision No. 0 EC Chapter 1 /33


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

(i) to prevent causalities-both on-site and off-site;


(ii) to reduce damage to property, machinery, public and environment;
(iii) to develop a state of readiness for a prompt and orderly response to
an emergency and to establish a high order of preparedness
(equipment, personnel) commensurate with the risk;
(iv) to provide an incident management organogram with clear missions
and lines of authority;
(v) to ensure an orderly and timely decision-making and response
process (notification, standard operating procedures);
(vi) to maintain good public relations;

In order to achieve the objectives of emergency planning, the critical


elements that form the backbone of the Emergency Response and Disaster
Management Plan (ERDMP) are:

i) Reliable and early detection of an emergency and careful planning.


ii) The command, co-ordination and response organization structure along
with efficient trained personnel.
iii) Availability of resources for handling emergencies.
iv) Appropriate emergency response actions.
v) Effective notification and communication facilities.
vi) Regular review and updating of the Disaster Management Plan.
vii) Proper training of the concerned personnel.
viii) Liaison with civil Administration.

Imperatives of such a plan are to minimize the adverse effects of an accident


and restoration of normalcy at the earliest by providing measures to contain
the incident and limit the consequences.

Above objectives are sought to be achieved through following


measures:

i) Providing information to all concerned regarding consequences of likely


emergencies
ii) Warning and advising POL terminal personnel & people likely to be
affected
iii) Mobilizing on-site and off-site resources
iv) Calling up assistance from outside agencies
v) Initiating and organizing evacuation of affected people
vi) Providing necessary First aid and other medical services as required
vii) Coordinating action taken by various agencies.

Kadapa POL terminal has considered all the above scope and intent of
above clause and prepared the document accordingly.

Revision No. 0 EC Chapter 1 /34


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 5

Contents of ERDMP
(As per Clause No 5.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /35


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Contents of ERDMP. Clause No 5.0

Contents of this ERDMP documents have been listed under Table of Contents.
For better correlation, same Clause No’s have been retained in the Contents as
in PNGRB regulations G.S.R. 39(E).

(a) Classification of emergencies;


(b) Implementation schedule;
(c) Consequences of defaults or non-compliance;
(d) Statutory requirements;
(e) Pre-emergency planning;
(f) Emergency mitigation measures;
(g) Emergency preparedness measures;
(h) Emergency response procedures and measures;
(i) Emergency organisation and responsibilities;
(j) Infrastructure requirements;
(k) Declaration of on-site and off-site emergency;
(l) Resources for controlling emergency;
(m) Demographic information;
(n) Medical facilities;
(o) Evacuation;
(p) Public relations and information to public;
(q) Reporting of the incident;
(r) Emergency recovery procedures;
(s) Integration of the ERDMP with National Disaster Management Authority
(NDMA) guidelines and action plan on Chemical Disasters (Industrial);
(t) Security threat plan and action plan to meet the eventualities.

Kadapa POL Terminal Depot has considered all the above contents and prepared
the document accordingly.

Revision No. 0 EC Chapter 1 /36


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 6

Classification of Emergencies
(As per Clause No 6.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /37


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Classification of Emergencies (Clause No 6.0)

ERDMP has been developed to deal with emergency incidents which occur
within the premises of Hindustan Petroleum Kadapa POL terminal within its
jurisdiction. Emergency incidents will be classified by the level of response
that will be required. The actual classification will be made by the Officer in
Charge (OIC) or his nominee as information first becomes available on an
incident. The level of response may change as more information becomes
available or conditions change. Where information is lacking the worst case
scenario will dictate the level of response.

In Hindustan Petroleum Kadapa white Oil Terminal under its jurisdiction,


probable emergencies can be categorized into three broad levels on the basis
of seriousness and response requirements, which are given as under:-

Credible accident scenarios for the Terminal have been divided into following
categories according to the mode of release of petroleum products, physical effects
and the resulting damages:

 Pool fire (release of petroleum products from a tank, forming a pool within
the dyke/fire wall and catching fire)

 Jet fire (leakage of petroleum products from a tank/pipe/pump/joints and


the products stream catching fire)
 Tank On Fire

 Spilled Product Fire (Spillage at TT Gantry/TLF Pump House/Tank Truck)

 Unconfined Vapor Cloud Explosion (UVCE) as a secondary effect of above


mentioned scenarios
Based on the hazard identification and comparing the nature of installation with that
from past accidents in similar units, a final short list of MCA scenarios for the

Revision No. 0 EC Chapter 1 /38


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Terminal has been made, which are given in following Table. These are the
maximum credible accidents, which may occur, in the respective unit.

S. N. Tank No. POL Product MCA Scenario


1. 101A/B MS Pool Fire, Spilled product Fire,
Tank on Fire & Vapour Cloud
Explosion
2. 201A/B HSD Pool Fire, Spilled product Fire &
Tank on Fire
3. 202A/B SKO Pool Fire, Spilled product Fire &
Tank on Fire.
4. 301A/B FO Pool Fire, Spilled product Fire &
Tank on Fire
5. Major Pipeline Rupture MS, Ethanol Pool Fire, Spilled product Fire &
Vapour Cloud Explosion
6. Major Pipeline Rupture HSD,SKO,FO Pool Fire, Spilled product Fire
7. Truck Tanker MS, Ethanol Pool Fire, Spilled product Fire
,Vapour Cloud Explosion & BLEVE
8. Truck Tanker HSD,SKO,FO Pool Fire, Spilled product Fire
9. Tank Wagon MS Pool Fire, Spilled product Fire &
Vapour Cloud Explosion
10. Tank Wagon HSD,SKO,FO Pool Fire, Spilled product Fire

Revision No. 0 EC Chapter 1 /39


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 7

ERDMP Implementation Schedule


(As per Clause No 7.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /40


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

ERDMP Implementation Schedule Clause No 7.0

Schedule-1
(As per of PNGRB regulations G.S.R. 39(E))
Schedule of implementation of Code of Practice for ERDMP

Implementation Compliance
Sl.
Activity Time (from the status
No.
notification date)
1 On-Site Emergency Plan 3- Months Half yearly

2 Off-Site Emergency Plan


(Submission of Information to 3- Months
District Authority)
3 Resources in Position 6-Months Yes
4 Accredited Third Party 1-Year Yes
certification of ERDMP.
5 Testing and Mock Drills (On-Site) 3-Months Monthly
6 Testing and Mock Drills (Off-Site) ** 12 months Yes

** To be coordinated with District Authority

Kadapa white Oil terminal committed in implementation of the above


schedule.

Revision No. 0 EC Chapter 1 /41


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 8

Consequences of Default or Non-Compliance


(As per Clause No 8.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /42


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Consequences of Default or Non Compliance (Clause No 8.0)


8.1 There shall be a system for ensuring compliance to the provision of these regulations
through developing a well defining ERDMP plan and conduction of mock drill and safety
audit during the construction, commissioning and operation phase, as well as an on-
going basis. There shall also be system of do’s & don’ts regarding safety, mock drill or
real emergencies for visitors before entering and establishment. This should be
supported by written instruction sheet for visitor and ensured the visitor is accompanied
by the plant representative on forward visit and return gate.

DO'S AND DON'TS

DO'S DON'TS
DO NOT panic and avoid
running all over the place,
Any One Noticing
Actuate nearest fire alarm prevent other from doing so.
An Emergency
manual call point and inform
Situation
Plant Manager, Supervisor. DO NOT enter the site unless
instructed or all clear
siren/message is heard.
On hearing FIRE alarm, get
alerted, go to the spot, take DO NOT panic
All other
positions according to their roles DO NOT enter the site unless
Employees
mentioned in Fire Organization instructed or all clear
On Site
Chart and report to incident siren/message is heard.
controller.
Stop work on hearing alarm.
DO NOT enter the site, till it is
Contractor Assemble at the nearest /
cleared for the normal work
Personnel designated ASSEMBLY POINT
by site incident controller.
and be ready to evacuate.
Keep the gate manned; Keep
the road clear for movement of
Security Emergency Vehicles/ Fire DO NOT allow unauthorized
Tenders/Ambulance. Control visitors free to enter.
traffic at gates. Take the
position as per FOC

Revision No. 0 EC Chapter 1 /43


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Visitors Leave the place and assemble DO NOT enter the site if
at Assembly point. emergency alarm is heard.
Stop the operation, disconnect
Do not panic or leave the
Drivers/Helpers the hoses/arms and wait for the
vehicle unless given
of Truck Tanker instructions of operator for
directions.
evacuation
Stop the operation, tie the gates
Do not panic or leave the
Drivers/Helpers properly and wait for the
vehicle unless given
of Truck Tanker instructions of operator for
directions.
evacuation

8.2 The Board shall monitor the compliance of ERDMP, Technical Standards and
Specifications including Safety Standards either directly or indirectly by accredited third
party through separate regulations on third party conformity assessment.

8.3 In case of any deviation or shortfall, in achieving the recommended


standards the entities are liable to penal provisions under the provisions of the technical
standards, specifications including safety standards

8.4 Mutual Aid Association not responding as per memorandum of Understanding (MOU)
or written agreement on request of assistance shall attract penalty as per mutual Aid
agreement are as under. However details are elaborate in clause no-12.3 and
check list-3:

 In the event of any dispute or differences between the parties, such dispute or
differences shall be resolved amicably by mutual consultation or through the good
offices of empowered agencies of the government. If such resolution is not possible
then the unresolved dispute or differences shall be referred to the arbitration or a
arbitrator to be nominated by the Department of legal affairs (Law Secretary) in
terms of the Office memorandum No. 55/3/1/78-CF dated 19-12-1975 issued by the
Cabinet Secretariat Department of cabinetry affairs) as modified from time to time.
The arbitration and conciliation Act 1996 (26 of 1996) shall not be applicable to the
arbitration under this clause. The award of the arbitrator shall be binding upon
parties to the dispute. However, any party aggrieved by such award may make
further reference for setting aside or revision of the award to Law Secretary whose
decision shall bind the parties finally and conclusively.

 The authorities mentioned in Mutual Aid Agreement both the parties shall meet once
in every Quarter to discuss the arrangement of drills etc. and take necessary steps
to overcome the short comings. It will be the responsibility of all the two members’
establishments to train their own personnel in fire fighting.

Revision No. 0 EC Chapter 1 /44


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 9

Requirements under other Statutes


(As per Clause No 9.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /45


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Requirements under other Statutes (Clause No 9.0)

Implementation of ERDMP is primarily governed & complying with following regulations as per
Schedule – II of PNGRB regulations G.S.R. 39(E)

 The Environment (Protection) Act, 1986 (amended 1991) and following Rules thereunder:

The Environment (Protection) Rules, 1986 (amended 2004).


The Manufacture, Storage and Import of Hazardous Chemicals Rules, 1989 (amended,
1994 and 2004).
The Hazardous Wastes (Management and Handling) Rules, 1989 (amended 2000 and
2003).
The Environment Prior Clearance Notification, 2006.
The Chemical Accidents (Emergency Planning, Preparedness and Response) Rules, 1996.
Bio-medical Wastes (Management and Handling) Rules. 1989-N/A.

 The Factories Act, 1948 (amended 1987).


 Andhra Pradesh State Factory Rules, 1950

 The Inflammable Substances Act, 1952.

 The Motor Vehicles Act, 1988 (amended 2001).


The Central Motor Vehicles Rules, 1989 (amended 2005).

 The Public Liability Insurance Rules, 1991 (amended 1992).


The Public Liability Insurance Rules, 1991 (amended 1993).

 The Petroleum Act, 1934.


The Petroleum Rules, 2002.

 The National Environment Tribunal Act, 1995.

 The Explosives Act, 1884 (amended till 1983).

The Static and Mobile Pressure Vessels (Unfired) Rules, 1981 (amended 2002).
The Explosives Rules, 1983 (amended 2002).

Revision No. 0 EC Chapter 1 /46


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Current compliance status with above rules / permissions is stated in TABLE.


As on DATE: 15.04.2018

S.NO DESCRIPTION LICENSE NO. VALIDITY ORIGINAL

1 Available
Peso License P/HQ/AP/15/3980-P259074 31/12/2019

2 Electrical
29/330/9/2013-RIO/1591 --- Available
Inspectorate

VALID UNTIL IT
3 Factories Lr. No. AP/H.O/MAH/0003/2015
HAS BEEN DULY Available
License Dt. 06.04.2015
CANCELLED
4 APPCB APPCB/KNL/TPT/18723/CFO&HWA/HO/2015 30/06/2020 Available
License for
5 FL-737 & FL-1374 31/12/2018 Available
Station
6 Labour License COR. NO.3/2016 dt.on.(14/03/2016) OPEN VALIDITY Available
ERDMP
7 HPCL/KDP/ERDMP dt: 22.11.2015 Available
Approval
Central Excise
8 Registration CERTIFICATE NO: 910/2015/CPE/G4 ,
Available
DATED: 31.03.2016
Certificate
20/05/2011 Available
Environment
9 SEIA/AP/KDP-21/2011-572
Clearance

Peso Night 05/11/2013 Available


10 HPC/KDP/13-14/NIGHT WORKING
Operation
11 VHF License FL-737 & FL-1374 31/12/2018 Available
Prohibited Area REF.NO:C1/550/M/2013 &
12 DATED:19.10.2013, GOVT.REF.NO: Available
Declaration
252/SCB/A1/2012-5 & DATED: 20.06.2013
12 Ethanol License 910/2015/CPE/G4 31/03/2018 Available

Revision No. 0 EC Chapter 1 /47


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 10

Pre-Emergency Planning
(As per Clause No 10.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /48


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Pre- Emergency Planning (Clause No 10)

10.1 Hazard Identification

"Hazard" is a characteristic of a system, plant or processes that present potential for an


accident. Therefore, all the relevant aspects of petroleum oil storage and handling process
have been thoroughly examined to assess their potential for initiating or propagating an
unintentional event or sequence of events, which can lead to an accident or disaster. Type,
quantity, location & conditions of release of the petroleum oils under various scenarios have
been examined in order to estimate its damage potential, area affected, and the precautionary
measures to be taken.

Hazard Identification

THE PLANT

The M/s Hindustan Petroleum Corporation Limited (HPCL) white Oil terminal & marketing
division was constructed in 2015 at Kadapa, Andhra Pradesh site in area around 84
acres. The Depot is situated approximately 30 kms away from Kadapa City. Kadapa
terminal is receiving the petroleum products from HPCL, Vijayawada POL & Chennai POL
terminal through railway wagon. Kadapa Terminal is an intermediate stock point for
feeding HPCL’s retail outlets (RO) in the Kadapa, Chitoor & Kurnool Districts surrounding
area to ensure there is no distruption in the feed from the terminals to the ROs. These
received POL products are stored in designated storage tanks and distributions of these
products are carried out by road tankers and wagons to different consumers. These POL
products are Motor Spirit (MS), High Speed Diesel (HSD), Superior Kerosene Oil (SKO),
FO and Ethanol which stored in designated storage tanks and distributions of these
products are carried out by road tankers to different consumers.

THE EXISTING ENGINEERING AND/OR OPERATIONAL CONTROLS

Revision No. 0 EC Chapter 1 /49


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

M/s HPCL has defined and exhaustive manual for operations of POL product Receipt
through pipelines from HPCL, Vijayawada POL & Chennai POL terminal through railway
wagon and dispatch through Road tankers.

Credible Accident Scenarios

A Maximum Credible Accident (MCA) can be characterized as an accident with a


maximum damage potential, which is believed to be credible. For selection of a MCA
scenario following factors have been taken into account.

* Flammability of the petroleum Products


* Quantity of Petroleum Products present in the storage tank
* Process or storage conditions such as temperature, pressure, flow, mixing
and presence of incompatible materials

In addition to the above factors, location of the unit with respect to adjacent
establishment has been taken into consideration to account for the potential of
escalation of an accident. This phenomenon is known as the domino or secondary
effect. In order to visualize MCA scenarios Chemical Inventory Analysis, Event Tree
Analysis and Past Accident Review have been employed.

The credible scenarios identified for the POL Depot are as follows:

Credible accident scenarios for the Depot have been divided into following categories
according to the mode of release of petroleum products, physical effects and the
resulting damages:

 Pool fire (release of petroleum products from a tank, forming a pool within
the dyke/fire wall and catching fire)

 Jet fire (leakage of petroleum products from a tank/pipe/pump/joints and


the products stream catching fire)

 Tank On Fire

 Spilled Product Fire (Spillage at TT Gantry/TLF Pump House/Tank Truck)

 Unconfined Vapor Cloud Explosion (UVCE) as a secondary effect of above


mentioned scenarios

HAZOP STUDY :

The process of HAZOP STUDY, recording and reporting is a structured hazard


Identification tool that uses a multi-disciplined team. It is accepted as an important

Revision No. 0 EC Chapter 1 /50


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

technique for the identification of process hazards in the design and operation of a
facility. HAZOP is the application of a formal systematic examination of the process and
engineering intentions of new or existing facilities to assess the potential of mal-
operation or malfunction of individual items of equipment and their consequential effects
on the facility as a whole.

The method is equally applicable to major green-field developments, brown-field


projects, small plant modifications or operating procedures. The concept is to break the
plant into small sections and then to identify hazards by examining each section and
using a series of parameter and guide word filters to structure the brainstorming
process. Brainstorming is an effective meeting technique and its strengths is that, when
led by a competent Facilitator; it breaks down rivalries and a narrow view point.

The HAZOP relies on the broad experience of the team to identify potential hazards and
operability problems. Individual or discipline reviews are unlikely to be able to identify all
the possible interdepartmental interfaces which are recognized as critical to the safety of
complex plant. The HAZOP technique's strength is that it allows personnel from all
disciplines to interact and question aspects of the facilities beyond their usual sphere of
activity.

The HAZOP process is the systematic application of combinations of parameters (flow,


pressure and temperature) and guide words (no, more, less) to produce deviations (no
flow,less pressure) from the design intent or intended operational mode of the plant.
Credible causes of deviations are identified for each plant section (called node). The
consequences arising are then discussed, assessed and minuted with actions or requests
for further consideration by the project team.

