km 242+827.00
platform limit
SPRIJINIRE CU COLOANE DE BETON ARMAT distanta pe orizontala 3.00m ZONA / AREA KM 242+827.00
ELEVA IE / ELEVATION FIR II / LEFT TRACK II, FIR II / LEFT TRACK II,
PROPPING WITH REINFORCED CONCRETE COLUMNS ELEVATION 15.00m, 2 pcs/section,
PROTEC PROTEC horizontal distance 3.00m
1.50 Scara / Scale 1:50 Scara / Scale 1:50
ca
1.50 Scara / Scale: 1:50 DETALIU / DETAIL ''C''
Scara / Scale 1:50 Scara / Scale: 1:50
A
PERON
56
Designed rail upper level, track II Slope protection with 90
1.0 Ground level 2.20
130.00
three-dimensional geo-net 1:1 11
1.30
1.30
1.30
0 40
1:1.5
Protectie taluz cu .5
Scara / Scale: 1:50 40 g 50 1.20 50 1.60
15
Scara / Scale: 1:50
15
25
20
1:1.5
max. 5.00
1.30
Slope protection with
three-dimensional geo-net
25
1:1 25 11 25 ''C''
50
.5 1:1
2
1.30
.5
1.45
''A'' 5% 5% 6
1:1.5
1.30
50
15
10:1
1.00
50
1.80
3
1.78
1.60
1:
4.50
4.50
1
40
1.40
1:
8.33 Scoabe de fixare din o
5.00
5.00
2
2.50
Scoabe de fixare din o
50
de ''U'' i lungi de
1.30
10:1
10
de ''U'' i lungi de 1.40
4.50
50 1.20 50 300mm 26 108.00 26
3.20
300mm
6.00
6.00
3 1 1.65 23 30 80 30 16 1
50
4.00
Nivel scurgere ape
3.70
3.70
10:1
18 41 52 41 25 25 25 25 65
1.05
''U''-shaped, 300mm long
4.00
50
25 8 25 Water discharge level)
''U''-shaped, 300mm long
3.20
2 D
1.70
25
50
55
4.70
5% 5% Work platform level 5
2.70
15
3 5 5 C
40 30
30
40 30
1.00 1.00 1.00 1.00 1.00 6 5.74 10
1:
1.80
40
1
1:
Funda ie ranforsat 10 40
60
1.80
3.00 B
4.75 4.75 5.00
1.30
Reinforced ditch foundation peron linia 2
21
dou tronson funda ie / foundation section 75 75 75 75 56 1:
21
LEGEND : A
15
3.60 3.60 platform track 2
40
40
18 41 52 41 18
15
Nivel scurgere ape 94 1.80
Vertical separation joint out of
10
2.28
2.28
km 247+253.80
km 247+263.85
65
Aprobat Consultant Aprobat CFR
1.93
10:1
Hiding wall upper level Indice Data Modificare Proiectant
1.70 3.56
15
Water discharge level two asphalt board sheets Nivel scurgere ape 2 Index Date Modification/Revision Designer Approved Consultant Approved CFR
40
40
var. 50 1.47 50 1.60 Water discharge level) 1. Casiu din beton clasa C 25/30.
55
11.00
40
15
2. Umplutur din beton clasa C 20/25,
20 43
15
43
34 21 GUVERNUL ROMANIEI
6
Nivel coronament PROIECT FINAN AT DE UNIUNEA EUROPEAN
40.05
15
15
40
6
15
30cm grosime. EUROPEAN UNION FINANCED PROJECT
25
20
Crown level 1:1
35
34
.5 6
60
Nivel coronament 1.50 1.50 1.50 1.50
1:1 4.75
25
20
13.00
65 25 25 25 25
15
15
66
designed railway
3.60 30cm thick concrete filling 2
4 TIP 1 TIP 2 Prefabricated reinforcing LEGEND:
track axis II
14.00
4 CONCRETE DITCH PREFABRICATED REINFORCED DITCH TYPE 2 "B"
1.60
5 LEGEND :
10:1
:1. .5 5%
1:1 (according to the embankment project) (plan a / drawing EA5101E00QCCT00050130) (plan a / drawing EA5101E00QCCT00050140)
1.20
13.50
2 NSS + 0.38 1% 6.00
5 5 3
50 horizontal distance 3.00m 4 CLIENT / CLIENT
50 2. C 20/25 class concrete filling, 30cm thick.
13.00
0.40
0.40
L = 10.00 M km 247+
1. Coloane din beton armat D=1080mm
40
40
5%
65
5%
10 10 3
Dataliu / Detail "B" 2.
