Professional Documents
Culture Documents
Rachel Yin is Level 1 Registered Fire Engineer in China and Chartered Engineer in UK.
7
Inspection, Testing and Maintenance of
Fire Protection Systems
- FM Global Practice
WEBINAR
November 16th, 2020
© FM Global 2020. All rights reserved.
Presenters
Shut Valve
Fires
Unsprinklered
Fires
Sprinklered
Fires
0 1 2 3 4
US $ millions
0 6 12 18 24 30 36 42
Interval (months)
Monthly (3 turns):
Non-indicating valves
and PIV
Impairment Information
Guiding principles…
Communicate
WARNING !!
FIRE PROTECTION EQUIPMENT:
DO NOT SHUT OFF WITHOUT
PROPER AUTHORIZATION
P7834 Equipment/Valve No._________
PRP)
8
7 PSD
6
5
4 150 % Rated Point
3
(1,5 x QRP ; 0,65 x
2
PRP)
1
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
% Rated Flow
© FM Global 2020. All rights reserved.
© FM Global 2020. All rights reserved.
Resources
rachel.yin@fmglobal.com
fenghui.jiang@fmglobal.com