Inspection Element Location 1 Location 2 Location 3 Location 4 Location 5 Wamsutter Jayhawk San Juan San Juan East Texas OGC STX Field OGC South F&H CCDF Totals
South North Field Louisiana
Electrical 19 0 0 0 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Emergency Mgmt. 23 0 0 0 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Energy Isolation 4 0 0 0 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Fire Protection 4 0 0 0 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Hazcom 10 0 0 0 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Housekeeping 35 0 0 0 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
IH/PPE 9 0 0 0 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Lifting 4 0 0 0 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Machine Guards 15 0 0 0 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Mechanical Integrity 14 0 0 0 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!
Stairways, 18 0 0 0 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Walkways, Ladders #REF!
Training and Written 4 0 0 0 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Programs #REF!
Totals 159 0 0 0 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
OSHA 300, 300A logs & OSHA 301, past three years,
Workers Comp First report of injury
Document Link Site Specific Orientation
PPE Training
Fall Protection/ PPE selection and inspections
Lifting Equipment Inspections ( slings, chains, clevices, etc..)
Ladder inspections
Gaurding Floor and Wall Openings
Electrical equipment inspections cords and tools
Drill documentation (internal)
Drill documentation: comprehensive, including emergency services such as
ambulance, air ambulance, fire & law enforcement officials as applicable
- Eric shared three areas of interest from OSHA that he and Dustin will incorporate into the
o Are employees provided specific guidance and instruction on the reporting of work
o Is the company aware of the requirements for reporting to OSHA workplace fataliti
o Are emergency response services, specific to the location, equipped and suitable fo
NA, N, Comments / Action Resp. Party Work Order
CDW, BP
Dustin will incorporate into the check list:
Is there an equipment specific procedure for isolation Have all employees involved been
trained on those procedures?
Have all employees involved been trained on applicable LOTO procedures?
Is required re-training complete and up to date?
Have all energy sources and isolation points been identified and recorded on the Isolation
Log?
Has the Issuing Authority determined the monitoring requirements and have those
requirements and results been documented on the Isolation Log? Are the monitoring
points free of obstruction?
Does this isolation have an established procedure for normal shut down and start up of
equipment and/or process?
Have all Authorized Employees involved in this isolation reviewed the isolation?
If single block isolation is involved in this isolation, has the Single Block Isolation Hazard
Assessment and Form been completed?
Permit
Do you have an Isolation Permit for this isolation and is it filled out completely?
Does the scope of this isolation match the work being performed and are the conditions of
the Isolation Permit being met?
Has the Isolation Permit been signed by the Issuing Authority and all Performing
Authorities and a copy of both documents at the work site?
Execution
Have all Affected Employees been identified and notified of the isolation?
Do all Authorized Employees involved in this isolation have a personal lock applied?
Have all lockout/tagout points been locked and tagged out and blinds been tagged if
blinding is part of this isolation?
Has the isolation been verified (e.g. bump test)?
If this is a confined space, has positive isolation been achieved?
If this is an electrical isolation has a visual (physical break in the circuit) or metered
verification for the absence of voltage been completed?
Return to Service
Upon completion of the work and prior to the removal of the isolation has the area been
surveyed to make sure tools and individuals are no longer on the site?
Upon completion of the isolation has the Isolation Log been reviewed and a determination
all isolations have been removed?
Upon completion of the isolation has the Isolation Permit been reviewed and closed and
all Affected Employees notified?
Periodic Review of LOTO
Has a documented periodic review of the LOTO program been conducted?
LOTO Materials and Hardware
Standardized locks
Group LOTO
Ladder Maintenance
• The feet of ladders, especially straight or extension ladders, should be equipped with slip-resistant surfa
• Untreated wooden ladders should be stored in dry areas to prevent moisture or water absorption;
• Wooden ladders must not be painted, since this may hide serious defects that may develop. A wood pre
clear finish coating (e.g. varnish) should be used to protect the ladder;
• Avoid painting the rungs/steps with anything, even clear coatings, unless a non-slip material has been a
prevent slipping;
• Ladders constructed from fibreglass should be cleaned and sprayed lightly with a clear or pigmented lac
wax once every three (3) months to reduce deterioration (weathering);
• When transported on a vehicle, ladders should be properly supported and secured using proper “tie dow
Avoid using rubber “bungy cords” unless the travel distance is short;
Scaffolding Inspections and Fall Protection
Construction
1. Does each scaffold and scaffold component Y N N/A ?
?
support (without failure) its own weight and
at least 4 times the maximum intended load?