The main deliverables from a HAZOP study are as follows. The first is a set of detailed
worksheets, presented for each node. These show the results of the team's discussions
with action recommendations. The second deliverable is a detailed discussions and
recommendations and summary of the main action points. Performing a HAZOP is
generally an assurance that if procedural and/or engineering modification is implemented
to mitigate risk, the plant will then be operating at some lower level of risk. It is not,
however, a guarantee that no risk exists, nor does it guarantee that hazardous events or
operating or operating problems will not be encountered.

NODE POINTS

The various petroleum product handling processes/storage units have been selected for
HAZOP evaluation with respect to most hazardous petroleum product as listed below:

S.N. Nodes Facilities


1. Receipt of HSD/SKO/FO from Wagon Pipeline, Wagon Pump House outlet to
Unloading gantry to HSD/SKO/FO Storage Tank
Storage Tanks

Revision No. 0 EC Chapter 1 /51


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

S.N. Nodes Facilities


2. Receipt of MS from Truck tank TT Gantry to Storage Tank
Unloading Gantry to MS Storage Tanks
3. Receipt of Ethanol from TT Gantry to TT Gantry to Storage Tank
Ethanol U/G Tank
4. Dispatch of MS from Storage Tanks Storage Tank, Pipeline, Product Pump
through Product Pumps House, TLF Gantry
5. Dispatch of HSD/SKO/FO from Storage Storage Tank, Pipeline, Product Pump
tanks through Product Pumps House, TLF Gantry
6. Power Generation DG Set
7. VRU Process operation consists of
Adsorption/Desorption/Absorption.

Based on findings of HAZOP study in the form of HAZOP worksheets of Kadapa POL
terminal, the aroused recommendations are listed in worksheets. However, these are
also summarized below as specific recommendations. Some other general
recommendations are listed under “General Recommendation” heading.

3. Specific Recommendations:

S.N. Recommendations Reference


from Sheet
Table 12 Receipt of MS/HSD/SKO/FO from Wagon Unloading gantry to
Storage Tanks
1 Strict Visual Inspection of operations to be carried out 12.1.1
2 Calibration of the instruments to be carried out as per 12.1.1
schedule
3 Inspection & maintenance of valves / pipelines should be 12.1.2
carried out as per schedule
4 High pressure trip must be integrated with Pump 12.1.3
5 Adhere to the SOP & SMP’s 13.3.1
Table 13 Receipt of Ethanol from TT Gantry to Ethanol U/G Tank
6 Visual Inspection of operations to be carried out 13.1.1
7 Inspection & maintenance of valves / pipelines to be carried 13.1.1
out as per schedule
8 Adhere to the SOP & SMP’s 13.1.1
Table 14 Dispatch of Products from Storage Tanks through Product Pumps
9 It is required to follow relevant OISD for maintenance of 14.1.1
Pumps, valves & pipelines.
10 Adhere to the SOP & SMP’s 14.1.1
11 Seal Flushing / quenching system for clogging must be 14.1.2
checked regularly

Revision No. 0 EC Chapter 1 /52


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

S.N. Recommendations Reference


from Sheet
12 Fire protection system check should include in regular 14.2.1
checklist to ensure the healthiness of the system.
Table 15 VRU Operation-I
13 Scrubber to be put on circulation with PCV601 spill back on. 15.1.1
14 Check at site to rectify the possible causes. 15.1.1
15 Adherence to SOP 15.1.1
16 Reduction at TT loading operation. 15.2.2
17 Close monitoring of parameters with respect to design. 15.2.2
18 Stack area to check for any spillage due to PSV opening. 15.3.2
19 Ensure adequate number of fire monitor/hydrant in stack 15.3.2
area.
Table 16 VRU Operation-II
20 Schedule Maintenance checklist should be follow up strictly 16.1.1
for healthiness of pump
21 Instrument interlocks simulation checklist should be follow up 16.1.1
strictly.
22 Adherence to SOP. 16.1.1
23 Field check for cause rectification. 16.1.2
24 High bed temperature safety interlocks should act. 16.2.2
Table 17 VRU Operation-III
25 UCV045 and PC045 should include in safety interlocks. 17.1.1
26 PCV197 closer should incorporate with opening of UV196. 17.1.3
27 Vacuum pump should trip at PS064HH and TISA062HH. 17.1.3
28 Adherence to SOP 17.3.1
Table 15 VRU Operation-IV
29 Operation to step up to increase the vapor recovery at first 18.1.3
two stages.
30 HV186 should float with stack directly if PC187/VP101 very 18.3.1
low and QT587 shows very very low HC content.
31 Adherence to SOP. 18.3.1

4. General Recommendations:

13. Strict supervision of Depot personnel during Loading of Petroleum products in


storage tanks, loading of tank trucks, blending of ethanol with MS during MS
TT Loading operation, should be carried out.

14. Any change/replacement /removal, addition etc in facility instrument /valve


/setting /cut off/trip /alarms setting must be ensured of safe operation and
updated in P&ID.

15. Integrity of instrumentation, facilities must be ensured periodically through

Revision No. 0 EC Chapter 1 /53


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

calibration and other verification measures.

16. In case of major change in process parameter /facility, risk analysis and
HAZOP study must be carries out.

17. Maintenance of pumps must be done as per OISD-STD 119.

18. Mechanical seal of pipeline, flange joints of valves should be regularly


monitored to prevent leakage.
19. Visual inspection of pipeline must be done regularly to locate leaks.
20. MSDS of petroleum products should be followed while handling & storage.

21. Earthing must be provided on the pipeline & storage tanks and should be
checked.

22. All the hydrant points should be easily accessible. All should be in working
condition. Maintenance of all fire fighting systems should be done on regular
basis as per schedule developed at Depot.

23. Back washing of strainer should be done in regular interval in order to avoid
chocking.

24. All Electrical Equipment & their installation should be as per OISD standard
137. All electrical fittings should be flame proof type. .

Fire Explosion & Toxicity Index (FEI & TI) Analysis

The most widely used relative ranking hazard indices are Dow chemical Company's Fire
Explosion Index (FEI) and Mond's Toxicity Index (TI). They are commonly together
referred to as Fire Explosion and Toxicity Index (FEI & TI).

FEI & TI involves objective evaluation of the realistic fire, explosion, toxicity and reactivity
potential of process or storage units. The quantitative methodology relies on the analysis
based on historic loss data, the energy content of the chemical under study and the extent to
which loss prevention measures are already incorporated. FEI & TI are primarily designed
for operations involving storage, handling and processing of flammable, combustible and
reactive chemicals.
Fire & Explosion Index & Category:

S.N. Fire & Explosion Index (FEI) Category


1 FEI < 65 Light
2 65 > FEI < 93 Moderate
3 FEI > 93 Severe

Revision No. 0 EC Chapter 1 /54


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Computations of FEI for storage units of POL Depot are computed in the following Table.

Fire Explosion & Toxicity Index for Storage Units of Kadapa white oil Terminal

S. Tank No. Product Capacity Material Factor Penalties Fire & Explosion
N. (kL)
NH NF NR MF GPH SPH Index Category
1. 101A MS 2800 0 3 0 16 0.5 2.00 72.11 Moderate

2. 101B MS 2800 0 3 0 16 0.5 2.00 72.11 Moderate

3. 400T-061A ETHANOL 100 0 3 0 16 0.5 1.75 66.00 Moderate


4. 400T-061B ETHANOL 100 0 3 0 16 0.5 1.75 66.00 Moderate
5. 201A HSD 8400 0 2 0 10 0.5 1.71 40.59 Light

6. 201B HSD 8400 0 2 0 10 0.5 1.71 40.59 Light

7. 202A SKO 1300 0 2 0 10 0.5 1.78 41.63 Light

8. 202B SKO 1300 0 2 0 10 0.5 1.78 41.63 Light


9. 301A FO 4390 0 2 0 10 0.5 1.45 36.72 Light
10. 301B FO 4390 0 2 0 10 0.5 1.45 36.72 Light

All other Tanks of POL Products are coming under light category.

RISK ANALYSIS

Identification of Accident Event

Despite the best efforts of good design, construction of a plant and well trained
experienced operating staff, accidental release of chemicals take place in any process
unit where hazardous chemicals are stored and handled. This may lead to either vapor
clouds or liquid pools. Depending on the nature of chemical and availability of ignition
source, such releases can cause damage due to heat radiation, over pressure or toxic
effects. Risk Analysis study will help to identify and quantify these hazards and
associated risk. The Risk Analysis can be broadly divided into three basic steps
a) What can go wrong? (Hazard Identification)
b) How often can it go wrong? (Failure Frequency)
c) What are the effects and consequences? (Effect and Damage Calculations)
Hazard Identification has been discussed in Section 3. Failure Frequency and Effects and
Consequences of accidental releases are discussed in this Section.

Consequence Analysis

Revision No. 0 EC Chapter 1 /55


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

This deals with the quantification of various effects of release of Petroleum products on
the surrounding area by means of mathematical models and internationally recognized
Safety software.

It is intended to give an insight into how the physical effects resulting from the release
of hazardous substances can be calculated by means of computerized models and how
the vulnerability models can be used to translate the physical effects in terms of injuries
and damage to exposed population & environment.

Mathematical and Analytical Model for Hazard Analysis

S.N. Phenomenon Applicable Models


1 Outflows: Bernoulli flow equation; phase equilibria;
multiphase flow models; orifice/nozzle flow
 Liquid, Two phase equations; gas laws; critical flow criteria
 Mixtures, Gas/vapor
2 Discharges:

 Spreading liquid Spreading rate equation for non-penetrable


surfaces based on cylindrical liquid pools

 Vapor jets Turbulent free jet model

 Flashing liquids Two zone flash vaporization model

 Evaporation of liquids on land & Spreading, boiling & moving boundary heat
water transfer models; Film & meta-stable boiling
phenomenon; cooling of semi infinite
medium
3 Dispersion:
 Boundary dominated, stable stratified &
 Heavy Gas positive dispersion models (similarity)
 3D Models based on momentum, mass &
energy conservation

Gaussian Dispersion models for naturally


 Natural Gas buoyant plumes

Boundary layer theory (turbulence), Gauss


 Atmospheric stability Ian distribution models
4 Heat Radiation:

 Liquid pool fires Burning rate, heat radiation & incident heat
correlation (semi imperial); Flame
propagation behavior models

 Jet fires Fire jet dispersion model

 Fire balls API fire ball models relating surface heat flux

Revision No. 0 EC Chapter 1 /56


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

S.N. Phenomenon Applicable Models


of flame, geometric view factor &
transmission coefficients
5 Vulnerability:

 Likely damage Probit functions; Non-Stochastic


vulnerability models

MODELS FOR DETERMINING THE SOURCE STRENGTH FOR THE RELEASE


OF HAZARDOUS SUBSTANCES

Source strength of a release means the quantity of the substance released with respect
to time. The release may be instantaneous or continuous. In case of instantaneous
release, the strength of the source is given in kg whereas in continuous release source
strength depends on the outflow time and expressed in kg/s. In order to find the source
strength, it is first necessary to determine the state of a substance in a vessel or pipe
along with physical properties, viz. vapor pressure & minimum ignition energy required.
Phase of petroleum Product at the time of accidental release is also to be determined.
This may be gas, gas condensed to liquid or liquid in equilibrium with its vapor.

Instantaneous Release
In the event of the instantaneous release of a liquid a pool of liquid will form. The
evaporation can be calculated on the basis of pool size, volatile nature of the product
(i.e. vapor pressure) and meteorological conditions.

Semi-Continuous Outflow
In the case of a semi continuous outflow, it is again first of all necessary to determine
whether it is gas, a gas condensed to liquid or liquid that is flowing out. The following
situations can occur here.

(A) Gas Outflow:


The model with which the source strength is determined in the event of a gas outflow is
based on the assumption that there is no liquid in the system.

(B) Vapor Outflow:


If the outflow point is located above the liquid level, vapor outflow will occur. In the case
of a gas compressed to liquid the liquid will start boiling as a result of the drop in
pressure. The source strength of the out flowing vapor is a function of the pressure in
the storage system and after the liquid has reached the boiling point at atmospheric
pressure the temperature will remain constant.

(C) Pressurized Liquefied Gas Outflow:


If the outflow point is located below the liquid level, liquid outflow will occur resulting in
flash off. The outflow will generally be so violent that the liquid will be turned into drops

Revision No. 0 EC Chapter 1 /57


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

as a result of the intensity of the evaporation. The remaining liquid, which is cooled
down to boiling point, will start spreading on the ground and forms a pool. Evaporation
will also take place from this pool, resulting in a second semi continuous vapor source.

(D) Liquid Outflow:


In case of liquid outflow, discharge due to over all head difference takes place.

Model For Evaporation

In application of evaporation models, petroleum product is a case of volatile liquid. From


the pool, which has formed, evaporation will take place as a result of the heat flow from
the ground and solar radiation. The evaporation model only takes account of the heat
flow from the ground since the heat resulting from solar radiation is negligibly small
compared with the former. The evaporation rate depends on the kind of liquid and the
kind of subsoil.

Model For Dispersion

The gas or vapor released either instantaneously or continuously will be spread in the
surrounding area under the influence of the atmospheric turbulence. In the case of gas
dispersion, a distinction is required to be made between neutral gas dispersion and
heavy gas dispersion.

The concentrations of the gas released in the surrounding area can be calculated by
means of these dispersion models. These concentrations are important for determining
the nature of accidents for example an explosive gas cloud formation injuries will occur
in the case of toxic gases.

Heavy Gas Dispersion Model

If the gas density is higher than that of air due to higher molecular weight or marked
cooling, it will tend to spread in a radial direction because of gravity. This results in a
"gas pool" of a particular height and diameter. As a result of this, in contrast to a neutral
gas, the gas released may spread against the direction of the wind.

Model For Heat Load And Shock Waves

Model For Flare

If an out-flowing gas forms a cloud with concentrations between the lower and upper
explosion limit and ignition takes place, a torch occurs. A model with which the length of
a torch and the thermal load for the surrounding area can be calculated, assumes an
elliptic shaped torch. The volume of the flare in this model is proportional to the outflow.

Revision No. 0 EC Chapter 1 /58


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

In order to calculate the thermal load, flare is regarded as a point source located at the
center of the flare. This center is taken as being half a flare length from the point of
outflow.

Model FOR POOL FIRE

The schematic of a pool fire is depicted in Figure 7. The heat load on objects outside a
burning pool of liquid can be calculated with the heat radiation model. This model uses
average radiation intensity, which is dependent on the liquid. Account is also taken of
the diameter-to-height ratio of the fire, which depends on the burning liquid. In addition,
the heat load is also influenced by the following factors:

* Distance from the fire


* Relative humidity (water vapor has relatively high heat absorbing capacity)
* The orientation i.e. horizontal/vertical of the object irradiated with respect to the fire

Injuries Resulting From Flammable Liquids And Gases

In the case of flammable liquids and gases and immediate ignition a pool fire or a flare
will occur depending on the conditions. The injuries in this case are mainly caused by
heat radiation.

Damage Models For Heat Radiation

It is assumed that everyone inside the area covered by the fire ball, a torch, a burning
pool or gas cloud will be burned to death or will asphyxiate. The following Probit
functions are an example of a method, which can be used to calculate the percentage of
lethality, and first-degree burns that will occur at a particular thermal load and period of
exposure of an unprotected body.
Lethality: Pr = -36.83 + 2.56 ln (t.q4/3)

First degree burn symptoms: Pr = -39.83 + 3.0186 in (t.q4/3)

In which, t = exposure time in seconds and;


q = thermal load W/m2

Two values have been chosen for the exposure time to heat radiation:

* 10 seconds: for exposed persons in populated area it is assumed that they


will have found protection from the heat radiation e.g. from a wall, within 10
seconds
* 30 seconds: this pessimistic assumption applies if people do not run away
immediately or when no protection is available

Revision No. 0 EC Chapter 1 /59


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Summary Of Damage Criteria

The summary of damage criteria adopted in the study based on vulnerability models and
published health criteria for arriving at damage distances for the identified effects are:

S.N. Damage Exposure Time = 10s Exposure Time = 30s


With Without With Without
Protection Protection Protection Protection
1 100% lethality & severe Within pool Within pool Within pool Within pool
damage to life &
property
2 1% Lethal Injury 21.1 16.5 9.3 7.3
(kW/M2)
3 1% First Degree Burns 8.5 6.9 3.7 3.0
(KW/M2)
Damage Criteria for Pool Fire

Spilled Product Fire Scenario

In HPCL, Kadapa white Oil terminal, handling of petroleum products (MS, HSD, SKO, FO
& Ethanol) for any leakage or spillage at Tank Wagon unloading Gantry or leakage in any
of the Tank Truck at the Tank Lorry Filling Shed and at the Pump House, there will be
accumulation of petroleum products. In either of the cases if it catches fire depending on
availability of potential ignition source in the vicinity, it will take form of a Spilled Product
Fire. But this fire has comparatively less impact on the surrounding area and there are
less chances of damaging the other facilities of the Depot.

Analysis For Propensity Towards Predicted Consequences

Risk of operation of any activity involving hazardous chemicals consists of the following
two elements:

1. Consequences of certain unwanted event &


2. Propensity that these consequences will occur.

Propensity or likelihood of the predicted consequence for the Installation will depend
upon the following items:

1. Propensity of the Depot towards occurrence of initiating event.


2. Propensity that the designed counter measures provided in the Installation
would fail.

Revision No. 0 EC Chapter 1 /60


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Propensity of A Certain Consequence Of An Accident

Any initiating event would take place first, there after the designed counter measures
would attempt to limit the effects of the initiating event. Such deviations from the
intended operation may lead to an accident. In reality, accident scenario and severity of
the consequences will depend on type of product leaked, quantity of the product leaked,
location of the incident (tank farm/TW Product unloading gantry/pump shed/T/T plate
form), availability of ignition source, response of emergency systems and emergency
team, weather conditions (wind velocity & direction), etc. Further propensity of being
killed or injured would also depend on the aspects like time of accident and number of
people in damage area at that time.

