You are on page 1of 116

Government of Nepal

National Reconstruction Authority


Central Level Project Implementation Unit (Education)
District Level Project Implementation Unit (Education),Gorkha
Emergency School Reconstruction Project (ESRP), JICA Loan No. : NE-P11
Contract Bills
FINAL INTERIM PAYMENT CERTIFICATE
Period: 15th November 2018 to 14th January 2020
Name of School: Shree Chandrodaya S. School Payment Voucher no:
Name of Contractor:Sharma-A.M Joint Venture Date of payment:
Contract Number:ESRP/MOE/CLPIU/074/075-GORKHA-15 Page no of measurement book:
Serial no. of previous payment bills: 7
Voucher no.of previous payment bills:
Date of order for commencement of work: 15th November, 2018
Date of work to be completed: 14th January, 2020
Date of completion of work:

Quantity Update of work till now Previous Bill Currently Accomplished Work Percentage
S.N. Description of Work Unit Rate (NRs) Amount (NRs) Remarks
in BOQ Progress
Quantity Total Amount Quantity Total Amount Quantity Total Amount
1 2 3 4 5 6 7 9 10 11 12 13 14 15
A PRELIMINARIES/TEMPORARY WORKS
GENERAL
MOBILIZATION AND DEMOBILIZATION
1 Mobilization of the construction by constructing temporaty L.S. 1.00 500,000.00 500,000.00 1.00 500,000.00 1.00 500,000.00 0.00 - 100.00%
acomodation for labours and site staff with required suitable facilities
and keeping the same in good hygenic condition for entire project
SITE OFFICE
completion time.ESTABLISHMENT
Demolition of the same and cleaning the site after
2 Providing
completionand of Maintaining Site Office
the construction of two
activities allRooms having
complete. [Note: 50% Per
total Area 16.00 25,000.00 400,000.00 16.00 400,000.00 16.00 400,000.00 0.00 - 100.00%
20 sq.m shall
payment for thebe use
made ofafter
Client and Consultant
completion includingand
of mobilization office chair, Month
remaining
Table, Lockable
50% after file cabinet,
completion of worksStationery Items (Ink, Paper, Pen, Pencils
as per contract]
PROJECT INFORMATION
etc.), 1 Computer and 1 PrinterBOARD
with all necessary set up. all complete
3 Providing and Fixing
as per instruction of ProjectThe
of engineer. Information board
Specification ofwith approved
computer shallText
not nos. 1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 0.00 - 100.00%
in
be appropriate location
less than (19.5" led including all required
monitor with Core i5,fixing accessories500
7th Generation, as per
gb
drawing all complete.
Hdd, 8gb ddr 4 ram), Printer should function at least of Printing,
SAFETY SIGN BOARD
Scanning and Photocopy of A4 size documents. Providing and
4 Providing
Maintaining andallFixing
aboveof items
Safety onSignRental
BoardBasis
with approved
for entireText and nos.
project 1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 0.00 - 100.00%
Sinage
completionincluding
time. required fixing accessories as per drawing all
complete.
BARRICADING WORKS
5 Barricading between the School Academic area and Construction area R.m 130.00 2,000.00 260,000.00 130.00 260,000.00 130.00 260,000.00 0.00 - 100.00%
with 1.8 m high CGI Sheet fixed to Bamboo support frame all
complete as per instruction of Engineer.
BARRICADING WORKS
6 Barricading between the School Academic area and Construction area Sq.m 174.95 2,000.00 349,900.00 151.00 302,000.00 151.00 302,000.00 0.00 - 86.31%
with 1.8 m high CGI Sheet fixed to Bamboo support frame all
complete as per instruction of Engineer.
SAFETY MATERIALS & SITE SAFETY
7 Providing and Maintaining Construction Safety Measures in L.S. 1.00 100,000.00 100,000.00 1.00 100,000.00 1.00 100,000.00 0.00 - 100.00%
Construction Site with proper Safety measures to person and work area
(Helmet, Shoes, First Aid Kit, Clothing, Glove, Guard Rail for edge
RELOCATING
protection, SafetyOF Net,EXISTING
Safety rope,TLCFall Protection etc.) as required by
8 Relocating
the Contractof ClauseExisting
GCC 24 Temporary Learningdivision
and Specification Centre 1 (TLC),
"GENERAL from sq.m 89.90 3,000.00 269,700.00 89.90 269,700.00 89.90 269,700.00 0.00 - 100.00%
construction
REQUIREMENT site to other place
CLAUSE 8(C)".byTheDemolition
number of andSafety
usingMaterials
existing
materials obtained from demolition of TLC to the
Personal Protecting Equipments (PPE) shall be minimum but not place decided by
LAB TEST(WATER TEST)
SMC.
limited to 40 sets. Payment shall be made in Prorata Basis for entire
9 Testing
durationand Providing Lab Test Report for Quality of Water in Water Job
of project. 1.00 7,500.00 7,500.00 0.00 - 0.00 - 0.00 - 0.00%
Stream (Up and Down streem) located near by Construction site before
Starting and after completion of construction work. This Test has to be
done to mark the affect of construction work in water stream.

Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Quantity Update of work till now Previous Bill Currently Accomplished Work Percentage
S.N. Description of Work Unit Rate (NRs) Amount (NRs) Remarks
in BOQ Progress
Quantity Total Amount Quantity Total Amount Quantity Total Amount
TEMPORARY TOILET
10 Construction of temporary toilet with CGI Sheet fixed to Bamboo nos. 2.00 150,000.00 300,000.00 2.00 300,000.00 2.00 300,000.00 0.00 - 100.00%
support frame and all necesary items including Septic pit, Pipeline,
Toilet Pan etc. for entire project completion time all complete as per
ROAD REPAIR
Instruction AND MAINTENANCE
of Engineer. Rate shall include all Material cost with fixing,
11 Providing
construction andcharges
Maintaining the roads as &
and demolition necessary
cleaningto ofavoidthe blockage
same afterby km 12.00 50,000.00 600,000.00 12.00 600,000.00 12.00 600,000.00 0.00 - 100.00%
Landslides and Rockfall
completion of the construction for regular transport
activities of construction materials
all complete.
and site inspection during overall construction period. Rate shall
include all Material cost with demolition charges, cleaning, fixing &
B construction
CIVIL WORKS charges of the same after completion of the construction
- BUILDING
activities all complete.
1 EARTHWORKS
SITE CLEARANCE & MOBILIZATION:
1.1 Clearing and grubbing the site for construction by removing 150mm sq.m 925.01 100.00 92,501.00 943.09 94,309.37 34.56 3,456.25 908.53 90,853.12 101.95%
thick top soil including bushes, small trees, leveling of undulated
ground,
EARTHWORK shorting and stacking/storing selected
IN EXCAVATION : top soil for reuse in
1.2 landscaping works, disposing
Excavation in foundationsunsuitable materials
in all type from
of soils forsite, etc., all
foundation, cu.m 381.55 400.00 152,620.00 380.38 152,151.43 45.27 18,107.32 335.11 134,044.11 99.69%
complete footing,
trenches, as per drawings,
pits etc. tospecifications
the requiredand depthinstructions
including of the
dewatering
Engineer.
EARTH
by manualBACK FILLING
or mechanical : etc. as per specifications with all
means
1.3 Back cu.m 236.67 300.00 71,001.00 284.96 85,487.54 0.00 - 284.96 85,487.54 120.40%
contractor�s own machinery andfilling in foundation
equipment's, providing andcrossing
sides of of
foundation
track, with approved
shoring, strutting, soil
timberingobtained from the excavation
and buttressing at site and
with appropriate
1.4 BOULDER
stacked atand orSOLING
siteall brought : outside
from in layer not exceeding 15
materials
Providing and such
laying measures
uncoursed necessary
hand packedto retain
Dry in position
Rubble thecm
Stone sides
soling
1.4 thick
of the (compacted
foundation thickness)
pit and including
including transportation
refilling thespecial of soil,
excavated spreading
material with cu.m 119.02 6,000.00 714,120.00 119.01 714,067.20 63.35 380,094.60 55.66 333,972.60 99.99%
in
in foundation, under
requiredramming, floor
line and level, plinth
sprinklingwith out
water, any
ramming, dressing of stone
watering,
including filling leveling
interstices the site
with and
suitable disposing
quarry offcompacting
waste the with
mechanical
1.5 SAND rammers,
FILLING
surplus/unusable earthtesting,
:to outsideetc.,the
allconstruction per drawing, all or
complete as premises, or stone chips
quarry sand,
specification watering,
and instructions compacting
of thepit. using appropriate etc.
Engineer. mechanical
1.5 Providing
complete as
compaction and filling
per
means sand
drawings,
with allin soak
specifications
contractors all complete
and
materials, as per of
instructions
handling, drawings,
the
placing etc. cu.m 7.40 600.00 4,440.00 7.84 4,704.00 - 7.84 4,704.00 105.95%
specifications
Engineer.
all complete as andperinstruction
drawings, of the Engineer. and instruction of the
specifications
Engineer. The complete item including all lead & lift.
2 CONCRETE WORK
2.1 P.C.C
2.1.1 cu.m 15.38 14,000.00 215,320.00 16.19 226,650.81 0.09 1,256.06 16.10 225,394.75 105.26%
P.C.C (1:3:6)
Providing and laying machine mixed Plain Cement Concrete of
P.C.C
nominal(1:2:4)
mix 1:3:6 WORKS (1 cement : 3 sand : 6 coarse aggregate ) for leveling
2.1.2 course in foundations Providing
and under andfloor
laying of machine
building,mixed
etc. inPlain Cement
all level with cu.m 41.00 16,000.00 656,000.00 41.68 666,900.00 4.39 70,203.60 37.29 596,696.40 101.66%
Concrete
broken stone of nominal
aggregate mix of1:2:4 (1 cement
size not more than : 2 sand
25 mm : 4 of
coarse aggregate )
approved
P.C.C.
for FORcourse
leveling R.C.C. in WORKS : and under floor of building, etc. in
foundations
2.2 quality including formwork wherever necessary, dewatering, batching, cu.m 291.47 20,000.00 5,829,400.00 292.71 5,854,131.50 274.83 5,496,671.31 17.87 357,460.19 100.42%
Providing
all andbroken
laying stone
level transporting,
with in position machine
aggregate of sizemixed and machine
not more than 25allvibrated
mm of
mixing, placing, compacting, curing, including lead
cement
approved concrete
quality of mix
including 1:1.5:3 (1 cement:1.5 sand: 3 coarse
SILICA
and CEMENT
lift, etc. all complete asformwork
ADMIXTURE per drawings, wherever necessary,
specifications anddewatering,
2.3 aggregate)
batching, M20
mixing, grade for reinforced cement concrete work using kg 2914.70 300.00 874,410.00 2927.07 878,119.73 2748.34 824,500.70 178.73 53,619.03 100.42%
Providing
the instructions of transporting,
and mixing Silica Cement
the Engineer. placing, compacting,
Admixture of incuring,
structuralincluding
approved
all lead and
concrete atcement
the with
lift,rate
etc. 20
ofall2.50% mmby
complete graded
as per
weight machine
drawings,
of crushed
the cement stone
specifications
for aggregate
promotingand
of
theapproved
STEEL
workability, quality
REINFORCEMENT
instructions of the
improving in Engineer.
various
strength, locations
achieving andwaterproofing
heights including properties,
2.4 transportation
Providing
bleeding and of
prevention, concrete
fixing etc. to siteCement
in position
Silica of placing,
Fe steelcompaction,
500 Admixture reinforcement
shall befinished
the to
of various
product Mt. 46.66 130,000.00 6,065,800.00 48.52 6,308,049.98 44.85 5,830,341.27 3.67 477,708.71 103.99%
required
of Silica line
diameter Japan and
confirmingor level,to protection
superior relevant ISand
and shall code curing,
meet inthe etc. all
R.C.C. complete
works
requirements as as per
including
drawings,
straightening,
mentioned specifications
cutting, bending,
in specification and the instructions
binding and
of materials of the
withWorkmanship, Engineer,
20 SWG annealed butwire –
Division
FORM WORKS
2.5 excluding
for tying the
4: Concrete the cost ofArticle
reinforcement
Works, centering,
2.4 shuttering,
bars at and reinforcement,
each junctions (binding wireall
shall sq.m 2136.07 800.00 1,708,856.00 2118.09 1,694,470.16 1947.63 1,558,101.98 170.46 136,368.18 99.16%
Supplying and laying centering, shuttering of various pattern
complete
not be as per drawings,
measured separately) specifications
including all and
wasteinstructions
and cut of the
pieces,
formworks with 19/12 mm thick water proof ply wood & steel
Engineer. for adequate numbers of spacers, chairs, providing and
provision
adjustable props for all kinds of RCC works for foundations, columns,
3 placing
BRICK cement
shear walls,MASONRY
beams,mortar (1:1)
WORKS
slab, cover blocks
staircase, to keep
lintel, sill, the bars
pergola, in intended
including nails,
position atscaffolding,
propping all levels allstaging,
complete as per drawings,
supporting specifications
and bracing in proper andlines
3.1 BRICK
instructionsMASONRY
of thethe WORKS
Engineer. ( 1 :
(Authorized4 c/s )ONE
lapbrown SIDE
length self FAIRFACE
and adhesive
for the bar cu.m 96.21 20,000.00 1,924,200.00
and level, sealing joints with heavy duty tape,
7.2.3 CLEAR
length exceeding
SILICON 10 WATER-REPELENT
meter in length shall be
COATING
aligning to line and levels including Ties, PVC Spacer, Providing measured for the payment, sq.m
8.1.1 except
openings/
POINTING to column).
cutouts/
WORKpockets, IN BRICK applying
MASONARYDe-shuttering chemical, De- sqm
shuttering
BOQ Total asofapproved
items 3.1., by the
7.2.3 Engineer
& 8.1.1:etc., complete at all levels as
per drawing, specifications and instructions of the Engineer.
Replaced items 3.1, 7.2.3 and 8.1.1 with following items for 3-
6C(S)-A, 2-LaLiEC and Tc(S)
Brick Masonry Works (1:4 c/s) cu.m 18,000.00
Cement Plaster Works on Outer Wall (1:6) sq.m 600.00
Exterior Weather Coat Paint sq.m

Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Quantity Update of work till now Previous Bill Currently Accomplished Work Percentage
S.N. Description of Work Unit Rate (NRs) Amount (NRs) Remarks
in BOQ Progress
Quantity Total Amount Quantity Total Amount Quantity Total Amount
3.2 BRICK MASONRY WORKS ( 1 : 4 c/s ) cu.m 105.78 18,000.00 1,904,040.00 209.08 3,763,428.40 175.00 3,150,060.21 34.08 613,368.20 197.65%
3.3 HALF BRICK WORKS ( 1 : 4 c/s ) sq.m 79.2 1,500.00 118,800.00 89.27 133,909.80 61.24 91,866.00 28.03 42,043.80 112.72%
3.4 HONEY COMB BRICK WORKS (1:3 c/s) sq.m 4.52 9,000.00 40,680.00 5.87 52,861.95 1.59 14,341.95 4.28 38,520.00 129.95%
4 DOORS & WINDOWS WORKS
4.1 METAL FRAME(4.1.1 DOOR FRAME)
4.1
Providing and fixing in position in required line and level pressed r.m 162 1,100.00 178,200.00 161.84 178,024.00 153.54 168,894.00 8.30 9,130.00 99.90%
(folded) Steel door and window frame of size shown in drawings
WINDOW FRAME
4.1.2 manufacture from galvanized iron sheet of 1.20 mm thick including r.m 493.83 1,100.00 543,213.00 479.40 527,340.00 425.40 467,940.00 54.00 59,400.00 97.08%
METAL
4.2 hinges, jamb, SHUTTER
lock jamb, head, base ties of 1.2 mm pressed GI welded
on rigidly fixed
WINDOW SHUTTERtogether by mechanical means, adjustable lugs with
split end tailfabrication
4.2.1 Providing, to each jamb and including
installation steel butt hinges
in position 35 mm 2.5 mm thickthick glazed with sq.m 101.91 7,500.00 764,325.00 83.84 628,800.00 44.44 333,300.00 39.40 295,500.00 82.27%
mortar guards, reinforcing
window and ventilator shutter to door made hardware,
with 1.2mm strike-plate,
thick galvanized shock iron
absorbers
FLUSH folded in required size and shape including glazing with 5 mm per
as
DOOR required, SHUTTER factory Zinc
(32MM) Rich Primer etc., all complete as
4.3.1 sheet
drawings, sq.m 61.98 8,000.00 495,840.00 55.39 443,120.00 49.57 396,560.00 5.82 46,560.00 89.37%
thick clearspecification
Providing & fixing
float glass 32mmwithandthick instruction
glazing solidbeads, of washer
core the
flush Engineer.
door
and shutters,
special glazing in single
4.1.1UPVC
leaf
4.4
putty,orDOORdouble
required DOORFRAME
leaf
numbers as perand detailed
sizes drawing.
hardwareThe likeflush
hinges, doors shall be
tower-bolts,
factory made solid core blockpriming board shutters bonded with Primer
phenol of
4.4.1 4.4.1
handles, SHUTTER/FRAME
formaldehyde
eye-hook, applying coat with Zinc Rich sq.m 14.28 9,000.00 128,520.00 13.53 121,770.00 - 13.53 121,770.00 94.75%
approved make,
Providing and resin. etc.,The
fixing to
all doorlipping
complete frames shall
as 24 bemm
per of teakwood
drawings,
thick factory all-round
specificationmade PVC the
and
flush door
instruction
door with
shutterofmade a minimum
of styles and rails of UPVC hollow section ofC.P.
the Engineer. thickness of 12mm. The following size
fittings
59 shall
x 24 mm and
WINDOW be
GRILL used: (a) - 2-150 mm Handles
wall thickness 2 mm � 0.2 mm with inbuilt edging in each leaf; (b) Tower-
4.5 Providing,
boltboth
on – 300 sides.mm
MSThe long
solid at
styles
barstopandof1 required
inrails
eachmotredleaf
sizeand and200
and at bottom
jointed
fixing theincorners
inatposition eachmild leaf;
by sq.m 69.07 2,500.00 172,675.00 91.18 227,950.00 62.84 157,100.00 28.34 70,850.00 132.01%
( c ) 1grille
means
steel no. 300
made mm
of galvanized/plastic
with long C.P.brackets
required Aldrops
MS flats, with
of size Godrej
strips,75 bars made
x 220 mm padlock;
fabricated having (d)
wall
as per
COLLAPSIBLE
125 mm heavy GATE
dutyposition
GIstainless
But Hinges 3screws.
nos. infasteners
eachstyles
leaf.including
(rate shall
4.6 drawings,
thickness
Supplying 1.0
fixingmm
andinand fixing in using
position steelapproved
local make The collapsible of the gate shutter
2ofcoat sq.m 15.10 10,000.00 151,000.00 15.10 151,000.00 15.10 151,000.00 0.00 - 100.00%
include
reinforced
of enamel allandrequired
by inserting
Zincmake door
Rich hardware).
galvanized
Primer base tube of size
coat, etc., 20allx20 mmdouble
complete andas1 mm
approved
5. FLOORING size and WORKS properly fabricated with vertical
� 0.1 mm
detailed
5.1 channels wall
in20drawing,
x 10 thickness.
x 2mm The
specification
atCONCETE
100mm lockand rail
centers made andofbraced
instructions 'H'
ofsection,
thewith a UPVC
Engineer.
M.S. flat sq.m 977.10 900.00 879,390.00 981.29 883,160.78 853.78 768,404.93 127.51 114,755.85 100.43%
HARDENED
hollow CEMENT andFLOOR
diagonalsection 20 of sizewith
x 5mm,
Providing,
100top
laying
x 24 and
into
mm bottom
required
2rails
line,
mm� of Tand
level ironpattern
40 x 40 40xmm 6mm
0.2
NEAT mm wall
CEMENT thickness SKIRTINGfixed the shutter styles by means of a
5.2 with
thick 38mm
IPS floor
plastic/galvanized
Providing,
dia finish
laying
steel pulleys
iniron with
'U'
required
complete
cement
cleats.
line, concrete
The
level
with of
shutter
and
bolts
mixnuts
frame
pattern 1:2:4
shall
40
locking
mm (1
be cement
filled
thick :2
with
IPS r.m 446.74 100.00 44,674.00 458.50 45,850.00 446.46 44,646.00 12.04 1,204.00 102.63%
arrangements
sand :finish steppers
4multichambered
crushed stone handles including
aggregate 12 mm applying
and down agrade)
priming coat of
UPVC
floor
Zinc Rich
TERRAZZO with
Primer cement
CAST-INcarriage single
concrete
hoisting
SITU
panelofall
DADO
ofcomplete
mix required
1:2:4 size
(1as perhaving
cement :laid
2 overin all
sand
specification : 4and
alternate
thicknessstone
5.3 Providing
crushed panel
of the
20 mmor providing
and 112mm glass �and dividing
0.1downmm wall strips and
thickness. finished with
The panel sq.m 92.43 1,500.00 138,645.00 89.87 134,803.50 89.95 134,922.00 -0.08 - 118.50 97.23%
direction
approved and aggregate
of
floor Engineer.
laying
hardener mmmm
25 (Dreitop thick terrazzo grade) laid indado
cast-in-situ alternateup topanel the
filled vertically
or providing Glass anddividing
tie bar two FH
atstrips andof
places equivalent
by inserting
finished withfloor hardener)
horizontally
approved floor 6
height
applied
ROOFING/ shown
as(Dreitop in drawing with
perTERRACING
manufacturer's marble
instructions
WORKS chips rubbed
including and
mixing polishedlaying toin
6 mm galvanized
hardener rodFH and of fastened
equivalent with nutshardener)
floor and washers, applied complete
as per as
granolithic
required finish
slope, underfinishing
intrigal layer of 19 usingmmappropriate
thick cement power concrete 1:2:4 (1
trowelling
per manufacturer's
manufacturer's
METAL specification
instructions including and instruction
mixing10laying of Engineer.
in required slope,
6.1 cement
equipment, : 2WORKS
sand
etc. all
(TRUSS)
: 4 complete
crushed stone
as per aggregate
drawing, mm and
specification down and grade) k.g 8175.99 220.00 1,798,717.80 9257.95 2,036,749.25 8964.22 1,972,128.69 293.73 64,620.56 113.23%
(Plasopan
intrigal or
finishing Sintex) using Rate shall include the cost of door hardware.
Providing
base and topof
instructions
and fixing
layer
the of 6 mm thick with required color marble chipsetc.
Engineer.
appropriate
tubular roof power
trusses trowelling
with rafters, equipment,
purlins, wind of all
complete
ties,
CGI fromas1 per
sizesbrackets
SHEET mm drawing,
etc., tomade
ROOFING 4 mmwith specification
nominalrequired and
sizegradelaidinstructions
mild
in steelmarble
cement of theand
tubes Engineer.
powdermild
6.2 Providing
- do 3:1
steel
mix -sections
as (3 above,
& ofbut
fixing
cement for
required 100
: precoated
1 marble mm
sizes, high skirting.
including
galvanized
powder mixironhoisting,profile
: 7 marble fixing in by
Terracota
chips) position
colour
volume sq.m 555.99 2,000.00 1,111,980.00 560.17 1,120,334.00 354.67 709,334.00 205.50 411,000.00 100.75%
with
sheets MS
including (size,bed
cementplates,
shape and shoe
slurry, pitch angles,
required anchor
of corrugation
pigment, bolts etc., and
as approved
grinding, concrete
by Engineer)
polishing, buffing
CGI
grouting, SHEET ROOFING
concreting nut bolts,RIDGE fabrication, fixing and treated with two
6.3 0.52 mm +/- 5%
and applying sealertotal coat,coated etc.,thickness
all complete (TCT), as perBase Material Thickness
drawing, r.m 53.6 1,200.00 64,320.00 53.75 64,500.00 35.85 43,020.00 17.90 21,480.00 100.28%
Providing
coats
(BMT) of & laying
anticorrosive
of 0.50 mm, prefinished
paints
Zinc coating all plain
complete (colouras permatching
drawings, to roofing
specification and instruction of the120gsmEngineer. as per IS: 277 , 5-7 microns
sheet)
GI FACIA
epoxy CGI
specifications
primer Sheet
(EAVES) Ridge
andboth
on instructions
sideCoverof the of sheet
of 0.52Engineer.
the mm +/- 5%
and polyester Rate totaltopcoated
shall include
coat 15-18
6.4 thickness
Providing,
preparingSheet
microns. (TCT),
fabrication
shop Base to
drawings,
should Material
have required
obtaining Thickness
protective size and
Engineer's
guard (BMT)
shape
filmorand of25
Client's
of 0.50
fixing mm (Coating
in position
approval,
microns Kg 429.07 250.00 107,267.50 457.96 114,489.53 257.20 64,300.78 200.75 50,188.75 106.73%
and
1.2 Primer
mm thick as
supplying,tofabricating,
minimum above)
GI folded
avoid scratches over ridge
plates
delivering of with
size all
shown
whileattransportation required
in fixing
drawing
site, hoisting and should accessories
including
fixing in be the
like
CEMENT
cost self
fixing
position,
supplied tapping
singlescrew,
BOARD
brackets,
temporary
in FALSE
flats,clips,
staging,
length upscrews, clamps,
CEILING
preparation
to washer
painting
6 meter orofaswith etc.all
surface,
desiredenamel complete
applying
by with Zinc
Engineer. on The Rich
6.5 Primer,
building
Primer
sheet shall floors
required
of one asscaffolding
coat
be fixed perbefore
usingdesign,
Providing andtodrawing,
self and
work
one
drilling fixing
coat specifications
at/self
anyattapping
after all height
height,
erection etc.,instructions
6 mmallof
including
screws thick
complete
size of the
two(5.5x as sq.m 489.36 1,500.00 734,040.00 513.13 769,701.00 503.39 755,083.50 9.75 14,617.50 104.86%
Engineer.
Cement
per
coats
55mm)design,
ofwithBoard
synthetic
EPDMfalse
drawing, ceiling,
enamel specifications
seal paint
etc., including
allofcomplete
approved providing
instructions upmaketoof and
anyand fixing
thepitch inof
Engineer.
color etc. frame
all
horizontal/
7.
workPLASTERING/
complete
vertical made of
perspecial
orascurved drawing, WALL
surfaces sections FINISHING
power the
specification
excluding pressed
and WORKS
cost from
instruction MSof
of purlins, sheet
the Engineer.
rafters and
7.1 CEMENT
Galvanized
trusses withPLASTER
and including zinc cutting
coating WORKSand
to sizeconsisting
and shape angle hangerrequired.
wherever of
7.1.1 7.1.1 ON
25x25x0.55 INNER
of requiredWALL (1:6)
length at 1250mm c/c fixed to purlins with nut sq.m 1217.81 600.00 730,686.00 1267.38 760,425.02 1068.86 641,317.73 198.51 119,107.29 104.07%
ansProviding
bolts andand otherapplying
end of at angleall levels
hangerand shape
being 20 mm
fixed withthick nut and cementbolts
plaster
to GI main in building
channelinside 45x18x0.6 in specified
running cement
at the mortar
rate of 900mm in two layers c/c toas 6
to 8 mm
which thick section
ceiling final coat 0.55mmwith 1:6 thick (1 cement
bottom :6 wedgefine sand)
of 45mm cement withmortar
7.1.2
over
tapered ON
the 12CEILING
flangesto 14of mm26mm (1:4)
thick each1:6 (1
having cement clips : 6
of coarse
2.3mm sand)
at under
613mm coat in
with
7.1.2 12.5.mm, thick cement and sand plaster work of mix 1:4 (1 cement &4 sq.m 491.59 500.00 245,795.00 615.40 307,698.50 479.17 239,583.75 136.23 68,114.75 125.19%
all surface
ceiling sectionat alland height including
perimeter mixing
channels of mortar,
0.5mm laying thick 25mm in perfect highline,
sand)
7.1.3
level and
having in
ON concrete
OUTER
plumb
flanges ofandsurface,
20mmWALL
finishing ceiling
and(1:6): surface
in regular
30mm long,and at all
theeven heightsurface
perimeter including
of including mixing
ceiling fixed all
mortar, laying in perfect line, level and plumb and finishing in regular
7.1.3.1 7.1.3.1
necessary
and even
EXTERNAL
to wall/partition single with
surface including
PLASTER
or multi-stage
the help ofscaffolding,
all
raw plugs at
necessary single
making
450mm
or
grooves
c/c with
multi-stage
and finished sq.m 453.57 600.00 272,142.00 822.28 493,365.53 558.65 335,190.00 263.63 158,175.53 181.29%
Providing
recesses,
25mm long and
throating, applying
drive alldusting, at
screws dripping, all levels
@ 230mmwetting, and shape
interval,curing, 20
jointing mm thick
protection, cement
and fixing to
scaffolding,
plaster
providing
in required providing
in building
chicken
pattern, exterior
wire and
finishedmesh fixing
inwithat the200
specified mm cement
junction
recommended wide 24
of mortar gauge
concrete
filler, with
and
making GI1:6 Chicken
(1
masonry
openings
wire
7.1.3.2
7.1.3.2 cement
etc.,
for mesh
all
light do
:6 at junction
as
fine
complete
fittings,above
sand)as per
access inofall
for R.C.C.
Band surface
drawing
panel, and
Plaster
cutoutsat masonry,
allmade
, specificationheight withmaking
including
andframe grooves
mixing
instruction
of andthe
of
perimeter rm. 484.65 100.00 48,465.00
recesses,
mortar,
channelslaying
Engineer. throating,
[Rate
suitably inshall dusting,
perfect
fixed also line,
all dripping,
include level
complete and
for wetting,
plumb
asproviding
per drawingcuring,
anddrips and protection,
finishing
band, in regular
moulds,
specification etc.
INTERNAL PALSTER ON WALL (1:4)WITH CEMENT
all
and complete
even
groove, chicken
direction asofper
surface wire
the drawing
includingmesh all
Engineer at, specification
necessary
junction
but excluding ofsingle
RCCand
the instruction.
or
and
costmulti-stage
masonry,
of [Rate
painting. etc.,shallto
PUNNING
7.1.4 also include for providing drips band, moulds, groove, chicken wire sq.m 36.14 700.00 25,298.00 35.65 24,955.00 37.08 25,959.36 -1.43 - 1,004.36 98.64%
scaffolding,
complete the
12.5.mm, making
thick works
cement grooves
at any and plaster
andheights].
sand recesses, work throating,
of mix dusting,
1:4 (1 cement dripping, &4
mesh at junction
wetting, curing, of RCC and
protection, masonry,chicken
providing etc., to wire completemesh the
at works at
the
sand) and 3 mm thick cement punning over plaster for water
any
7.2 junctionheights.
PAINTING of WORKS
concrete and masonry etc., all complete as per drawing , 0.00 0.00
tank,Septic tank,Man hole e.t.c on concrete surface, ceiling surface and
specification
wall surface atand allinstruction
height including of the mixing
Engineer. [Ratelaying
mortar, shall also include
in perfect
for providing
line, level anddrips plumb band,and moulds,
finishinggroove, in regular chicken
and even wire surface
mesh at
junction ofallRCC
including and masonry,
necessary single oretc., to complete
multi-stage the worksproviding
scaffolding, at any ,
Prepared by contractorheights.
making grooves and Checkedrecesses, bythroating,
Consultant, dusting,
DSC dripping, wetting, Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
curing, protection, etc. all complete as per drawing , specification and
instruction. [Rate shall also include for providing drips band, moulds,
groove, etc., to complete the works at any heights.
Quantity Update of work till now Previous Bill Currently Accomplished Work Percentage
S.N. Description of Work Unit Rate (NRs) Amount (NRs) Remarks
in BOQ Progress
Quantity Total Amount Quantity Total Amount Quantity Total Amount
DISTEMPER PAINT
7.2.1 Providing and applying two or more coats sq.m 2167.88 200.00 433,576.00 2395.91 479,182.60 1806.98 361,395.98 588.93 117,786.62 110.52%
of washable distemper paint of approved manufacturer and shade over
aEXTERIOR
coat of alkaliWEATHERresistant cement COAT primer of approved manufacturer as
PAINT
7.2.2 per manufacturer'sProviding specifications to the surface
and applying two orofmorewall,coats
ceiling, beams
of first sq.m 491.67 350.00 172,084.50 822.28 287,798.00 434.61 152,112.17 387.67 135,685.83 167.24%
columns,
quality canopies,
hundred staircase,
percent acryliclobbies
paint ofetc., all complete
approved shadeasand perpattern
drawings,to
specifications
ENAMEL
the exterior PAINT andof
walls instruction.
buildings The etc., rates shall shall
The rates include for scraping,
include for
7.2.4 washing the
scrapping surface with
, washing water,
Providing
the surface surface
with and preparation,
applying
water, applyingby scaffolding
spray/brush
a coat of approvedetc.,
two or sq.m 475.91 400.00 190,364.00 527.49 210,995.40 454.80 181,921.30 72.69 29,074.10 110.84%
all
morecomplete
qualitycoats
water ofasbase
perquality
1st the manufacturer's
cement synthetic recommendations
enamel
primer, surface paint of approved
preparation, and as etc.,
scaffolding
8 MISCELLANEOUS
approved
manufacturer by the Engineer.
all complete as(Asian, per theBerger or equivalent)
manufacturer's over woodenand
recommendations or metal
as
CEMENT
surface
approved in by BOARD
required WALL
shade
the Engineer. at any height, shape, including surface
8.2 Supplying,
preparation, fabrication,
fillers/putty, fixing of cement
scaffolding, protection board
etc.inallposition
complete foras per sq.m 37.4 6,500.00 243,100.00 46.61 302,965.00 27.90 181,350.00 18.71 121,615.00 124.63%
internal
drawings, and external made
specifications andwith 9mm thickThe
instructions. cement board
finished (Shera
surface or
shall
Siam Cement
give even
RAILING and Board
uniform
Providing, orfabrication
equivalent)asfrom
surface. both sides
per design fixed to
drawings and75mm X
8.3 0.6mm thick C-stud fixed to U-Track with spacing
installation in position Mild Steel railing in staircase, verandah and 300mm o/c of kg. 1657.4 220.00 364,628.00 1682.17 370,077.90 1448.49 318,668.50 233.68 51,409.40 101.49%
horizontal
other areasframe,
including central coretofilled
cutting with shape
required cement mortar
and size, with
welding PE joints,
granules
installation
PUMP SHED having
of basecombined densityofapproximately
anchor plates appropriate size 900with
kg/m3, including
required
8.4 sealing joints
numbers
Supply, with fiber
of expansion
fabrication, tapes
bolts ofand
installation ofjoint
required sealing
2mx1.5m compound,
size, providing
and 1m high fillingsize
required
pump screw
shed nos. 1 80,000.00 80,000.00 1.00 80,000.00 1.00 80,000.00 0.00 - 100.00%
heads with
bends,
made as per50x50x6
finishingmanufacturer's
weldMS joints installation
to produce
Angle guidelines,
smooth
frame , covered sealing
surface,
outside perimeter
applying
and one
roof with
gaps
CGI with
coat of
sheet, silicon
Metal locakablesealant,
Primer and etc.,
door,two all complete
or morepad
including coats as per drawing,
of enamel
lock, base PCC paint of required
(1:2:4) 75mm
specifications
shade,
all etc., all
complete asandperinstructions
complete
design, per of
as drawing, theand
Engineer.
drawings, Rate shall
specifications
instructions and
of the include the
instruction
Engineer.
C ELECTRICAL
cost of metal WORKS
framing, joint and screw head sealing, required additional
of the Engineer.
A. strengthening
Common Installation member for the wall length exceeding 3 meter in length
1.1 or around
Stand door40
Alone and
A window
DP MCB opening, sealing perimeter with silicon
with Enclosure no. 2.00 12,000.00 24,000.00 2.00 24,000.00 2.00 24,000.00 0.00 - 100.00%
sealant. Total finished wall thickness 93 mm.
1.2 Stand
8.2.1 FORAlone 6 A DP MCB with Enclosure
PARTITION no. 2.00 8,500.00 17,000.00 2.00 17,000.00 2.00 17,000.00 0.00 - 100.00%
2 CABLES & WIRES
2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded copper conductor
2.1 rm 100.00 1,400.00 140,000.00 100.00 140,000.00 100.00 140,000.00 0.00 - 100.00%
wires
2 Nos 2.5 Sq.mm + 1 No 1.5 Sq.mm mutistranded copper conductor
2.2 rm 95.00 250.00 23,750.00 96.00 24,000.00 96.00 24,000.00 0.00 - 101.05%
wires
B School Blocks
1 DISTRIBUTION BOARDS
1.1 DB (DB-1) nos. 1.00 30,000.00 30,000.00 1.00 30,000.00 1.00 30,000.00 0.00 - 100.00%
1.2 DB (DB-1) nos. 1.00 45,000.00 45,000.00 1.00 45,000.00 1.00 45,000.00 0.00 - 100.00%
1.3 DB (DB-2) & DB (DB-3) nos. 2.00 22,000.00 44,000.00 2.00 44,000.00 2.00 44,000.00 0.00 - 100.00%
1.4 DB (DB-2) nos. 1.00 32,000.00 32,000.00 1.00 32,000.00 1.00 32,000.00 0.00 - 100.00%
1.5 6A DP MCB with Enclosure nos. 2.00 8,500.00 17,000.00 2.00 17,000.00 2.00 17,000.00 0.00 - 100.00%
2 CABLES & WIRES
2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4 Sq mm Multistranded
2.1 r.m. 15.00 600.00 9,000.00 16.00 9,600.00 15.00 9,000.00 1.00 600.00 106.67%
Cu wire
2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5 Sq mm
2.2 r.m. 10.00 500.00 5,000.00 10.00 5,000.00 10.00 5,000.00 0.00 - 100.00%
Multistranded Cu wire
2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No 1.5 Sq mm
2.3 r.m. 30.00 250.00 7,500.00 27.00 6,750.00 30.00 7,500.00 -3.00 - 750.00 90.00%
Multistranded Cu wire
3 General Service Light Point Wiring
3.1 One Way Light Point pts. 90.00 700.00 63,000.00 90.00 63,000.00 90.00 63,000.00 0.00 - 100.00%
3.2 Two Way Light Point pts. 3.00 900.00 2,700.00 3.00 2,700.00 3.00 2,700.00 0.00 - 100.00%
3.3 Ceiling Fan Point pts. 4.00 900.00 3,600.00 4.00 3,600.00 4.00 3,600.00 0.00 - 100.00%
4 6A Universal Pin Light Power Socket Wiring pts. 77.00 900.00 69,300.00 77.00 69,300.00 77.00 69,300.00 0.00 - 100.00%
5 Switch Socket Outlets
5.1 6A Universal Power Switch Socket nos. 77.00 700.00 53,900.00 77.00 53,900.00 77.00 53,900.00 0.00 - 100.00%
6 Sweep Ceiling/ Exhaust Fan/Wall Fan
6.2 225mm dia M/D exhaust Fan nos. 4.00 6,000.00 24,000.00 4.00 24,000.00 4.00 24,000.00 0.00 - 100.00%
7 Light Fixtures/Luminaires & Accessories

Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Quantity Update of work till now Previous Bill Currently Accomplished Work Percentage
S.N. Description of Work Unit Rate (NRs) Amount (NRs) Remarks
in BOQ Progress
Quantity Total Amount Quantity Total Amount Quantity Total Amount
7.1 24 W LED Surface Mounted Square type nos. 6.00 4,500.00 27,000.00 6.00 27,000.00 6.00 27,000.00 0.00 - 100.00%
7.2 24 W LED Recessed Mounted Square type nos. 6.00 4,500.00 27,000.00 6.00 27,000.00 6.00 27,000.00 0.00 - 100.00%
7.3 18 W LED Surface Mounted Square type nos. 20.00 2,700.00 54,000.00 20.00 54,000.00 20.00 54,000.00 0.00 - 100.00%
7.4 18 W LED Recessed Mounted Square type nos. 12.00 2,700.00 32,400.00 12.00 32,400.00 12.00 32,400.00 0.00 - 100.00%
7.5 12 W LED Surface Mounted Circular type nos. 16.00 2,400.00 38,400.00 16.00 38,400.00 16.00 38,400.00 0.00 - 100.00%
7.6 12 W LED Recessed Mounted Circular type nos. 13.00 2,400.00 31,200.00 13.00 31,200.00 13.00 31,200.00 0.00 - 100.00%
7.7 LED Wall Light nos. 4.00 1,800.00 7,200.00 4.00 7,200.00 4.00 7,200.00 0.00 - 100.00%
7.8 9 W LED Surface Mounted Cylindrical type nos. 2.00 2,000.00 4,000.00 2.00 4,000.00 2.00 4,000.00 0.00 - 100.00%
7.9 6 W LED Recessed Circular type nos. 6.00 1,800.00 10,800.00 6.00 10,800.00 6.00 10,800.00 0.00 - 100.00%
7.10 7 W LED T5 Slim Mirror Light nos. 2.00 2,000.00 4,000.00 2.00 4,000.00 2.00 4,000.00 0.00 - 100.00%
8 Pull Box
Junction Box At External Post Top Light nos. 6.00 700.00 4,200.00 6.00 4,200.00 6.00 4,200.00 0.00 - 100.00%
9 External Post Top Light Pole nos. 6.00 7,500.00 45,000.00 6.00 45,000.00 6.00 45,000.00 0.00 - 100.00%
10 Post Top External Light Fixtures nos. 6.00 9,800.00 58,800.00 6.00 58,800.00 6.00 58,800.00 0.00 - 100.00%
11 Earthing & Lighting Protection
11.1 Chemical Earthing nos. 6.00 45,000.00 270,000.00 6.00 270,000.00 6.00 270,000.00 0.00 - 100.00%
11.2 Earthing Bar nos. 6.00 22,000.00 132,000.00 6.00 132,000.00 6.00 132,000.00 0.00 - 100.00%
12 Earthing Strip/Wires
12.3.1 25 x 3 mm GI strip Mtr. 130.00 300.00 39,000.00 114.00 34,200.00 97.00 29,100.00 17.00 5,100.00 87.69%
12.3.2 12 SWG Cu wire Mtr. 30.00 200.00 6,000.00 28.00 5,600.00 28.50 5,700.00 -0.50 - 100.00 93.33%
13 Earth Test link nos. 2.00 1,500.00 3,000.00 2.00 3,000.00 2.00 3,000.00 0.00 - 100.00%
C Solar PV System
1 Solar PV Panel nos. 8.00 26,000.00 208,000.00 8.00 208,000.00 8.00 208,000.00 0.00 - 100.00%
2 Tubular Deep Cycle Battery nos. 4.00 30,000.00 120,000.00 4.00 120,000.00 4.00 120,000.00 0.00 - 100.00%
3 Hybrid Inverter nos. 1.00 100,000.00 100,000.00 1.00 100,000.00 1.00 100,000.00 0.00 - 100.00%
D Fire Extinguisher
a ABC Stored Pressure 5.0kg size nos. 3.00 8,000.00 24,000.00 3.00 24,000.00 3.00 24,000.00 0.00 - 100.00%

D SANITARY WORKS
1 WATER SUPPLY INSTALLATION
a CPVC pipes SDR-11
40 mm r.m 140.00 1,600.00 224,000.00 142.00 227,200.00 142.00 227,200.00 0.00 - 101.43%
20mm r.m 22.00 700.00 15,400.00 23.00 16,100.00 23.00 16,100.00 0.00 - 104.55%
15mm r.m 8.00 500.00 4,000.00 7.00 3,500.00 7.00 3,500.00 0.00 - 87.50%
c CPVC Ball Valve
40 mm nos. 4.00 2,000.00 8,000.00 4.00 8,000.00 4.00 8,000.00 0.00 - 100.00%
25 mm nos. 2.00 900.00 1,800.00 2.00 1,800.00 2.00 1,800.00 0.00 - 100.00%
d 40mm dia Gun Metal Check Valve nos. 1.00 4,500.00 4,500.00 1.00 4,500.00 1.00 4,500.00 0.00 - 100.00%
e Electrical Centrifugal Water Pump nos. 1.00 12,500.00 12,500.00 1.00 12,500.00 1.00 12,500.00 0.00 - 100.00%
f 2000 litres Capacity Water Storage Tank nos. 1.00 34,000.00 34,000.00 1.00 34,000.00 1.00 34,000.00 0.00 - 100.00%
2 Sewer, Rain and Waste Water Installation
110 mm r.m 59.00 1,400.00 82,600.00 61.00 85,400.00 61.00 85,400.00 0.00 - 103.39%
75mm r.m 49.00 1,200.00 58,800.00 50.00 60,000.00 50.00 60,000.00 0.00 - 102.04%
50mm r.m 22.00 350.00 7,700.00 21.00 7,350.00 21.00 7,350.00 0.00 - 95.45%
B School Blocks
1 Sanitary Installation
a Lab Sink set 5.00 30,000.00 150,000.00 5.00 150,000.00 5.00 150,000.00 0.00 - 100.00%

Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Quantity Update of work till now Previous Bill Currently Accomplished Work Percentage
S.N. Description of Work Unit Rate (NRs) Amount (NRs) Remarks
in BOQ Progress
Quantity Total Amount Quantity Total Amount Quantity Total Amount
2 Sanitary Installation
a Water Closet Set set 2.00 34,000.00 68,000.00 2.00 68,000.00 2.00 68,000.00 0.00 - 100.00%
b Orissa Pan set 4.00 3,100.00 12,400.00 4.00 12,400.00 4.00 12,400.00 0.00 - 100.00%
c Hand Wash Basin set 2.00 8,000.00 16,000.00 2.00 16,000.00 2.00 16,000.00 0.00 - 100.00%
d Ladies Urinal set 2.00 110,000.00 220,000.00 2.00 220,000.00 2.00 220,000.00 0.00 - 100.00%
e Self Closing Bib Cock nos. 12.00 4,000.00 48,000.00 12.00 48,000.00 12.00 48,000.00 0.00 - 100.00%
f CP Spreader in Urinal set 4.00 2,500.00 10,000.00 4.00 10,000.00 4.00 10,000.00 0.00 - 100.00%
g Toilet Paper Holder nos. 2.00 2,600.00 5,200.00 2.00 5,200.00 2.00 5,200.00 0.00 - 100.00%
h Commode Spray nos. 2.00 2,000.00 4,000.00 2.00 4,000.00 2.00 4,000.00 0.00 - 100.00%
i PVC Multi Floor Trap nos. 10.00 600.00 6,000.00 10.00 6,000.00 10.00 6,000.00 0.00 - 100.00%
j Waste Coupling and PVC Bottle Trap nos. 4.00 1,500.00 6,000.00 4.00 6,000.00 4.00 6,000.00 0.00 - 100.00%
k 40mm SS Grab Bar-Side nos. 2.00 4,500.00 9,000.00 2.00 9,000.00 2.00 9,000.00 0.00 - 100.00%
l 40mm SS Grab Bar-Rear nos. 2.00 4,500.00 9,000.00 2.00 9,000.00 2.00 9,000.00 0.00 - 100.00%
m CP Foldable Hinge nos. 4.00 5,500.00 22,000.00 4.00 22,000.00 4.00 22,000.00 0.00 - 100.00%

