0 PERSONAL DETAILS
Academic qualifications.
Diploma in Ferrous Metallurgy awarded by Material Engineering Institute, ASM, OH, USA.
Certificate in Mechanical Engineering awarded by City & Guild, London, UK.
GCE ‘A’ level awarded by Cambridge University LES, UK.
5.0 CERTIFICATIONS
Aramco Qualifications
SAP: 70020775, Name: Chin-Chan Chong, QM: 3/4/512/41/42.
QM Description Ctry Cty Last Evaluated
QM03 Mechanical-Gen(01-04,13,31,32) CN Shanghai 5/25/2016
QM04 Non-Destructive Examination
QM05 Line Pipe (01)
QM12 Coatings - Non-Critical (09)
QM41 OCTG-Oil Country Tub Gds (45)
QM42 Wellhead Equipment (45)
Technical Qualifications
MICorr, Professional member of institute of corrosion UK,
NACE MR0175-CS Certified User, Cert#13
NACE Senior Corrosion Technologist, Cert#4325
http://www.naceinstitute.org/cstm/education/certification/certsearch.aspx
CSWIP 3.1/3.2 Inspector, IIW Welding Inspector, European Welding Inspector,
Undersign has been working in the oil and gas industries both onshore and offshore fabrication and
refinery works with responsibilities for approximately 30 years. Working as source inspector, yard
supervisor, inspector, technician and subject matter in welding and NDE, providing supervision &
inspection of ASME VIII pressure vessel, AWS D1,1 structural steel, API5L mill inspection,
API6A/16A/6D wellhead, X’mas tree and valve manufacturing,
OCTG API5CT mill inspection, offshore pipeline installation, derrick fabrications, heat exchanger &
pressure vessels inspection to ASME VIII.
For the past few years’ major involvements are source inspection for ARAMCO AOC, yard
inspection and fabrication surveillances of pressure vessels, heat exchanger and Ultra Deepsea
Derrick for National Oilwell Varco Shanghai.
Undersign is familiar with following standards and codes requirements, among others:
Shell/Petronas DEP/PTS L2-2/3, General Pipeline and Material & Corrosion, API5L, API RP2A
WSD, API2B, API2H, API Spec 6A Specification for Wellhead and Christmas Tree Equipment, API
Spec. API Spec 6D, Specification for Pipeline and Piping Valves, API Apec 16A Specification for
Drill Through Equipment, API5CT, API Spec 4F, Specification for Drilling and Well Servicing
Structures, API RP49, API RP55, API1104, API620, AWS D1.1, AWS D1.2, AISC 360, NACE
RP001, NACE MR01-75, API RP14E, API 1104, ANSI B31.2/31.4/31.8, ASME section
II/V/VII/VIII/IX, SSPC specs, Refractory testing ASTM C113/133/181704. NFPA 70, API RP 500B,
DNV RP B401, BS7361 and DNV-OS-F101(2000), ANSI/AISC 360 codes. DNV-OS-E101, C401,
B401, B101, F101- Submarine Pipeline, DNV IMDG of aluminum and CS construction and other
DNV-OS rules. IMO IGC component. China National GB Specifications and CNPC SY
Specifications.
Following are brief description of undersign employment history and related work experiences and
responsibility.
7.1
Employment period : December 2016 – March 2018
Employer : Technip Geo-Production Malaysia
Position : Subject Matter Expert- NDE/Welding
Client : Seconded to Petronas PIC
Location : Malaysia
Project : PIC- Petronas Integrated Project
Brief description:
PIC is PETRONAS' largest investment in Malaysia, located in Pengerang, Johor and forming part of
Johor state's ambitious Pengerang Integrated Petroleum Complex (PIPC). The PIC project is
designed to produce premium differentiated petrochemicals; meeting domestic demand for
petroleum products and the Malaysian government's future legislative requirements on the
implementation of Euro 5. With total investment of USD27 billion.
Brief description:
Work as a surveyor at DNV Energy Shanghai, PR China, providing inspection and certification
services to ultra-deep water offshore drillship derrick fabrication works. The applicable codes and
standards were;
- API Spec 4F “Spec. for Drilling and Well Servicing Structures” 2nd Edition.
- API 6A “API Spec 6A Specification for Wellhead and Christmas Tree Equipment”.
- AWS D1.1 Welding of Steel Structure 2008.
- AISC Manual of steel construction, 13th editions.
- DNV Offshore Standard DNV-0S-El01 "Drilling Plant", October 2008.
- DNV Offshore Standard DNV-OS-F101 “Submarine pipeline System” 2010.