Probability Estimation for Occurance of MCA Scenario

Applying equipment failure rate data and ignition probability data probability values have
been estimated for consequences of various MCA scenarios, which are as follows:

For the following accident scenarios the categorization is as follows, which is inferred on
the basis of past accident analysis, information & approach provided in Green Book &
Purple Book of EFFECTS, TNO:

S.N. Categorization Probability Range


1. Low < 10-3 To< or = 10-4 per year
2. Very Low < 10-4 To< or = 10-6 per year
3. Extremely Low < 10-6 per year on wards

The probabilities for various accident scenarios have been estimated as follows:

S.N. Accident Scenario Probability


1. Spilled Product catching fire Very Low (about 10-5 per year)
2. Jet Fire in POL Pipeline/Product Pump Very Low (about 10-5 per year)
House/Tank Farm/TLF Shed/TT Decanting
Area/Tank Truck
3. Pool Fire in SKO/HSD tank in Main Tank farm Very Low (about 10-6 per year)

4. Tank On Fire Very Low (about 10-7 per year)

Mitigation/Preventive Measures For MCA Scenarios

In order to mitigate/prevent any minor incident from becoming a major accident


following measures along with Onsite and if required Offsite Emergency
(Disaster) Management Plan should be followed:

Revision No. 0 EC Chapter 1 /61


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

1. Spillage in tank area: small leakage through tank valves/joints will take a form of
spillage if not identified immediately. If this spillage gets on contact with ignition
source will take a form of fire and lead to an accident. In order to prevent it from
becoming a major accident, stop the operation immediately. Remove the spillage
with proper corrective method from that area. REMOVE SPILLED PRODUCT using
Sand or Fire Extinguishers (By Spreading Foam Solution). Do not touch or walk
through spilled material, stop leak if possible. Use water spray to reduce vapor,
do not put water directly on leak or spill area. And if ignition of spilled product
takes place necessary emergency procedure must be followed as soon as possible
to avoid damage to other property due to secondary effect accidents. For small
spillage, flush area with flooding amounts of water.

2. Pool Fire in Dyke Area: Failure of outlet valve of tanks or any one of valve will
lead to leakage of product. This will form a pool inside dyke area if not identified
immediately. This pool if comes in contact with an ignition source will lead to an
major accident. In order to mitigate it, stop the operation immediately. Be ready
will all fire fighting equipments at the site. Start sprinkler system to cool the
surrounding tanks. Immediately follow both onsite and offsite emergency plan.

3. Tank On Fire: For preventing tank on fire, cool the surrounding tanks by means of
sprinkler system and foam system. Bring all fire fighting equipments at the site
and start fighting with fire following proper onsite emergency plan.

4. Unconfined Vapor Cloud Explosion: UVCE is a secondary domino effect. Vapors


releasing into atmosphere are not in so much quantity that it lead to an
explosion. For an ignition, a proper mixture of fuel to air is required, if this
mixture between UEL & LEL comes in contact with an ignition source, it will lead
to an explosion. In order to prevent it, immediately stop the leakage from the
source by identifying it. For this, it is recommended to install hydrocarbon
Detector in Pump House area, Tank Farm area and TT Gantry area.

Revision No. 0 EC Chapter 1 /62


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 11

Emergency Mitigation Measures


(As per Clause No 11.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /63


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Basic requirements of ERDMP


Schedule–III
(Refer regulation 11.1)

Basic requirements of ERDMP as per Schedule–III of PNGRB


regulations G.S.R. 39 (E):

1. Location Plan of the Installation indicating siting of the installation at


neighbouring details up to a distance of 2 kms from the installation in
each direction – ANNEXURE 2
2. Site plan of the installation showing a complete layout of the
installation indicating boundary walls, exit and entry gates and location
of various facilities- ANNEXURE 3
3. Layout of Fire Water Systems and Fire Fighting Equipment details –
ANNEXURE 4
4. Material Safety Data Sheet (MSDS) for all hazardous chemicals stored,
handled, produced and transported in the installation - ANNEXURE 5
5. Internal and External Emergency contact numbers and addresses of
police, fire station, hospitals, mutual aid industry, factory inspectors,
Board, State Pollution Control Board, Petroleum and Explosive Safety
Organization (PESO), etc - ANNEXURE 6
6. Addresses and Telephone Directory of Technical Support Services such
as Environmental Laboratories, fire fighting chemical suppliers, public
and private consultant associated with emergency handling and
Medical Services, if any - ANNEXURE 7
7. Security Threat Plan as per Chapter-29.

Revision No. 0 EC Chapter 1 /64


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Resource Mobilization
Schedule IV
(Refer Regulation 11.2)

Resource Mobilizations (Men and Equipment)- ANNEXURE 8

11.3 Incident preventing measures and procedures:

The incident prevention measures and procedures includes following prevention


measures:-

I. Health Safety and Environment (HSE) policy has been formulated and
approved by management.

II. Even though pre-OISD location, to meet the revised OISD-244


requirement management has taken adequate measures such providing
fixed water spray & other system complying to OISD.

III. Meetings of Safety committee with participation of executives & staff are
held every quarter in order to deliberate on any unsafe development and
recommendations for elimination of risks. Safety committee also
discusses pending recommendations of earlier meetings, performance &
shortcomings observed during recent mock drills etc. and minutes
signed by all members.

IV. Internal safety audits and inspections are carried out quarterly as per
OISD-145 checklists. Inter unit safety audits are conducted by experts
from other facilities.

V. Work permits in line with OISD – 105 are issued and monitored. List of
Authorized issuers and receives is approved by HPC.

Revision No. 0 EC Chapter 1 /65


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

VI. In-built safety interlocks system such as Pressure Safety Valves (PSVs);
non-returning valves (NRVs), Shutdown Valves (SDVs) and emergency
trip systems are incorporated in design of installation.

VII. Written safety instructions are given to visitors including assembly


procedure and escape route, dos and don’ts before entry.

VIII. Safety MIS system is established. Unit sends monthly safety reports
including Exception reports to Corporate HSE department who issues
monthly HSE report for whole organization.

IX. All standby equipment’s are operated periodically and checked as per
specified schedule. Warning system, first aid & definitive treatment
methods, evacuation procedures are tested periodically.

X. Check list points for incident prevention measures as per

Sr. Yes
# Check-point No Remarks
1 Whether Safety, Health and Environment Policy of the location is
displayed
2 Whether the Safety Policy is documented and duly approved by the
top management
3 Whether the Safety Policy is well structured to cover all elements of
Safety, Health and Environment protection
4 Whether the layout is convenient from operation and safety aspects
and meets minimum distance norms as per OISD-118
5 Whether a duly constituted Safety Committee is functioning in the
location with representation from workmen/staff
8 Whether all unsafe developments and likely risks are deliberated in the
meetings and appropriate steps are recommended for eliminating
such risks
9 Whether compliance status of recommendations of earlier Safety
Committee meetings are discussed before taking up new issues.
10 Whether performance and shortcomings observed during recent
mock disaster drills form part of the discussions in safety committee
meetings
11 Is the safety committee minutes are recorded and signed by all the
attending members
13 Whether periodical safety audits and inspections by internal and
external audit teams are conducted in defined intervals
14 Whether a system of regular monitoring of such audit compliances by
controlling offices / HO are in place
15 What is the composition of external audit teams to ensure impartiality
of audit findings

Revision No. 0 EC Chapter 1 /66


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

16 Whether Work Permit System in line with OISD-105 have been


implemented
17 Whether work permits are issued for hot work, cold work, electrical
work and vessel entry jobs
18 Whether the location-in-charge or his authorized nominee remain the
issuer for all hot work and vessel entry permits for enhanced safety and
control.
19 Whether work permits are duly closed at completion of the stipulated
jobs, duly certified by the supervising officer
20 Whether heat detectors in tank sprinkler systems, high level alarms of
tank farm management system are provided and checked for regular
functioning
21 Whether in-built safety interlocks provided in the design of the terminal
are adequately specified and checked for regular functioning

Revision No. 0 EC Chapter 1 /67


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 12

Emergency Preparedness Measures


(As per Clause No 12.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /68


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Emergency Preparedness Measures (Clause No 12.0)

12.1 Emergency Drills & Mock Exercises (As per clause No. 12.1)

In emergency management time is very important, the initial few minutes are
critical and timely action may contain the emergency. For persons to perform
quickly their assigned roles, it is essential that each individual should be made
aware of emergency rehearsals which will impart procedures and their individual
roles through proper training.

Testing & Mock drills for On-site emergency plans are carried out once every
fortnight. These mock drills cover various probable emergency scenarios e.g. a
fire, explosion, gas leak, electrical fire, evacuation etc. Mock drill results are
reviewed by OIC and reports communicated to HQO HSE Dept online every
month.

Mock Drill rehearsals are carried out as per scheduled frequency (i.e. Mock Drills
on Half Yearly and off site Drill on yearly basis) involving Dept of Factories,
Police, Fire Dept, Mutual Aid members considering different scenarios to improve
awareness and to build up the confidence among the employees for quick and
correct action as per their role and responsibilities to mitigate the Emergency.

Mock Drill rehearsal of On Site Emergency action plan is carried out once in a
fortnight. On completion of the mock drill rehearsal, the debriefing meeting
chaired by Officer In-charge of the unit is conducted to ensure the efficacy of the
rehearsal and to discuss the observations. Recommendations/observations
received from the observers in this regards are complied with time bound
schedule.

Moreover the rehearsal on “Off-site emergency action” has been conducted with
the consent of and under the guidelines of District Collector for surrounding MAH
industries.

Last on site emergency mock drill rehearsal was conducted on 02nd


November 2017.

Revision No. 0 EC Chapter 1 /69


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Revision No. 0 EC Chapter 1 /70


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Revision No. 0 EC Chapter 1 /71


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Revision No. 0 EC Chapter 1 /72


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Revision No. 0 EC Chapter 1 /73


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Revision No. 0 EC Chapter 1 /74


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

12.2 Training (As per clause No. 12.2)

1. An ERDMP shall be easier to use if training material and general


philosophy on emergency prevention and control are kept separate from
the working plan.

2. Training shall be imparted to all the personnel likely to be involved directly


or indirectly to the emergencies including employees, contract workers,
transport crew and security personnel.

3. Contract personnel and contract labourer shall be allowed to start work


only after clearance of attending and passing safety training.

4. Refresher training shall be conducted at regular intervals.

5. Critical Safety Campaigns are being conducted monthly on various safety


topics circulating by HSE by involving all Employees, Contract Employees
and Security Personnel.

Moreover Training is being imparted to all HPCL regular employees, security


personnel, contract employees on schedules as per approved Training Calendar
as per OISD Std. 154 for HSE training. Training modules are prepared by Fire &
Safety specialists and external expert faculty also invited. Contract workers are
allowed to work only after attending safety training.

Conducted trg for all the drivers/Helpers under CMV Rule

12.3 Mutual Aid (As per clause No. 12.3)

(a) To evaluate the thoroughness and effectiveness of an ERDMP, it is


necessary to conduct periodic table top exercises full-scale or
announced, and unannounced drills. Each site should hold drills on the
night shifts, change shifts as well as during the day as mandated under
regulation 12.1 (e).

(b) Drills should present a variety of Emergency scenarios and designed to


challenge each segment of the organization. Limited scale drills are
useful and should be used by Chief of each Support Service to train his
own team. Plans should be made to have periodic mass casualty
exercises. These exercises should attempt to simulate as closely as
possible a fire, explosion, or toxic agent release and comparison of the
prescribed time lines and the actual received.

Revision No. 0 EC Chapter 1 /75


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

(c) The warning system, first aid, evacuation procedures and the definitive
treatment procedures should all be tested periodically.

(d) Some of the drills should also include the participation of outside groups
and agencies such as police, fire companies, ambulance service, civil
defence organizations and mutual aid groups.

(e) Testing and mock drills for onsite emergency plan shall be carried once
in three months and for offsite emergency plan twelve months.

(f) For other installations, the mock drill shall be carried out once a year.
However, for locations having more than one industry member, the
annual mock drill can be carried out by one industry member in turn,
thus ensuring one mock drill in every year at the location.

(g) These mock drills will enable the unit/location to assess the capability of
the individual and performance as a group. The frequent discussions
and drills will help in eliminating the confusion and shortcomings, if
any.

(h) Each Mock Drill should be recorded with observations and deficiencies
to be rectified within 24 hours.

(i) Check Points for mutual aid and mock drills are given at Check list - 3.

Revision No. 0 EC Chapter 1 /76


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

MUTUAL AID / MOCK DRILLS

Sr.# Yes No
Check-point Remarks
1 Whether mock fire / emergency response drills are held
2 If yes, periodicity of emergency response drills
3 Mock drills cover all types of probable emergencies
4 Does the location have Mutual Aid Plan
5 If yes, the details of other members including names and
contact nos. of concerned officials
6 List of fire fighting equipments available with each
Mutual Aid members including District Fire Service
7 Compatibility of safety equipment of all Mutual Aid
members including District Fire Services with said
location has been tested and documented in the DMP
8 Details of water storage available with Mutual Aid
member including District Fire Service and mechanism to
utilize the same in the said location well documented in
the DMP
9 Details of fire fighting foams concentrate/chemicals
available with Mutual Aid members including nearest Fire
Service has been incorporated

Details of lead time for response of Mutual Aid


10 members including District Fire Service has been
documented in the DMP
11 Periodicity of safety training for officers, staff, contractor
workers, TT crew and security personnel mentioned in
the ERDMP.

12 Mutual Aid Plans


Does the location have established Mutual Aid Plans
13 Which are the Mutual Aid Team members and the
assistance offered
14 Does the plan clearly indicate types of possible hazards
and fire fighting measures required.
15 Does the plan include expected assistance from each
members

Revision No. 0 EC Chapter 1 /77


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

16 Does the Plan spell out the communication protocol and


the channels in times of emergency
17 Periodic joint exercise and meetings for practice,
familiarization and identifying and resolving compatibility
issues.

Revision No. 0 EC Chapter 1 /78


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

A Mutual Aid Agreement is in between the mutual aid members which includes M/s
HINDUSTAN PETROLEUM CORPORATION LTD. KADAPA NEW IRD, BAKARAPET and M/s
Indian Oil Corporation Limited, Indane Bottling Plant, Kadapa. Various activities to
promote Health Safety and Environment awareness amongst each other, regular lectures
/ visits / exhibitions are conducted for knowledge sharing of the expertise of individual
organisational related activities to adopt the best suitable measures in each other –
Mutual Aid Agreement –

To make the emergency plan a success, the following exchange of information


amongst the member organizations of mutual aid association is considered
essential:

(i) The types of hazards in each installation and fire fighting measures.
(ii) List of all the installations or entities falling along the routes of transport
vehicles carrying petroleum or petroleum products.
(iii) The type of equipment, that would be deployed and procedure for making
the replenishment.
(iv) Written procedures which spell out the communication system for help
and response. This is also required to get acquainted with operation of
different fire fighting equipment available at mutual aid members and
compatibility for connecting at users place.
(v) Familiarization of topography and drills for access and exit details carried
out by mutual aid members.

Revision No. 0 EC Chapter 1 /79


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 13

Response Procedures and Measures


(As per Clause No 13.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /80


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Response Procedures and Measures (Clause No 13.0)

(a) Zoning and Maps:

The zones and maps attached highlighting the Incident prone areas of the
unit so that in case of an emergency it serves as a basis for taking the
action.

ii) The entities shall help District Disaster Management Authority (DDMA)
in finalizing the full drawn map of installations and nearby areas under
their operations having presence of habitats which are vulnerable and
sensitive like old age homes, schools, prison, etc attached – Annexure- 10

(b) Layout / Flow Diagram

PI Diagram Layout attached – Annexure - 11.

ROUTE MAP is depicted in Annexure -2.

(C) Manpower Data

Staff Total Strength


Management 05
Non Management 03
Security 26
Contractor's Workers 49

Revision No. 0 EC Chapter 1 /81


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

ERDMP Response Measures/Infrastructure

Sr.# Yes No
Check-point Remarks
Zones, maps and layouts
1 Does the Location have Emergency Zones clearly identified for
Incident prone areas
2 Do the Maps indicate location of Emergency Assembly Points and
Emergency Control Rooms
3 Is the process Lay-out prominently displayed
4 Does the Piping and instrument Diagram include emergency
control valves, shutdown system, isolation valves, important control
valves etc.
5 Does the Fire Hydrant Layout conspicuously displayed.
Manpower
1 Is the ERDMP Organogram clearly displayed.
2 Does the Organogram include all duties to be attended in
connection with an emergency.
3 Is the organogram include key personnel by their names or, work
position
4 Does it have the alternate coverage to take care of the absence
of a particular person [ in cases where organogram is developed
basis names]
5 Does it include assignment of all key coordinators viz. the Incident
Controller, Administration and Communication Controller and
Safety Coordinator.
Emergency Control Centre (ECC)
1 Is the ECC well defined and clearly marked on the displayed layout
2 Is it strategically positioned to be outside the periphery of
immediate affected area.
3 Is the centre have adequate communication channels including
internal and external telephone connections, PA, paging and VHF
systems
4 Is list of key personnel and essential telephone nos. are prominently
displayed.
5 The layout of fire fighting system, different hazardous zones,
Assembly Points are prominently displayed.
Emergency Assembly Points
1 Are the EAPs well defined and clearly marked on the displayed
layout
2 The EAPs have pre-defined in-charges during emergencies who
keep in touch with the Emergency Control Centre and
Administrative Controllers and updates on the roll call on people
reporting.

Revision No. 0 EC Chapter 1 /82


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Emergency Shutdown Procedures

General:

Kadapa POL terminal is location where all receipt, storage & dispatch, testing
activities are as per OISD regulations. As per the management circular the
following Emergency Shutdown philosophy is adopted in the location in case of
emergency.

ESD:

ESD is the procedure to be invoked in case of any emergency at the location,


purpose of ESD is to STOP all ongoing process/Power at the location including
the pipeline pumping stations.

 Power Emergency Shout Down- Power ESD is to trip the power supply of
predefined equipment’s/area.

When ESD is pressed from anywhere in the location power emergency shutdown
are getting activated in tandem with time lag of approximately 100 secs. So that
field equipments which uses power like ROVs, Pumps, Other equipment etc
comes to halt.

LOCATION OF ESD:

ESD’s are provided at the following locations with Rotate Push & Lock type to
avoid accidental pressing.

 UnLoading Gantry
 Pump House

Functions of ESD:

 All process pumps irrespective of the mode will be stopped.


 All ROVs/Manual Valve on delivery and receipt lines etc will be closed.
 During fire mock drills also ESD’s are operated & logs maintained.

Actuation of Power ESD switches of the power to all facilities except the
following.

 Siren
 Power in Fire Pump House/DG Shed.

