Eldorado Tool

Work Instruction P# 30306 – Sword Pin

Sequence of Operations Milling Operation #20

Fixture Put part from Lathe as shown (Dia. 18.15mm to stop)

Push part to stop and tighten clamp Lightly Tap part with hammer to
Use Torque Wrench to tighten clamps Finish part from Mill

Finish part from mill

De-burr sharp edges on soft wheel Check dim 12.0 ± 0.15

Check Dim. 12 ±0.15 mm

Plug gage to go in smoothly to bottom Check 18.15 ±0.05 mm


Check 23.00 ±0.10 mm Check Dim. Φ14.50 ±0.15 mm.

Check Dim. 54.0 ±0.15 mm Check O/L 85.00 ±0.15 mm

Check Dim. 7 ±0.15 mm Stamp Letter E as shown