E CIVIL WORKS : SITE DEVELOPMENT


1 EARTHWORKS
1 SITE CLEARANCE AND MOBILIZATION Sq.m 284.24 100.00 28,424.00 208.83 20,883.00 208.83 20,883.00 0.00 - 73.47%
2 EARTHWORK IN EXCAVATION Cu.m 135.73 400.00 54,292.00 37.64 15,057.60 37.64 15,057.60 0.00 - 27.73%
3 EARTH BACK FILLING : cu.m 10.95 300.00 3,285.00 5.09 1,528.35 - 5.09 1,528.35 46.53%
4 BOULDER SOLING Cu.m 29.45 6,000.00 176,700.00 31.60 189,609.00 31.60 189,609.00 0.00 - 107.31%
5 P.C.C (1:3:6) Cu.m 0.69 14,000.00 9,660.00 0.54 7,602.00 0.54 7,602.00 0.00 - 78.70%
6 P.C.C (1:2:4) Cu.m 15.86 16,000.00 253,760.00 15.54 248,652.00 15.54 248,652.00 0.00 - 97.99%
7 P.C.C FOR R.C.C WORK cu.m 0.99 20,000.00 19,800.00 0.99 19,766.20 0.99 19,766.20 0.00 - 99.83%
8 STEEL REINFORCEMENT Mt. 0.10 130,000.00 13,000.00 0.10 13,343.25 0.10 13,343.25 0.00 - 102.64%
9 SILICA CEMENT ADMIXTURE Kg 9.90 300.00 2,970.00 9.88 2,964.93 9.88 2,964.93 0.00 - 99.83%
10 FORM WORKS Sq.m 9.12 800.00 7,296.00 11.33 9,064.00 9.12 7,292.80 2.21 1,771.20 124.23%
13 BRICKS MASONRY WORKS (1:4 c/s) Cu.m 0.22 18,000.00 3,960.00 0.72 13,032.72 0.72 13,032.72 0.00 - 329.11%
14 NEAT CEMENT SKIRTING r.m 4.72 100.00 472.00 4.40 440.00 4.40 440.00 0.00 - 93.22%
15 METAL WORKS FOR FENCE k.g 2255.87 220.00 496,291.40 1791.66 394,165.20 1749.38 384,863.60 42.28 9,301.60 79.42%
16 METAL WORKS FOR GATE k.g 130.78 220.00 28,771.60 123.31 27,128.20 118.89 26,155.45 4.42 972.75 94.29%
17 PLASTER ON OUTER WALL Sq.m 7.92 600.00 4,752.00 7.80 4,679.04 7.80 4,679.04 0.00 - 98.46%
18 EXTERIOR WEATHER COAT PAINT Sq.m 8.87 350.00 3,104.50 8.27 2,895.20 8.27 2,895.20 0.00 - 93.26%
19 CHAIN LINK FENCE Sq.m 253.76 1,000.00 253,760.00 252.00 252,000.00 252.00 252,000.00 0.00 - 99.31%
20 FLAG POLE nos. 2.00 25,000.00 50,000.00 2.00 50,000.00 2.00 50,000.00 0.00 - 100.00%

CIVIL WORKS-RESERVOIR TANK


1 EARTH WORK
1.1 SITE CLEARANCE AND MOBILIZATION sq.m 22.31 100.00 2,231.00 22.31 2,231.00 22.31 2,231.00 0.00 - 100.00%
1.2 EARTHWORK IN EXCAVATION cu.m 24.58 400.00 9,832.00 24.57 9,828.72 24.57 9,828.72 0.00 - 99.97%
1.3 EARTH BACK FILLING cu.m 4.02 300.00 1,206.00 4.01 1,202.85 4.01 1,202.85 0.00 - 99.74%
1.4 BOULDER SOLING cu.m 2.08 6,000.00 12,480.00 2.08 12,462.00 2.08 12,462.00 0.00 - 99.86%
2 CONCRETE WORKS
2.1 P.C.C (1:3:6) cu.m 0.78 14,000.00 10,920.00 0.78 10,904.25 0.78 10,904.25 0.00 - 99.86%
2.2 P.C.C FOR R.C.C WORKS cu.m 7.42 20,000.00 148,400.00 7.41 148,295.00 7.41 148,295.00 0.00 - 99.93%
2.3 SILICA CEMENT ADMIXTURE kg 74.2 300.00 22,260.00 74.15 22,244.25 74.15 22,244.25 0.00 - 99.93%
2.4 STEEL REINFORCEMENT Mt 1.46 130,000.00 189,800.00 1.47 191,574.92 1.47 191,574.92 0.00 - 100.94%

Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Quantity Update of work till now Previous Bill Currently Accomplished Work Percentage
S.N. Description of Work Unit Rate (NRs) Amount (NRs) Remarks
in BOQ Progress
Quantity Total Amount Quantity Total Amount Quantity Total Amount
2.5 FORMWORKS sq.m 54.93 800.00 43,944.00 54.67 43,738.00 54.67 43,738.00 0.00 - 99.53%
3 PLASTERING/WALL FINISHING WORKS
INTERNAL PLASTER ON WALL (1:4) WITH CEMENT PUNNING
3.1.1 sq.m 33.66 700.00 23,562.00 33.66 23,565.25 33.66 23,565.25 0.00 - 100.01%

4 WATERPROOFING WORKS sq.m 33.66 550.00 18,513.00 33.66 18,515.55 33.66 18,515.55 0.00 - 100.01%

F Furniture Works lot 1 4,000,000.00 4,000,000.00 1.00 4,000,000.00 1.00 4,000,000.00 0.00 - 100.00%
Total 42,800,969.34 37,511,382.50 5,289,586.84

Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Project Name : Emergency School Reconstruction Project (ESRP)
Block : 2-LaLiEC, 3-6C(S), Tc(S)
School Name : Shree Chandrodays S.S
Location : Shreenathkot, Gorkha
Abstract of Cost
Pay Type Design
Quantity in Total
Item Description of Works Unit Rate (NRs.) Site Amount Remarks
BOQ 2LaliEC 3-6C(S) Tc(S) Water Tank Quantity
No. Development
A PRELIMINARIES/TEMPORARY WORKS
GENERAL -
1 MOBILIZATION AND DEMOBILIZATION L.S. 1.00 500,000.00 1.00 500,000.00
2 SITE OFFICE ESTABLISHMENT Per Month 16.00 25,000.00 16.00 400,000.00
3 PROJECT INFORMATION BOARD nos. 1.00 10,000.00 1.00 10,000.00
4 SAFETY SIGN BOARD nos. 1.00 10,000.00 1.00 10,000.00
5 BARRICADING WORKS R.m 130.00 2,000.00 130.00 260,000.00
6 BARRICADING WORKS Sq.m 174.95 2,000.00 151.00 302,000.00
7 SAFETY MATERIALS & SITE SAFETY L.S. 1.00 100,000.00 1.00 100,000.00
8 RELOCATING OF EXISTING TLC sq.m 89.90 3,000.00 89.90 269,700.00
9 LAB TEST(WATER TEST) Job 1.00 7,500.00 - -
10 TEMPORARY TOILET nos. 2.00 150,000.00 2.00 300,000.00
11 ROAD REPAIR AND MAINTENANCE km 12.00 50,000.00 12.00 600,000.00

B CIVIL WORKS - BUILDING


1 EARTHWORKS -
1.1 SITE CLEARANCE & MOBILIZATION: sq.m 925.01 100.00 401.89 306.20 235.00 943.09 94,309.37
1.2 EARTHWORK IN EXCAVATION : cu.m 381.55 400.00 149.66 146.33 84.39 380.38 152,151.43
1.3 EARTH BACK FILLING : cu.m 236.67 300.00 108.14 109.75 67.07 284.96 85,487.54
1.4 BOULDER SOLING : cu.m 119.02 6,000.00 53.76 45.99 19.26 119.01 714,067.20
1.5 SAND FILLING : cu.m 7.40 600.00 4.91 2.93 7.84 4,704.00
2 CONCRETE WORK
2.1 P.C.C
2.1.1 cu.m 15.38 14,000.00 6.05 7.32 2.82 16.19 226,650.81
P.C.C (1:2:4)
2.1.2 P.C.C (1:3:6) WORKS cu.m 41.00 16,000.00 19.51 12.16 10.01 41.68 666,900.00
2.2 P.C.C. FOR R.C.C. WORKS : cu.m 291.47 20,000.00 127.78 137.04 27.89 292.71 5,854,131.50
2.3 SILICA CEMENT ADMIXTURE kg 2914.70 300.00 1277.80 1370.37 278.90 2,927.07 878,119.73
2.4 STEEL REINFORCEMENT Mt. 46.66 130,000.00 21.92 22.97 3.63 48.52 6,308,049.98
2.5 FORM WORKS sq.m 2136.07 800.00 947.41 947.85 222.83 2,118.09 1,694,470.16

3 BRICK MASONRY WORKS - -


3.1 BRICK MASONRY WORKS ( 1 : 4 c/s )ONE SIDE FAIRFACE cu.m 96.21 20,000.00 - -

Prepared By: Checked By: Verified By:


Sharma AM JV Consultant Engineer DLPIU
Pay Type Design
Quantity in Total
Item Description of Works Unit Rate (NRs.) Site Amount Remarks
BOQ 2LaliEC 3-6C(S) Tc(S) Water Tank Quantity
No. Development
7.2.3 CLEAR SILICON WATER-REPELENT COATING sq.m - -
8.1.1 POINTING WORK IN BRICK MASONARY sqm - -
BOQ Total of items 3.1., 7.2.3 & 8.1.1: - -
Replaced items 3.1, 7.2.3 and 8.1.1 with following items for 3-
6C(S)-A, 2-LaLiEC and Tc(S) - -
Brick Masonry Works (1:4 c/s) cu.m 18,000.00 - -
Cement Plaster Works on Outer Wall (1:6) sq.m 600.00 - -
Exterior Weather Coat Paint sq.m

3.2 BRICK MASONRY WORKS ( 1 : 4 c/s ) cu.m 105.78 18,000.00 89.26 72.19 47.63 209.08 3,763,428.40
3.3 HALF BRICK WORKS ( 1 : 4 c/s ) sq.m 79.2 1,500.00 49.15 11.04 29.08 89.27 133,909.80
3.4 HONEY COMB BRICK WORKS (1:3 c/s) sq.m 4.52 9,000.00 4.28 1.59 5.87 52,861.95
4 DOORS & WINDOWS WORKS
4.1 METAL FRAME(4.1.1 DOOR FRAME)
4.1 4.1.1 DOOR FRAME r.m 162 1,100.00 71.90 161.84 178,024.00
89.94
4.1.2 WINDOW FRAME r.m 493.83 1,100.00 255.60 223.80 479.40 527,340.00
4.2 METAL SHUTTER
4.2.1 WINDOW SHUTTER sq.m 101.91 7,500.00 44.63 39.21 83.84 628,800.00
4.3.1 FLUSH DOOR SHUTTER (32MM) sq.m 61.98 8,000.00 24.36 31.03 55.39 443,120.00
4.4 UPVC DOOR
4.4.1 4.4.1 SHUTTER/FRAME sq.m 14.28 9,000.00 13.53 121,770.00
13.53
4.5 WINDOW GRILL sq.m 69.07 2,500.00 45.18 39.77 6.23 91.18 227,950.00
4.6 COLLAPSIBLE GATE sq.m 15.10 10,000.00 7.55 7.55 15.10 151,000.00
5 FLOORING WORKS
5.1 HARDENED CEMENT CONCETE FLOOR sq.m 977.10 900.00 452.25 433.94 95.10 981.29 883,160.78
5.2 NEAT CEMENT SKIRTING r.m 446.74 100.00 205.90 228.46 24.14 458.50 45,850.00
5.3 TERRAZZO CAST-IN SITU DADO sq.m 92.43 1,500.00 22.60 2.40 64.87 89.87 134,803.50
6 ROOFING/ TERRACING WORKS
6.1 METAL WORKS (TRUSS) k.g 8175.99 220.00 4712.85 3545.29 999.81 9,257.95 2,036,749.25
6.2 CGI SHEET ROOFING sq.m 555.99 2,000.00 295.74 205.50 58.93 560.17 1,120,334.00
6.3 CGI SHEET ROOFING RIDGE r.m 53.6 1,200.00 23.75 17.90 12.10 53.75 64,500.00
6.4 GI FACIA (EAVES) Kg 429.07 250.00 170.52 143.91 143.52 457.96 114,489.53
6.5 CEMENT BOARD FALSE CEILING sq.m 489.36 1,500.00 289.83 174.90 48.40 513.13 769,701.00
7. PLASTERING/ WALL FINISHING WORKS
7.1.1 7.1 CEMENT PLASTER WORKS sq.m 1217.81 600.00 599.03 534.33 134.02 1,267.38 760,425.02
7.1.1 ON INNER WALL (1:6)
7.1.2 7.1.2 ON CEILING (1:4) sq.m 491.59 500.00 291.97 288.40 35.03 615.40 307,698.50
7.1.3 ON OUTER WALL (1:6):
7.1.3.1 7.1.3.1 EXTERNAL PLASTER sq.m 453.57 600.00 343.47 372.47 106.34 822.28 493,365.53
7.1.3.2 7.1.3.2 do as above for Band Plaster rm. 484.65 100.00
7.1.4 INTERNAL PALSTER ON WALL (1:4)WITH CEMENT PUNNING sq.m 36.14 700.00 35.65 35.65 24,955.00
7.2 PAINTING WORKS

Prepared By: Checked By: Verified By:


Sharma AM JV Consultant Engineer DLPIU
Pay Type Design
Quantity in Total
Item Description of Works Unit Rate (NRs.) Site Amount Remarks
BOQ 2LaliEC 3-6C(S) Tc(S) Water Tank Quantity
No. Development
7.2.1 DISTEMPER PAINT sq.m 2167.88 200.00 1180.83 997.64 217.44 2,395.91 479,182.60
7.2.2 EXTERIOR WEATHER COAT PAINT sq.m 491.67 350.00 343.47 372.47 106.34 822.28 287,798.00
7.2.4 ENAMEL PAINT sq.m 475.91 400.00 256.60 258.43 12.46 527.49 210,995.40
8 MISCELLANEOUS
CEMENT BOARD WALL
8.2 sq.m 37.4 6,500.00 29.04 15.39 2.18 46.61 302,965.00
8.3 8.2.1 FOR PARTITION
RAILING kg. 1657.4 220.00 689.19 992.98 1,682.17 370,077.90
8.4 PUMP SHED nos. 1 80,000.00 1.00 1.00 80,000.00

C ELECTRICAL WORKS
A. Common Installation
1.1 Stand Alone 40 A DP MCB with Enclosure no. 2.00 12,000.00 1.00 1.00 2.00 24,000.00
1.2 Stand Alone 6 A DP MCB with Enclosure no. 2.00 8,500.00 2.00 2.00 17,000.00
2 CABLES & WIRES
2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded copper conductor
2.1 rm 100.00 1,400.00 50.00 50.00 100.00 140,000.00
wires
2 Nos 2.5 Sq.mm + 1 No 1.5 Sq.mm mutistranded copper conductor
2.2 rm 95.00 250.00 51.00 45.00 96.00 24,000.00
wires
B School Blocks
1 DISTRIBUTION BOARDS
1.1 DB (DB-1) nos. 1.00 30,000.00 1.00 1.00 30,000.00
1.2 DB (DB-1) nos. 1.00 45,000.00 1.00 1.00 45,000.00
1.3 DB (DB-2) & DB (DB-3) nos. 2.00 22,000.00 1.00 1.00 2.00 44,000.00
1.4 DB (DB-2) nos. 1.00 32,000.00 1.00 1.00 32,000.00
1.5 6A DP MCB with Enclosure nos. 2.00 8,500.00 2.00 2.00 17,000.00
2 CABLES & WIRES
2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4 Sq mm Multistranded
2.1 r.m. 15.00 600.00 8.00 8.00 16.00 9,600.00
Cu wire
2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5 Sq mm
2.2 r.m. 10.00 500.00 5.00 5.00 10.00 5,000.00
Multistranded Cu wire
2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No 1.5 Sq mm
2.3 r.m. 30.00 250.00 14.00 13.00 27.00 6,750.00
Multistranded Cu wire
3 General Service Light Point Wiring
3.1 One Way Light Point pts. 90.00 700.00 35.00 44.00 11.00 90.00 63,000.00
3.2 Two Way Light Point pts. 3.00 900.00 1.00 2.00 3.00 2,700.00
3.3 Ceiling Fan Point pts. 4.00 900.00 2.00 2.00 4.00 3,600.00
4 6A Universal Pin Light Power Socket Wiring pts. 77.00 900.00 49.00 28.00 77.00 69,300.00
5 Switch Socket Outlets
5.1 6A Universal Power Switch Socket nos. 77.00 700.00 49.00 28.00 77.00 53,900.00
6 Sweep Ceiling/ Exhaust Fan/Wall Fan
6.2 225mm dia M/D exhaust Fan nos. 4.00 6,000.00 4.00 4.00 24,000.00
7 Light Fixtures/Luminaires & Accessories

Prepared By: Checked By: Verified By:


