You are on page 1of 1

3050

615 910 910 615 11KV,200A


A.B.SWITCH

7/3.15 AASR CONDUCTOR


11KV INCOMING FROM
11KV AP.TRANSCO.
STRAIN
INSULATOR

9KV,5KA
LAs for APTRANSCO
1000 GATE
450
E2 E1
Jumper
11KV

250 KVA
No'O'HDBC
PIN INSULATOR

TR.
254
203
1600

Post TYPE RSJ175X85 E4 E3


insulator 9000mm Long

108
11KV
HG FUSE E5

254

305
CONSUMER
CT&PT DP

1200 E5

for Consumer
7500

APTRANSCO
14

GATE
00 DP

3CX50 SQ.MM AL.AR.CABLE


PLAN

11KV HT CABLE
4300

200 KVA METERING BOX


11KV/433V
TR.

2750
1800

1800

1800
Tr. plinth with APSEB
brick masionary STRUCTURE
1500

and 1:2:4CC on
1200

top

G L G L
1500 E2
5500
1500

E1 1000 2600
2000
ELEVATION END ELEVATION
SUB-STATION
E3 E4
E5 E5

EARTHING:-
E1,E2-TR.NEUTRAL 25X6MM CU- FLAT.
E3,E4-TR.BODY 40X06MM GI- FLAT.
E5-LA 25X3MM CU- FLAT.

NOTES:-
1.ALL CHANNEL SECTIONS ARE 100X50UNLESS OTHERWISE SPECIFIED.
2.A CLEARENCE 305MM SHALLBE MAINTAINED BETWEEN JUMPER AND CONSERVATOR ASPER IS 162-1962.
CUSTOMER:
3.A CLEARENCE 310MM WILLBE MAINTAINED BETWEEN HG FUSE CHANNEL AND JUMPER. DADASAHEB CHARITABLE TRUST
SURVEY NO: 224/A/7/2, KESANUPALLY-VILLAGE,
4.THE DISTANCE BETWEEN TR.LT SIDE TO SWITCH BOARD WILL NOT EXCEED 15MTRS UNLESS OTHERWISE SPECIFIED. NARASARAOPET-MANDAL, GUNTUR-DIST, AP, INDIA

5.50MM GRANATE METAL WILLBE SPREAD IN THE TR.YARD. CONTRACTOR NAME SIGN DATE
6.SECTIONAL CLEARENCE OF 2500MM WILLBE MAINTAINED BETWEEN INCOMING APSEB LINE JUMPER AND OUR HG FUSE CHANNEL. RK POWER CONTROL SYSTEMS DRAWN NAREN 17.09.2020
GUNTUR CHECKED GVBR 17.09.2020
7.EARTHING PROVIDED ASPER IS 3043.
DESIGNED KN 17.09.2020
8.EARTHING SHOWN IN GREEN. DRG NO REV : 00
TITLE:

SUB STATION STE/SS