[29 CFR 1926.451(a)(1)]
17. Are footings level, sound, and rigid? Can they Y N N/A ?
support the loaded scaffold without settling or ?
displacement?
[29 CFR 1926.451(c)(2)(i)]
as work platforms?
[29 CFR 1926.451(e)(6)(iii)]
Use
46. Are scaffolds and scaffold components loaded Y N N/A ?
below their maximum intended loads or rated ?
300 volts to 50 kv
More than 50 kv
More than 50 kv
required conditions.
Definitions:
Competent person: one who can identify hazards in the surroundings or working conditions that are unsanitary, hazardou
Lean-to scaffold: a supported scaffold that is kept erect by tilting it toward and resting it against a building or structure.
Personal fall arrest system: a system used to stop an employee's fall. It consists of an anchorage, connectors, a body bel
Shore scaffold: a supported scaffold that is placed against a building or structure and held in place with props.
Supported scaffold: one or more platforms supported by outrigger beams, brackets, poles, legs, uprights, posts, frames, o
Comments/Corrective action:
2. Does a competent person determine the feasibility Y N N/A ??
4. Are personal fall arrest systems used on scaffolds Y N N/A ??
5. When vertical lifelines are used, are they Y N N/A ??
fastened to a fixed safe point of anchorage,
independent of the scaffold, and protected
from sharp edges and abrasion?
[29 CFR 1926.451(g)(3)(i)]
6. When horizontal lifelines are used, are they Y N N/A ??
secured to two or more structural members
of the scaffold?
[29 CFR 1926.451(g)(3)(ii)]
8. When guardrail systems are required, are Y N N/A ??
they installed along all open sides and
Y N N/A ??
ends of platforms?
[29 CFR 1926.451(g)(4)(i)]
11. Are midrails, screens, mesh, intermediate Y N N/A ??
vertical members, and solid panels (or
equivalent structural members) installed
between the top edge of the guardrail
system and the scaffold platform?
[29 CFR 1926.451(g)(4)(iii)]
12. When midrails are used, are they installed Y N N/A ??
approximately midway between the top
edge of the guardrail system and the
Y N N/A ??
platform surface?
[29 CFR 1926.451(g)(4)(iv)]
13. When screens and mesh are used, do they Y N N/A ??
extend from the top edge of the guardrail
system to the scaffold platform, and along
the entire opening between the supports?
[29 CFR 1926.451(g)(4)(v)]
15. Can each toprail (or equivalent member) Y N N/A ??
of a guardrail system withstand (without
failure) a 200-pound force applied in any
downward or horizontal direction at any
point along its top edge?
[29 CFR 1926.451(g)(4)(vii)]
17. Can midrails, screens, mesh, intermediate Y N N/A ??
vertical members, solid panels, and equivalent
structural members of a guardrail system
withstand (without failure) a 150-pound force
applied in any downward or horizontal
direction at any point along the midrail
or other member?
[29 CFR 1926.451(g)(4)(ix)]
18. Are guardrails surfaced to prevent snagging Y N N/A ??
of clothing and injury from punctures or
lacerations?
[29 CFR 1926.451(g)(4)(xi)]
19. Is it prohibited for rails to overhang the Y N N/A ??
terminal posts, except when such overhang
does not constitute a projection hazard?
[29 CFR 1926.451(g)(4)(xii)]
20. Is the use of steel or plastic banding for Y N N/A ??
toprails or midrails prohibited?
[29 CFR 1926.451(g)(4)(xiii)]
21. If manila, plastic, or other synthetic rope is Y N N/A ??
used for toprails or midrails, is it inspected
by a competent person as necessary to
ensure that it continues to meet the OSHA
strength requirements?
[29 CFR 1926.451(g)(4)(xiv)]
26. Are workers protected from falling hand tools, Y N N/A ??
27. If objects are too large, heavy, or massive to Y N N/A ??
be contained or deflected, are they moved
away from the edge of the surface from which
they could fall and secured?
[29 CFR 1926.451(h)(1)]
28. If tools, materials, or equipment could fall Y N N/A ??
from a scaffold and strike workers, are one of
the following protective measures used?