Sharma AM JV Consultant Engineer DLPIU
Pay Type Design
Quantity in Total
Item Description of Works Unit Rate (NRs.) Site Amount Remarks
BOQ 2LaliEC 3-6C(S) Tc(S) Water Tank Quantity
No. Development
7.1 24 W LED Surface Mounted Square type nos. 6.00 4,500.00 6.00 6.00 27,000.00
7.2 24 W LED Recessed Mounted Square type nos. 6.00 4,500.00 6.00 6.00 27,000.00
7.3 18 W LED Surface Mounted Square type nos. 20.00 2,700.00 4.00 16.00 20.00 54,000.00
7.4 18 W LED Recessed Mounted Square type nos. 12.00 2,700.00 4.00 8.00 12.00 32,400.00
7.5 12 W LED Surface Mounted Circular type nos. 16.00 2,400.00 7.00 9.00 16.00 38,400.00
7.6 12 W LED Recessed Mounted Circular type nos. 13.00 2,400.00 8.00 5.00 13.00 31,200.00
7.7 LED Wall Light nos. 4.00 1,800.00 1.00 1.00 2.00 4.00 7,200.00
7.8 9 W LED Surface Mounted Cylindrical type nos. 2.00 2,000.00 2.00 2.00 4,000.00
7.9 6 W LED Recessed Circular type nos. 6.00 1,800.00 6.00 6.00 10,800.00
7.10 7 W LED T5 Slim Mirror Light nos. 2.00 2,000.00 2.00 2.00 4,000.00
8 Pull Box
Junction Box At External Post Top Light nos. 6.00 700.00 3.00 3.00 6.00 4,200.00
9 External Post Top Light Pole nos. 6.00 7,500.00 3.00 3.00 6.00 45,000.00
10 Post Top External Light Fixtures nos. 6.00 9,800.00 3.00 3.00 6.00 58,800.00
11 Earthing & Lighting Protection
11.1 Chemical Earthing nos. 6.00 45,000.00 3.00 3.00 6.00 270,000.00
11.2 Earthing Bar nos. 6.00 22,000.00 3.00 3.00 6.00 132,000.00
12 Earthing Strip/Wires
12.3.1 25 x 3 mm GI strip Mtr. 130.00 300.00 61.00 53.00 114.00 34,200.00
12.3.2 12 SWG Cu wire Mtr. 30.00 200.00 16.00 12.00 28.00 5,600.00
13 Earth Test link nos. 2.00 1,500.00 1.00 1.00 2.00 3,000.00
C Solar PV System
1 Solar PV Panel nos. 8.00 26,000.00 8.00 8.00 208,000.00
2 Tubular Deep Cycle Battery nos. 4.00 30,000.00 4.00 4.00 120,000.00
3 Hybrid Inverter nos. 1.00 100,000.00 1.00 1.00 100,000.00
D Fire Extinguisher
a ABC Stored Pressure 5.0kg size nos. 3.00 8,000.00 3.00 3.00 24,000.00

D SANITARY WORKS
1 WATER SUPPLY INSTALLATION
a CPVC pipes SDR-11
40 mm r.m 140.00 1,600.00 142.00 142.00 227,200.00
20mm r.m 22.00 700.00 23.00 23.00 16,100.00
15mm r.m 8.00 500.00 7.00 7.00 3,500.00
c CPVC Ball Valve 0.00
40 mm nos. 4.00 2,000.00 4.00 4.00 8,000.00
25 mm nos. 2.00 900.00 2.00 2.00 1,800.00
d 40mm dia Gun Metal Check Valve nos. 1.00 4,500.00 1.00 1.00 4,500.00
e Electrical Centrifugal Water Pump nos. 1.00 12,500.00 1.00 1.00 12,500.00
f 2000 litres Capacity Water Storage Tank nos. 1.00 34,000.00 1.00 1.00 34,000.00
2 Sewer, Rain and Waste Water Installation 0.00
110 mm r.m 59.00 1,400.00 61.00 61.00 85,400.00

Prepared By: Checked By: Verified By:


Sharma AM JV Consultant Engineer DLPIU
Pay Type Design
Quantity in Total
Item Description of Works Unit Rate (NRs.) Site Amount Remarks
BOQ 2LaliEC 3-6C(S) Tc(S) Water Tank Quantity
No. Development
75mm r.m 49.00 1,200.00 50.00 50.00 60,000.00
50mm r.m 22.00 350.00 21.00 21.00 7,350.00
B School Blocks 0.00
1 Sanitary Installation 0.00
a Lab Sink set 5.00 30,000.00 5.00 5.00 150,000.00
2 Sanitary Installation 0.00
a Water Closet Set set 2.00 34,000.00 2.00 2.00 68,000.00
b Orissa Pan set 4.00 3,100.00 4.00 4.00 12,400.00
c Hand Wash Basin set 2.00 8,000.00 2.00 2.00 16,000.00
d Ladies Urinal set 2.00 110,000.00 2.00 2.00 220,000.00
e Self Closing Bib Cock nos. 12.00 4,000.00 12.00 12.00 48,000.00
f CP Spreader in Urinal set 4.00 2,500.00 4.00 4.00 10,000.00
g Toilet Paper Holder nos. 2.00 2,600.00 2.00 2.00 5,200.00
h Commode Spray nos. 2.00 2,000.00 2.00 2.00 4,000.00
i PVC Multi Floor Trap nos. 10.00 600.00 10.00 10.00 6,000.00
j Waste Coupling and PVC Bottle Trap nos. 4.00 1,500.00 4.00 4.00 6,000.00
k 40mm SS Grab Bar-Side nos. 2.00 4,500.00 2.00 2.00 9,000.00
l 40mm SS Grab Bar-Rear nos. 2.00 4,500.00 2.00 2.00 9,000.00
m CP Foldable Hinge nos. 4.00 5,500.00 4.00 4.00 22,000.00

E CIVIL WORKS : SITE DEVELOPMENT


1 EARTHWORKS
1 SITE CLEARANCE AND MOBILIZATION Sq.m 284.24 100.00 208.83 208.83 20,883.00
2 EARTHWORK IN EXCAVATION Cu.m 135.73 400.00 37.64 37.64 15,057.60
3 EARTH BACK FILLING : cu.m 10.95 300.00 5.09 5.09 1,528.35
4 BOULDER SOLING Cu.m 29.45 6,000.00 31.60 31.60 189,609.00
5 P.C.C (1:3:6) Cu.m 0.69 14,000.00 0.54 0.54 7,602.00
6 P.C.C (1:2:4) Cu.m 15.86 16,000.00 15.54 15.54 248,652.00
7 P.C.C FOR R.C.C WORK cu.m 0.99 20,000.00 0.99 0.99 19,766.20
8 STEEL REINFORCEMENT Mt. 0.10 130,000.00 0.10 0.10 13,343.25
9 SILICA CEMENT ADMIXTURE Kg 9.90 300.00 9.88 9.88 2,964.93
10 FORM WORKS Sq.m 9.12 800.00 11.33 11.33 9,064.00
13 BRICKS MASONRY WORKS (1:4 c/s) Cu.m 0.22 18,000.00 0.72 0.72 13,032.72
14 NEAT CEMENT SKIRTING r.m 4.72 100.00 4.40 4.40 440.00
15 METAL WORKS FOR FENCE k.g 2255.87 220.00 1,791.66 1,791.66 394,165.20
16 METAL WORKS FOR GATE k.g 130.78 220.00 123.31 123.31 27,128.20
17 PLASTER ON OUTER WALL Sq.m 7.92 600.00 7.80 7.80 4,679.04
18 EXTERIOR WEATHER COAT PAINT Sq.m 8.87 350.00 8.27 8.27 2,895.20
19 CHAIN LINK FENCE Sq.m 253.76 1,000.00 252.00 252.00 252,000.00
20 FLAG POLE nos. 2.00 25,000.00 2.00 2.00 50,000.00

CIVIL WORKS-RESERVOIR TANK

Prepared By: Checked By: Verified By:


Sharma AM JV Consultant Engineer DLPIU
Pay Type Design
Quantity in Total
Item Description of Works Unit Rate (NRs.) Site Amount Remarks
BOQ 2LaliEC 3-6C(S) Tc(S) Water Tank Quantity
No. Development
1 EARTH WORK
1.1 SITE CLEARANCE AND MOBILIZATION sq.m 22.31 100.00 22.31 22.31 2,231.00
1.2 EARTHWORK IN EXCAVATION cu.m 24.58 400.00 24.57 24.57 9,828.72
1.3 EARTH BACK FILLING cu.m 4.02 300.00 4.01 4.01 1,202.85
1.4 BOULDER SOLING cu.m 2.08 6,000.00 2.08 2.08 12,462.00
2 CONCRETE WORKS
2.1 P.C.C (1:3:6) cu.m 0.78 14,000.00 0.78 0.78 10,904.25
2.2 P.C.C FOR R.C.C WORKS cu.m 7.42 20,000.00 7.41 7.41 148,295.00
2.3 SILICA CEMENT ADMIXTURE kg 74.2 300.00 74.15 74.15 22,244.25
2.4 STEEL REINFORCEMENT Mt 1.46 130,000.00 1.47 1.47 191,574.92
2.5 FORMWORKS sq.m 54.93 800.00 54.67 54.67 43,738.00
3 PLASTERING/WALL FINISHING WORKS
INTERNAL PLASTER ON WALL (1:4) WITH CEMENT PUNNING
3.1.1 sq.m 33.66 700.00 33.66 23,565.25
33.66
4 WATERPROOFING WORKS sq.m 33.66 550.00 33.66 33.66 18,515.55

F Furniture Works lot 1 4,000,000.00 0.5 0.5 1.00 4,000,000.00


Total 42,800,969.34

Prepared By: Checked By: Verified By:


Sharma AM JV Consultant Engineer DLPIU
Project Name : Emergency School Reconstruction Project (ESRP)
School Name : Shree Chandrodaya S.S
Location : Shreenathkot, Gorkha

S. No. Description No. Length Breadth Height Qty. Unit


1 Mobilization and Demobilization 1 1 L.S

2 Site Office Establishment 1 16 Per month

3 Project Information Board 1 1 No.

4 Safety Sign Board 1 1 No.

5 Barricading Works 1 45 45 Rm

Dismantling of completely damaged


6
building
Building 1 1 15.00 8.00 120.00 sq.m

7 Safety materials and site safety L.S

8 Relocating of existing TLC 1 3.7 3.5 12.95 sq.m

10 Construction of Temporary Toilet 2 2 Nos.

11 Road Repair and maintenance 12 km

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Remarks

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-6C(S)-B
School Name : Shree Chandrodaya S.S
Location : Shreenathkot, Gorkha

Breadth Height
S.No Description No. Length (m) Qty. Unit Remarks
(m) (m)
1 Earthworks
1.1 Site Clearance and Mobilization 1 21.95 13.95 306.20
Total 306.20 Sq.m

1.2 Earthwork in excavation


For Footing
Grid 1
Footing (F2) 2 2.50 2.50 1.50 18.75
Footing (F3) 2 2.80 2.80 1.50 23.52
Grid 2
Footing (F3) 2 2.80 2.80 1.50 23.52
Footing (F4) 2 3.10 3.10 1.50 28.83
Grid 3
Footing (F1) 4 1.80 1.80 1.50 19.44
Excavation for lower tie beam
Grid 1 1 7.40 0.60 0.90 4.00
Grid 2 1 6.50 0.50 0.90 2.93
Grid 3 1 10.10 0.60 0.90 5.45
Grid A & Grid D 2 3.55 0.60 0.90 3.83
Grid B 1 3.10 0.60 0.90 1.67
Grid C 1 3.10 0.50 0.90 1.40
Front Steps/Drain 1 10.03 1.50 0.15 2.26
1 10.03 0.60 0.05 0.30
Back Drain 1 15.95 0.98 0.15 2.33
1 15.95 0.60 0.05 0.48
Side Drain 2 6.45 0.98 0.15 1.89
2 6.45 0.60 0.05 0.39
Side Steps 1 2.43 0.75 0.15 0.27
1 2.50 0.75 1.15 2.16
Ramp
For Slope 1 3.50 1.03 0.28 0.99
For Front wall 3-AB 1 6.50 0.55 0.45 1.61
For Side wall -3B 1 1.33 0.55 0.45 0.33
Total 146.33 Cu.m

1.3 Earth Back filling


Excavated earthwork 146.33
Boulder soling -14.65
PCC -7.32
RCC -28.76
Brick masonry work below plinth tie beam -6.28
Class room 2 5.70 5.70 0.18 11.37
Staircase 1 3.20 5.70 0.18 3.19
Corridoor 1 14.60 2.20 0.18 5.62
Below Ramp 1 1.40 1.30 0.14 0.25
Total 109.75 Cu.m

1.4 Boulder Soling

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
For Footing
Grid 1
Footing (F2) 2 2.20 2.20 0.20 1.94
Footing (F3) 2 2.50 2.50 0.20 2.50
Grid 2
Footing (F3) 2 2.50 2.50 0.20 2.50
Footing (F4) 2 2.80 2.80 0.20 3.14
Grid 3
Footing (F1) 4 1.50 1.50 0.20 1.80

For Lower Tie Beam


Grid 1,3 2 12.95 0.45 0.10 1.17
Grid 2 1 12.95 0.35 0.10 0.45
Grid A,B,D 3 6.80 0.45 0.10 0.92
Grid C 1 6.80 0.35 0.10 0.24

Building Floors
Classroom
Class Room 2 5.75 5.75 0.20 13.23
Corridor 2 5.75 2.25 0.20 5.18
1 3.25 2.25 0.20 1.46
Below Staircase 1 3.25 5.75 0.20 3.74

Front Steps/Drain 1 10.03 1.50 0.10 1.50


1 10.03 0.60 0.05 0.30
Back Drain 1 15.95 0.98 0.10 1.56
1 15.95 0.60 0.05 0.48
Side Drain 2 6.45 0.98 0.10 1.26
2 6.45 0.60 0.05 0.39
Side Steps 1 2.43 0.60 0.10 0.15
1 2.50 0.60 0.10 0.15

Below ramp
For Slope 1 6.82 1.18 0.20 1.61
For Front wall 3-AB 1 6.50 0.45 0.10 0.29
For Side wall -3B 1 1.33 0.45 0.10 0.06
Total 45.99 Cu.m

2 Concrete Works
2.1 PCC
2.1.1 PCC work (1:3:6)
For Footing
Grid 1
Footing (F2) 2 2.20 2.20 0.10 0.97
Footing (F3) 2 2.50 2.50 0.10 1.25
Grid 2
Footing (F3) 2 2.50 2.50 0.10 1.25
Footing (F4) 2 2.80 2.80 0.10 1.57
Grid 3
Footing (F1) 4 1.50 1.50 0.10 0.90

For Lower Tie Beam


Grid 1,3 2 12.95 0.45 0.05 0.58
Grid 2 1 12.95 0.35 0.05 0.23
Grid A,B,D 3 6.80 0.45 0.05 0.46

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Grid C 1 6.80 0.35 0.05 0.12
Total 7.32 Cu.m

2.1.2 P.C.C.(1:2:4) Works


Entire Building Floors 1 14.60 7.90 0.08 8.65
Below staircase 1 1.50 0.06 0.08 0.01
Ramp
Below Ramp 1 6.80 1.30 0.08 0.66
Ramp Side Support 1 6.80 0.45 0.05 0.15
1 6.80 0.13 0.05 0.04
Ramp Front Side Support 1 1.33 0.45 0.05 0.03
1 1.33 0.25 0.05 0.02

Front Steps/Drain 1 10.03 1.50 0.05 0.75


Back Drain 1 15.95 0.98 0.05 0.78
Side Drain 1 6.45 0.98 0.05 0.31
Side Steps 1 2.43 0.60 0.05 0.07
1 2.50 0.60 0.05 0.08
Above exterior steps 1 13.50 0.90 0.05 0.61
Total 12.16 Cu.m

2.2 PCC for RCC Work 1:1.5:3


For Footing
Footing F1 4.00
Square portion 1.50 1.50 0.20 1.80
Trapezoid portion Area 1.49 0.25 1.49
Footing F2 2.00
Square portion 2.20 2.20 0.20 1.94
Trapezoid portion Area 2.78 0.25 1.39
Footing F3 4.00
Square portion 2.50 2.50 0.20 5.00
Trapezoid portion Area 3.49 0.25 3.49
Footing F4 2.00
Square portion 2.80 2.80 0.20 3.14
Trapezoid portion Area 4.28 0.25 2.14
Lower Tie Beam
Grid 1,2,3 3.00 14.15 0.25 0.30 3.18
Grid A,B,C,D 4.00 7.60 0.25 0.30 2.28
Column
From lower to plinth tie beam 12.00 0.45 0.45 1.20 2.92
Plinth tie beam
Grid 1,2,3 3.00 14.15 0.30 0.53 6.69
Grid A,B,C,D 4.00 7.60 0.30 0.53 4.79
Ground Floor
For column 12 0.45 0.45 3.00 7.29
G.F Staircase
Landing beam 1 3.05 0.25 0.38 0.29
Landing 1 1 3.20 1.50 0.15 0.72
Landing 2 1 3.20 1.85 0.15 0.89
First flight
Waist Slab 1 3.35 1.50 0.15 0.75
Riser 9 Area 0.02 1.50 0.30
Second Flight
Waist Slab 1 3.40 1.50 0.15 0.77
Riser 10 Area 0.02 1.50 0.34

