Col. Size Section Main Reinf. Lateral Ties Schedule of Column
Col. Size Section Main Reinf. Lateral Ties Schedule of Column
SCHEDULE OF COLUMN
COL. 1. THE STRUCTURAL DRAWINGS SHOULD BE READ IN CONJUNCTION WITH
SECTION MAIN REINF. LATERAL TIES APPROVED WORKING DRAWING
SIZE 25 STANDARD NUT WITH
LOCK NUT/ WASHERS 2. STRESSES ADOPTED FOR STRUCTURAL DESIGN ARE :-
200
1200 X 900
BASE PLATE A. fck = 25 N/mm² FOR CONCRETE GRADE M25
B. fy = 500 N/mm² TMT BAR, CONFORMING TO IS-1786 (Fe 500).
750
20 nos. #10@175mm C/C stirrups THREADED LENGTH
25 mm dia. placed alternatively as M25 FDN. BOLTS, 12 NOS. 3. CLEAR COVER TO REINFORCEMENT SHALL BE AS FOLLOWS:-
(750MM LONG A. FOOTING [BOTTOM] = 50 mm.
shown
4D
R= 3D
J - BOLTS
B. COLUMN = 50 mm.
4. FOR BENDING, BINDING, CRANKING AND ANCHORAGE OF
REINFORCEMENT SHOULD BE AS PER IS 456-2000.
Y 5. PROVIDE SEPERATOR BARS, M. S. CHAIR WHEREEVER NECESSARY, TO
KEEP ADEQUATE COVER TO REINFORCEMENT.
6. DEVELOPMENT LENGTH OF REINFORCEMENT SHOULD BE AS PER IS
456[SP-16].
50MM DIA CORRUGATED PIPE
3000 7. ALL DIMENSIONS ARE IN mm. EXCEPT WHERE OTHERWISE STATED.
FOR CABLE ENTRY 8. P.C.C WORK IN SUBSTRUCTURE IS TO BE DONE WITH M15 GRADE OF
CONCRETE PROJECTED 100MM BEYOND THE FOUNDATION.
200
3200
STANDARDS.
750
12. WELL COMPACTED JHAMA BRICK AGGREGATE LAYER OF 300 mm
10Ø @175C/C
X X'
BELOW FOUNDATION SHOULD BE PRESENT.
1350
12Ø @150C/C
13. SEISMIC LOADS ARE CONSIDERED BASED ON IS 1893
14. THIS DRAWING IS INTENDED FOR AS GOOD FOR CONSTRUCTION.
2100
BOTHWAYS
12Ø @175C/C 960 960 960 960 960
250
BOTHWAYS (TOP)
DRAWING FOR APPROVAL
400
CLIENT:
P.C.C M15
JHAMA BRICK LAYER
100
Y'
300
3200
PLAN VIEW REPRESENTING ORIENTATION OF SUPERSTRUCTURE
SECTION ALONG Y-Y'
BASE PLATE
THICK
1080mm x 700mm
x 20mm THICK 17.2MM COPPER
900 GROUND STRIP SIGNATURE OF ENGINEER:
LEVEL
219MM DIA PIPE FOUNDATION J
BOLT OF 25MM DIA
2000
1050
3200
1200
750 LENGTH TO BE
X X' PROVIDED ON
12Ø @175C/C
EACH GROVE
BOTHWAYS (TOP)
FOUNDATION J 900 12Ø @150C/C
BOLT OF 25MM DIA BOTHWAYS
750 LENGTH TO BE
PROVIDED ON EARTHING
1000
400
EACH GROVE
NAME OF WORK: IMPLEMENTATION OF
P.C.C M15
JHAMA BRICK LAYER INTEGRATED COMMAND & CONTROL CENTER &
SMART ELEMENTS IN AGARTALA CITY.
100
300
3000
Y'
DRAWING TITLE: FOUNDATION DETAIL FOR VMD
PLAN OF FOOTING SECTION ALONG X-X' MOUNTING STRUCTURE FOR 5m x 3m at 3m HEIGHT.