Revision No. 0 EC Chapter 1 /83


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

 Security Rooms
 Control Room
 CCTV
 3-4 High Mast towers in hazardous & Non-hazardous areas.
 Lighting at the gate.

Revision No. 0 EC Chapter 1 /84


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 14

Emergency Organization and


Responsibilities
(As per Clause No 14.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /85


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

14.0 Emergency Organization and Responsibilities.

(1) The ERDMP shall identify the safe transition from normal operation to
emergency operations and systematic shut down, if any, and the
delegation of authority from operations personnel to emergency
response personnel. For this purpose, the plan shall identify an
emergency response organization with appropriate lines of authority
with succession planning and actuating the response management.
Responsibilities for decision making shall be clearly shown in an
emergency organization chart. The plan shall identify each responder's
position, mission, duties and reporting relationship.

(2) Overall objectives of an emergency control organization shall be:

(a) to promptly control problems as they develop at the scene.

(b) to prevent or limit the impact on other areas and off-site.

(c) to provide emergency personnel, selecting them for duties


compatible with their normal work functions wherever feasible.
The duties and functions assigned to various people shall include
making full use of existing organizations and service groups such
as fire, safety, occupational health, medical, transportation,
personnel, maintenance, and security.

(d) Employees must assume additional responsibilities as per laid


down procedure of ERDMP whenever an emergency alarm
sounds.

(e) In setting up the organization, the need for round-the-clock


coverage shall be essential. Shift personnel must be prepared to
take charge of the emergency control functions or emergency
shutdown of system, if need be, until responsible personnel arrive
at the site of emergency. The organization should have an
alternate arrangement for each function.

Revision No. 0 EC Chapter 1 /86


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

14.1 Organization chart.

Affected Stake Off-Site Incident


Holders and Off-Site
Off-Site Incident
Incident
CONTROLLER
Government Commander
Commander
(District
Authorities (District
(District
Magistrate/District Medical Services
Medical Services
Magistrate)
Magistrate)
Authority) and Ambulance
and Ambulance

Municipal transport
rescue and
rehabilitation team
Fire Brigade
Fire Brigade
Services
Services

Police
Services

CHIEF INCIDENT
CONTROLLER

Mutual Aid

SITE INCIDENT
CONTROLLER

Administration and Fire Safety and Fire Operation Team,


Support Communication Team /HSE technical team,
Services * Coordinator Coordinator
* See Note (2): etc.

Index

Level – I
Level II
Level III ---------

Revision No. 0 EC Chapter 1 /87


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Note: (1) Above is a typical and basic organogram for control of emergency.
Entity can merge the functions as per their other statutory requirements
and based on level of risk and range of operations. The organisation shall
have to address all services and support system required and available to
it.
(1) Support Services Include Communication Services,
Engineering/Maintenance Services, Medical and Occupational Health,
Human Resource and Welfare Service, Security, Media/Public Relations,
Transport and Logistics, Finance, Contract and Procurement and
Environmental Services.
(2) Role of both CIC and SIC can be merged depending upon the
requirement.

14.2 Roles and Responsibilities.- - Fire Organisation Chart – Annexure - 12

14.2.1 Chief Incident Controller.

The Chief Incident Controller (CIC) shall have overall responsibility to


protect personnel, site facilities, and the public before, during, and
after an emergency or disaster. The CIC shall be present at the main
emergency control centre for counsel and overall guidance.

Responsibilities of the Chief Incident Controller shall include the


following:-

(a) preparation, review and updation of the ERDMP as per


Check List-5;

(b) assessment of situation and declaration of emergency;

(c) mobilization of main coordinators and key personnel;

(d) activation Emergency Control Centre;

(e) taking decision on seeking assistance from mutual aid


members and external agencies like Police, Fire Brigade,
Hospitals etc.;

(f) continuous review of situation and decide on appropriate


response strategy;

Revision No. 0 EC Chapter 1 /88


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

(g) taking stock of casualties and ensure timely medical


attention;

(h) ensuring correct accounting and position of personnel after


the emergency;

(i) ordering evacuation of personnel as and when necessary;

(j) taking decision in consultation with District Authorities when


an Off-site emergency to be declared.

14.2.2 Site Incident Controller (SIC)

The Site Incident Controller shall be identified by the Chief Incident


Controller and will report directly to him. SIC should be nominated by
the entity in each shift 24 hrs.

Responsibilities of the Site Incident Controller shall include the


following:-

(a) The SIC shall maintain a workable emergency control plan,


establish emergency control centers, organize and equip
the organization with ERDMP and train the personnel;

(b) The SIC shall be capable of making quick decisions and


taking full charge;

(c) The SIC shall communicate to the Emergency Control


Centre where it can coordinate activities among groups;

(d) The SIC shall be responsible for ensuring that appropriate


local and national government authorities are notified,
preparation of media statements, obtaining approval from
the CIC and releasing such statements once approval
received;

(e) The SIC shall also ensure the response to the incidents or
the emergencies, as the case may be, is in line with entity
procedures, coordinating business continuity or recovery
plan from the incident. He must ensure next of kin are
notified in a timely manner;

Revision No. 0 EC Chapter 1 /89


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

(f) The SIC shall also co-ordinate if any specialist support is


required for the above purpose; and

(g) The SIC shall decide on seeking assistance of mutual aid


members and external agencies like police, fire brigade,
hospital etc.

14.2.3 Administration and Communication Coordinator.

Responsibilities of the administration and communication controller shall


include the following:-

(a) to coordinate with mutual aid members and other external


agencies;

(b) to direct them on arrival of external agencies to respective


coordinators at desired locations;

(c) to activate the medical centre and render first aid to the injured.
arrange ambulance and coordination with hospitals for prompt
medical attention to casualties;

(d) to ensure head counts at assembly points;

(e) to arrange procurement of spares for fire fighting and additional


medicines and drugs;

(f) to mobilize transport to various teams for facilitating the response


measures;

(g) to monitor entry and exit of personnel into and out of premises;

(h) to ensure only authorized personnel enter into the premises;

(i) To regulate the flow of traffic into and out of premises and control
the mob outside, if any, with the assistance of the police.

(j) to provide administrative and logistics assistance to various teams;


and

(k) to arrange evacuation as directed by the chief incident


controller, and in coordination with the civil authorities like police,
panchayat/municipal authorities etc.

14.2.4 Fire Safety Coordinator and Fire Team.

Revision No. 0 EC Chapter 1 /90


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Responsibilities of the Fire and Safety Coordinator shall include the


following:-

(a) to activate emergency sirens as per the practiced codes;

(b) to take charge of all fire fighting and rescue operations and safety
matters;
(c) to ensure that key personnel are called in and to release crew of
fire fighting operations as per emergency procedure;
(d) assess functioning of his team and communicate with the CIC and
or administrative controller for any replenishment or, replacement
of manpower or firefighting equipment;
(e) direct the fire brigade personnel and mutual aid members to their
desired roles as also proper positioning of the manpower and
equipment;
(f) to decide the requirement of mutual aid and instruct fire station,
who, in turn will contact mutual aid members;
(g) to coordinate with outside fire brigades for properly coordinated
fire fighting operation;
(h) to ensure that casualties are promptly sent to first aid centre /
hospital;
(i) to arrange requirement of additional fire fighting resources
including help from mutual aid partners;
(j) ensure empty and loaded trucks are removed to safer area to the
extent possible so as not to affect emergency handling operations;
(k) continually liaise with the SIC and or CIC and implement the
emergency combat strategies as communicated by him; and
(l) ensure adequate hydrant pressure in the mains and monitor water
level in the reservoir.

Note: Fire chief shall wear identification jackets at the site of disaster so that he is
clearly distinguished among fire fighting personnel and is visible from a distance.

14.2.5 Support and auxiliary services for major installations.

Revision No. 0 EC Chapter 1 /91


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

The following additional coordinators (refer 14.2.5.1 up to 14.2.5.4) may be


nominated and delegated the specific responsibilities falling under the basic
functions of SIC and or CIC: -
14.2.5.1 Human Resources and Welfare Services Coordinator

14.2.5.2 Transport and Logistics Services Coordinator

14.2.5.3 Media and Public Relations Coordinator

14.2.5.4 Operations and Technical Coordinator

14.2.5.6 Security Coordinator.

The Security Coordinator reports to the Chief / Site Incident Controller and
is responsible for security of the installation during any incident or
emergency situation and for implementing the actions below:

(a) Obtaining an approved visitor list from the security department or


reception for ensuring that personnel on the list are escorted to
reception by security staff;

(b) Maintaining security of the office in the event of an office


evacuation;

(c) Providing office security and assisting authorities in the event of civil
unrest or when required organising additional security at the
emergency scene;
(d) Obtaining initial briefing from Chief / Site Incident Controller and
providing security information and or status reports to Site Incident
Controller during the emergency;
(e) Assuming responsibility for any task delegated by Chief Incident
Controller; and
(f) Assessing the emergency, identify security specific problems and
recommend solutions to Chief Incident Controller.

14.2.5.7 (a) Maintenance of ERDMP Records.

There shall be maintenance of ERDMP records for all kind of emergencies


covering near Miss. Organization shall maintain an Incident Record
Register for the above purpose and post–disaster documentation like
resources deployed, relief, rehabilitation measures and lesson learned to
avoid re-occurrence of any such emergency. Head of HSE or any other
designated personnel by the CIC/SIC shall be responsible for

Revision No. 0 EC Chapter 1 /92


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

maintenance of such records.

(1) A good public relations program is extremely important in an


emergency situation. Inquiries will normally be received from the
media, government agencies, local organizations and the general
public.

(2) This section of the Response Plan shall include a public relations or
media plan. It should identify an Information Officer that is well-
equipped and trained in media relations.

(3) Initial releases shall be restricted to statements of facts such as the


name of the installation involved, type and quantity of spill, time of spill,
and countermeasure actions being taken. All facts must be stated
clearly and consistently to everyone.

Note- Plans shall also be developed to utilize local media and television
stations for periodic announcements during an emergency. This
shall also assist in reducing rumours and speculation.

14.2.5.7 (b) Recorder.

The Recorder responsibility is to maintain an accurate time record of key


information received from the incident or emergency location and to
record the actions initiated by the site incident controller and for
implementing the emergency response actions below:

(a) to record key incident events/actions on incident status


board/display manually or electronically ;
(b) to maintain essential equipment checklist status;
(c) to ensure all status and information is up to date and correctly
displayed;

(d) to take all necessary recorded material to the alternate ECC


room in the event of emergency in main ECC room; and

(e) to maintain a log book.

14.2.5.8 Communications Services.

(1) The Communications Coordinator shall ensure the following actions


below:
(a) Ensuring the ECC equipment and systems are maintained to a
high standard and remain functional throughout the
emergency.

Revision No. 0 EC Chapter 1 /93


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

(b) Ensuring a back-up communication system is available in the


event of the ECC Room is not available.

(c) Providing quality and diverse communication systems for use in


routine and emergency situations.

Revision No. 0 EC Chapter 1 /94


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

COMMUNICATION FLOW CHART

Employee/
Police Security
Public
Fire and gas
detection
system/ SCADA
EMERGENCY
System
CONTROL
CENTRE

First MANAGEMENT
Responder TEAM
(Head Operations, Head CRISIS
Maintenance, Head MGMT
Technical, Head HSE, GROUP
Fire safety/HSE
SITE INCIDENT
CONTROLLER Head Security, Head
Coordinator and (HR)
fire team
District
CHIEF INCIDENT Administration
and Central
CONTROLLER
Govt. agencies
Info. to Fire Mutual Aid
Brigade, Police, Members
Medical and
Government Others (required Note: Level I
Authorities coordinators of the
installation) Level II

Level III

Note: 1. above is a typical communication flow chart for notification of


emergency.
2. Wherever communication exists for any level of emergency, it
automatically implies that the communication exists for all higher levels
of emergencies.
(2) Flow of Information.

(a) Control Centre shall receive the information form field either in
person or from the various systems available in the installation.

(b) on receipt of information, the control room shift In-charge will


actuate the ERDMP and notify the emergency to site incident
controller.

Revision No. 0 EC Chapter 1 /95


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

(c) Control room shift in-charge will act as site incident controller till
arrival of designated person.

(d) SIC or CIC depending upon the level of emergency will actuate
the ERDMP and inform the concerned authorities as depicted
above in the chart.

Note: Apart from the above main function, the role and responsibility of other
support services such as finance, material etc should also be detailed in disaster
management plan.

14.2.5.9 Siren Codes.

(1) The Emergency siren/s should be located suitably to cover the whole area
with the operational control within the installation. These should be tested
at least once in a week to keep them in working condition.
(2) Emergency siren code should be as follows, namely: -

(a) Emergency Level-I: A wailing siren for two minutes.

(b) Emergency Level-II and III: Same type of siren as in case of Level – I
and II but the same will be sounded for three times at the interval
of one minutes i.e.( wailing siren 2min + gap 1 min + wailing siren
2min + gap 1min + wailing siren 2min) total duration of Disaster siren
to be eight minutes.

(c) ALL CLEAR: Straight run siren for two minutes.

(d) TEST: Straight run siren for two minutes at frequency at least once a
week

Public address system should be provided with message

Revision No. 0 EC Chapter 1 /96


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Review and Updation of ERDMP

Sr.# Yes No
Check-point Remarks
1 Frequency of mock-drills for practice, refinement and
updation
2 Are the records for periodic Mock drills maintained in
a well defined format.
3 After each drill, whether assembly meetings involving
all staff and contract personnel are conducted to
share experience of the event as also to identify the
shortcomings and scopes for further improvement in
procedures. Whether the issues are discussed and
the plan modified suitably.
4 Does the review ensures efficiency of the plan
particularly w.r.t. response, communication and
coordination aspects.
5 Do the Mutual Aid members participate in the drills
and based on the actual response and difficulties
experienced, corrective actions initiated for
refinement of the plan.
6 Does a procedure exist in incorporating the findings/
learnings of the actual disaster management
handling, if any so that the plan can be revised
accordingly.

Revision No. 0 EC Chapter 1 /97


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 15

Infrastructure
(As per Clause No 15.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /98


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Emergency Infrastructure (Clause No 15.0)

Emergency Control Centre (ECC) (As per clause No. 15.1)

Plant Manager cabin has been designated as Emergency Control Centre (ECC)

Following supplies and dedicated equipment are made available at the ECC.

1) A copy of the ERDMP is made available.


2) Maps and diagrams showing buildings, roads, process lines, drainage
trenches, and utilities such as air, nitrogen, water and electricity are
displayed.
3) Maps showing the site, surrounding area, high-ways, rivers, etc. are
displayed,
4) Names, addresses, and telephone numbers of employees displayed.
5) Updated lists of names, addresses, and telephone numbers of off-site
groups and organizations are made available that might have to be
contacted during emergency.
6) Dedicated and reliable communication equipments are provided at the
ECC.
7) ECC has emergency lights and back up UPS power so that operations can
continue in the event of power failure.
8) Logbooks for recording the sequence of events have been provided to
assist in investigating causes, evaluating performance, and preparing
reports.
9) ECC also has dedicated computer with LAN / internet facility to access the
installation data and also it has the latest and updated soft copies of all
standard operating practices (SOP) etc.

Telephone Numbers of Emergency Control Centres


Control Room EPABX No. Land Line

SFG cabin -- 08562 338504

Revision No. 0 EC Chapter 1 /99


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Assembly Points (As per clause No. 15.2)- Layout with escape route
and assembly points – Annexure -13

(1) Emergency Assembly near security main gate area is pre-designated


areas in safe zone as per quantitative risk assessment, where the
personnel like workers, staff, contractor workers etc. not involved in
emergency operations (as per ERDMP) shall assemble in case of an
emergency.

(2) Depending on the location of the emergency, the assembly point can
vary. Accordingly for each potential hazardous zone, a specific
assembly point is identified and clearly marked on the zones or maps
as tabulated below.

Assembly point
SL.No Potential Hazard Zone
Designated
1 Office/Workers cabin Assembly point
2 TT Gantry/MCC Room Assembly point
3 Pump house/TW Gantries Assembly point
4 Vehicle TT Crew Assembly point

Assembly point - Near Admin Building

(3) All Designated assembly points are clearly marked with directional
display board along the route. Routes are well lighted with florescent
marking.

(4) During an emergency, pre-designated persons would take charge of


this point and take the roll call of the people reporting. Provisions are
made for assembly points, communication and headcount facilities at
assembly points, and personnel to control the movement of
assembled employees.

(5) The assembly point coordinators should rush to their designated


assembly point. The name of coordinators and their assembly points
are CIC/Security Representative at Maingate.

(6) The assembly point coordinators will


 Keep in touch with Chief Incident Controller for further instruction.
 Ensure the assembling of residents at their nearest Assembly point.
 Request the assemble persons, not to get panic and be ready for
evacuation (if required).

Revision No. 0 EC Chapter 1 /100


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

 Keep in touch with Welfare and Media Coordinator {i.e. Mgr - HSE)}
for arrangement of transport facility for evacuation (if required)
Carryout the head count of the assembled persons at the respective
assembly point and report the same to the CIC.

Revision No. 0 EC Chapter 1 /101


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 16

Declaration of On-Site & Off-Site Emergencies


(As per Clause No 16.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /102


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Declaration of On-Site & Off-Site Emergencies (Clause No 16.0)

Initial Announcement of an Emergency:

Any untoward incident/emergency has to be reported either by person or


through telephone/VHF or by any other means to the Location In-
Charge/Security Gate. The Location In-Charge shall act as per Roles &
Responsibility defined in clause No.14.2 displayed on Fire Organisation Chart.

Incident Controller shall decide the nature of emergency [Minor/Major/Disaster]


and take appropriate action.

In the event of Emergency, the same will be communicated to all Coordinators.


All employees will report to nearest Assembly points as specified, on hearing the
siren or getting the message over telephone/VHF. Maintenance
personnel/Contract workmen working with machines also proceed for Assembly
point after leaving the machine in safe condition.

Note: The announcement regarding Major Emergency will be made by the


Location-in-Charge [Chief incident Coordinator] or his nominee as information
first becomes available on an incident.

This plan has been developed to deal with emergency incidents which occur
totally within the Hindustan Petroleum POL terminal Plant premises and which do
not endanger the outside community. Emergency incidents will be classified by
the level of response that will be required. The actual classification will be made
by the Location-In-Charge or his nominee as information first becomes available
on an incident. The level of response may change as more information becomes
available or conditions change. Where information is lacking the worst case
scenario will dictate the level of response.