50
Nivel scurgere ape Nivel scurgere ape 40 40 40 40 0.50
Water discharge level Water discharge level Scara / Scale 1:20 5
3. Zid masc 7.53
A'
25
25
15
5 4. Geocompozit drenant
15
15
Foundation level Foundation level
1 1 7 25
5.
40
1.10 4.75 1.16 4.74 DETALIU / DETAIL ''A'' 5% .5 6 CONSULTANT / CONSULTANT
Data Semn tur
1:1 6. Beton de egalizare
Date Signature
Aprobat
Approved Project manager R. Liuzza dec. 2011
5% 5% 7. 25/30
65
Scara / Scale 1:50 Aprobat
15
5.14 5.14 Hiding wall lower level Nivel scurgere ape 8. Approved Section 1 Coordinator C. Gambelli dec. 2011
Water discharge level 9. Verificat Expert Cheie
A. Troiano dec. 2011
designed railway
Checked
designed railway
Key Expert
15
2.24 30 30 90 5 10.Rost de separa
15
ax c.f. pr. fir II
5.35
NOT :
track axis II
track axis II
designed railway
1. Detaliile pentru armarea coloanelor se g a SUBCONTRACTANT / SUBCONTRACTOR
LEGEND : 5.01 1.02 6.31
track axis II
1 Funda ie din beton clasa C 8/10 de 15cm grosime 50 1:
1 7.33 LEGEND: Approved Subconsultant Responsible A. Stanciu - Dinulescu
NOT : 4.75 2. Detaliile pentru armarea grinzii de solidarizare i zidului-masc 1:3
30
2 tip 1 (plan EA5101E00QKCT0005013) Proiectant
15
ECHIVALARE KILOMETRAJ Elaborated Designer E. Terziman
3 tip 2 (plan EA5101E00QKCT0005014) - Lucr KILOMETER EQUIVALENCE se g EA51 01 E 00 BB CT 000 X 018 1. Reinforced concrete columns
15
Reabilitarea liniei de cale ferata a coridorului
3. Dimensiunile coloanelor proiectate se vor definitiva
52
4 Geocompozit drenant - Apele colectate de geocompozitul drenant vor fi evacuate 2. C 25/30 class concrete stiffening beam Proiect/Project
designed railway
1:1 IV Pan European, pentru circula ia trenurilor cu viteza maxim de 160 km/h,
transversal, din 5 n 5m prin .5 50 dup realizarea investiga . Tronsonul : Bra 2004/RO/16/P/PA/003
50
1.52
Fir I / Track I Fir II / Track II
1.40
50
track axis II
6 . 4. Draining geo-composite Faza / Phase:
30
km 247+253.80 km 247+243.41 ,
NOTE: 5. PVC tube weeper, D=90mm
designed railway
1 Section : Bra
50
D.E. / E.D.
40
km 247+263.85 km 247+253.41 1.90 5.09 Beton simplu clasa C 8/10
NOTE: 1. The details for column reinforcement are found in drawing
track axis II
C 8/10 class concrete Denumire desen / Drawing Title :
1 15cm thick concrete foundation, class C 8/10 - The designed works shall be reported to track I kilometer. km 247+518.80 km 247+507.66 5 EA51 01 E 00 BB CT 000 X 017 7. C 25/30 class concrete monolith ditch 75 1.50 1.50 1.50 0.75
2 Prefabricated reinforcing ditch type 1 (drawing EA5101E00QCCT0005013) - The water collected by the draining geo-composite will be km 247+633.80 km 247+622.35 2. The details for reinforcement of stiffening beam and hiding wall 8. C 25/30 class concrete monolith ditch (drawing EA5101E00BBTR0001002) Interval Ca - Archita / Ca - Archita Section
3 Prefabricated reinforcing ditch type 2 (drawing EA5101E00QCCT0005014) discharged transversally, every 5 m, in the prefabricated 1 1.10 are found in drawing EA51 01 E 00 BB CT 000 X 018 9. Vegetal soil
55 55 1.55 4.96 7.53 7.53
Profile transversale caracteristice / Characteristic cross - sections and details
4 Draining geo-composite reinforced ditch, through PVC tubes 90mm. 3. The dimensions of the designed retaining wall will be 1 1 10. Vertical separation joint out of two asphalt board sheets km 247+253.80
2.65 finalized after receiving the required geotechnical investigations. 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 11.Reverted wall Scara / Scale Nr. / No
Codificare / Codification System LOT / LOT
6 Reverted wall 1:50 01 / 01
E A 5 1 0 1 E 1 4 P B C T 0 1 3 X 0 0 1 2