- DNV Offshore Standard DNV-0S-C101 "Design of Offshore Steel Structures, General (LRFD
method)", April 2008.
- NACE MR0175 -2009 Petroleum and natural gas industries - Materials for use in
H2S-containing environments in oil and gas production
- SSPC codes for painting and surface preparations.
- Sour oil field operational assessment (Bohai Oil Field for Major Operator – Platform operation
compliance assessment to API RP49 & API RP55.).
- Refractory inspection for cracker and reheat column.
- Consultancy inspection and certification on quality conformity of project construction for Ninh
Binh Urea Fertilizer Plant to GB/T Chinese Code & Standards.
- Nabor Drilling – NDUSA & Nabor International drill rigs fabrication at SJ Yard.
- NDC – National Drilling Company Abu Dhabi UAE land based drill rig at Baoji Yard
BOMCO.
References:
Mr. YP Tee. DNV Energy Country Manager 86-(0)21-62788086 yak.peik.tee@dnv.com, Mr. Bide
Alford NOV Shanghai Quality Director bide.alford@nov.com. Perstorp Formox AB Mr. Erik
Timander Erik.Timander@perstorp.com, Pan Chien CHIEN.Pan@conocophillips.com
7.4
Employment period : 2005 Sept – 2006 September.
Employer : Det Norske Veritas AS Shanghai Station, China.
Position : PQMS / Surveyor.
Project : Changbei Gas Development Project
Clients : CNPC/ SCEPCO, Shell China, Morimatsu Shanghai
Location : China.
Brief description:
Work as a Inspector / Surveyor in DNV Shanghai, PR China, providing PQMS inspection for CPC /
Shell JV at Changbei Gas Development Project. The project was a joint venture between China
National Petroleum Corporation (CNPC) and Shell China Exploration & Production Company Ltd.
(SCEPCO) to explore and develop gas resources at Changbei Block which will supply 3.0 bcm/yr of
natural gas during the plateau period.
Involved in PQMS Project Quality Management Services for main pipeline and networks
collecting pipelines and gas stations.
Establishing of coordination / communications with CNPC/SCEPCO and Main Contractors on
QA matters and field inspections.
Supervisory involvements on field inspection performed of Clients’ Inspector of Local
Inspection Agency.
References:
Mr. YP Tee. DNV Offshore Services Manager 86-(0)21-62788086 yak.peik.tee@dnv.com. Mr. Tan
Heng Lee, Lead QA Engineer Heng-Lee.Tan@shell.com
7.5
Employment period : 2003 January – 2005 September.
Employer : Det Norske Veritas AS Shanghai Station, China.
Position : Surveyor / Corrosion Specialist.
Project : CNOOC Chunxiao Gas Field Development Project
Location : China.
Brief description:
Work as a surveyor in DNV Shanghai, PR China, providing inspection and 3rd party certification
services to Chunxiao Gas Field Development Project. The field is located in Donghai, 300KM off
Zhou Shan. It consisted of a Central Processing Platform and 2 Well Head Platforms and an Onshore
Collecting Terminal DFTS. The gas produced was collected by the CHX CEP collecting platform
and transferred to the Chunxiao via 300KM API 5LX56 sub-sea gas line.
API RP2A WSD, API2B, API2H, AWS D1.1-96, NACE RP001, NACE MR01-75, API RP14E,
API 1104, ANSI B31.2/31.4/31.8, ASME section II/V/VII/IX, SSPC specs, NFPA 70, API RP
500B, DNV RP B401 , BS 7361 and DNV-OS-F101 (2000), NACE TPC,DNV RP B401 and BS
7361, DNV B101, DNV C401, DNV E101, DNV RP-F103, DNV RP-B403.
References:
Mr. YP Tee. DNV Offshore Services Manager 86-(0)21-62788086 yak.peik.tee@dnv.com.
Brief description:
Work as a surveyor in DNV Shanghai, PR China, providing inspection and 3rd party certification
services to DF1-1 Gas Field Development Project. The field is located in Beibu Bay, 110KM off
Hainan Island. It consisted of a Central Processing Platform and 3 Well Head Platforms and an
Onshore Collecting Terminal DFTS. The gas produced was collected by the DF1-1 CEP collecting
platform and transferred to the Hainan Island via 110KM 22” API 5LX56 sub-sea gas line. There
was also a parallel sub-sea cable from the mainland to provide power to offshore consumers.