Level 1: Minor Emergency

Incidents with minor release or leak of products or other emergency, which


amounts to minimum leakage or minimum release of volume, could poses a
minor threat to the safety of employees, residents, the environment or
property and can be safely contained On-Site, which doesn’t produce any
off site impact and doesn’t seek any outside involvement.

Level 2: Major Emergency

Incidents with moderate release or leak of petroleum products handled or


other emergency, which amounts to moderate spill or moderate release,
could poses a moderate threat to the safety of employees residents, the

Revision No. 0 EC Chapter 1 /103


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

environment or property which could have safely contained On-Site, could


produce off site impact and could seek any outside involvement and could
require outside resources.

Level 3: Disaster

Incidents with major release or leak of hydrocarbon products or other


emergency, which amounts to large spill or large release of volume
involved, could poses a total threat to the safety of employees, residents,
the environment or property which produce off site impact and require large
outside involvement & district outside resources.

Termination of emergency period and restoration of normalcy period, which


follows all clear sirens, shall also be declared by the “Site Coordinator” or the
higher management who replaces him.

Emergency Action Plan for Emergency during Off- Shift Hours (Including
Holidays):

1. During other than office hours (including holidays) the Security In-
charge shall perform the duties of Site Incident Controller. Security at
Visitor Gate shall also perform duties of Communication, Welfare &
Medical, and Material Coordinator in addition to his normal duties till the
arrival of the concerned coordinator.

2. The Security in-charge in consultation with the site incident controller


shall act upon depending on the situation till arrival of the concerned
coordinators for effective handling of emergency. They shall take care
of the safety of personnel, ASF, property etc. Safe operating procedures
which are already in practice shall be followed.

3. All other non-essential personnel whose roll is not defined in the action
plan shall assemble at assembly points and wait for further instruction
from CIC Control Room.

Fire / Vapour Cloud Explosion / Emergency

1. First responder is operator or maintenance worker who on discovering


fire / explosion / product leak shall inform to local CR.
2. Try to extinguish or contain fire with help of nearest available fire
extinguisher, water hydrant, Monitors without endangering himself.

3. The person has to operate the nearest MCP(Manual Call Point).

4. Upon operation of MCP, sprinklers system, siren will get activated and
ROVs of the concerned area gets closed.

Revision No. 0 EC Chapter 1 /104


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

5. Location In-charge who shall take charge to deal with emergency,


6. Fire coordinator shall take immediate action to control emergency.
7. All the teams Combat/Rescue/Auxiliary will report to CIC and take
charge as per their responsibilities mentioned in Fire Organization
Chart.
8. Security coordinator shall carry out rescue operations at site and control
of personnel to those required for emergency control.
9. SIC shall rush to site with members of Emergency Management team
and take action to mitigate / contain emergency. Time to time, he shall
communicate to CIC regarding status & action plan of emergency and
execute his instructions.
10. All coordinators shall be at respective duty stations and obey
instructions from CIC.
11. CIC will assume full responsibility of emergency action plan. He shall
take decision regarding level of emergency, start of Emergency Control
Centre (ECC).
12. CIC shall take necessary emergency control measures till situation is
brought under control. He shall initiate actions & decisions regarding:
 Operation & maintenance
 Shut-down of equipment
 Evacuation of personnel
 Medical assistance to injured
 Assistance from mutual aid members and external agencies.
 Escalation of emergency & reporting incident to district
authorities
 Communication & assistance to affected public

External Communication: There are P&T lines, fax and e-mail system at HPCL Khapri
POL Depot which will be used to communicate with external bodies. These numbers
should be available with Plant Persons. List of external agencies along with their contact
details is provided below:

Revision No. 0 EC Chapter 1 /105


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

List of District and State Authorities with Telephone Numbers

Emergency Contact Numbers to be called during emergency


District Authority Contact Number
SN AUTHORITY TELEPHONE
1 Dist. Collector, Kadapa 08562-244168, 9440748485
2 Joint Collector, Kadapa 08562-244548, 9849904110
3 District Crisis Group 08562-244168, 9440748485
4 Joint Chief Inspector Of Factories 08562-244836, 8897012228
5 Chief Controller of Explosives 022 - 27575946
6 Environmental Engineer, AAPCB. 0877-2253981
APSEB
AUTHORITY
9 Electricity Office- Kadapa 102, 08562-242457
10 DE 9440811964
13 AE - ?
POLICE
AUTHORITY
14 Police Control Room /Bomb Squade 08562-244198, 9440796900
15 SIDHOUT Police Station ?
16 Commissioner Of Police 08562-242293
17 Superintendent Of Police - Rural 08562-244967
08562242133
18
I Town Police Station
19 II Town Police Station 08562241387
23 Kadapa (Traffic, Law & Order) 08562244966
FIRE SERVICE
AUTHORITY
27 Kadapa Fire Station 9963737191
30 District Fire Officer 9949991069
Medical Service
AUTHORITY TELEPHONE
37 RIMS HOSPITAL 08652-220200, 9701501046
Ambulance Service
AUTHORITY TELEPHONE
44 Ambulance 108
Emergency Contact Numbers to be called during emergency as per guidelines
(FIRE & SAFETY)
AUTHORITY TELEPHONE
45 Safety Manager 08562-338501
46 Fire Officer 08562-241739
47 Fire Officer 9949991069

Revision No. 0 EC Chapter 1 /106


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

TELEPHONE NUMBERS OF EMPLOYEES OF VNWOT

Sl No Emp No EmpName Phone No.

1 31914350 P.VENKATA RAO (CDM) 7382158158


2 35418870 CH. SATYANARAYANA (MANAGER -OPNS) 9963994919
3 31958170 V. SIVA NAGESWARAO (Asst. Manager) 7036155672
4 31971320 CR. VINUTHNA (Officer) 8142457555
31977350 K. YUNEELA CHOWDARY(Operations
5 Officer) 8374671115
6 31970060 KATAM GANESH REDDY (Jr. Admin Asst) 9949506975
35324940 C.RAMESH REDDY (GENERAL SERVICE
7 ASSt) 9246940733
8 39937320 P. GILANI (GENERAL SERVICE ASSt) 9493351533

1. When emergency becomes catastrophic and evacuation beyond the


Plant premises is considered necessary by the chief incident controller,
the situation will be handed over to district authority for implementing
the off-site emergency plan.

2. The management of emergency henceforth has to be controlled by the


district crisis management group under the supervision of the District
Collector/DDMA.

3. In addition to preparation of on-site emergency plan, furnishing


relevant information to the district authorities for the preparation of
off-site emergency plan is a statutory responsibility of the occupier of
every industry handling hazardous substance.

Revision No. 0 EC Chapter 1 /107


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 17

Resources for Controlling Emergency


(As per Clause No 17.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /108


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Resources for Controlling Emergency (Clause No.17)


In order to meet all possible emergencies, adequate number of resources and
systems has been provided as per identified Risk level and also in compliance
with statutory requirements under Factories Act, 1948 and other OISD
regulations. These are enumerated Table – 1 below:-

Fire Fighting & Safety Systems

S.N. Description Nos.


Fire Extinguishers
1. DCP 75 Kg 8
2. DCP 10 Kg 160
3. DCP 25 Kg 19
4. CO2 (4.5 Kg) 40
5. CO2 (2 Kg) 50
Nozzles/Monitors/Hydrants/Fire Hoses
1. Fire Water 10875 KL (3 X 3625 KL)
2. Fire Engine 6 nos ( Each Cap: 616
M3/Hr)
3. Jet Nozzles 41
4. Water curtain Nozzles 20
5. Foam Branch pipe 35
6. Fog Nozzles 12
7. Curtain Nozzles 10
8. Universal Nozzles 30
9. Fire Hydrant Points 66
10. Foam Cum Water Monitor 35
11. Foam Compound Trolley 11
12. Hose Boxes 66
13. Fixed water Monitors 27
14. Foam Compound 40 KL
15. Fire Hoses 160

Details PPEs Available at Site:

S. No. Name of PPE No. of PPE


15. Helmet 30
16. Safety Shoes 20
17. Safety Belt 60

Revision No. 0 EC Chapter 1 /109


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

S. No. Name of PPE No. of PPE


18. Safety Goggles 10
19. FLP Torch 2
20. Stretcher 2
21. Compressed Air Breathing Apparatus Set 1
22. Refill Cylinders for all Breathing Apparatus Set 2
23. Breathing Apparatus Set 2
24. Gloves Electrical (11 kVA) 2
25. Cotton Hand Gloves 5
26. PVC Suit 2
27. Fire Proximity Suit 1
28. Gum Boots 3

Classification of Fire:

Fire is classified basically on the basis of the combustible material involved in it


as below:

Type of Fire Materials Involved


Class ‘A’ Fire Ordinary combustibles as Wood, Cloth,
(Combustible Solid) Rubbish, Plastic, Paper.
Inflammable substances as Oil, Mob,
Class ‘B’ Fire
Benzoyl, Solvent etc. And also all the fires,
(Combustible Liquid)
which occur in fast and vapour.
Class ‘C’ Fire Fire involving gases i.e. LPG, CNG,
(Combustible Gases & Energized Synthetic gas, Hydrocarbon Gases etc. and
Electrical Equipment ) energized electrical equipment.
Class ‘D’ Fire All Combustible metallic fire, Potassium,
(Combustible Metal) Magnesium, Sodium etc.

For Fires of:

1. Electric Origin, use only CO2 or dry chemical fire extinguishers to


extinguish fire on or around electrical equipment. Do not use water or
foam.
2. Do not extinguish a gas fire until the source of fuel has been cut off to
avoid an explosive mixture being formed.

Suitability of Fire Extinguishers:

Types of
Class ‘A’ Class ‘B’ Class ‘C’ Class ‘D’
Extinguishers
Water Type Suitable Unsuitable Unsuitable Unsuitable

Revision No. 0 EC Chapter 1 /110


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Fire Extinguishers
Foam Type Unsuitable but will
Suitable Unsuitable Unsuitable
Fire Extinguishers control small fires
CO2 Unsuitable but will
Suitable Suitable Unsuitable
Fire Extinguishers control small fires
Dry Powder Unsuitable but will
Suitable Suitable Suitable*
Fire Extinguishers control small fires

*Special type of DCP

Fire Alarm System:

Siren is kept in always in ON mode at outside office cabin near to security cabin

which is the nearest and most accessible point during emergency.

Type of Siren Location


Electric siren MCC Room/Security cabin
Hand Siren Filling shed/pump house/CR
Shed/TT Gantry/ TW gantries

Wind Socks:

Wind socks are installed for knowing wind direction during emergency. Wind Socks have
been installed at following locations

Security Main Gate


Water Tanks
Product storage Tank area
New TT parking area

Portable Fire fighting Extinguishers:

All the strategic location/areas are covered with portable fire extinguishers for tackling
fires at their incipient stage. Three type of extinguishers (DCP,ABC & CO2) of different
capacities (DCP-10 Kg,5 kg, 75 Kg.)& (CO2 - 4.5, 2.5 kg) have been provided at
hazardous area for instant use.

S.N Equipment As per OISD Availability


. At Depot
A. Fire Extinguishers

1 Lube Godown 1 No. 10 Kg DCP Extinguisher for 3 x 10 Kg


every 200 m2 or min. 2 Nos. in each DCP;2 X
Godown Whichever is Higher 4.5Kg CO2
type

Revision No. 0 EC Chapter 1 /111


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

S.N Equipment As per OISD Availability


. At Depot
2 Lube Filling Shed 1 No. 10 Kg DCP Extinguisher for 200 Available
m2 or min. 2 Nos. in each shed
whichever is Higher
Pump House (Class A/B): 15 x 10 Kg
3 Up to 50 HP 1 No. 10 Kg DCP for 2 Pumps DCP;
Above 50-100 HP 1 No. 10 Kg DCP for Each Pumps 1 X 25 Kg
Beyond 100 HP 2 Nos. of 10 Kg or 1 No. of 25 Kg DCP DCP
for each Pump
8 x 10 Kg
DCP; 1 X 25
Kg DCP
4 Pump House (Class C): 1 No. 10 Kg DCP for every 4 Pumps up Available
Up to 50 HP to 50 HP
Above 50 HP 2 Nos. of 1 0 Kg DCP or 1 x 25 Kg DCP
for 4 Pumps
5 Tank Truck Loading & 1 No. 10 Kg DCP Extinguisher for each 16 x 10 Kg
Unloading Gantry for Bay + DCP; 2 x 75
POL/Special Products 1 No. 75 Kg DCP Extinguisher for Each Kg DCP
Gantry
6 Tank Wagon Loading & 1 No. of 10 Kg DCP Extinguisher for 38 x 10 Kg
Unloading Gantry/Siding every 30 m of Gantry/Siding + DCP; 2 x 75
1 No. 75 Kg DCP Extinguisher for Each Kg DCP; 2 X
Gantry/Siding 25 Kg & 1X
Sand Bucket
7 A/G Tank Farm 2 Nos. 10 Kg DCP Extinguisher for 18 x 10 Kg
each Tank + DCP; 16 X 25
4 Nos. 25 Kg Extinguishers for each Kg DCP
Tank Farm positioned at 4 corners.
(In Case of Adjoining Tank Farms the
No. of 25 Kg Extinguishers can be
reduced by 2 No. per Tank Farm)
8 U/G Tank Farm 2 No. 10 Kg DCP Extinguisher for Each 4 x 10 Kg
Tank Farm DCP; 1 X 25
Kg DCP.
9 Other pump Houses 1 No. 10 Kg DCP Extinguishers for 13 x 10 Kg
every two pumps or min. DCP
2 No. 10 Kg DCP Extinguisher for each
pump House whichever is Higher
10 Admin Building/Store 1 No. 10 Kg DCP Extinguisher for 6 x 10 Kg
House every 200 m2 or min. DCP; 4 x 2 Kg
2 Nos. 10 Kg DCP Extinguisher for CO2; 4 x 2.5
each floor of Building/Store s Kg Clean
whichever is Higher Agent
11 VRU Vapour recovery unit, design with all 2 x 10 Kg
safety aspects. DCP; 1 x 75
Kg CO2
12 Main Switch Room/Sub- 1 No. 4.5 Kg CO2 Extinguisher for Available
Station every 25 m2 +

Revision No. 0 EC Chapter 1 /112


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

S.N Equipment As per OISD Availability


. At Depot
1 No. 9 Lit. Sand Bucket
13 Computer Room / Cabin 2 No. of 2 Kg CO2 or 2 Nos. of 2.5 Kg 1 x 10 Kg
Clean Agent Extinguisher per DCP; 4 x 2 Kg
Computer Room & CO2; 4 x 2.5
1 No. 2 Kg CO2 or 1 No. 1 Kg Clean Kg Clean
Agent Extinguisher per Cabin Agent
14 Security Cabin 1 No. 10 Kg DCP Extinguisher per 2 Kg DCP
Cabin
15 Canteen 1 No. 10 Kg DCP Extinguisher for 100 2 X 10 Kg
m2 DCP
16 Workshop 1 No. 10 Kg DCP Extinguisher & 1 X 10 Kg
1 No. 2 Kg CO2 Extinguisher DCP;
1 X 4.5 Kg
CO2
17 Laboratory 1 No. 10 Kg DCP Extinguisher & 2 X 10 Kg
1 No. 4.5 Kg CO2 Extinguisher DCP; 1X 4.5
Kg CO2
18 Oil Sample Storage 1 No. 10 Kg DCP Extinguisher per 100 Available
Room m2 or min.
1 No. 10 Kg DCP Extinguisher per
Room Whichever is Higher
19 Oil Water Separator/ETP 1 No. 75 Kg DCP & Available
2 No. 10 Kg DCP Extinguisher
20 Transformer 1 No. 10 Kg DCP Extinguisher per Available
Transformer

Telephones:

Following communication equipment’s are used for internal and external


communication:

For Internal and External:

1. Landline Phones
2. VHF (Walkie-Talkie)
3. Electric Siren
4. Hand Siren
5. Intrinsically Safe Mobile (IS).
6. Mobile phones for officials (Non Hazardous Area)
7. Fax
8. E-mail
9. Portable Loud Speakers (Mega Phone).
Telephone is provided at administrative cabin for external communication with
other outside working agencies and in the planning office. Mobile phone facility is
also available for officers for usage inside administrative cabin and also at the
residence of all employees. One dedicated mobile phone is for planning.

Revision No. 0 EC Chapter 1 /113


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

VHF hand Sets:

VHF hand sets are provided to all officers & Security Main gate for internal
communication during emergency. Operating personnel/contractors are provided
mobile type hand set walkie talkies are provided.

Transport Facilities:

Adequate transport vehicles are provided for medical treatment, evacuation and
the movement of key persons. one office jeep is stationed inside premise for
taking care of emergency situations. One additional bus is also.

Contract personnel shall take help from outside transport agencies for mass
evacuation, if required.

Available Neighbouring
Civil
SN Type of Vehicle with units
Authorities
installations
Jeeps 1 1
1.
Ambulances 1 1
2.
Buses 1 1
3.

Check list - 6 as per regulation 17 (5) is attached in Appendix

Water Calculation: As per Annexure

Revision No. 0 EC Chapter 1 /114


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 18

Demographic Information
(As per Clause No 18.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /115


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Demographic Information (As per Clause 18.0)

As per the Petroleum Act 1934 & rules issued on 2002, 2008 under the Act

Central Government or State Government or Corporation to construct petroleum


storage locations as per OISD provided guidelines:

(1) Where the right of user in any land has vested in the Central Government or
in any State Government or Corporation under section 6-

(i) It shall be lawful for any person authorized by the Central Government or
such State Government or corporation, as the case may be and his servants and
workmen to enter upon the land and lay pipelines or to do any other act
necessary for the laying of pipelines.

Restriction regarding the use of land:

(1) The owner or occupier of the land with respect to which a declaration has
been made under sub-section (1) of section 6 shall be entitled to use the land
for the purpose for which such land was put to use immediately before the date
of the notification under sub-section (1) of section 3.

Provided that, such owner or occupier shall not after the declaration under sub-
section (1) of section 6:

(i) Construct and building or any other structure.

