» exc -T-UP INSTRUCTIONS (CHECK TO SEE IF THERE IS A PROGRAM AVAILABLE. |A) IPN PROGRAMIS AVAILABLE, CREATE PROGRAM. B) WHEN PROGRAM IS AVAILABLE, GOTO STEP 2, SELECT TOOLING PER PROGRAM REQUIREMENTS. SET-UP TOOLING AS REQUIRED. DO ADRY RUN WITH NO MATERIAL, WHEN MACHINERY 1S ACCEPTABLE TO SET- UP OPERATOR PROCEED TO RUN 1” OFF PART. CHECK 1°" OFF PART AFTER OPERATION [8 COMPLETED, DO NOT REMOVE PART FROM THE MACHINE UNTIL SATISFIED THAT THE PART MEETS THE DRAWING REQUIRENENTS, REMOVE THE PART AND DO A COMPLETE 1"" OFF. DOCUMENT THE DIMENSIONAL RESULTS AND IP ALL DIMENSIONS ARE WITHIN THE DRAWING TOLERANCES SUBMIT THE PART AND DIMENSIONAL SHEET TO QUALITY ASSURANCE FOR A 1 (OFF QA INSPECTION. [WHEN 1" OFF 18 AFPROVED BY QUALITY ASSURANCE, OPERATOR CAN RUN PARTS, [NOTE: OPERATOR MUST INSPECT DIMENSIONS ON A REGULAR BASIS DEPENDING {GN CYCLE TIME OR SPECIAL INSTRUCTIONS IN THE FOLDER, [ALL DEVIATIONS MUST BE BROUGHT TO THE ATTENTION OF THE QUALITY [ASSURANCE DEPARTMENT. Rev: 000 Sept. 2598