[29 CFR 1926.451(h)(2)]
29. If tools, materials, or equipment are piled higher Y N N/A ??
30. If canopies are used to protect workers, are Y N N/A ??
they installed between the falling object
hazard and the workers?
[29 CFR 1926.451(h)(3)(i)]
31. If toeboards are used to protect workers, can Y N N/A ??
they withstand (without failure) a force of at
least 50 pounds applied in any downward or
horizontal direction at any point along the toeboard?
acceptable toeboards.
32. If toeboards are used to protect workers, are they Y N N/A ??
33. If toeboards are used to protect workers, are they Y N N/A ??
34. If toeboards are used to protect workers, are they Y N N/A ??
Pole Scaffolds
35. When platforms are moved to the next level, are Y N N/A ??
36. Is crossbracing installed between the inner and Y N N/A ??
37. Is diagonal bracing that is installed in both Y N N/A ??
directions across the entire inside face of
double-pole scaffolds used to support loads
equivalent to a uniformly distributed load of
50 pounds or more per square foot?
[29 CFR 1926.452(a)(3)]
38. Is diagonal bracing installed in both directions Y N N/A ??
across the entire outside face of all double-
Y N N/A ??
39. Are runners and bearers installed on edge? Y N N/A ??
40. Do bearers extend at least 3 inches over the Y N N/A ??
41. Do runners extend at least over two poles? Are Y N N/A ??
42. Is it prohibited to splice braces, bearers, and Y N N/A ??
43. If wooden poles are spliced, are they square? Does Y N N/A ??
45. Are transverse braces that form an "X" across the Y N N/A ??
46. Dose bracing extend diagonally from the inner or Y N N/A ??
47. Are building ties installed at the bearer levels Y N N/A ??
48. On straight run scaffolds, is longitudinal bracing Y N N/A ??
as possible?
50. Are bearers installed transversely between posts? Y N N/A ??
posts as possible.
51. Do bearers extend beyond the posts and runners, Y N N/A ??
52. Are runners installed along the length of the Y N N/A ??
scaffold, on both the inside and outside
posts at level heights?
[29 CFR 1926.452(b)(7)]
Y N N/A ??
53. Are runners interlocked on straight runs to form Y N N/A ??
54. Are couplers made of structural metal, such as Y N N/A ??
56. Are frames and panels braced by cross, horizontal, Y N N/A ??
58. Are frames and panels locked together vertically Y N N/A ??
60. Are diagonal braces installed on all sides of Y N N/A ??
each square?
[29 CFR 1926.452(e)(2)]
61. Are diagonal braces installed between squares on Y N N/A ??
62. Are scaffolds three tiers or less in height? Are they Y N N/A ??
the other?
[29 CFR 1926.452(e)(4)]
Note: The upper tiers shall stand on a continuous
Horse Scaffolds
63. Are scaffolds less than 10 high? Are they two tiers Y N N/A ??
high or less?
[29 CFR 1926.452(f)(1)]
64. When horses are arranged in tiers, is each horse Y N N/A ??
65. When horses are arranged in tiers, are the legs of Y N N/A ??
66. When horses are arranged in tiers, is each tier Y N N/A ??
crossbraced?
[29 CFR 1926.452(f)(4)]
the ground?
[29 CFR 1926.452(k)(1)]
68. Are ladders that are used to support ladder jack Y N N/A ??
69. Are ladder jacks designed and constructed so that Y N N/A ??
70. Are ladders that are used to support ladder jacks Y N N/A ??
71. Is it prohibited to bridge scaffold platforms one Y N N/A ??
to another?
[29 CFR 1926.452(k)(5)]
Training Requirements
72. Are workers trained to recognize the hazards Y N N/A ??
associated
with the type of scaffold used and to understand the
73. Are trainers qualified in the subject matter? Y N N/A ??
[29 CFR 1926.454(a)]
Y N N/A ??
74. Are workers who erect, disassemble, move, operate, Y N N/A ??
75. Are trainers who train the workers mentioned in Y N N/A ??
question 74 competent?
[29 CFR 1926.454(b)]
76. Are workers retrained when they show a lack of skills Y N N/A ??
Definitions:
Bearer (putlog): a horizontal transverse scaffold member supported by ledgers or runners. The scaffold platform rests o
Brace: a rigid connection that holds one scaffold member in a fixed position with respect to another member, or to a build
Competent person: one who can identify hazards in the work area or conditions that are unsanitary, hazardous, or dange
Coupler: a device for locking together the tubes of a tube and coupler scaffold.