(ii) Construct or excavate any tank, well, reservoir or dam or

(iii) Plant any tree on that land

The demography information around Plant & its associated area is duly obtained
before lying of any pipelines. (Reference Demography Survey Report)

The Land extent of 84 Acres is owned by HPCL

A representative estimate of the exposed populations is sufficient to


determine the acceptability of societal risks by determining the order of
magnitude of potential fatalities within a population group.

The basis of the population assigned to the facility will be based on the data
available according to the 2011 population Census near Kadapa HPCL new
Revision No. 0 EC Chapter 1 /116
EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

oil terminal area. The population covered in a distance 5000m perpendicular


to the plant premises on either side is considered.
Further analysis of the population will be conducted in order to define various
factors associated with the population presence, e.g. day/night variation,
fraction of time spent indoor etc. For all on-site population, the presence factor
of 0.2 is considered and for off-site population the presence factor of 1.0 is
considered. Predominantly in this study, off-site population is considered for all
risk estimation. Based on the 2011 India census report and area of consideration,
the following table is proposed for population density.

Sr.no Demographics of Kadapa Number


1 (a) Neighbouring population in a 5km radius 5,000
2 (b) housing colonies of industries 0
(c) sensitive institutions such as schools, hospitals,
2
3 religious establishments and old aged homes, etc.

4 (d) cattle and livestock 500


5 (e) flora and fauna 03

Population Table under Kadapa Rural Juridiction

SN Location Day Density Indoor Night Density Indoor


(Per KM2) Fraction (Per KM2) Fraction
Kadapa
1 188 0.1 150 0.9

Revision No. 0 EC Chapter 1 /117


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 19

Medical Facilities
(As per Clause No 19.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /118


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Medical Facilities (Clause No 19.0)

Facilities available at First Aid centre

First Aid Training has been imparted to more than 80% of the employees,
ensuring minimum two first aid trained person per Section. Hindustan Petroleum
Kadapa is having RIMS HOSPITAL nearby 7 kms away from Depot.

Occupational Health Centre (OHC):

Depot is having Company Designated Physician who visit monthly twice to


depot.
Facilities Qty
Doctor Dr. B.CHENNA REDDY

Compounder NA
Medical Observation Table Yes Available
Weighing M/c Available
Available
Blood pressure checking M/c
(Manual)
Blood pressure checking M/c Available
(electronic)
Stretcher Available

Saline stand Available


Refrigerator Available
Partition screen Available

Anti venom vial Arrangement Is Done At Rims

Details & Contact details of neighbouring Hospitals

List of Hospitals at Kadapa.


SN Name of the Hospital Telephone
1 RIMS Hospital 08562 220200, 9701501046

TELEPHONE NUMBERS OF AMBULANCE SERVICES


SN Ambulance service Telephone

Revision No. 0 EC Chapter 1 /119


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

1 Ambulance 108

TELEPHONE NUMBERS OF BLOOD BANKS


S No Blood Bank Telephone
1
2
3
List of Hospitals at Kadapa.
Facilities RIMS HOSPITAL RIMS

Round-the-clock Available Round-the-clock Emergency


Emergency Services Services fully equipped and
managed by a dedicated team of
qualified emergency care
professionals

Intensive Care Units Available The intensive care units are


equipped with the latest equipment
including monitors, defibrillators,
pulse oximeters, pace makers, ABG
analysers, infusion pumps and
ventilators

Operating Theatres Available The operation theaters with state of


the art facilities such as the C-Arm
image intensifier, power
instruments, operating microscope,
monitors accessories etc

Diagnostic Facilities Available Comprehensive diagnostic facilities


including Cath Lab, MRI, Spiral CT
Scan, Ultra Sound, 2D Colour
Doppler, Endoscopy, Colonoscopy,
fully automated laboratory services
etc.

Diagnostic Facilities Available Comprehensive diagnostic facilities


including Cath Lab, MRI, Spiral CT
Scan, Ultra Sound, 2D Color
Doppler, Endoscopy, Colonoscopy,
fully automated laboratory services
etc.

Revision No. 0 EC Chapter 1 /120


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

19.2 FIRST AID FACILITY

First Aid kits are kept at different places with First Aid Boxes with the
medicines as per statutory requirements and are refilled Monthly.

1. At Main Gate Security


2. At Admin Building
3. At MCC Room

Revision No. 0 EC Chapter 1 /121


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 20

Evacuation
(As per Clause No 20.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /122


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Evacuation (As per Clause No 20.0)


The Chief Incident controller will intimate regarding evacuation. Evacuation of
the personnel shall be carried out in a planned manner along the escape route to
assembly points. People must be evacuated at right angle to wind or opposite
the wind direction.

All Team Heads/Security will provide the exact head count details during the
emergency. Accounting for site personnel, visitors and contractors, particularly
those known to have been in the affected area will be done.

Figures of contract labor may vary depending upon day and time, but the exact
figure (inside Plant) will be available at main gate (Security Department keeps
record of contract person/ visitor etc. who have entered inside ASF. Total
number of persons available at site shall be calculated from above.

Rescue operation will be carried out by the Rescue/Incident Control personnel


immediately attending to the emergency. The above operations will be led by the
Incident Controller at site. The list of casualties etc. shall be reported to the
Communication coordinators who in turn will be reporting to the Chief Incident
Controller at site. Casualties will be shifted to hospital, if required, by
communication coordinators in consultation with Chief Incident Controller/SPM.

Evacuation of those personnel who are not required to be present will be carried
out in consultation with site incident controller. When required, all personnel
shall proceed to ASSEMBLY POINTS through designated routes. List of vehicles
will be used during evacuation is attached as Table 18.

TABLE -1

List of Vehicles to be used in an Emergency

Available Neighbouring
Civil
SN Type of Vehicle with units
Authorities
installations
Jeeps 1 1
1.
Ambulances (Jeep) 1 1
2.
Buses (Jeep) 1 1
3.

Revision No. 0 EC Chapter 1 /123


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

TABLE-2

All Section heads/ Team Coordinators will ensure that the employees nominated
by them from their respective Sections must report at emergency site to extend
their support to Team Coordinators.

Evacuation Plan

 When the emergency message received, all personnel should ensure that
nearby personnel are aware of the emergency, quickly shutdown
operating equipment by pressing ESD buttons (e.g., Valves, Pumps, flow
meters etc), close doors and exit the building using stairwells.

 All personnel should know where primary and alternate exits are located,
and be familiar with the various evacuation routes available.

 Be aware of all marked exits and evacuation routes from your area of the
building. Know the evacuation routes from your work area.

 When officially told to evacuate, leave by the nearest exit and alert others
to do the same.

 Assist the disabled in exiting the building, if requested.

 Once outside, move to the assembly point designated for your building.
Stay there until an accurate head count has been taken.

 Keep streets and walkways next to exits clear for emergency vehicles and
personnel. Keep the street side of buildings clear so that emergency
equipment can reach buildings.

 Do not return to an evacuated building until & unless directed to do so


by the Safety & Fire Department personnel.

Revision No. 0 EC Chapter 1 /124


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 21

Information to Public
(As per Clause No 21.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /125


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Information to Public (As per Clause No 21.0)


(1) General public who are likely to be affected shall be informed about safety
measures to be taken in the event of an emergency.

(2) Display boards carrying Do’s and Don’ts shall be located outside the gate
as well as in the neighbouring areas and other habitat areas in the
immediate vicinity. Use of Dos' and Don’ts shall be prepared and furnished
to the District Crisis Management Group.

(3) Safety leaflets are printed having the information on Hazards of Petroleum
products & action in case of emergency is distributed among villages near
by the area as per Chapter-18.

(4) Safety Awareness camps are conducted in and around the


Bakarapeta village and schools with the help of Industrial
Association and local public representative. They were told about
the hazards of POL products and steps to be taken during
emergencies.

Safety Leaflet in local language (Telugu) for Villagers Awareness attached as


Annexure-6.

Revision No. 0 EC Chapter 1 /126


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 22

Roles and responsibilities of stakeholders


including external agencies
(As per Clause No 22.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /127


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

22.0 Roles and responsibilities of stakeholders including external


agencies:

(1) Role and responsibilities of stakeholders including external agencies


such as District Authority, police, fire service, revenue department,
health department, pollution control board, National Disaster
Response Force (NDRF) and State Disaster Response Force (SDRF).

(2) For roles and responsibilities of above stakeholders and responders,


primarily district collector as Head of emergency operation and
other authorities under his charge including external agencies, has
been defined in Schedule–V. These roles and responsibilities are
generally in line with National Disaster Management Guidelines on
Chemical Disasters, April, 2007, brought out by National Disaster
Management Authority.

The important Roles and Responsibilities of Various Stakeholders

a) Oil and Gas Installations and Areas (Mentioned in Regulation 3).

The above mentioned Installation in Regulation 3 should provide


necessary information to Mutual Aid Association, District Authority,
Police and Fire Services.

i) List of Hazardous Chemical and Systems which have potential


to cause danger to Human, Environment and Property.
ii) On-Site Emergency Plan and Periodic Mock Drill.

The above entities should support authorities in mitigation, rescue and


rehabilitation, with resources identified and agreed with the authorities
in advance. Such areas shall be included in Off-Site Emergency Plans.
b) The district authority is responsible for the Off-Site emergency plan and
it shall be equipped with up-to-date Major Accident Hazard units,
website, control room etc., with provisions for monitoring the level of
preparedness at all times. Regular meetings of various stakeholders of
Chemical Disaster Management will be conducted by district
administration/District Disaster Management Authority to review the
preparedness of Chemical Disaster Management.

Revision No. 0 EC Chapter 1 /128


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

c) The police will be an important component of all disaster management


plans as they will be associated with investigation of incident
s/disasters. Police take overall charge of the Off-Site situation until the
arrival of the district collector or its representative at the scene.

d) The fire services are one of the first responders and shall be adequately
trained and equipped to handle chemical emergencies. Fire services
are to acquire a thorough knowledge of likely hazards at the incident
site and the emergency control measures required to contain it.

e) In a chemical emergency, the revenue department shall coordinate


with other agencies for evacuation, establishment of shelters and
provision of food, etc.

f) When required for evacuation purposes in a chemical emergency, the


department of transport should made transport promptly available.

g) The role of civil society and private sector in the Off-Site plan shall be
defined.

h) The health department needs to assure that all victims get immediate
medical attention on the site as well as at the hospitals/health-care
facility where they are shifted. In addition, the department needs to
network all the health-care facilities available in the vicinity for effective
management and also take effective measures to prevent the
occurrence of any epidemic.

i) Pollution control boards need to ascertain the developing severity of


the emergency in accordance with responsive measures by constant
monitoring of the environment. If and when an area is fit for entry will
depend upon the results of the monitoring. A decontamination
operation would be required to be carried out with the help of other
agencies and industries.

j) The NDRF and SDRF are the specialised forces to manage these
disasters in a longer run according to the severity and nature of the
disaster. Their specialised training is an effective measure that needs to
be built up and maintained with time for achieving a higher standard
of preparedness. They need to coordinate with other local agencies

Revision No. 0 EC Chapter 1 /129


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

such as the Central Industrial Security Force that may be responsible for
security at the industrial site.

* Role of above External Agencies have been defined in Annexure – E


of National Disaster Management Guidelines Chemical Disasters, April,
2007

NDRF: National Disaster Response Force


SDRF: State Disaster Response Force

Revision No. 0 EC Chapter 1 /130


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 23
Reporting of the Incident
(As per Clause No 23.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /131


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

23.0 Reporting of the Incident:

1) All incidents covered under Level-I should be maintained by the entity for
inspection whenever called for inspection and Level-II and Level-III shall be
reported to the Board in the format specified and placed at Schedule-VI
including near miss incident. The above report should be submitted within
48 hours after occurrence of the incidents or any other reason triggering
major incident.

2) Investigation report of all major incidents shall be submitted to the Board.


An incident shall be treated as Major if any of the following occurs;

(a) fire for more than 15 minutes


(b) explosion / blowout
(c) fatal incident.
(d) loss above Rs. 10.0 Lac
(e) cumulative man hours lost more than 500 hrs.
(f) plant shutdown / outage due to the incident
(g) Level-III incident

Revision No. 0 EC Chapter 1 /132


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

SCHEDULE – VI
(Refer Regulation 23.0)

INCIDENT REPORTING FORMAT

1. Organisation 2. Sector
3. Location 4. Incident Sr. No.
5. Date of Incident 6. Time of Incident
7. Major / Minor / Near 8. Report -
miss Preliminary / Final
9. Fire / Incident 10. Duration of fire -
Hrs / Min
11. Type of Incident with loss of life / injury, Fire, Explosion, Blowout,
Electrocution, Fall from Height, Inhalation of Gas, Driving, Slip / Trip, Others,
NA
12. Location of Incident ( Name of Plant / Unit / Area / Facility / Tank farm /
Gantry / Road / Parking area etc )
13. Whether plant shutdown / caused outage of the facility? Yes / No
14. Fatalities nos. a) Employees = b) Contractor = c) Others =
15. Injuries nos. a) Employees = b) Contractor = c) Others =
16. Man - hours Lost a) Employees = b) Contractor = c) Others =
17. Direct Loss due to the incident ( Rs. In Lacs ). Loss to equipment /
Machinery as per Insurance claim etc.
18. Indirect Losses : Through put / Production Loss, etc.
19. Status of the Facility : Construction / Commissioning / Operation / Shutting
down / Turn around, Maintenance / Start up / Any other.
20. Brief Description of the Incident including post
incident measures.
( Attach details in separate sheet )

21. Whether similar Incident has occurred in past at the


same location, If yes, give brief description of the
incident and attach details in separate sheet.
22. Whether Internal Investigation has been completed.
If no, likely date by which it will be completed.
23. Whether internal investigation report ( Major
Incident ) has been submitted to PNGRB. If no, likely
date by which it will be submitted.
24. Cause of the Incident ( Tick the most relevant cause preferably one, maximum two )
A) Deviation from Procedure I) Not using the PPE
B) Lack of Job Knowledge J) Equipment failure
C) Lack of supervision K) Poor design / Layout etc.
D) Improper Inspection L) Inadequate facility

Revision No. 0 EC Chapter 1 /133


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

E) Improper Maintenance. ( Mech. / Elec. / Inst ) M) Poor House Keeping


F) Improper material handling N) Natural Calamity
G) Negligent Driving O) Pilferage / Sabotage

H) Careless walking / climbing etc. P) Any other (give details)


25. Cause of leakage - Oil, Gas or Chemical ( Tick one only )
A) Weld leak from equipment / lines E) Leakage due to improper
operation
B) Leak from flange, gland etc. F) Leak due to improper
maintenance
C) Leak from rotary equipment G) Normal operation -
Venting / draining
D) Metallurgical failure H) Any other
26. Cause of Ignition leading to fire ( Tick only one cause )
A) Near to hot work F) Static Electricity
B) Near to Furnace / Flare etc. G) Hammering / Fall of
object
C) Auto - ignition H) Heat due to Friction
D) Loose electrical connection I) Lightning
E) Near to hot surface J) Any other ( pyrophoric etc
)
27. Was the incident Avoidable? ( Yes / No )
28. The incident could have been avoided by the use of / or by ;
( Tick the most relevant point preferably one, maximum two )
A) Better supervision F) Personal Protective
Equipment
B) Adhering to specified operating procedure G) Better equipment
C) Imparting Training H) Management Control
D) Giving adequate time to do the activity through I) Adhering to specified
proper planning. maintenance procedure
E) Adhering to the work permit system J) Adhering to specified
Inspection / Testing
procedures.
K) Any other information;

Revision No. 0 EC Chapter 1 /134


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Guidelines for filling the Incident Report:

1. All Major, Minor and Near miss incidents shall be reported in the quarterly report.
2. Incident Reporting form shall be filled up for all Major, Minor and Near miss
Incidents.
3. Summary report shall be enclosed with every quarterly report.
4. Investigations shall be carried out for all Major, Minor and Near miss Incidents.
5. Investigation report of all Major incidents shall be submitted to PNGRB. An incident
shall be treated as Major if any of the following occurs;

-Fire for more than 15 minutes


- Explosion / Blowout
- Fatal Incident.
- Loss above Rs. 5.0 Lac.
- Cumulative man hours lost more than 500 hrs.
- Plant Shutdown / Outage due to the incident

6. Loss time Incident shall be monitored till the affected person joins duty. In case
the affected person is yet to join the duty, then the status of report submitted will
be preliminary. Final report against the same incident shall be sent once he joins
duty and the man - hours lost are known.
7. All columns must be filled up.
8. For any additional information use separate sheets as required.
9. Quarterly report shall be sent to PNGRB within 15 to 30 days of end of quarter.
10. Immediate reporting of incident through fax/telephone shall continue as per the
prevailing system.

Revision No. 0 EC Chapter 1 /135


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 24/25/26
Action after reporting of incident
by the entity / Termination of emergency/
Emergency Recovery Procedures
(As per Clause No 24.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /136


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

24.0 Action after reporting of incident by the entity


After reporting of the incidents to Board, Nodal officer of the Board
(head of Technical Standards the specifications and safety group) shall
have responsibility of informing all the Members of the Board and shall
coordinate with appropriate level in National Disaster Management
Authority (NDMA) till normalization of the situation.

25.0 Termination of emergency

(1) Termination activities should concentrate on giving accurate


information to people who need it most especially employees,
neighbourhood, District Authorities engaged in offsite emergencies,
and should begin as soon as the emergency phase of the operation
is completed.
(2) The termination of emergency shall be declared through siren as
per the Siren Code defined by industry in case of Level- I and II. For
Level-III termination of emergency shall be declared by District
Authority through appropriate mode of information transfer so as to
reach each and every one.
26.0 Emergency Recovery Procedures

(1) After the emergency, the following activities need to be carried out
in detail.

a) Information to statutory authorities.


b) Incident investigation.
c) Damage assessment.
d) Salvage of products, de-contamination, clean-up and
restoration.
e) A detailed report shall be prepared based on the entire
experience of the incident, including restorations, limitations and
lessons learnt.
f) Ambient air monitoring at the site as well as 5 km radius of the
installation by State Pollution Control Board to determine the
contamination level affecting health.

