exc -T-UP INSTRUCTIONS
(CHECK TO SEE IF THERE IS A PROGRAM AVAILABLE.
|A) IPN PROGRAMIS AVAILABLE, CREATE PROGRAM.
B) WHEN PROGRAM IS AVAILABLE, GOTO STEP 2,
SELECT TOOLING PER PROGRAM REQUIREMENTS.
SET-UP TOOLING AS REQUIRED.
DO ADRY RUN WITH NO MATERIAL, WHEN MACHINERY 1S ACCEPTABLE TO SET-
UP OPERATOR PROCEED TO RUN 1” OFF PART.
CHECK 1°" OFF PART AFTER OPERATION [8 COMPLETED, DO NOT REMOVE PART
FROM THE MACHINE UNTIL SATISFIED THAT THE PART MEETS THE DRAWING
REQUIRENENTS,
REMOVE THE PART AND DO A COMPLETE 1"" OFF. DOCUMENT THE DIMENSIONAL
RESULTS AND IP ALL DIMENSIONS ARE WITHIN THE DRAWING TOLERANCES
SUBMIT THE PART AND DIMENSIONAL SHEET TO QUALITY ASSURANCE FOR A 1
(OFF QA INSPECTION.
[WHEN 1" OFF 18 AFPROVED BY QUALITY ASSURANCE, OPERATOR CAN RUN
PARTS,
[NOTE: OPERATOR MUST INSPECT DIMENSIONS ON A REGULAR BASIS DEPENDING
{GN CYCLE TIME OR SPECIAL INSTRUCTIONS IN THE FOLDER,
[ALL DEVIATIONS MUST BE BROUGHT TO THE ATTENTION OF THE QUALITY
[ASSURANCE DEPARTMENT.