Personal fall arrest system: a system used to stop an employee's fall. It consists of an anchorage, connectors, a body bel
Lifeline: a component consisting of a flexible line that connects to an anchorage at one end to hang vertically (vertical lif
Qualified: a person who, by a recognized degree, certificate, or professional standing; or by extensive knowledge, trainin
Runner (ledger or ribbon): the lengthwise horizontal spacing or bracing member that support the bearers.
Supported scaffold: one or more platforms supported by outrigger beams, brackets, poles, legs, uprights, posts, frames, o
Comments/Corrective action:
e unsanitary, hazardous, or dangerous, and who has the authority to take prompt corrective measures to eliminate them.
nchorage, connectors, a body belt or body harness, and may include a lanyard, deceleration device, lifeline, or combinations of these.
end to hang vertically (vertical lifeline), or that connects to anchorages at both ends to stretch horizontally (horizontal lifeline). The lifeline
r by extensive knowledge, training, and experience, has successfully demonstrated an ability to solve problems related to a subject matter, w
eliminate them.
29 CFR 1926.503
Is the Crane Operator’s evidence of competency card criteria sufficient to operate the
crane to be utilized?
Lift Information (Crane Operator/IA)
Do you know the capacity of the crane at this configuration?
Rigging (All)
Was the rigging performed by a competent rigger?
People (All)
Is the Lift Leader/Issuing Authority present at the lift site?
Have the crane operator and rigger signed the lift permit?
Have non-essential personnel in the vicinity of the lifting operations who are not directly
involved with the lift been controlled to stay out of the area of maximum boom radius?
Critical Lift Criteria (All)
Will the Crane/Hoist Operator lose sight of BOTH the load and signal person at any time
during the lift?
Are you lifting over energized or pressurized equipment?
Is the crane within twice the maximum swing radius of the crane, plus the required
clearance?
Does the lift exceed 80% of the lifting equipment capacity?
Tag Lines
Discussion of hand signals including stop the job signal during lift planning
Lift plan including travel path discussed with crane operator and spotter including walking
surfaces, ground condition, obstructions and escape route
Does the description of Hot Work activities identified on the permit cover the current tasks
being performed?
Has the Permit been reviewed with the Performing Authority?
Has the Permit been signed by the Issuing Authority?
Are any additional permits required for this job? (Can be Yes or No depending on scope
of work)
Are the energy isolation points properly identified, isolated and documented?
Monitoring
Can hot work be conducted when the LEL is greater than 10%?
Is documentation available to verify that the atmospheric monitor has been calibrated per
manufacturer’s requirements?
Has the Issuing Authority determined the monitoring requirements?
Is continuous atmospheric monitoring required when performing open flame hot work?
Controls
Is a Fire Watch required when performing open flame hot work?
Has the Fire Watch been identified on the Permit and signed in the appropriate area?
(Can be Yes or No depending whether a Fire Watch was required on Lines 6 & 7.)
Is appropriate fire extinguishing equipment identified and readily available? (Yes if open
flame hot work.)
Are alarms and shutdowns by-passed an if so, is it properly documented? (Can be Yes
or No depending on location.)
Can a hot work permit be closed while a Fire Watch is still on duty?
Can a motor vehicle be operated within 10’ of hydrocarbon equipment or piping without a
hot work permit?
Documentation
Are hot work permits valid for more than one shift?
Can a completed permit be retained for less than 30 days?
Can an Issuing Authority close a hot work permit without returning to the site?
Comments / Action Resp. Party Work Order
Area
Oxygen cylinders, valves, regulators, etc., must be free from grease or oily substances.
Cylinder valves closed before moving cylinders and when work is finished.
Valves on empty cylinders closed and capped.
Oxygen-acetylene torch handle and welding torches equipped with flashback protection
valves.
Worn / cracked hoses been replaced.
Cylinders are regularly checked for dents and corrosion.
Gas hoses stored with pressure bled off.
Compressed gas cylinders legibly marked, color coded and segregated by contents.
Cylinders stored away from heat and sources of ignition.
Gas cylinder gauges read zero psi when not in use.
Electric Welder
Welding cables free of defects. No repairs within 10' of stinger
Welding equipment proper slicing at clamp connections.