Check points on ERDMP recovery measures as given at Check list-7

Revision No. 0 EC Chapter 1 /137


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHECK LIST-7

(Refer Regulation 26.0 (2))

ERDMP - Recovery Measures

Sr.# Yes No
Check-point Remarks
Post Emergency Recovery
Salvage of product
1 Check that spilled / accumulated product contents are
transferred to the OWS or collected in drums.
2 Check whether the quality and quantity estimation of the
product extracted from OWS has been done for further disposal in
line with standing QC guidelines by either transferring to service
tanks or to nearest refinery for blending / reprocessing or not.
3 Check that correct stock accounting of spilled product as loss
has been completed in accounting system.
4 Check that affected area has been completely cleaned and
dried after evacuation of spilled product.
5 Declare that affected area after salvage operations is fully clean
and safe for movement of the working personnel.
6 Check that all drains are not having any residual oil and are
thoroughly cleaned and dried.
7 Check that all control valves on product lines and OWS lines out
side dyke area and drains are completely closed after removal of
the spilled product.
8 Check that interlocking system of tanks / gantry has been re-
activated for normal operations.
9 Check whether the soil testing of the affected area, if required,
has been done to assess the soil contamination level to meet the
Environmental – SPCB norms / requirements.
Taking care of affected manpower
10 Whether physical accounting of all personnel on duty during and
after the incident are ascertained by the Site Incident Controller
and reconciled immediately
11 Whether the first-aid treatment and post-incident health check of
the affected personnel has been undertaken in time
12 Whether these personnel are declared fully physically fit before
allowing them to resume their normal duties
13 Whether the records for such first aid and treatment of the
affected personnel are maintained in a well defined format
Addressing media and outside bodies

Revision No. 0 EC Chapter 1 /138


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

17 Whether the incident was appropriately informed to the local


media in line with the respective company’s Press and Media
Policy

18 Whether the role of neighbouring population during the drill /


disaster is suitably informed to the population during subsequent
meetings with local administration / panchayat etc. for necessary
improvements
19 Whether the awareness and preparedness on disaster is regularly
assimilated / shared with nearby public / societies and stake
holders.

Reporting
20 Check whether that disaster incident report was communicated
to respective controlling office / HQ promptly in a standard
format.
21 Whether the incident reports are also sent to concerned State
Level Industry Coordinator on time.
22 Check that detailed report on disaster in proper format was
communicated to PNGRB/ Factory inspector / Labour inspector /
SPCB / District Magistrate /PESO.
Investigation
23 Whether investigation teams are constituted as per respective
company policies
24 Whether RCA (Root Cause Analysis) of the disaster is conducted
by the investigating team
25 Whether detailed investigation into effective functioning of
interlocks, detection devices, automation controls and
applicable norms are carried out to find out possible
improvements in design / construction / operations /
maintenance and training aspects etc.
26 Whether a system of initiating appropriate corrective measures
including suitable revisions to the Disaster Management Plan are
adopted based on findings of the investigation
Damage Assessment – Monetary and Physical
27 Check the valuation / cost of product loss / down gradation on
account of contamination, if any / Property / Structures /
damaged assets – equipments.
28 Whether repairs and maintenance cost of property, assets and
equipment are assessed.
29 Whether any penalty by statutory authorities like SPCB / Factory
Inspector and Labour Commissioner are assessed.
30 Whether possible impact on environment are also assessed and
appropriate measures are taken
31 Whether damage assessment also include potential erosion of
reputation – from company, industry and national perspectives
Clean up and Restoration
32 Whether the affected area has been fully cleaned and cleared

Revision No. 0 EC Chapter 1 /139


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

after due clearance from investigation team


33 Check whether heat detectors, high level alarms, in built safety
systems (NRV, TSV etc.) are fully functional after the disaster
incident.

34 Check whether all fire fighting equipment like – hoses / nozzles /


Fire Extinguishers etc. have been put back at designated places
and are fully ready for reuse

35 Whether clear procedures are in place to allow resumption of


normal operations

Revision No. 0 EC Chapter 1 /140


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 28

ERDMP For Road Transportation


(As per Clause No 28.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /141


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

28.0 ERDMP for Road Transportation.

The road transport of Petroleum products has significant presence and


needs special attention. Complete details of treatment for handling
emergency arising out of road transportations have been provided
below:

28.1 Resource mobilisation for road transport emergency


Resource mobilisation for road transport emergency shall be as per the
Schedule-VIII.

(a) In order to handle Emergencies, which may arise due to


incident involving Petroleum Product Transportation, it is
required that a comprehensive Emergency Management
Plan is readily available with the industry as well as with other
related authorities all along the routes. The ERDMP should be
clearly understood by its users so that the emergencies can
be handled in a systematic manner with minimum response
time in accordance with the prescribed procedure.

(b) Copies of the ERDMP shall be made available by the Industry


to all the field locations i.e. Plants, Installations, POL Depots,
Terminals / Installations, Refineries, Gas Processing Plants,
Dispatch units of etc., the concerned District Administration,
Police Stations and Fire Brigades en-route and within vicinity
of specified tank truck routes, oil industry sales personnel of
concerned area as may be required.

(c) Location specific availability of Emergency Response Vehicle


shall be mentioned in the ERDMP.

28.2 TREM Card (Specific to Road Transportation)

TREM Card format including sample as per details shown in


Schedule-IX and Route Map shall be provided to the Tank Truck
Crew which should be referred in case of an emergency.

28.3 Role of External Agencies for road transportation emergency

Revision No. 0 EC Chapter 1 /142


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

It is expected that the following roles shall be performed by


various agencies:

28.3.1 Fire Brigade

On receipt of information from any source on incident of tank


truck, fire brigade may contact nearest installation and police
station. After assessing the situation, it may:

(a) rush fire tender to the incident site with all necessary fire
fighting equipments;
(b) prepare a contingency plan for removal of tank truck, if
not leaking, in consultation with installation personnel;
(c) dispersal of vapours by water spray away from inhabited
area, in case of leakage. Extinguish the fire, in case
leakage source cannot be stopped;
(d) allow the fire to burn under controlled conditions if isolation
is not possible in case of gaseous fuels;
(e) save human lives and salvage material from incident
affected truck;
(f) liaise with fire brigade in the adjoining town for additional
help, if necessary;
(g) arrange water through muni
(h) cipal water tanker or any other source;
In addition to the above, the Schedule-V shall be followed.

28.3.2 Role of Police

On receipt of information, police may take the following actions


as per Schedule-V derived from the National Disaster Management
Guidelines Chemical Disasters (Industrial), April, 2007. However,
the following points may also be taken care by the police
authority:

(a) stop the traffic from both ends of the road.


(b) warn the people living in adjacent area for stopping all
fire, smoking, evacuation to safe places, if necessary.

Revision No. 0 EC Chapter 1 /143


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

(c) contact nearest district police headquarters and giving


the situation report.
(d) evacuate personnel from the area, if required.
(e) extend help in removal of injured personnel to the
nearest first-aid centre /hospital, contacting highway
patrol, completing legal formalities in case of any
casualty.

In addition to the above, the following shall be followed

28.3.3 District Administration

On receipt of information, District Administration may take the


following actions as per Schedule-V derived from the National
Disaster Management Guidelines Chemical Disasters (Industrial),
April, 2007. However,

On receipt of information, following actions should be taken care

(a) to keep watch on the overall situation.


(b) rush ambulance to the incident site if casualties are
reported.
(c) direct cranes or any other such equipment to carry out
rescue operations.
(d) issue warning messages to people through public address
system, if any evacuation is required.
(e) arrange emergency vehicles for evacuation purposes.

(f) give direction to hospitals having burns injury ward for


readiness to receive patient in case of incident involving
fire.

(g) provide basic amenities, e.g., water, electricity, food and


shelter to the affected people as required.

In addition to the above, the Schedule-V shall be followed.

SCHEDULE –VIII

(Refer Regulation 28.1)

Resource Mobilisation for Road Transportation Emergencies


Revision No. 0 EC Chapter 1 /144
EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

A. In-Plant Resources

Following items should be available at the Plant in adequate quantity / nos.

Mechanical Equipment:

1. Gaskets (Carbon Asbestos Filled)


2. Studs and bolts.
3. Teflon tapes.
4. ½” / ¾” crowbar (1 m long)
5. Spade / blind flange
6. Rope (Manila / Jute)
7. Spark arrestors.
8. 1” tapered wooden pegs.
9. Chopper
10. Spare fan belt for tank lorry with P.T.O. unit
11. Wind sock
12. M-Seal / epoxy-base cold-welding compound.
13. Wooden slippers
14. Teflon-taped spanners, wrenches
15. Spark-proof wrenches, hammer and tools.
16. Barricading masts and ropes / tapes
17. hoses
18. Chain pulley blocks and stay pipes
19. Small valve keys for operating valves in the tank truck

Electrical Equipment :

1. Gas Explosive-meter
2. Flame-proof torches
3. Earthing wires (10 m long) with crocodile clips

Personnel Protective Equipment :

1. Gloves:
i) Rubber gloves
ii) Low Temperature Gloves
iii) Industrial gloves (with leather lining)
iv) Canvas gloves

2. Face shields
3. Ear muff / ear plugs

Revision No. 0 EC Chapter 1 /145


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Other Safety Items:

1. 1 roll of gunny / hessian cloth (about 10 mts. long)


2. First aid box (containing water gel compounds)
3. Soap
4. Blanket.
5. Water Gel Blanket
6. Breathing Apparatus (With spare filled cylinder and Canister gas masks)
7. Fire proximity suit

Fire Fighting Equipment :

1. Portable Dry Chemical Powder Fire Extinguishers


2. Fire-water Hoses
3. Triple Purpose diffuser nozzle for use with fire hoses.

Communication Equipment :

1. Hand operated sirens


2. Whistles
3. Megaphone, Mobile Phones, VHF sets.

Traffic Control Equipment:

1. Red lights (Battery operated) - for traffic diversion


2. Area maps
3. Diversion Boards

B. External Resources:

Emergency Contact Numbers to be called during emergency


District Authority Contact Number
SN AUTHORITY TELEPHONE
1 Dist. Collector, Kadapa 08562-244168, 9440748485
2 Joint Collector, Kadapa 08562-244548, 9849904110
3 District Crisis Group 08562-244168, 9440748485
4 Joint Chief Inspector Of Factories 08562-244836, 8897012228
5 Chief Controller of Explosives 022 - 27575946
6 Environmental Engineer, AAPCB. 00877 - 2253981
APSEB
AUTHORITY
9 Electricity Office- Kadapa 102, 08562-242457
10 DE 9440811964

Revision No. 0 EC Chapter 1 /146


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Emergency Contact Numbers to be called during emergency


POLICE
AUTHORITY
14 Police Control Room /Bomb Squade 08562-244198, 9440796900
16 Commissioner Of Police 08562-242293
17 Superintendent Of Police - Rural 08562-244967
08562242133
18
I Town Police Station
19 II Town Police Station 08562241387
23 Kadapa (Traffic, Law & Order) 08562244966
FIRE SERVICE
AUTHORITY
27 Kadapa Fire Station 9963737191
30 District Fire Officer 9949991069
Medical Service
AUTHORITY TELEPHONE
37 RIMS HOSPITAL 08652-220200, 9701501046
Ambulance Service
AUTHORITY TELEPHONE
44 Ambulance 108
Emergency Contact Numbers to be called during emergency as per guidelines
(FIRE & SAFETY)
AUTHORITY TELEPHONE
45 Safety Manager 08562-338501
46 Fire Officer 08562-241739
47 Fire Officer 9949991069

C. Identification of Communication Resources:

Particulars Name Address Ph. No. Any Other


Info.

1. Public Address
System

2. Retail Outlets

3. Railway Station

4. Power Houses

5. Civil Authorities

Revision No. 0 EC Chapter 1 /147


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

6.Voluntary Agencies

7.Local All India


Radio / Doordarshan/
other channels

Revision No. 0 EC Chapter 1 /148


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

SCHEDULE – IX
(Refer Regulation 28.2)

Transport Emergency Card Format

Nature of Hazard :

Protective Devices :

Emergency Action

Spillage

Fire

First Aid

Chemical Abstract Service (CAS). No

(for universal acceptance of material, both number should be


mentioned on TREM Card)

Emergency Telephone Numbers/mobile numbers

Name and contact numbers of the control room/contact person of the


supplying company

Name and contact numbers of the control room/contact person of the


receiving company

Name and contact numbers of Transporter

Other important Name and contact numbers of civic authorities, fire


and police

Note: The format shall be designed in English, Hindi and local language where crews are
operating.

Revision No. 0 EC Chapter 1 /149


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

SAMPLE TRANSPORT EMERGENCY CARD FORMAT

TT : Petroleum product

Nature of Hazard : Highly volatile and Inflammable.


Can cause Cold Burns.
Inhaling vapour can cause nausea, breathlessness and headache.
Air / vapour mixture highly explosive.
Leakage of LPG can cause Vapour Cloud explosion and BLEVE.

Protective Devices : Hand gloves (Rubber / low temperature)


Safety Goggles
Self-contained Respiratory device to work in vapour-rich area.
Low temperature / fire proximity suit.

Emergency Action

Try to move the vehicle to open area.


Stop Engine.
Vehicle should not be left unguarded.
Contact Police, Fire Brigade, Sarpanch, nearest oil company by sending
helper / passer by.
Keep public and traffic away by displaying ‘Danger Boards’ at sufficient distance.
“No Smoking” and “No Naked Lights” within the cordoned off area.
Keep ready for action Fire Extinguishers and Safety Kit.
Stay Upwind.

Spillage
Check the valves and caps for tightness by hand and stop leak if possible

Fire
If minor, try to extinguish by DCP fire extinguishers

First Aid
Pour water in case of cold or hot burn
Seek medical help, if necessary

Emergency Telephone Numbers/mobile numbers

IOC _______________ HPC_______________________

BPC _____________________ IBP________________________

FIRE 101 _______________ POLICE 100_________________

Revision No. 0 EC Chapter 1 /150


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 29

Integration of ERDMP with NDMP


(As per Clause No 29.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /151


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Integration of ERDMP with NDMP (As per Clause No 29.0)

29.1 National Disaster Management Plan (NDMP)

On 23 December 2005, the Government of India took a definite step towards


NDMP by enacting the NDMP ACT, 2005. The NDMP Act, 2005 covers all aspects
of disasters from prevention, mitigation, preparedness to rehabilitation,
reconstruction and recovery.

National Disaster Management Guidelines Chemical Disasters (Industrial)

The growth of chemical industries has led to an increase in the risk of occurrence
of incidents associated with hazardous chemicals (HAZCHEM). Common causes
for chemical accidents are deficiencies in safety management systems and
human errors, or they may occur as a consequence of natural calamities or
sabotage activities. Chemical accidents result in fire, explosion and / or toxic
release.

With formulation of National Disaster Management Guidelines—Chemical


Disasters. There has been a paradigm shift in the government’s focus from its
rescue, relief, and restoration-centric approach to a planning, prevention /
mitigation and preparedness approach. It has been realized that effective
Chemical Disaster Management (CDM) is possible by the adoption of preventive
and mitigation strategies as most chemical disasters are preventable in
comparison to natural disasters that are difficult to predict and prevent. With this
renewed emphasis, the National Disaster Management Authority (NDMA) took up
the task of strengthening CDM in recognition of the gravity of the risk posed by
HAZCHEM.

The main stakeholders in the management of chemical disasters are Ministry of


Environment and Forests (MoEF; the nodal ministry); Ministry of Home Affairs
(MHA); Ministry of Health and Family Welfare (MoH & FW); Ministry of Labour
and Employment (MoLE); Ministry of Agriculture (MoA); Ministry of Shipping,
Road Transport and Highways (MoSRT & H); Ministry of Defence (MoD); Ministry
of Chemicals and Fertilizers (MoC & F); Ministry of Petroleum and Natural Gas
(MoP & NG), Department of Atomic Energy (DAE); state governments and Union
Territories (UTs) and the chemical industries.

Revision No. 0 EC Chapter 1 /152


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Andhra Pradesh State Disaster Management Policy (APSDMP)

Andhra Pradesh is situated in Tropical Region and on East Coast in which 960 kms are of
Coast line. State is covered under 3 Topographical Zones.
 Coastal Plains
 Eastern Ghats
 Western Pene Plains
Total of 34 Major and Minor Rivers flow in the State. It receives a rainfall from Southwest &
Northeast Monsoons. Agriculture is Major Land use and about 23.2% of area are covered
under forests. Urban Population is about 30%. In a state around 37,000 Factories are
operational out of which 3600 major & Minor Industries.

Disaster Profile of the state


Andhra Pradesh State is exposed to Cyclones, Storm surges, Floods, Tsunami, Drought,
Earthquake & Climate extremity.

Cyclones: 44% of the State is vulnerable to Cyclonic Storms. At around 103 Cyclones
affected AP in last century. The Coast between Ongole and Machilipatnam is highly
vulnerable to Tropical Surges.

Floods: There are five major river systems (Godavari, Krishna, Penna, Vamsadhara ,
Nagavali). Floods in AP is due to Cyclone Rains, spilling of smaller Rivers, Drainage
problems in Delta etc.

Tsunami: In Dec 2004 total nine districts were affected. Due to Tsunami. At around 107
people lost life along with huge loss of livelihoods. Frequent threatening of Tsunami warning
to state.

Earthquake: Andhra Pradesh state is lies in 3 Seismic Zones (I, II & III). All Zones are
relatively less risky.

Drought: Prone area for drought are Rayalaseema, Telangana and parts of Andhra Pradesh.

Fires: During last decade (2000 - 10) at about 2125 Human casualties, around Rs1520 crore
Property damaged were happened. AP State Disaster Response & Fire Services Dept is
statutory department for Fire fighting.

Industrial Accidents: The annual average fatal accidents are 500 and annual Non-fatal
accidents are 360.

Revision No. 0 EC Chapter 1 /153


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Urban Vulnerabilities: Uncontrolled Expansions lead to deteriorating environment &


depletion of eco systems/natural resources.  Urban flash floods are increasing.  Building

Collapses are new phenomenon of Urban Disasters .  Increasing urban waste  In adequate
infrastructure  Violation of building by-laws.

Disaster Management system

Revenue (DM) department is the Nodal Department in the Andhra Pradesh state. It is Headed
by Commissioner & EO secretary to Govt. And Supported by Additional Commissioner. The
State Disaster Management Authority (SDMA) is established with Special Commissioner as
Head. The District Disaster Management Authorities formed in all 23 Districts. State Disaster
Management Plan prepared by Center for Good Governance and Govt. of AP formulated DM
Rules-2007.

