You are on page 1of 1

JOHN B. LACSON FOUNDATION MARITIME UNIVERSITY - (MOLO), INC.

(Formerly Iloilo Maritime Academy)


M. H. del Pilar Street, Molo, Iloilo City, 5000 Philippines
Fax / Tel. Nos. (63) (33) 3365449
E-mail: admin.molo@jblfmu.edu.ph
www.jblfmu.edu.ph
Assessment No.1 (PRELIM) Date:
Name YR & SEC Subject PPS

Learning The students shall be able to: draw the block diagram of rankine cycle; indicate the flow
Outcome direction of the fluid; identify the main components of rankine cycle; state the function of
the components, define the processes of rankine cycle; and differentiate steam engine
rankine cycle from refrigeration cycle.
Assessment Strategy (Rankine cycle) Points Score
Tasks:
1. Draw the block diagram of rankine cycle. 4
2. Indicate the flow direction of the fluid in the block diagram (from feedwater 4
pump back to feedwater pump).
3. Identify the 4 main components of rankine cycle in the block diagram. 4
4. State the function of each components. 4
5. Define the processes 1-2, 2-3, 3-4, 4-1 of Rankine cycle. 4
6. Differentiate the Steam engine Rankine cycle from Refrigeration cycle. 5
Overall total points = 25 Raw Score =

________________ ______________________ ______________________


Signature above printed name Signature above printed name Signature above printed name
TRAINEE LAB. TRAINOR INSTRUCTOR
“To maintain the highest standards of Quality, Health, Safety, Environmental Protection and Pollution Prevention in our
consistent drive to satisfy and strive to exceed stakeholders’ expectations.”

You might also like