MAGWAY UNIVERSITY, MEN CHAMMERY (158'-0" X 30'-0")

1
2-Storyed R.C.C Building, Super-Structure
Work Done List
Sr
Particulars Quantity Unit Rate Per Amount
No
1 (1:2:4) R.C.Concrete Work.(F.FL) 3719.34 Cuft Cuft
2 (1:2:4) R.C.Concrete Work.( Roof) 2089.97 Cuft Cuft
3 Timber Shuttering Formwork (F.FL) 12705.39 Sqft Sqft
4 Timber Shuttering Formwork (Roof) 8685.83 Sqft Sqft
5 Rebar Work Cut, Bend & Fixed 26.14 Tons Ton
6 4½"tk: Brick Work in (1:3) Cement Mortar G.FL 6919.88 Sqft Sqft
7 4½"tk: Brick Work in (1:3) Cement Mortar F.FL 7544.38 Sqft Sqft
8 ½" tk: (1:3) Cement Mortar Plastering 37019.8 Sqft Sqft
9 Steel Roof Truss Work 15.04 Tons Ton
10 Roofing Work 7742 Sqft Sqft
11 Ridging Work 223 Rft Rft
12 Doors & Windows Chowkets Work 3168 Rft Rft
13 11/2"th Teak Wood Fully Panelled Door (1st class) 725.67 Sqft Sqft
14 Door Leaf Fixing With Necessary Fittning
Including Easing 725.67 Sqft Sqft
15 Teak Wood Fully Glazed Window & Fanlight 1308.5 Sqft Sqft
16 Window & Fanlight Leaf Fixing With
Necessary Fittning Including Easing 1308.5 Sqft Sqft
17 Teak Wood Work for Stair Handril(4" x 2½") 31.25 Rft Rft
18 6"x1"Teak Skirting Work For Stair Handril 56.5 Rft Rft
19 8 " x 1" E-Board 386 Rft Rft
20 A.C Sheet Ceiling Work 5458.52 Sqft Sqft
21 1½'tk: (1:2:4) Cement Concrete Floor Topping 9624.76 Sqft Sqft
22 Plastic Painting Work (3. Coats) 53696.96 Sqft Sqft
23 Oil Painting Work (3. Coats) 10847.81 Sqft Sqft
24 Stair Handrail Iron Grill Work 93.75 Sqft Sqft
25 Corridor Iron Grill Work 2909 Sqft Sqft
26 Ground Floor +F.FL Doors & Windows Iron Grill 2476 Sqft Sqft
27 Bamboo Scaffolding Work 15048 Sqft Sqft

Total Costs

C:\Users\Yomanadi Co.Ltd\Desktop\For Copy\0123\4\4-4\Civil\Sub+Super\SUPER-STRUCTURESUPER-STRUCTURE


MAGWAY UNIVERSITY, MEN CHAMMERY (158'-0" X 30'-0")
2
2-Storyed R.C.C Building, Super-Structure
Work Done List
Sr
Particulars Quantity Unit Rate Per Amount
No

C:\Users\Yomanadi Co.Ltd\Desktop\For Copy\0123\4\4-4\Civil\Sub+Super\SUPER-STRUCTURESUPER-STRUCTURE


MAGWAY UNIVERSITY, MEN CHAMMERY (158'-0" X 30'-0")
3
2-Storyed R.C.C Building, Super-Structure
Work Done List
Sr
Particulars Quantity Unit Rate Per Amount
No

C:\Users\Yomanadi Co.Ltd\Desktop\For Copy\0123\4\4-4\Civil\Sub+Super\SUPER-STRUCTURESUPER-STRUCTURE