Preparedness Activities

Cyclones Disaster Scenario:

 1136 Cyclone shelters were built in Coastal Districts.


 Cyclone Warning Center of Visakhapatnam in association with IMD.
 EOC at Head Quarters (Hyderabad) /Control Rooms at districts.
 2 stage cyclone warning system.

Floods Disaster:

 About 600kms long embankments constructed.


 About 14000 kms length of Drainage Channels.
 AP has strong “Flood Monitoring System”.
 11 “Flood Forecasting Systems along Godavari & Krishna.
 E-in- C Irrigation administers Flood Control Room.
 APSRAC has prepared 100 year flood return maps.

Fire Disaster:
 251 Fire Stations.
 About 350 Fire Fights Vehicles EMRI/Private Ambulance services.

Capacity Building:
 NDRF unit in Vijayawada.

Revision No. 0 EC Chapter 1 /154


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

 SDRF under formation


 NCC/NSS/NYKS volunteers being trained.
 SHG members trained under various programs.
 NGO’s active Role Play during disasters.
 Training to various Govt. functionaries
 Establishment of EOC’s at District level under 13th FC funds.

Mitigation / Main streaming:

 Adoption of National Building code in Building Rules.


 DM curriculum from class viii to xii.
 DM syllabus for APPSC Exams.
 Emergency Hospital Preparedness Plans.
 Promoting public transport in Cities /Towns.
 Drought Mitigation measures by irrigation /Agriculture Departments.
 Strengthening Fire Safety measures in Building Bye Laws.

History of Disasters in the Andhra Pradesh State

S. Year Event No. Of district Loss in


No. affected Crores
1 Nov-77 Cyclone storm with core of 08 172
hurricane
2 May-79 Floods Severe Cyclonic 10 242.65
Storm
3 Aug-83 Heavy rain/Floods 08 89.56
4 Nov-84 Severe Cyclonic Storm 03 55.5
with core of hurricane
winds
5 Aug-86 Heavy rain/Floods 13 1685
6 Nov-87 Severe Cyclonic Storm 10 127
7 July-88 Heavy rain/Floods 11 245
8 Nov-89 Heavy rain/Floods 22 915
9 May-90 Severe Cyclonic Storm 14 2135
with core of hurricane
winds
10 Oct & Severe Cyclonic Storm 07 625
Nov-94
11 May-95 Severe Cyclonic Storm 10 472
with core of hurricane
winds
12 Oct-96 Heavy rain/Floods 11 843
13 Nov-96 Severe Cyclonic Storm 04 6129

Revision No. 0 EC Chapter 1 /155


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

with core of hurricane


winds
14 Aug- Heavy rain/Floods 17 966
2000
15 Sept- Heavy rain/Floods 10 2698
2005
16 Aug- Cyclone Storm / Floods 10 3455
2006
17 Oct- Ogni Cyclone 05 7173
Nov-06
18 Jun-07 Heavy Rains 16 1296
19 Oct-07 Heavy Rains/Floods 06 1156
20 Feb-08 Heavy Rains/Floods 11 741
21 Mar-08 Unseasonal Heavy Rains 22 929
and Consequent Floods
22 Sept- Floods due to 13 12455
Oct-09 unprecedented Rains
23 May-10 Laila - Cyclone 14 1603
24 June- Heavy Rains/Floods 22 5776
Sept-10
25 Oct- Heavy Rains/ Floods/JAL 13 2496
Nov-10 Cyclone
26 Dec-10 Heavy Rains/Floods 15 2739

Manmade Disasters

Man-made disasters are the result of carelessness or human errors during


technological and industrial use. The disasters are in the form of accidents,
which occur all of a sudden and take a huge toll on life and property. Unnatural
and manmade disasters such as road accidents, industrial accidents, fires,
accidents in quarries and mines, drowning, explosion etc. may occur due to
some technical blunders or man made changes in the environment.
Man-made disasters are mainly of two types:
Local disasters:
These are small-scale disasters such as train accidents, plane crashes and
shipwrecks.

Industrial and technological disasters:

These are much larger in scale and are the result of technology failures or
industrial accidents. Such disasters affect both local population and may even
cover a much larger area. Industrial disasters result due to accidental leakage of
water or air pollutants. Many of the chemicals are extremely toxic and
carcinogenic which affect the human population in an adverse way. Some people

Revision No. 0 EC Chapter 1 /156


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

die instantly while others are crippled for whole life in the form of blindness,
paralysis and many other chronic diseases

Impact on the environment:

Leakage of toxic chemicals from the industries and accidents in the nuclear
reactors has short-term and long-term effects on the environment and human
health. Short-term effects on human health relate to casualties and diseases like
blindness, cancer, paralysis, heart trouble, gastric and respiratory abnormalities.
Long-term effects include genetic imbalances in humans and its impact on the
future generations. Soil and water sources also remain polluted for long
durations of time

Prevention, control and mitigation:

Man-made disasters can be minimized to a large extent by adopting the


following measures:

1. Proper training of personnel working in the hazardous industries.


2. Proper maintenance and care of safety measures.
3. Removing human encroachments around hazardous industries.
4. Making the people aware about the first-aid methods in case of accidents.
5. Applying wet cloth over the mouth and nose in case of gas leakages
minimizes the health hazards.
6. Remaining indoors in case of radioactive accidents.
7. Providing the people with proper medical care, in some cases throughout their
life.
8. Providing adequate compensation to the affected people by way of money and
employment.
Some of the local disasters which were happened in the past.

Date City Fatalities Injured


March 12, 1993 Mumbai bombings 259 713
January 27, 2003 Mumbai bombings 1
March 13, 2003 Mumbai train bombings 11
July 28, 2003 Mumbai bus bombings 4 32
August 25, 2003 Mumbai bombing 52
July 11, 2006 Mumbai train bombings, Series of 209 500
7 train bombings during rush hour
Sept. 29, 2008 Maharashtra (Malegaon) and 10 80

Revision No. 0 EC Chapter 1 /157


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Gujurat bombing
Nov. 26, 2008 Mumbai Terrorist attacks 171 239
Feb.13, 2010 Pune bombing 17 60
July 13, 2011 Mumbai bombing 26 130

Some of the Industrial and technological disasters which were happened in the
past.
Bhopal Gas Tragedy (BGT):
The most serious industrial disaster occurred on December 3, 1984 at Bhopal,
India, which is known as the Bhopal Gas Tragedy (BGT). The Bhopal gas tragedy
occurred due to leakage of methyl isocyanide (MIC) gas from the factory of
Union Carbide of India Ltd. MIC gas is used as an ingredient in pesticides.

It leaked from the factory and formed the deadly cloud over Bhopal. People
living in slums in the vicinity of the factory were the most affected and more
than 5000 people were killed, half of them due to direct exposure and other half
due to after affects. MIC is a colourless gas which causes severe irritation,
violent coughing, swelling of the lungs, bleeding and death due to direct
inhalation. It also caused loss of eye-sight in more than 1000 people. More than
50,000 people were affected with respiratory, eye, gastric, neurological and
gynaecological problems.

Jaipur oil depot fire

The Jaipur oil depot fire broke out on 29 October 2009 at 7:30 PM (IST) at the
Indian Oil Corporation (IOC) oil depot's giant tank holding 8,000 kilolitres
(280,000 cu ft) of petrol, in Sitapura Industrial Area on the outskirts of Jaipur,
Rajasthan, killing 12 people and injuring over 300. The blaze continued to rage
out of control for over a week after it started and during the period half a million
people were evacuated from the area. The oil depot is about 16 kilometers
(9.9 mi) south of the city of Jaipur

The incident occurred when petrol was being transferred from the Indian Oil
Corporation's oil depot to a pipeline. There were at least 40 IOC employees at
the terminal (situated close to the Jaipur International Airport) when it caught
fire with an explosion. The Met department recorded a tremor measuring 2.3 on
the Richter scale around the time the first explosion at 7:36 pm which resulted
in shattering of glass windows nearly 3 kilometers (1.9 mi) from the accident
site.
Institutional Framework

The State Disaster Management Authority

Revision No. 0 EC Chapter 1 /158


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

In order to respond to disasters the State Disaster Management Plan allows all
disaster specific mechanisms to work together at the time of emergency. For this
purpose the existing administrative set up at State level needs to be defined and
make it more specific and operational in terms of emergency management. The
Incident Response System (IRS) which has been taken as an effective disaster
management system and customized in Indian context considering the
administrative establishment proposes Chief Secretary as the head supported by
the Secretary of Disaster Management Unit (DMU) at State level and district
collectors at district level with Emergency Operation Centres (EOC).

The State Disaster Management Authority headed by the Chief Minister is the
apex body for disaster management in the State. The other members of the
authority as stipulated in DM Act 2005.

The State Executive Committee

The State Executive Committee comprises the State Chief Secretary as the
Chairperson. Other members of the committee would be as stipulated in DM Act
2005.

The Home Department will be the Nodal Department for disaster management
and under the leadership of the Additional Chief Secretary/ Principal Secretary
Home and Secretary/OSD, SDMA shall play the coordinating role in disaster
management. All departments shall ensure adequate assistance to the nodal
department.

The District Disaster Management Authority

The District Disaster Management Authority is headed by the District


Magistrate/District Collector of the District with the chairperson of the Zilla
Parishads as the Co-Chairperson. The other members of the authority will be as
stipulated in DM Act 2005.

The State Disaster Emergency Response Force

The State will create response capabilities from within its existing resources by
equipping and training at least one battalion equivalent force for effective
management of disasters and necessary training arrangement will be made for
the force in disaster management skills in consultation with the National Disaster
Response Force.

State Police and Fire Services

The State Police Forces and the Fire Services are crucial responders to disasters.
The police force will be trained in disaster management skills and the Fire
Services will be upgraded to acquire multi-hazard rescue capability.

Revision No. 0 EC Chapter 1 /159


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Civil Defence and Home Guards

The mandate of the Civil Defence and the Home Guards will be redefined to
assign an effective role in the field of disaster management. They will be
deployed for community preparedness and public awareness. A culture of
voluntary reporting to duty stations in the event of any disasters will be
promoted.

Revision No. 0 EC Chapter 1 /160


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Revision No. 0 EC Chapter 1 /161


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

29.2 Integration of ERDMP with NDMP

This ERDMP document has been developed taking into account all possible Inputs on the
subjects from various stake holders. Efforts have also been made to synergize this with
the document on National Disaster Management Guide - Chemical Disasters (Industrial)
as well as Petroleum and Natural Gas Regulatory Board Gazette notification G.S.R. 39
(E) (Codes of Practices for Emergency Response and Disaster Management Plan
(ERDMP)) Regulations, 2010.

For the purpose of specialized response to a threatening disaster situation or disasters/


emergencies both natural and manmade such as those of CBRN (Chemical, Biological,
Radiological and Nuclear) origin, the DM Act, 2005 has mandated the constitution of a
NDRF. The following battalions are made responsible for CBRN disasters.

- Kolkatta Battalion
- Arakkonam battalion
- Pune Battalion
- Ghaziabad Battalion

In the support of NDRF, SDRF are the available forces At state level. In some cases
SDRF has not been created.

These battalions are equipped to handle all types of the chemical emergencies. These
battalions are trained at various places. In emergency these nearby teams should be
called for help as per Table-1

S. No. NDRF Bn State CPF


1 NDRF Bn, Ghaziabad Uttar Pradesh ITBP
2 NDRF Bn, Bhatinda Punjab ITBP
3 NDRF Bn, Kolkata West Bengal BSF
4 NDRF Bn, Guwahati Assam BSF
5 NDRF Bn, Mundali Orissa CISF
6 NDRF Bn, Arakkonam Tamil Nadu CISF
7 NDRF Bn, Pune Maharashtra CRPF
8 NDRF Bn, Gandhinagar Gujarat CRPF
9 NDRF Bn, Patna (under-construction) Bihar BSF
10 NDRF Bn, Guntur (under-construction) Andhra Pradesh CRPF

Revision No. 0 EC Chapter 1 /162


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Contact Details Of NDRF Officers


NDRF Head Quarter
Name Designation Address Tele. Fax. Mobile E-mail.

Shri Krishna DG Directorate General, 011- 011- 08750555500 dg.ndrf@nic.in


Chaudhary , National Disaster 26712851 26105912.
IPS Response Force 011-
(NDRF) 26161442
Sector-1 R K Puram,
New Delhi -66

Shri IG Directorate General, 011- 011- 09540610101 ig-ndrf@nic.in


Sandeep.R.Rathore National Disaster 26160252 26105912.
Response Force 011-
(NDRF) 24106667
Sector-1 R K Puram,
New Delhi -66

Shri J K S Rawat DIG Directorate General, 011- 011- 09968262466 dig.ndrf@nic.in


National Disaster 26105910 26105912.
Response Force 011-
(NDRF) 26260369
Sector-1 R K Puram,
New Delhi -66

Shri Rakesh Ranjan Dy Directorate General , 011- 011- 08860136649 rakeshbsf@gmail.com


Commandant National Disaster 26107921 26105912.
(Proc) Response Force
(NDRF)
Sector-1 R K Puram,
New Delhi -66

Shri Keshav Kumar DC(Adm) Directorate General , 011- 011- 09015243611 keshavkumar128@rediffmail.com
National Disaster 26107934 26105912.
Response Force
(NDRF)
Sector-1 R K Puram,
New Delhi -66

Shri R K Srivastava DC(Ops/Trg) Directorate General , 011- 011- 09990572600 srivastava_rks19@yahoo.com


National Disaster 26181519 26105912.
Response Force
(NDRF)
Sector-1 R K Puram,
New Delhi -66

Shri Ashok Malhotra Sr AO Directorate General , 011- 011- - hq.ndrf@nic.in


National Disaster 26105911 26105912.
Response Force
(NDRF)
Sector-1 R K Puram,
New Delhi -66

Revision No. 0 EC Chapter 1 /163


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Shri Sudhir Thapa Inspector Directorate General , 011- 011- 09711448595 hq.ndrf@nic.in
Control Room National Disaster 26107953 26105912.
Response Force
(NDRF)
Sector-1 R K Puram,
New Delhi -66

NDRF BNS

Name Designation Address Tele. Fax. Mobile E-mail.

Sh. A.K.Singh Commandant 1st BN NDRF, 0361-2840027 0361- 09435545951 ndrf01@yahoo.ocm.in


Patgaon PO- 2840284 ndrf01@hotmail.com
Azara,Guwahati

Sh. Sukhdev Raj Commandant 2nd BN NDRF 033-25264302, 033- 09434742836 comdt106@bsf.nic.in,
Digberia Camp, 033-25264394 25263077 bnndrf106@rediffmail.com,
PO-Badu Road, 2ndndrf@gmail.com
Madhyamgram,Barasat
Kolkata-700128

Sh. M.K.Yadav Commandant 3rd BN NDRF, 0671-2879710 0671- 09439103170 bn-4th@cisf.gov.in,


PO-Mundali, 2879710 09437964571 3rdndrfmundali@gmail.com
Cuttack-Odisha

Sh.M K Verma Commandant 4th Bn NDRF, 04177-246269 04177- 08903687065, rb-6th@cisf.gov.in


PO-Suraksha Campus, 246594 09442105169
Arrakonam,Distt. Vellore,
Tamilnadu

Sh.Alok Avasthy Commandant 5th Bn NDRF, 02114-231245 02114- 09423506765 145crpf@gmail.com


PO-Vishnupuri,Telegaon, 231509
Pune(Maharashtra)

Sh.R.S Joon Commandant 6th Bn NDRF, 079-23202540 079- 09428826445 comdt6ndrf@gmail.com


Chilora Road, 23201551
Gandhinagar,
Pin-382042

Sh.Jaideep Singh Commandant 7th Bn NDRF, 0164-2246030 0164- 09417802032 comdt.27thbn@itbp.gov.in,


Bibiwala Road, 2246570 7thbnndrfbathinda@gmail.com
Bhatinda(Punjab)

Sh.Jaipal Yadav Commandant 8th Bn NDRF, 0120-2766013 0120- 09968610011 eighthndrf@yahoo.com,


Greater 2766618 jpyadav1960@yahoo.com
Noida,Distt.G.B.Nagar,
UP

Sh.S.S.Guleria Commandant 9th Bn NDRF, 06115-253942 06115- 08986909490 ndrfpatna@gmail.com,


Bihata Patna, 253939 ndrfpatna@yahoo.com
Bihar

Revision No. 0 EC Chapter 1 /164


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Sh.Parshant Dhar Commandant 10th Bn NDRF, 09419217790 01955- 09419217790 Commandant125@rediffmail.com


Malkangiri, 252646
Vijaywara(AP)

29.3 Security Threat Plan

With increase in terrorist activities towards the end of 20th century and installations
having, significant role in national economy, sabotage and bomb threats to such
installation should also be considered in the disaster management plan. Such as high
level of alertness measures, strengthening security measures by security gadgets
mechanical and electronic security gadgets. In any of such situation, city police/
administration should be informed immediately and their help should be sought.

Emergency Action in case of Bomb Threat:

a) The persons inside the plant should be evacuated as soon as possible.


b) All the vehicles in the plant premises should be evacuated to safer Places.
c) Plant personnel should contact district authorities immediately.
d) Any new or doubtful thing should not be touched.
e) All pipeline and storage tank valves should be closed and all operations
inside are carried out with due vigilance.
f) In case of fire, firefighting equipment shall be operated and city fire brigade
should be called immediately during emergency.

Plant has developed an action plan on bomb threats and implemented Instructions &
check lists applicable for bomb threat. These include receiving & verification of bomb
threats, search for bomb / explosives and action plan .

Revision No. 0 EC Chapter 1 /165


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

CHAPTER – 30

Miscellaneous
(As per Clause No 30.0 of PNGRB Notification Dated 18th January 2010)

Revision No. 0 EC Chapter 1 /166


EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN
HINDUSTAN PETROLEUM CORPORATION LIMITED,
KADAPA NEW IRD

Miscellaneous (As per Clause No 30.0)


Whenever any deviation from this code of practices is required to be
implemented, the HPCL Kadapa New IRD, Bakarapeta shall inform and
obtain approval of the Board with mitigation measures proposed to be
carried out giving full details and justification for such deviation.

Revision No. 0 EC Chapter 1 /167