» » (CHECK TO SEEIP THERE IS A PROGRAM AVAILABLE, 1A) TENO PROGRAM IS AVAILABLE, CREATE PROGRAM. 1B) WIEN PROGRAM IS AVAILABLE, 00 TO STEP 12 SELECT TOOLING PER PROGRAM REQUIREMENTS. SET-UP TOOLING AS REQUIRED. DO A DRY RUN WITHNO MATERIAL. WHEN MACHINERY IS ACCEPTABLE TO SET- UP OPERATOR PROCEED TO RUN I" OFF PART. (CHECK 15" OFF PART AFTER OPERATION IS COMPLETED, DO NOT REMOVE PART ‘SRoM TH MACHINE UNTIL SATISEIED THAT THE PART MEETS THE DRAWING REQUIREMENTS. REMOVE THE PART AND DO A COMPLETE 1*" OFF. DOCUMENT THE DIMENSIONAL RESOLTS AND PALL DIMENSIONS ARE WITHIN THE DRAWING TOLERANCES SUBMIT THE PART AND DIMENSIONAL SHEET TO QUALITY ASSURANCE FOR A 1" OFF QA INSPECTION. ‘wate 1° OFF 18 APPROVED BY QUALITY ASSURANCE, OPERATOR CAN RUN PARTS, NOTE: OPERATOR MUST INSPECT DIMENSIONS ON A REGULAR BASIS DEPENDING GN CYCLE TIME OR SPECIAL INSTRUCTIONS IN THE FOLDER. [ALL DEVIATIONS MUST BE BROUGHT TO THE ATTENTION OF THE QUALITY [ASSURANCE DEPARTMENT, Rev: 000 Sept 2508