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Staircase gap
Waist Slab 1 1.30 0.20 0.15 0.04
Riser 3 Area 0.02 0.45 0.03
First floor beam
Primary Beam
Grid 1-2-3 3 14.15 0.30 0.53 6.69
Grid A-B-C_D 4 7.60 0.30 0.53 4.79
Secondary Beam
Grid A1-C1 2 7.90 0.25 0.43 1.68
Grid 1a 2 5.45 0.25 0.43 1.16
Grid 1b 1 3.20 0.25 0.43 0.34
F.F. Slab
Class room 8 2.73 2.73 0.13 7.43
Corridoor 4 2.73 2.20 0.13 3.00
1 3.20 2.20 0.13 0.88
Slab between beam 1b & 2B-2C 1 0.49 3.20 0.13 0.20
Staircase top slab 1 0.39 3.20 0.15 0.18
Lintel Bands, Ground floor level
Along grid A,B,C,D 4 5.55 0.23 0.13 0.64
Along grid 1 1 11.10 0.23 0.13 0.32
Along grid 2 1 11.10 0.23 0.13 0.32
Sill Bands, Ground floor level
Along grid A,B,C,D 4 5.55 0.23 0.08 0.38
Along grid 1 1 11.10 0.23 0.08 0.19
Along grid 2 1 11.10 0.23 0.08 0.19
At store 1 1.30 0.12 0.08 0.01
Vetical Band 4.00 2.48 0.25 0.08 0.19

First Floor
For column 12 0.45 0.45 3.00 7.29
F.F Staircase
Landing beam 1 3.05 0.25 0.38 0.29
Landing 2 1 3.2 1.85 0.15 0.89
First flight
Waist Slab 1 3.35 1.5 0.15 0.75
Riser 9 Area 0.02 1.50 0.30
Second Flight
Waist Slab 1 3.40 1.50 0.15 0.77
Riser 10 Area 0.02 1.50 0.34
Second Floor Beam
Primary Beam
Grid 1-2-3 3 14.15 0.30 0.53 6.69
Grid A-B-C_D 4 7.60 0.30 0.53 4.79
Secondary Beam
Grid A1-C1 2 7.90 0.25 0.43 1.68
Grid 1a 2 5.45 0.25 0.43 1.16
Grid 1b 1 3.20 0.25 0.43 0.34
S.F. Slab
Class room 8 2.73 2.73 0.13 7.43
Corridoor 4 2.73 2.20 0.13 3.00
1 3.20 2.20 0.13 0.88
Slab between beam 1b & 2B-2C 1 0.49 3.20 0.13 0.20
Staircase top slab 1 0.39 3.20 0.15 0.18
Lintel Bands, First floor level
Along grid A,B,C,D 4 5.55 0.23 0.13 0.64

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Along grid 1 1 11.10 0.23 0.13 0.32
Along grid 2 1 11.10 0.23 0.13 0.32
Sill Bands, First floor level
Along grid A,B,C,D 4 5.55 0.23 0.08 0.38
Along grid 1 1 11.10 0.23 0.08 0.19
Along grid 2 1 11.10 0.23 0.08 0.19
Vetical Band 4.00 2.48 0.25 0.08 0.19

Second Floor
For column 12 0.45 0.45 2.60 6.32
Second Floor Truss Beam
Primary Beam
Grid 1-2-3 3 14.15 0.30 0.40 5.09
Grid A-B-C-D 4 7.60 0.30 0.40 3.65
Lintel Bands, Second floor level
Along grid A,B,C,D 4 5.55 0.23 0.13 0.64
Along grid 1 1 11.10 0.23 0.13 0.32
Along grid 2 1 14.15 0.23 0.13 0.41
Sill Bands, Second floor level
Along grid A,B,C,D 4 5.55 0.23 0.08 0.38
Along grid 1 1 11.10 0.23 0.08 0.19
Along grid 2 1 11.10 0.23 0.08 0.19
Vetical Band 4.00 2.48 0.25 0.08 0.19

Deduction of Doors For Sill


Ground floor level
D1 -4 1.10 0.230 0.08 -0.08
First floor level
D1 -4 1.10 0.230 0.08 -0.08
Second floor level
D1 -4 1.10 0.230 0.08 -0.08
Pedestal in corridor 8 0.50 0.25 0.25 0.25
Bench Slab 2 2.50 0.60 0.08 0.23
Total 137.04 Cu.m

2.3 Silica Admixture


10 Kg per cu.m. of R.C.C. M20 10 137.04 1,370.37
Total 1370.37 kg
2.5 Form Works
For Footing
Footing F1 4 6.00 0.20 4.80
Footing F2 2 8.80 0.20 3.52
Footing F3 4 10.00 0.20 8.00
Footing F4 2 11.20 0.20 4.48
Lower tie beam
Grid 1,2,3 3 14.15 0.60 25.47
Grid A,B,C,D 4 7.60 0.60 18.24
For Column
From lower to plinth tie beam 12 1.80 1.20 25.92
Deduction1 at beam and column junction at -34 0.25 0.30 -2.55
LTB
Deduction1 at beam and column junction at -34 0.30 0.53 -5.36
UTB
For Plinth Tie Beam
Grid 1,2 & 3 3 14.15 1.05 44.57

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Grid A,B,C &D 4 7.60 1.05 31.92
Landing Beam 1 3.20 1.01 3.23
Ground floor
For column 12 1.80 3.00 64.80
Deduction for Beam opening part -34 0.30 0.53 -5.36
Staircase Area
First flight
Waist slab 1 3.35 1.50 5.03
Landing 1 1.94 1.50 2.90
1 1.47 1.70 2.49
Riser 10 1.50 0.15 2.25
Side 2 3.35 0.30 2.01
1 4.00 0.15 0.60
Second flight
Waist slab 1 3.40 1.50 5.10
Riser 10 1.50 0.15 2.25
Side 2 3.40 0.30 2.04
First floor beam
Main beam
Grid 1 (A-B & C-D) 2 5.55 1.23 13.60
Grid 1 (B-C) 1 3.05 1.35 4.12
Grid 2 1 14.15 1.10 15.57
Grid 3 1 14.15 1.23 17.33
Grid A & D 2 7.60 1.23 18.62
Grid B & C (1-2) 2 5.55 1.23 13.60
Grid B & C (2-3) 2 2.05 1.10 4.51
Secondary beam
Grid A1-C1 2 7.65 0.85 13.01
Grid 1a 2 5.70 0.85 9.69
Grid 1b 1 3.20 0.85 2.72
Deduction on main beam and secondary beam
-14 0.30 0.25 -1.05
junction
Slab
Class room 8 2.73 2.73 59.41
Corridoor 4 2.73 2.20 23.98
1 3.20 2.19 7.01
Stair case area 1 3.20 0.49 1.57
1 3.20 0.39 1.23
First Floor
For column 12 1.80 3.00 64.80
Deduction on beam and column junction -34 0.30 0.53 -5.36
F.F.Staircase Area
First flight
Waist slab 1 3.35 1.50 5.03
Landing 1 1.94 1.50 2.90
1 1.47 1.70 2.49
Riser 10 1.50 0.15 2.25
Side 2 3.35 0.30 2.01
1 1.47 0.15 0.22
1 1.94 0.15 0.29
1 1.25 0.15 0.19
Second flight
Waist slab 1 3.40 1.50 5.10
Riser 10 1.50 0.15 2.25
Side 2 3.40 0.30 2.04

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Second Floor Beam
Main beam
Grid 1 (A-B & C-D) 2 5.55 1.23 13.60
Grid 1 (B-C) 1 3.05 1.35 4.12
Grid 2 1 14.15 1.10 15.57
Grid 3 1 14.15 1.23 17.33
Grid A & D 2 7.60 1.23 18.62
Grid B & C (1-2) 2 5.55 1.23 13.60
Grid B & C (2-3) 2 2.05 1.10 4.51
Secondary beam
Grid A1-C1 2 7.65 0.85 13.01
Grid 1a 2 5.70 0.85 9.69
Grid 1b 1 3.20 0.85 2.72
Deduction on main beam and secondary beam
-14 0.30 0.25 -1.05
junction
Slab
Class room 8 2.73 2.73 59.41
Corridoor 4 2.73 2.20 23.98
1 3.20 2.19 7.01
Stair case area 1 3.20 0.49 1.57
1 3.20 0.39 1.23
Second Floor
For column 12 1.80 3.00 64.80
Deduction on beam and column junction -34 0.30 0.53 -5.36
Second Floor Beam
Truss beam
Grid 1-2-3 3 14.15 1.10 46.70
Grid A-B-C-D 4 7.60 1.10 33.44
Lintel Bands
Ground floor level
Along grid A,B,C,D 8 5.55 0.13 5.55
Along grid 1 2 11.10 0.13 2.78
Along grid 2 2 11.10 0.13 2.78
First floor level
Along grid A,B,C,D 8 5.55 0.13 5.55
Along grid 1 2 11.10 0.13 2.78
Along grid 2 2 11.10 0.13 2.78
Second floor level
Along grid A,B,C,D 8 5.55 0.13 5.55
Along grid 1 2 11.10 0.13 2.78
Along grid 2 2 11.10 0.13 2.78
Sill Bands
Ground floor level
Along grid A,B,C,D 8 5.55 0.08 3.33
Along grid 1 2 11.10 0.08 1.67
Along grid 2 2 11.10 0.08 1.67
At store 2 1.30 0.08 0.20
First floor level
Along grid A,B,C,D 8 5.55 0.08 3.33
Along grid 1 2 11.10 0.08 1.67
Along grid 2 2 11.10 0.08 1.67
Second floor level
Along grid A,B,C,D 8 5.55 0.08 3.33
Along grid 1 2 11.10 0.08 1.67

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Along grid 2 2 11.10 0.08 1.67
Vetical Band
Ground Floor 4.00 2.48 0.38 3.76
First Floor 4.00 2.48 0.38 3.76
First Floor 4.00 2.60 0.38 3.95

Deduction of Doors For Sill


Ground floor level
D1 -8 1.10 0.08 -0.66
First floor level
D1 -8 1.10 0.08 -0.66
Second floor level
D1 -8 1.10 0.08 -0.66
Pedestal in corridor 8 1.25 0.25 2.50
Bench
Bench Top Slab 2 5.80 0.125 1.45
Bottom 2 1.90 0.25 0.95
Total 947.85 sq.m

3 Brick works
3.2 Brick Masonary Works (1:4 c/s)
Foundation upto plinth
Grid 1,2,3 3 14.15 0.23 0.38 3.66
Grid A,B,C,D,E 4 7.60 0.23 0.38 2.62

Ground floor
Along grid A,B,C,D/(1-2) 4 5.55 0.23 2.33 11.87
Along grid 1 1 11.10 0.23 2.33 5.94
1 3.05 0.23 2.02 1.42
Along grid 2 1 10.80 0.23 2.33 5.78

Deduction for doors and windows


Ground floor plan
W1 -8 1.10 0.23 1.13 -2.28
V1 -8 1.10 0.23 0.53 -1.06
W3 -1 1.50 0.23 0.37 -0.13
D1 -4 1.10 0.23 2.33 -2.35

First floor level


Along grid A,B,C,D 4 5.55 0.23 2.33 11.87
Along grid 1 1 11.10 0.23 2.33 5.94
1 3.05 0.23 2.05 1.43
Along grid 2 1 10.80 0.23 2.33 5.78

Deduction for doors and windows


First floor plan
W1 -8 1.10 0.23 1.13 -2.28
V1 -8 1.10 0.23 0.53 -1.06
W2 -1 1.50 0.23 1.00 -0.35
D1 -4 1.10 0.23 2.33 -2.35

Second floor level


Along grid A,B,C,D 4 5.55 0.23 2.45 12.51
Along grid 1 1 11.10 0.23 2.45 6.25

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
1 3.05 0.23 2.53 1.77
Along grid 2 1 10.80 0.23 2.45 6.09

Deduction for doors and windows


Second floor plan
W1 -8 1.10 0.23 1.13 -2.28
V2 -8 1.10 0.23 0.65 -1.32
W2 -1 1.50 0.23 1.00 -0.35
D2 -4 1.10 0.23 2.45 -2.48

Drain 1 33.40 0.23 0.15 1.15


Below ramp
For Front wall 3-AB 1 6.50 0.35 0.30 0.68
For Side wall -3B 1 1.33 0.35 0.30 0.14
Above ramp
For Front wall 3-AB 1 1.40 0.23 0.38 0.12
1 4.25 0.23 0.19 0.18
For Side wall -3B 1 1.33 0.23 0.59 0.18

External Steps 1 13.50 0.48 0.10 1.35


1 13.50 0.18 0.15 2.03
1 13.50 0.08 0.10 1.35
Grid 2A 1 0.60 0.50 0.45 0.14
Grid 3A 1 0.53 0.40 0.45 0.09
Grid 2D 1 0.60 0.50 0.45 0.14
Total 72.19 Cu.m

3.3 Half brick work (1:4 c/s)


Storeroom below staircase 1 3.00 1.35 2.03
1 0.20 1.35 0.27
1 0.90 1.50 1.35
1 1.50 1.65 2.48
Deductions D3 -1 1.00 1.55 -1.55
Ramp
Grid 3AB
1 1.40 0.22 0.31
1 5.12 0.22 1.13
Bench
4 2.15 0.53 4.52
4 0.25 0.53 0.53
Total 11.04 Sq.m

4 Doors and Windows


4.1 Metal Frame
4.1.1 Door Frame
D1 8 7.07 56.56
D2 4 7.32 29.28
D3 1 4.10 4.10
Total 89.94 R.m

4.1.2 Window Frame


W1 24 5.58 133.80
W2 2 5.00 10.00
V1 16 3.25 52.00
V2 8 3.50 28.00

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Total 223.80 R.m

4.2 Metal Shutter


4.2.1 Window Shutter
W1 24 1.01 1.04 25.09
W2 2 1.41 0.91 2.57
V1 16 1.01 0.44 7.03
V2 8 1.01 0.56 4.52
Total 39.21 Sq.m

4.3 Flush Door Shutter


D1 8 1.01 2.46 19.84
D2 4 1.01 2.56 10.32
D3 1 0.91 0.96 0.87
Total 31.03 Sq.m

4.5 Window Grill


W1 24 1.01 1.04 25.09
W2 2 1.41 0.91 2.57
W3 1 1.50 0.37 0.56
V1 16 1.01 0.44 7.03
V2 8 1.01 0.56 4.52
Total 39.77 Sq.m

4.6 Collapsable Works


1 3.05 2.475 7.55
Total 7.55 sq.m

5 FLOORING WORKS
5.1 Hardened Cement Concrete Flooring (40mm) With Neat Cement Punning
Ground floor plan
Class Room 2 5.78 5.75 66.41
Corridor 1 15.80 2.50 39.50
1 3.20 1.50 4.80
Below Staircase 1 4.50 3.20 14.40
Staircase Tread 18 0.3 1.50 8.10
Riser 20 0.15 1.50 4.50
Staircase landing 1 1.80 3.20 5.76

First floor plan


Class Room 2 5.78 5.75 66.41
Corridor 1 15.80 2.50 39.50
1 3.20 1.50 4.80
Staircase Tread 18 0.3 1.50 8.10
Riser 20 0.15 1.50 4.50
Staircase landing 1 1.80 3.20 5.76

Second floor plan


Class Room 2 5.78 5.75 66.41
Corridor 1 15.80 2.50 39.50
1 3.20 1.50 4.80

Ramp 1 6.52 1.30 8.48


Exterior Steps (Front) 1 13.50 0.90 12.15
Drain

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Back of Building 1 15.95 0.95 15.15
Side of bulding 1 6.45 0.95 6.13
Side Steps 1 10.03 0.875 8.77
Total 433.94 sq.m

5.2 Neat Cement Skirting works


Ground floor plan
Room 2 21.35 42.70
Staircase Lobby 1 15.75 15.75
Waist Slab 2 3.00 6.00
Store Below Landing 1 4.85 4.85
Staircase/Landing 1 12.94 12.94
Column 4 2.25 9.00
Corridor 2 3.85 7.70

First floor plan


Room 2 21.35 42.70
Staircase Lobby 2 1.77 3.54
Waist Slab 2 3.00 6.00
Staircase/Landing 1 12.94 12.94
Corridor 2 4.53 9.05

Second Floor Plan 0.00


Room 2 21.35 42.70
Staircase Lobby 2 1.77 3.54
Corridor 2 4.53 9.05
Total 228.46 rm

5.3 25mm Terrazo Finishing


For In-built Furniture
Bench 2 2.40 0.50 2.40
Total 2.40 sq.m

6 Roofing/ Terracing Works


6.1 Metal Works
Truss 1 3,545.29
Total of Truss Total 3,545.29 k.g

6.2 CGI Sheet Roofing


Total Area 2 17.90 5.74 205.49
Total 205.50 sq.m

6.3 CGI Ridge


Top 1 17.90 17.90
Total 17.90 r.m

6.4 GI Facia(Eaves) Length (WxT) Density


Grid 1,3/AC 2 17.90 0.00031 7850 87.68
Grid A,D/1-3 4 5.74 0.00031 7850 56.23
Total 143.91 kgs.