Bench Grinder
Cord free from splices and damage, proper ground, factory end
Wheels inspected and ring tested, proper speed rating, grinding wheel dressed
Tool Rest <1/8" from wheel
Tongue guard < = 1/4" space
Eye shield adjusted, clear
Face protection available and used
Original guard in place, properly adusted, tight
Normal RPM ( motor brushes good condition)
Dust mask utilized as per hazard assessment
Portable Grinder
Cord free from splices and damage, proper ground, factory end
Wheels inspected and ring tested, proper speed rating for machine
Eye and face protection available and used
Original guard in place, properly adusted, tight
Handle installed and used for control
Dust mask utilized as per hazard assessment
Drill Press
Cord free from splices and damage, proper ground, factory end
Proper bit for material
Electric Threader
Electrical cord proper grounding, stress relief, cracking and wear
Machine guard(s)
non-portable units bolted to floor
Vise
Inspected for proper mounting
inspect jaws and handles for wear,cracks, bent parts& misuse.
Hand Tools
Wooden handles inspected for cracks, splits and defects, secure at end
Metal tools inspected for wear, misuse
Metal tool handles damage, bent or cracked
Plastic handles inspected for cracks, defects
Air Compressor
Secured to floor
Machine guard(s) in place
PRV tested
Electrical cord inspected for defects, stress relief
Proper grounding
Tank inspected
Condensed fluid removed periodically
Each cord set, attachment cap, plug and receptacle of cord sets, and any
equipment connected by cord and plug, except cord sets and receptacles which
are fixed and not exposed to damage, shall be visually inspected before each
day's use for external defects, such as deformed or missing pins or insulation
damage, and for indications of possible internal damage.
Equipment found damaged or defective shall not be used until repaired.
Repairs of electrical cords on portable double insulated equipment such as
electrical drills is not permitted except by replacement of the cord as per
manufacturer's specifications
Free from grease, oil or other substances which may degrade outer coverings
( follow manufacturer's recommendations)
Flexible cords shall be used only in continuous lengths without splice or tap. Hard
service flexible cords No. 12 or larger may be repaired if spliced so that the splice
retains the insulation, outer sheath properties, and usage characteristics of the
cord being spliced.
This provision precludes the repair of flexible cords smaller than No.12 (the
higher the number, the smaller the cord). Since hand power tools typically have
flexible power cords smaller than No.12, those cords are not permitted to be
spliced. Heavier cords -- those No. 12 or larger (that is, with a lower gauge
number), may be repaired with a molded or vulcanized splice as long as the
repair returns the cord to at least the equivalent of its original specifications.
Repairs are made by qualified personnel
Cords and electrical tools stored properly, to protect from potential UV,excessive
heat, contact and strain damage.
Extension cords not used for permanent wiring
Extension cords proper guage for load and length
Operator understands guage and load requirement
Damaged cord(s) are tagged out and not used until repaired by a qualified person
Breaker boxes 3' clear for emergency management
Switches are marked as to equipment they control unless obvious
Switches, panels and breakers labelled with arc-flash labels as appropriate
Wall receptacle covers are tightly secured with proper covers
Wall receptacles used near water sources have ground-fault protection
Ground fault receptacles and breakers are tested periodically
NA, N, Comments / Action Resp. Party Work Order
CDW, BP
Date
Facility
Location
Participants
NA = Not Applicable, N = Needs Attention, CDW= Corrected During Walkthrough, BP=Beat Practice
Area Element: Production Facility (Developed by Anadarko OS)
Structural Defects
Are all guards (belt guards, machine guards, weight guards) in place with adequate machine guarding and in
SD-001 good working order?
SD-002 Are guards pinned / bolted (not welded) to allow removal for LOTO / Service?
Are there guards and caution signage in place around hot (>140 F) piping / equipment (e.g. compressor
SD-003 discharge / exhaust piping, fire tubes, etc.)?
SD-004 Are all automation and electrical lines properly tied in and secured with no exposed wiring?
SD-005 Are all production lines properly tied in and secured to production equipment and tanks?
Fixed Ladders
L-001 Are all tank ladders, landings secured, level, with all bolts and bracing in place?
L-002 Are ladders that exceed 24 feet equipped with a cage or ladder safety device?
L-003 Is the ladder properly angled to prevent slipping?
L-004 Are fixed ladders angled at no more than 90º from the ground?
L-005 Are the ladder steps properly spaced (no less than 10 inches and no more than 14 inches)?
