You are on page 1of 1

MAKKAH

JEDD
A
THIS SHEET

H - JA
ZAN E
X
PR ES
SWAY
KING ABDU
LLAH ROAD
/ BAISH RO
AD
OPTION-2
PROPOSED GUEST CENTER
AREA=3033.67 m²

CE-A1-017

ROAD 4 ROAD 4

ROAD 6

ROAD 5
ROA

R OA

ROA
RCHQ

D
D8

D3
1

D7
ROA RC ADMINISTRATIVE
BUILDINGS - JCPDI

6
ROAD
SUPPORT SERVICE
WAREHOUSE
FACILITY - JCPDI

KEYPLAN
NOTES
1. ALL DIMENSIONS ARE IN METERS AND COORDINATES BASED ON ROYAL
COMMISSION JAZAN LOCAL COORDINATES.
2. MISSING SURVEY DATA FOR KING ABDULLAH ROAD TO BE UPDATED IN THE NEXT
STAGE OF SUBMITTAL AFTER RECEIVING UPDATED SURVEY DATA.
LEGEND AND ABBREVIATIONS

DRAWING LIMIT
DRAWING LIMIT
25.00 EXISTING MAJOR CONTOUR
25.00 EXISTING MINOR CONTOUR
EXISTING ROAD EDGE
EXISTING FENCE
JCPDI BOUNDARY
EXISTING STREET LIGHT
EXISTING ROAD SIGN CIRCLE,RECTANGLE & TRIANGLE
EXISTING SIGN BOARD
EXISTING CAMERA
EXISTING UNDERGROUND FIBER OPTIC CABLE
27 EXISTING EARTH ROD
27.50 .50

29.50
25.50 5 0 28.50 EXISTING GUARD POST
25.

.00
EXISTING ELECTRICAL BOX

29
26.50
EB

0 29
MATCH LINE, FOR CONTINUATION SEE DWG NO. 2016-CE-A1-016

2 6.5 30 .50

50
.00 .00 EXISTING PLANTERS

27.
5 0 28
27. 27.00 EXISTING STORM DRAIN MANHOLE CIRCLE
C

28.00
26.00 EXISTING STORM DRAIN MANHOLE RECTANGLE
N 1923300 29.00 29.50
R

27.00

DRAWING LIMIT
26.50 27.50 28.50 EXISTING TREE DECIDEOUS
27.00 28.00
27.50 28.50 29.00 30.00 EXISTING TREE
0 EXISTING BUSH
28.0 KING ABDULLAH ROAD / BAISH ROAD 29.50
R EXISTING SANITARY SEWER RECTANGLE
28.00 28.5 0 29.00
28.50 0 29.0 29.50 EXISTING SANITARY SEWER MANHOLE CIRCLE
C

29.00 29.50 30.00


30.50 EXISTING WATER WELL
29.00 I-B
EXISTING IRRIGATION BOX
28.0 30.0
0 0
27. EXISTING DECORATION LAMP POST
50 28.50
28.00 29.50 SWITCH
28.50 29.00 TF
TRANSFORMER
27.50 27.00 27.50 28.00
0
27.5 27.50 JCPDI BOUNDRY
ELECTRIC POST LOW VOLTAGE
28.00

29.50
0
27.5 28.50
28.00
28.00
REFERENCE DRAWINGS
28.50
DRAWING NO. DRAWING TITLE
28.50 28.00 2016-CE-A1-001 GENERAL NOTES,LEGENDS,SYMBOLS AND ABBREVIATIONS
N 1923200
28.00

2016-CE-A1-003 SITE LOCATION MAP


27.50

.00
2016-CE-A1-010 TOPOGRAPHIC SURVEY KEY PLAN

28
28.50 28
.00
.00

28
27

26. .00
.00
29.00

0 0 28.00
50

0
29
.00

27.5
26.

28.00
28
29

GRAPHIC SCALE

.50
29
.00
.00 28.50 28.50
28
E 223200

E 223300

E 223400

E 223500

E 223600

E 223700
.50

PHOTO
1874-1877
28

0 10 20 30 40 50 60 70 80 90 100M
SCALE 1:1000 METERS

.0 0 DRAWING LIMIT .50


27 29

A OCT' 20 FAEC PRELIMINARY (30%) SUBMITTAL FOR REVIEW AND APPROVAL M. OUTEIRO
NO. DATE BY DESCRIPTION APPROVED BY :

KINGDOM OF SAUDI ARABIA

Royal Commission for Jubail and Yanbu

Royal Commission at Jazan

JAZAN CITY FOR PRIMARY


AND DOWNSTREAM INDUSTRIES
DRAWING TITLE
DEVELOPMENT OF INFRASTRUCTURE, ROADS, AND FACILITIES
FOR CITY ENTRANCES

TOPOGRAPHIC SURVEY LAYOUT PLAN


DESIGNED BY: DW

DRAWN BY: PJ

CHECKED BY: MSZ

PROJ. ENGR. : M. OUTEIRO PO Box 7545, King Khalid Road, Tahliya, Khobar, KSA
Tel. +966 13 887 8838 / Fax +966 13 887 0574
DU SUPV : www.faec.com

TOPOGRAPHIC SURVEY LAYOUT PLAN (SHEET 7 OF 7) A/E APPROVAL: WBS NO.: DRAWING NO.

SCALE: 1:1000 R. C. APPROVAL: CONT. NO.: JCPDI I-2016


2016-CE-A1-017
DATE: OCTOBER 2020 SCALE: 1:1000 REV. NO. : A SHEET 07 OF 07

You might also like