API RP2A WSD, API2B, API2H, AWS D1.1-96, NACE RP001, NACE MR01-75, API RP14E,
API 1104, ANSI B31.2/31.4/31.8, ASME section II/V/VII/IX, SSPC specs, NFPA 70, API RP
500B, DNV RP B401 , BS 7361 and DNV-OS-F101 (2000), NACE TPC,DNV RP B401 and BS
7361, DNV B101, DNV C401, DNV E101, DNV RP-F103, DNV RP-B403.
References:
Mr. YP Tee. DNV Offshore Services Manager 86-(0)21-62788086 yak.peik.tee@dnv.com.
7.7
Employment period : May 1999 to December 2001
Employer : Det Norske Veritas AS Shanghai Station, China.
Position : Surveyor / NDT Specialist.
Project : CNOOC QHD 32-6 Field Development Project
Location : China.
Brief description:
Work as a surveyor in DNV Shanghai, PR China, providing inspection and 3rd party certification
services to QHD 32-6 Field Development Project. The field is located in Bohai Bay off Tangshan
City. It consisted of 6 production platforms and a FPSO. The project was a joint venture between
Arco, Texaco and CNOOC.
API RP2A WSD, API2B, API2H, AWS D1.1-96, NACE RP001, NACE MR01-75, API RP14E,
API 1104, ANSI B31.2/31.4/31.8, ASME section II/V/VII/IX, SSPC specs, NFPA 70, API RP
500B, DNV RP B401 and BS 7361, NACE TPC,DNV RP B401 and BS 7361, DNV B101,
DNV C401, DNV E101, DNV RP-F103, DNV RP-B403.
References:
Mr. Huo Jinlin CNOOC, QHD 32-6 Chief Company Representative 086-022-25808664. Mr. YP Tee.
DNV Offshore Services Manager 86-(0)21-62788086 yak.peik.tee@dnv.com.
Brief description:
Work as a surveyor in DNV Shanghai, PR China, providing inspection and 3rd party certification
services to Weizhou Oil & Gas Field Development Project. The field is located in Beibu Bay off
Hainan Island. It consisted of 5 production platforms, namely WZ10-3C, WZ10-3A, WZ10-3AP,
WZ10-3B, WZ11-4A and WZ12-1 collecting platform. The gas & oil produced are collected by the
WZ12-1 collecting platform are transfer to the Weizhou Island via 12”/18” sub-sea oil line and 8”
sub-sea gas line which is located approximately 32km away.
References:
Mr. Lu YuanFa. WZ12-1, Chief Company Representative, Deputy Project Manager
86-(0)759-3900338. Mr. YP Tee. DNV’s Offshore Services Manager 86-(0)21-62788086.
7.9
Employment period : April 1997 to May 1998
Employer : Det Norske Veritas AS Shanghai Station, China.
Position : Surveyor.
Project : CNOOC Pinghu Oil & Gas Field Development Project.
Location : Korea and China.
Brief description:
Work as a surveyor in DNV Shanghai, PR China, providing inspection and 3rd party certification
services to Pinghu Oil & Gas Field Development Project. The field is located in East China Sea
approximately 400km south east of Shanghai. It consists of a single 6-legged self-contained drilling
and production platform with living quarter. Gas and oil produced are piped onshore via a 14” OD
gas line and a 10” OD oil pipeline to a gas processing plant and storage tanks onshore.
References:
Mr. Yang Binyi- CNOOC, Pinghu Chief Company Representative 0082-522-50-1576/9. Mr. YP Tee.
DNV’s Offshore Services Manager 86-(0)21-62788086 yak.peik.tee@dnv.com.
Pinghu.
7.10
Employment period : June 1995 to April 1997
Employer : PETRONAS / Shell Joint Venture.
Position : Quality Assurance Supervisor.
Project : Multi Product Pipeline & Distribution Terminal Project.
Location : Malaysia, Singapore.
Brief description:
The MPP-KVDT Project consisted of 140km of 14” OD pipeline and a distribution terminal, inter
connected to Petronas refinery and Shell refinery, delivering multi-product to KL City, Klang valley
and the then newly constructed KL International Airport.
7.11
Employment period : November 1992 to June 1995
Employer : Det Norske Veritas Pte. Ltd. Singapore.
Position : Surveyor.
Project : Phillip Petroleum Xijiang Field project
: Total Thailand Bongkok Field.
: Vietsopetro Vietnam White Tiger Project.
: Atomash, Valkadon, Russia. Vessel Inspection.
: Lanchou Petrochemical, China. Drilling Equipment.
: McDermott, Indonesia, Vessel & Jacket Fabrication.
: Dowell Schlumberger, Drilling equipment certification.