Is the ladder mounted at least 7 inches and not more than 12 inches away from the wall/tank/fixture behind
L-006 it?
L-007 Are ladders without cages at least 15 inches away from the nearest structure?
L-008 Is the ladder area completely unobstructed?
Stairs
S-001 Are hand rails, mid-rails, and toe boards in place and secure / stable?
S-002 Are there handrails on all stairs having four or more risers?
S-003 Are the stairs at least 22 inches wide?
S-004 Do stairs angle between 30º and 50º from the ground (horizontal)?
S-005 Are stairway handrails located between 34 and 37 inches above the leading edge of stair treads?
S-006 Are step risers on stairs uniform from top to bottom (variation not more than 1/4”)?
S-007 Are steps on stairs slip resistant (designed or provided with a non-slip surface)?
Are elevated surfaces provided with standard 4 inch toe boards (bottom of toe board no more than ¼” above
S-008 landing)?
S-009 Are there any catch / snag points on hand rails?
S-010 Is the stairway path completely unobstructed?
Tanks
Is lateral vent located at least 10 ft from public roadway and venting away from ignition source (gas fired
T-001 production units, etc.)?
T-002 Visually inspect seams, valves, piping, load lines for damage or leaks
Check heater treater, separator, or production unit for correct operation (e.g.: liquid level, dump operation,
T-003 temperature controller, etc.).
T-004 Are environmental pots in place on tank load line and drain line (empty, with lid closed and pinned)?
T-005 Do the load lines have bull plugs?
Is the containment ring structurally sound (no holes in panel for a former or existing load line, no missing
T-006 nuts and bolts along the seams)?
T-007 Any erosion features that would allow released fluids to easily bypass the secondary containment?
T-008 All hammer unions on dump lines and water transfer lines secure?
T-009 Is the thief hatch closed and latched properly?
T-010 Does the thief hatch seal properly (lid is aligned to allow proper seating on rubber seal)?
T-011 Is the tank clean and free of oil stains (overfilled or blew oil out thief hatch)?
T-012 Is the manway cover free of any seeps and all nuts and bolts are in place?
T-013 All openings on fiberglass tanks properly protected to prevent bird taking?
T-014 Are the tanks, valves, and associated piping structurally sound (no discoloration, drips, seeps, cracks, etc.)?
T-015 Do all fiberglass tanks have solid fiberglass top?
T-016 Are fiberglass tanks in water service ONLY?
T-017 If fiberglass tank has netted top, is it in good condition? (no holes greater than 1 ½”)
Pumping Units
Check unit fluids for correct levels (e.g.: lube oil, cooling water, lubricator box, day tank, etc.). Do not need
PU-001 to check gear box (part of pm).
PU-002 Check stuffing box for leaks and tighten or replace packing as required.
PU-003 Listen to unit for any unusual noises
PU-004 Visually check unit for mechanical function and structure integrity (alignment, cracking, etc.)
Flam-001 Are approved containers and tanks used for the storage and handling of flammable and combustible liquids?
Flam-002 Are all flammable liquids kept in closed containers when not in use?
Flam-003 Are storage tanks guarded to prevent damage from vehicles?
Flam-004 Are all connections on drums and combustible liquid and vapor piping tight?
Flam-005 Are storage tanks adequately vented, including being equipped with emergency venting?
Proper Signage
Sgn-001 Are H2S warning signs posted (if well >10 ppm)?
Sgn-002 Are Lease signs posted at lease entry, wellhead, and tank battery?
Sgn-003 Is “Unit starts automatically” sign posted if appropriate?
Sgn-004 Are tank contents w/ hazard warnings posted?
Sgn-005 Are high voltage signs erected if appropriate?
Sgn-006 Are “Underground buried pipe may be present” signs posted?
Sgn-007 Are warning signs clean and visible?
Sgn-008 Are “No Smoking” areas designated and posted?
Sgn-009 Are hearing protection signs posted?
Sgn-010 Are rig anchor markers in place?
Sgn-011 Are emergency phone numbers posted?
Labeling of Containers
Lbl-001 Are barrels, tanks, or other movable containers properly labeled?
Lbl-002 Are the labels legible and prominently displayed?
Does the label include the name of the chemical, the hazard associated with the chemical and the target organ
Lbl-003 affected by the chemical?