6.5 Cement Board For False Ceiling


Backward and front slope of roof 2.00 15.95 1.18 37.64
Side Slope of Roof 4.00 5.65 0.97 21.92

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Classroom 2.00 5.70 5.70 64.98
Staircase 1.00 5.70 3.20 18.24
Corridor 2.00 5.70 2.20 25.08
1.00 3.20 2.20 7.04
Total 174.90 Sq.m

7 PLASTER/PAINTING WORKS
7.1 Internal Plaster
7.1.1 Internal Plaster on Wall (1:6)
Ground Floor
Classroom 2.00 23.15 2.91 134.73
Staircase 1.00 14.67 2.91 42.69
Store Below Landing 1.00 2.50 1.25 3.11
2.00 0.31 1.25 0.78
2.00 0.69 1.44 1.98
2.00 1.44 1.63 4.69
Pedestal 4.00 1.25 0.25 1.25
4.00 0.50 0.25 0.50
Column
Grid 2A,2D 2.00 0.35 0.68 0.47
Grid 2B,2C 2.00 0.98 0.68 1.32

Grid 2A,2D 2.00 0.45 2.20 1.98


Grid 2B,2C 2.00 1.08 2.20 4.73
Deductions
W1 -8 1.10 1.13 -4.95
V1 -8 1.10 0.53 -2.31
W3 -1 1.50 0.37 -0.28
D1 -4 1.10 2.48 -5.45
D3 -2 1.00 1.55 -1.55

First Floor
Classroom 2.00 23.15 2.91 134.73
Staircase 1.00 14.67 2.91 42.69
Column
Grid 2A,2D 2.00 0.45 2.91 2.62
Grid 2B,2C 2.00 1.08 2.91 6.26

Deductions
W1 -8 1.10 1.13 -4.95
V1 -8 1.10 0.53 -2.31
W2 -1 1.50 1.00 -0.75
D1 -4 1.10 2.48 -5.45

Second Floor
Classroom 2.00 23.15 3.00 138.90
Staircase 1.00 14.67 3.00 44.01
Column
Grid 2A,2D 2.00 0.45 3.00 2.70
Grid 2B,2C 2.00 1.08 3.00 6.45
Deductions
W1 -8 1.10 1.13 -4.95
W2 -1 1.50 1.00 -0.75
V2 -8 1.10 0.65 -2.86
D2 -4 1.10 2.60 -5.72

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Total 534.33 sq.m

7.1.2 Internal Plaster on Ceiling (1:4)


Ground floor
Classroom 1 4 2.73 2.73 29.70
Classroom 2 4 2.73 2.73 29.70
Corridor 4 2.73 2.20 23.98
1 3.20 2.20 7.04
Staircase Area 1 3.20 0.88 2.80
Secondary Beam
Along Grid A1-C1 2 7.65 0.60 9.18
Along Grid 1a 2 5.77 0.60 6.92
Along Grid 1b 1 3.20 0.60 1.92
Below staircase
Waist slab 1 3.35 1.50 5.03
Landing 1 1.94 1.50 2.90
1 1.47 1.70 2.49
First floor
Classroom 3 4 2.73 2.73 29.70
Classroom 4 4 2.73 2.73 29.70
Corridor 4 2.73 2.20 23.98
1 3.20 2.20 7.04
Staircase Area 1 3.20 0.88 2.80

Secondary Beam
Along Grid A1-C1 2 7.65 0.60 9.18
Along Grid 1a 2 5.70 0.60 6.84
Along Grid 1b 1 3.20 0.60 1.92

Below staircase
Waist slab 1 3.35 1.50 5.03
Landing 1 1.94 1.50 2.90
1 1.47 1.70 2.49
Second floor
Truss Beam
Classroom 4 4 5.55 0.40 8.88
Classroom 5 4 5.55 0.40 8.88
Corridor; Along grid 2 , ( A-B) and (C-D) 2 5.55 0.40 4.44
Corridor; Along grid 2 , ( B-C) 1 3.05 1.10 3.36
Corridor; Along grid 3 , ( A-B), (B-C) and (C-
D) 1 14.15 0.70 9.91
Corridor; Along grid A, B, C and D; (2-3) 4 2.20 1.10 9.68
Total 288.40 sq.m

7.1.3 External Plaster


Outer Plaster
Beam Plaster
Plinth Beam
Along grid 1 1 14.15 0.45 6.37
Along grid A & D 1 5.55 0.45 2.50

First Floor Level


Main Beam(300 x 525)
Along grid 1 1.00 11.10 0.53 5.83
Grid 1-BC 1.00 3.05 0.65 1.97

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Landing Beam 1.00 3.05 0.56 1.71
Along grid 3 1.00 14.15 0.83 11.67
Along grid A and D 2.00 7.60 0.53 7.98

Second Floor Level


Main Beam(300 x 525)
Along grid 1 1.00 14.15 0.53 7.43
Landing Beam 1.00 3.05 0.38 1.16
Along grid 3 1.00 14.15 0.83 11.67
Along grid A and D 2.00 7.60 0.53 7.98

Truss Level
Main Beam(300 x 400)
Along grid 1 1.00 14.15 0.40 5.66
Along grid 3 1.00 14.15 0.40 5.66
Along grid A and D 2.00 7.60 0.40 6.08

Column Plaster
Upto Plinth Level
Along grid 1
Grid 1A,1D 2.00 1.10 0.45 0.99
Grid 1B,1C 2.00 0.65 0.45 0.59
Along grid 2
Grid 2A,2D 2.00 0.55 0.45 0.50
Along grid 3
Along grid 3A 1.00 0.08 0.38 0.03
1.00 0.45 0.40 0.18
Grid 3B 1.00 0.08 0.15 0.01
Grid 3C 1.00 0.60 0.15 0.09
Grid 3D 1.00 1.05 0.15 0.16
Upto Sill Level
Along grid 1
Grid 1A,1D 2.00 0.90 0.68 1.22
Grid 1B,1C 2.00 0.45 0.68 0.61
Along grid 2
Grid 2A,2D 2.00 0.55 0.68 0.74
Ground Floor
Along grid 1
Grid 1A,1D 2.00 1.10 2.33 5.12
Grid 1B,1C 2.00 0.65 2.33 3.02
Along grid 2
Grid 2A,2D 2.00 0.65 2.33 3.02
Along grid 3
Grid 3A,3D 2.00 1.05 3.00 6.30
2.00 0.75 2.88 4.31
Grid 3B,3C 2.00 1.20 2.88 6.90
2.00 0.60 3.00 3.60
First Floor
Along grid 1
Grid 1A,1D 2.00 1.10 2.33 5.12
Grid 1B,1C 2.00 0.65 2.33 3.02
Along grid 2
Grid 2A,2D 2.00 0.65 2.33 3.02
Along grid 3
Grid 3A,3D 2.00 1.05 3.00 6.30

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
2.00 0.75 2.88 4.31
Grid 3B,3C 2.00 1.20 2.88 6.90
2.00 0.60 3.00 3.60
Second Floor
Along grid 1
Grid 1A,1D 2.00 1.10 2.33 5.12
Grid 1B,1C 2.00 0.65 2.33 3.02
Along grid 2
Grid 2A,2D 2.00 0.65 2.33 3.02
Along grid 3
Grid 3A,3D 2.00 1.05 3.00 6.30
2.00 0.75 2.88 4.31
Grid 3B,3C 2.00 1.20 2.88 6.90
2.00 0.60 3.00 3.60

Plaster in Outer Wall


Ground floor
Along grid A,D/(1-2) 2 5.55 2.33 25.81
Along grid 1 1 11.10 2.33 25.81
1 3.05 2.02 6.16
Along grid 2 1 10.80 2.33 25.11

First floor level


Along grid A,D 2 5.55 2.33 25.81
Along grid 1 1 11.10 2.33 25.81
1 3.05 2.05 6.24
Along grid 2 1 10.80 2.33 25.11

Second floor level


Along grid A,D 2 5.55 2.45 27.20
Along grid 1 1 11.10 2.45 27.20
1 3.05 2.53 7.70
Along grid 2 1 10.80 2.45 26.46
Deduction for doors and windows
Ground floor plan
W1 -8 1.10 1.13 -9.90
V1 -8 1.10 0.53 -4.62
W3 -1 1.50 0.37 -0.56
D1 -4 1.10 2.33 -10.23
First floor plan
W1 -8 1.10 1.13 -9.90
V1 -8 1.10 0.53 -4.62
W2 -1 1.50 1.00 -1.50
D1 -4 1.10 2.33 -10.23
Second floor plan
W1 -8 1.10 1.13 -9.90
V2 -8 1.10 0.65 -5.72
W2 -1 1.50 1.00 -1.50
D2 -4 1.10 2.45 -10.78

Outer Steps
Grid 2A,2D 2.00 1.03 0.45 0.92
Grid 3A 1.00 0.93 0.45 0.42
Steps Edge 3.00 0.60 0.45 0.81
For Ramp

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Top-3B 1.00 1.33 0.25 0.33
Top 3AB 1.00 6.47 0.13 0.81
Front 3-AB 1.00 1.60 0.60 0.96
1.00 5.10 0.38 1.91
Inner 1.00 7.52 0.15 1.13
Side-3B 1.00 1.33 0.60 0.80
For Bench
Top 2.00 2.40 0.50 2.40
Edge 2.00 5.80 0.13 1.45
Total 372.47 sqm

7.2 Painting Works


7.2.1 Distemper Painting Works
As per Internal plaster on wall 1.00 534.33 Area 534.33
As per internal plaster on ceiling 1.00 288.40 Area 288.40
False Ceiling 1.00 174.90 Area 174.90
Total 997.64 sq.m

7.2.2 Exterior Weather Coat Paint


Beam,Column and Walls Paint 1.00 372.47 Area 372.47
Total 372.47 sq.m

7.2.4 Enamel Painting


Doors Factor
D1 8 1.10 2.44 2.00 42.86
D2 4 1.10 2.56 2.00 22.53
D3 1 1.00 1.55 2.00 3.10
Collapsible Gate 1 3.05 2.48 2.00 15.10
Window
W1 24 1.10 1.13 2.00 59.40
W2 2 1.50 1.00 2.00 6.00
V1 16 1.10 0.53 2.00 18.48
V2 8 1.10 0.65 2.00 11.44
Window Grill
W1 24 1.01 1.04 2.00 50.18
W2 2 1.41 0.91 2.00 5.13
W3 1 1.50 0.37 2.00 1.11
V1 16 1.01 0.44 2.00 14.06
V2 8 1.01 0.56 2.00 9.05
Total 258.43 sq.m

8 MISCELLANOUS
8.2 Cement Board
Partition
Above Side Walls 1.00 9.73 1.58 15.38
Total 15.39 sq.m

8.3 Railing
Total
Staircase Railing Kg/m Total
No. Length (m) Length
Horizontal ISNB 40 M 1 18.40 18.40 3.61 66.42
Vertical 38 mm Square Pipe 14 0.86 12.04 3.14 37.81
Horizontal 25mm Square Pipe 4 17.35 69.40 0.85 58.99
Balcony Railing

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Horizontal ISNB 40 M 2 18.25 36.50 3.61 131.77
Horizontal ISNB 32 M 4 16.40 65.60 3.14 205.98
Vertical ISNB 40 M 34 1.08 36.72 3.61 132.56
Vertical 25mm Square Pipe 236 0.82 193.52 0.85 164.49
Pedestal
ISNB 40M 8 1.70 13.60 3.61 49.10
ISNB 40M 8 2.05 16.40 3.61 59.20
Base plate 69 0.00009375 0.01 7850 50.78
12 mm dia. Anchor Bolt, Nut 276 0.13 35.88
Total 992.98 k.g

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Block : 3-6CS
School Name : Shree Chandrodaya S.S
Location : Shreenathkot, Gorkha

Site
S. No. Description G.F F.F S.F Quantity Unit Remarks
Development
A. Common Installation
1.1 Stand Alone 40 A DP MCB with Enclosure 1.00 1.00 nos.
2 CABLES & WIRES
2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded
2.1 50.00 r.m
copper conductor wires

2.2 2 Nos 2.5 Sq.mm mutistranded copper conductor 45.00 r.m


wires + 1 Nos. 1.5sq mm multistranded Cu wire
B School Blocks
1 DISTRIBUTION BOARDS 1.00 1.00 1.00 3.00 nos.
2 CABLES & WIRES
2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4
2.1 8.00 r.m
Sq mm Multistranded Cu wire
2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5
2.2 5.00 r.m
Sq mm Multistranded Cu wire
2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No
2.3 13.00 r.m
1.5 Sq mm Multistranded Cu wire
3 General Service Light Point Wiring
3.1 One Way Light Point 6.00 13.00 12.00 13.00 44.00 pts.
3.2 Two Way Light Point 1.00 1.00 2.00 pts.
3.3 Ceiling Fan Point 2.00 2.00 pts.
4 6A Universal Pin Light Power Socket Wiring 12.00 12.00 4.00 28.00 pts.
5 Switch Socket Outlets
5.1 6A Universal Power Switch Socket 12.00 12.00 4.00 28.00 no.
7 Light Fixtures/Luminaires & Accessories
7.1 18 W LED Surface Mounted Square type 8.00 8.00 16.00 no.
7.2 18 W LED Recessed Mounted Square type 8.00 8.00 no.
7.3 12 W LED Surface Mounted Cylindrical type 4.00 5.00 9.00 no.
7.4 12 W LED Recessed Mounted Circular type 5.00 5.00 no.
7.5 7W LED Wall Light 1.00 1.00 no.
8 Pull Box 3.00 3.00 no.
9 External Post Top Light Pole 3.00 3.00 no.
10 Post Top External Light Fixtures 3.00 3.00 no.
11 Earthing & Lighting Protection
11.1 Chemical Earthing 3.00 3.00 no.
11.2 Earthing Bar 3.00 3.00 no.
12 Earthing Strip/Wires
12.1 25 x 3 mm GI strip 65.00 53.00 r.m
12.2 12 SWG Cu wire 15.00 12.00 r.m
13 Earth Test link 1.00 1.00 no.