: HEA, Australia, Boiler and Heat Exchanger certification.
: Cooper Oil Tools / FMC / Baker Hughes, Xmas trees &
Data lodging’s cabin certification.
Brief description:
Work as a surveyor in DNV Singapore, providing inspection and 3rd party certification services to
major oil & gas companies.
References:
Mr. YP Tee. Head of Facilities, Equipment & QA Department, DNV Singapore. Tel: 65-7796363. Mr.
Tan Kah Seng- Process Engineer Heerema Far East Pte. Ltd. Tel: 65-2251085.
7.12
Employment period : May 1991 to November 1992
Employer : Comprimo Malaysia
Position : Quality Control Coordinator.
Project : Shell Refinery Jetty Loading/Receiving Facilities.
Location : Malaysia, Singapore
Brief description:
Shell refinery jetty loading facilities, consisted of approximately 4km x 12 products of off-plot
pipelines. Ranging from 36” to 8” NPS, extended into the newly constructed marine
loading/receiving jetty, 2km into the Strait of Malacca.
References:
Mr. JT Goh-Project Quality Manager, Comprimo Malaysia Sdn Bhd. Tel: 65-7435378 Mr. Tan
Cheong Meng-Corrosion Specialist, Shell Refinery Port Dickson. Tel: 606-6471311
7.13
Employment period : July 1990 May 1991
Employer : MMC Gas Sdn Bhd. Malaysia.
Position : Pipeline Inspector.
Project : Petronas Gas Utilization Project (PGUP II).
Location : Malaysia, Singapore
Brief description:
Petronas PGUP II consisted of approximately 750km of 36 inches API 5Lx70 transmission pipeline.
Delivering LNG to power station and tap off station for industrial reticulation. The pipeline covered
central and southern regions of Peninsular Malaysia and Singapore.
References:
Mr. Roy B Backeley-Senior Metallurgist, MMC Gas Sdn. Bhd. Tel: 403-2849140. Mr. Ong Nam
Siong-Deputy Quality Manager, MMC Gas Sdn. Bhd. Tel: 603-2547111.
7.14
Employment period : April 1989 to July 1990
Employer : Sabah Shipyard, Malaysia.
Position : General Inspector.
Project : Petronas “Dulang” Off –Shore Production Platforms.
Location : Malaysia
Brief description:
Petronas “Dulang-A”, Production Platform and “Dulang-B” Living Quarter is situated in the South
China Sea “Dulang” fields.
References:
Mr. CM Cheyu Quality Control Manager, SASHIP Sdn Bhd. Tel: 087-41228. Mr. Rosli
Shafe-Quality Assurance Engineer, Petronas Carigali Tel: 087-412228.
7.15
Employment period : May 1987-April 1989
Employer : Malaysian Shipyard and Engineering.
Position : Painting Inspector.
Project : Esso Production Incorporation “Seligi-A” Offshore
Production Platform Project.
: Shell St Joseph Platform De-bottle Necking Project.
Location : Malaysia & Singapore.
Brief description:
Esso EPMI “Seligi-A” Project consisted of 5 production platforms and 3 no of dehydration
platform. Situated in the South China Sea off Trengganu, Peninsular Malaysia.
Shell St Joseph De-bottlenecking project consisted of a single platform for St Joseph Field
located in the South China Sea off Sarawak, Malaysia.
References:
Mr. Nordin Mat Yussoft-MSE Quality Control Manager. Tel: 607-2512111. Mr. Ong Nam Hwa-MSE
Quality Control Engineer. Tel: 607-2512111.
7.16
Employment period : Oct 1984-May1987
Employer : Sepakat Setia Perunding Civil & Structural Consultant.
Position : General Inspector.
Project : Inter-Urban Toll Express Way.
Location : Malaysia
Brief description:
The project consisted of 120km of highway and bridges and toll facilities between Air Keroh and
Pagoh Interchanges, in the state of Malacca extended into the state of Johore, Malaysia.
References:
Mr. CG Patrick-Chief Resident Engineer, SSP Sdn Bhd. Tel: 606-982523. Mr. B.Jovanovic-Chief
Structural engineer, EnergoProject. Tel: 606-982520
References:
Ir. Hiam Hoon.-Resident Engineer Tel: 607-3222984
7.18
Employment period : August 1981- August 1983
Employer : Malaysian International Consultant Sdn Bhd.
Position : Inspector of Works.
Project : Western Johore Agricultural Development
Project (Phase I)
Location : Malaysia
References:
Ir. Mutiar Rahman-Resident Engineer Tel: 607-38373451