Compressors
C-001 Are air filters installed on the compressor intake?
Check unit operating conditions at control panel (e.g.: suction/discharge pressures, rpm, oil pressure, coolant
C-002 temperature, etc.)
C-003 Check for gas and liquid leaks.
C-004 Check fluid level in scrubbers.
C-005 Check distance-piece drip container for fluid and drain as required.
C-006 Confirm scrubber dumps operating correctly.
C-007 Listen to unit for any unusual noises.
Visually check unit for mechanical function and structure integrity (e.g.: excessive vibration, cracked nipples,
C-008 etc.).
C-009 Check unit fluids for correct levels (e.g.: lube oil, cooling water, lubricator box, day tank, etc.).
C-010 Are safety devices on compressed air systems checked frequently?
C-011 Are environmental skids installed? Do they need to be emptied?
General Housekeeping
Hou-001 Proper Tool/Equipment Placement?
Hou-002 Are trip hazards removed and/ or adequately marked (painted yellow, etc.)?
Hou-003 Is all equipment painted consistently?
All tanks, separators, well heads, painted BP tan, on tanks bottom step and top step, hand rails 6 in on
Hou-004 tips safety yellow
All fence panels brown and safety yellow. ( if painted Bp tan and safety yellow 18 in from ground up)
Hou-005 Do not paint brown and yellow panels
Hou-006 BP owned compressors BP green
Hou-007 Pumping unit Gas fired motors BP green or Bp tan ( all gas fired motors replaced BP green)
Pumping units BP tan, weights and horses head have to painted safety orange 6 in on tips as OSHA
Hou-008 requires
Hou-009 All tripping hazards Safety yellow
Hou-010 All above ground piping not fenced in with panels, safety yellow below 6 feet, BP tan above 6 feet
All piping, walkovers and guards not fenced in with panels, safety yellow below 6 feet, BP tan above 6
Hou-011 feet (if fenced in with panels BP tan or safety yellow for tripping hazards)
Hou-012 Is the Wind Sock present and readily visible from at sites with >10ppm?
Lockout/Tagout: Does all equipment required to be de-energized or disengaged and blocked have the design
Hou-013 to be locked out?
Other
O-001 Do all flanged connections have bolts in all holes with 2 threads past the nut?
O-002 If Huber head is present, do visual inspection.
O-003 Lube oil tank specifications – Ensure appropriate tank height, labeling, and secondary containment.
O-004 Is roll line present?
O-005 Are panels in place and properly secured, in good shape?
O-006 Do all reservoirs on location have containment?
O-007 Is all secondary containment free of trash, debris, and liquids?
O-008 Do all stacks have a bird barrier?
O-009 Any Other Safety or Environmental Concerns?
All Findings: specify equipment for required work order and discuss with team leader
Any finding that would be deemed safety critical – Call Team Leader immediately and discuss
Signature: ___________________________________________
Revision Log
Revision Authority
Date
2/4/2006 Dan Lawson
10/10/2006 Dan Lawson
Guages
PSV caps
Check Off Needs Attention Comments
Date: ______________
Custodian Revision Details
Pre-Job
Did everyone participate in the JSEA
Was the JSEA completed on location with actual site hazards identified and control
measures applied?
Has a One Call been made and been cleared ?
Did the IA fill and sign the Ground Disturbance Permit?
Is the Ground Disturbance Permit on location?
Have all involved with the excavation read and signed the permit?
Was the search zone marked with white paint or white flags?
Has an Emergency Response Plan been reviewed and available at the work site?
Has a plot plan/drawing of the site been completed?
Have all lines to be crossed been positively identified?
Confirmed
Tentative
Eric Fletcher
Eric Fletcher
K. Mortensen
K. Mortensen
K. Mortensen
Carl Dupuy
Carl Dupuy
Jon Lowe
Jon Lowe
Richard Rose
Mike Deherrera
Len Sisk
Fred Lemond
Doug Woodrow
Doug Woodrow
Doug Woodrow
Date:
Facility:
Location:
Participants:
NA = Not Applicable, N = Needs
Attention, CDW= Corrected During
Walkthrough, BP=Best Practice
Electrical
Emergency Mgmt.
Energy Isolation
Fire Protection
Hazcom
Housekeeping
IH/PPE
Lifting
Machine Guards
Mechanical
Integrity
Stairways,
Walkways,
Ladders
Training and
Written Programs
Total