You are on page 1of 1
Be daca & aso ‘ dase tasiee FACTORY ACCEPTANCE TESTS CERTIFICATE ASHTART REVAMPING PROJECT SUPPLY OF GENERATOR CONTROL PANEL FOR Gl & Gill CONTRACT N°: 20-0679 DATED: 26 July 2011 Between: Serept (hereinafter called COMPANY) and: Actemium hereinafter called CONTRACTOR) 1. Inaccordance with the CONTRACT, and in compliance with the agreed inspection and test plan, it is hereby certified by CONTRACTOR and COMPANY that all provided Factory Tests are performed by the CONTRACTOR with successful result. (*) 2. Issuance of this Factory Test Acceptance Certificate shall not relieve CONTRACTOR from his warranty obligations and other provisions of the CONTRACT which expressly or by their nature survive the said certificate, Serept Actemium (COMPANY) (CONTRACTOR) = — Name: Name: Ramin Esfandiarinia Position: Position: Business Unit Manager In the presence of: In the presence of: ‘Signature: Signature: oad Date: Date: 26 July 2011 (*) CONTRACTOR shall communicate Manufacturing Data Book and third party Certificate,