Prepared and Submitted By: Checked By: Approved By:


DLPIU Engineer
Sharma-AM J/V Consultant Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-6C(S)-B
School Name : Shree Chandrodaya S.S
Location : Shreenathkot, Gorkha
BAR BENDING SCHEDULE

Spacing c/c Length/pc. Total Length Weight Per Total Weight


SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

A Foundation
Longitudional Bar

a. F1
1 1400 1 12 150 4 20 1600 128 0.889 113.78
0 0
0 0
b. F2
1 2100 1 12 150 2 30 2300 138 0.889 122.67
0 0
0 0
c. F3
1 2400 1 12 150 4 34 2600 353.6 0.889 314.31
0 0
0 0
1 2700 1
d. F4 12 150 2 38 2900 220.4 0.889 195.91
0 0
0 0
B Foundation Beam 300*250

8850
a 3-12Ø Top Bar Along Grid A, B, C & D 2 2 12 4 3 9710 116.52 0.889 103.57
5 5
0 180 180 0

b 3-12Ø Bottom Bar Along Grid A, B, C & D 4 8850 4 12 4 3 9710 116.52 0.889 103.57
3 3
0 0
15850
c. 2-12Ø Top End Bars Along Grid 1,2&3 2 2 12 3 2 16710 100.26 0.889 89.12

5 5
0 520
180 520
180 0

d. Lapping on Top End Bars 720 12 3 4 720 8.64 0.889 7.68

15850
e 1-12Ø Top Mid Bar Along Grid 1,2&3 2 2 12 3 1 16710 50.13 0.889 44.56
5 5
0 520
180 520
180 0

f Lapping on Top Mid Bar 720 12 3 1 720 2.16 0.889 1.92

g 2-12Ø Bottom Ends Bar Along Grid 1,2&3 7 12 3 2 16710 100.26 0.889 89.12
15850 7
2 2
0 0
h Lapping on Bottom Ends Bar 720 12 3 2 720 4.32 0.889 3.84

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

i 1-12Ø Bottom Mid Bar Along Grid 1,2&3 7 7 12 3 1 16710 50.13 0.889 44.56
2 15850
2
0 0
j Lapping on Bottom Mid Bar 720 12 3 2 720 4.32 0.889 3.84

k Stirrups For Foundation Beam

200
80
l Entire Beam Length 250 8 100/150 1 673 1060 713.38 0.395 281.83

C Plinth Beam 300*525

15850
a 2-16Ø Top Ends Bar Along Grid 1, 2 & 3 7 16 3 2 17290 103.74 1.580 163.94
7
2 2
0 0

b Laping
960 16 3 4 960 11.52 1.580 18.21

15850
c 2-16Ø Top Mid Bar Along Grid 1, 2 & 3 16 3 1 17290 51.87 1.580 81.97
7 7
2 2
0 0
d. Laping 960 16 3 1 960 2.88 1.580 4.55

1 1
e 2-20Ø Bottom Ends Bar Along Grid 1, 2 & 3
0 15850 0 20 3 2 17850 107.10 2.469 264.45

0 0
0 0
f Laping 1200 20 3 2 1200 7.20 2.469 17.78

1 1
g 2-20Ø Bottom Mid Bar Along Grid 1, 2 & 3 0 15850 0 20 3 2 17850 107.10 2.469 264.45
0 0
0 0

h Laping 1200 20 3 4 1200 14.40 2.469 35.56

1500+70Ø
i 2-20Ø Extra Bar Along Grid 1 & 2 at Grid A 20 2 2 2900 11.60 2.469 28.64
Grid A

6950
j 2-20Ø Extra Bar Along Grid 1 & 2 at Grid B & C 20 2 2 6950 27.80 2.469 68.64

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

k 2-20Ø Extra Bar Along Grid 1 & 2 at Grid D 25 2 2 3450 13.80 3.858 53.24
Grid D
1700+70Ø

1500+70Ø
l 2-16Ø Extra Bar Along Grid 3 at Grid A 16 1 2 2620 5.24 1.580 8.28
Grid A

3050
m 2-16Ø Extra Bar Along Grid 3 at Grid B 16 1 2 3050 6.10 1.580 9.64

3050
n 2-16Ø Extra Bar Along Grid 3 at Grid C 16 1 2 3050 6.10 1.580 9.64

1500+70Ø
o 2-20Ø Extra Bar Along Grid 3 at Grid D 16 2 2 2620 10.48 1.580 16.56
Grid D

p Torsion Bars 15850 16 3 2 15850 95.10 1.580 150.28

q Laping
960 16 3 2 960 5.76 1.580 9.10

8850
r 3-16Ø Top Bar Along Grid A, B, C & D 16 4 3 10290 123.48 1.580 195.13
7 7
2 2
0 0

1 1
s 4-20Ø Bottom Bar Along Grid A, B, C & D
0 0 20 4 4 10850 173.60 2.469 428.64
8850 0
0
0 0
4200+70Ø
t 2-20Ø Extra Bar Along Grid A, B, C & D at Grid 2 & 3 25 4 2 5950 47.60 3.858 183.64

1700+70Ø
u 2-20Ø Extra Bar Along Grid A, B, C & D at Grid 1 25 4 2 3450 27.60 3.858 106.48

v Torsion Bars 8850 16 4 2 8850 70.80 1.580 111.88

w Stirrups for Plinth Beam 0.00

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

250
12
0
x Grid 1, 2 & 3 475 12 100 3 143 1690 725.01 0.889 644.45

250
12
0
y Grid A, B, C & D 475 12 100 4 77 1690 520.52 0.889 462.69

D Column 450*450 upto Floor Height

Longitudional Bar upto ground floor height 6-20Ø for 1( A D ), 2 (A) & 3(A 3283
a 20 7 6 4107 172.494 2.469 425.91
B C D)

100 724

Longitudional Bar upto first floor height 6-20Ø for Grid 1( A D ), 2 (A) &
3283
b 20 7 6 7107 298.494 2.469 737.02
3( A B C D)

100 724

3283
c Longitudional Bar upto ground floor height 6-25Ø for 1( B C ) 25 2 6 4407 52.884 3.858 204.03

100 1024

6283
d Longitudional Bar upto first floor height 6-25Ø for Grid 1( B C ) 25 2 6 7407 88.884 3.858 342.92

100 1024

3283
e Longitudional Bar upto ground floor height 2-20Ø for Grid 2( B C D ) 20 3 2 4107 24.642 2.469 60.85

100 724

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

3283
f Longitudional Bar upto ground floor height 4-25Ø for Grid 2(B C D) 25 3 4 4407 52.884 3.858 204.03

100 1024

6283
g Longitudional Bar upto first floor height 6-20Ø for Grid 2(B C D) 20 3 6 7107 127.926 2.469 315.87

m
100 724
h Stirrups for Column upto Floor Height 0.00

370
80
370
i 8 100 12 8 1640 157.44 0.395 62.20

460
140
80
370
j 8 100 12 8 1180 113.28 0.395 44.75

460
370
80
k 8 100 12 8 1180 113.28 0.395 44.75
140

l C-Bars 8 100 12 5 1180 70.8 0.395 27.97


m Stirrups for Column upto Plinth Height-450 0.00

370 460
80
370
n 8 100 12 8 1640 157.44 0.395 62.20

460

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)
460
140
80
370
o 8 100 12 8 1180 113.28 0.395 44.75

460
370
80
p 8 100 12 8 1180 113.28 0.395 44.75
140

E First Floor Beam (300*525)-Main Beam


1 Along Grid 1, 2 & 3

15850
7 7
a Top Main Bar(3-16Ø) 16 3 3 17290 155.61 1.580 245.90
2 2
0 0
b Lapping 960 16 3 6 960 17.28 1.580 27.31

c Bottom Bar (2-20Ø)


1 1 20 3 2 17850 107.1 2.469 264.45
0 15850 0
0 0
0 0
d Lapping 1200 20 3 2 1200 7.2 2.469 17.78

e Bottom Bar (2-16Ø)


7 7 16 3 2 17290 103.74 1.580 163.94
2 15850 2
0 0
f Lapping 960 16 3 4 960 11.52 1.580 18.21

7445 8405
g Torsion Bar (2-16Ø) 16 3 2 16810 100.86 1.580 159.38

960
Extra Bar at Grid 1 & 2

1 1900
h Extra Bar at Grid A (2-20Ø) 0 20 2 2 2900 11.6 2.469 28.64

0
0
6950
i Extra Bar at Grid B & C (2-20Ø) 20 2 2 6950 27.8 2.469 68.64

2100 1
j Extra Bar at Grid D (2-20Ø) 25 2 2 3450 13.8 3.858 53.24
3
5
Extra Bar at Grid 3 0

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

7 1900
k Extra Bar at Grid A (2-16Ø) 2 16 1 2 2620 5.24 1.580 8.28
0
3050
l Extra Bar at Grid B & C (2-16Ø) 16 2 2 3050 12.2 1.580 19.28

1900 7
m Extra Bar at Grid D (2-16Ø) 2 16 2 2 2620 10.48 1.580 16.56
0
2 Along Grid A, B, C & D

8850
7 7
a Top Main Bar(3-16Ø) 16 4 3 10290 123.48 1.580 195.13
2 2
0 0

b Bottom Bar (4-20Ø)


1 1 20 4 4 10850 173.6 2.469 428.64
0 8850 0
0 0
0 0
c Torsion Bar (2-16Ø) 8850 16 4 2 8850 70.8 1.580 111.88

2100 1
d Extra Bar at Grid 1 (2-25Ø) 25 4 2 3450 27.6 3.858 106.48
3
5
0
1 4600
e Extra Bar at Grid 2 & 3 (2-25Ø) 25 4 2 5950 47.6 3.858 183.64
3
5
0
10
0
4
7
f Stirrups for Main Beam-Long Grid 10 125 1 381 1650 628.65 0.617 388.06
5

250

1
0
0 4
7
g Stirrups for Main Beam-Short Grid 10 125 1 284 1650 468.6 0.617 289.26
5

250
F Secondary Beam (300*425)
1 Along Grid A1 & C1

8870
a Top Main Bar (3-16Ø)
7 7 16 2 3 10290 61.74 1.580 97.57
1 1
0 0

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

b Bottom Main Bar (3-16Ø)


7 7 16 2 3 10290 61.74 1.580 97.57
1 8870 1
0 0
Along Grid 1a

6250
3
c Top Main Bar (3-16Ø)
7 3 16 2 3 7000 42 1.580 66.37

5 7
5

d Bottom Main Bar (3-16Ø)


3 3 16 2 3 7000 42 1.580 66.37
7 6250 7
5 5
Along Grid 1b

3750
3
e Top Main Bar (3-16Ø)
7 3 16 1 3 4500 13.5 1.580 21.33

5 7
5

3 3
f Bottom Main Bar (4-12Ø) 12 1 4 4500 18 0.889 16.00
7 3750 7
5 5

80
3
7
g Stirrups for Secondary Beam-Short Grid 8 125 1 142 1410 200.22 0.395 79.10
5

250

80
3
h Stirrups for Secondary Beam-Long Grid
7 8 125 1 125 1410 176.25 0.395 69.63
5

250

960

i U-Bent at the joint of Beam 16 12 2 3180 76.32 1.580 120.61


530
200 530

G STAIRCASE
200

3354 1560 330


a First Flight-Longitudional Bar 12 1 12 7409 88.908 0.889 79.03
1690
475

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

50
1150
b 12 1 12 2910 34.92 0.889 31.04
1410
300

c Distribution Bar- Top & Bottom 1460 10 150 1 14 1460 20.44 0.617 12.62

d First Flight- Top & Bottom Bar 1460 10 150 1 55 1460 80.3 0.617 49.57

e Landing 3200 10 150 1 18 3200 57.6 0.617 35.56

f 1800 12 150 1 2 1800 3.6 0.889 3.20

5
0
g Extra Bar 5 1 12 1 11 2100 23.1 0.889 20.54
0 1000 0
0
0
1840
850
h 220 12 1 12 2960 35.52 0.889 31.58

50

1000
1000 50
i 12 1 11 2100 23.1 0.889 20.54

50

900 3400
j Second Flight-Longitudional Bar 12 125 1 12 7320 87.84 0.889 78.08
450 2270

300

50 1150
k 2000 12 1 12 3420 41.04 0.889 36.48

220

5
l Extra Bar 0 12 1 11 2100 23.1 0.889 20.54
1000
5
1000 0

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
1000 (mm) (mm) (m) Meter (Kg) (Kg)

270 380 850


m 12 125 1 12 1550 18.6 0.889 16.54
5
5 0
0

350 270 1000


n 12 125 1 11 1670 18.37 0.889 16.33

5
0

o Distribution Bar-Top & Bottom Bar


1460 10 150 1 40 1460 58.4 0.617 36.05

p Nosing Bar 1460 10 1 20 1460 29.2 0.617 18.03

410 480
q Nosing Ties 8 4 6 1630 39.12 0.395 15.46
480 260

300 480

r 8 9 6 1410 76.14 0.395 30.08


480 150

410 480
s 8 3 6 1520 27.36 0.395 10.81
480 150

300 480

t 8 2 6 1520 18.24 0.395 7.21


480 260

480

u 8 2 6 1110 13.32 0.395 5.27


480 150

H First Floor Landing Beam (250*380)

a Top Bar 7 7 16 1 3 5290 15.87 1.580 25.08


1 3870 1
0
9 0 9
6 6
0 0

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
7 7 Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
1 1 (mm) (mm) (m) Meter (Kg) (Kg)
0
9 0 9
6 6
b Bottom Bar 7
0 7 0 16 1 3 5290 15.87 1.580 25.08
1 3870 1
0 0
200
80
c Stirrups for Landing Beam 8 125 1 26.9964 1220 32.94 0.395 13.01
330

I SLAB REINFORCEMENT DETAILS


575 1500
2375 1500

80 1375 500
a Along Short Span-Between Grid A-B & C-D
2000 80 8 300 1 40 9985 399.4 0.395 157.79

575 500
8 8
b 8 300 1 36 9985 359.46 0.395 142.01
0 8750 0

500
2000
c Btween Grid B & C 80 8 8 300 1 11 4535 49.885 0.395 19.71
1875 0

500
d
8 8 8 300 1 11 4535 49.885 0.395 19.71
0 3875 0

575
575 1500
e 80 8 300 1 35 7560 264.6 0.395 104.53
2375 2375
8
0

575 575
f 8 8 8 300 1 35 7560 264.6 0.395 104.53
0 6250 0

575 575
8 8
g Grid A-D, 1b-3 0 8 300 1 9 17540 157.86 0.395 62.37
480 4405 0
11345

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

575
2125 1500 1500
80

1625 1625
h 1750 8 300 1 9 17540 157.86 0.395 62.37

575
2230 1500 2125 8
0

i Top Main Bar


1950 8 150 1 38 1950 74.1 0.395 29.28

j
2050 8 150 1 94 2050 192.7 0.395 76.13

2250
k 8 150 1 18 2250 40.5 0.395 16.00

2130
l 8 150 1 11 2130 23.43 0.395 9.26

m Distribution Bar 8 150 1 72 2200 158.4 0.395 62.58


n 8 150 1 32 1800 57.6 0.395 22.76
J Column (450*450)

370
80
370
a Stirrups for First Floor 8 100 12 25 1640 492 0.395 194.37

460
140
80
370
b 8 100 12 25 1180 354 0.395 139.85

460

80
c 140 8 100 12 25 1180 354 0.395 139.85

370

370
80

d Stirrups for Second Floor


370 8 100 12 26 1640 511.68 0.395 202.15

460
Submitted by: Checked by: Verified by:
Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

460
140
80
370
e 8 100 12 26 1180 368.16 0.395 145.45

460
80
f 140 8 100 12 26 1180 368.16 0.395 145.45

370
K Second Floor Beam (300*525)-Main Beam 0.00
1 Along Grid 1, 2 & 3 0.00

3425 9000 3425


7 7
a Top Bars - Ends (2-16Ø) 16 3 2 19210 115.26 1.580 182.14
2 960 2
0 960
0
7445 8405
7 7
b Top Bars - Mid (1-16Ø) 16 3 1 18250 54.75 1.580 86.52
2 960 2
0 0

1 1200 1
c Bottom Bars - Ends (2-20Ø) 7275 8575 20 3 2 19050 114.3 2.469 282.22
0 0
0 0
0 0
7 7
d Bottom Bars- Mid (2-16Ø) 2 3250 960 960 2 16 3 2 19210 115.26 1.580 182.14
0 0
10700 1900

7445 8405
e Torsion Bars (2-16Ø) 16 3 2 16810 100.86 1.580 159.38

960
Extra Bar at Grid 1 & 2 0.00

1 1900
f Extra Bar at Grid A (2-20Ø) 0 20 2 2 2900 11.6 2.469 28.64

0
0
6950
g Extra Bar at Grid B & C (2-20Ø) 20 2 2 6950 27.8 2.469 68.64

1900 1
h Extra Bar at Grid D (2-20Ø) 20 2 2 2900 11.6 2.469 28.64
0
0
Extra Bar at Grid 3 0 0.00

7 1900
i Extra Bar at Grid A (2-16Ø) 2 16 1 2 2620 5.24 1.580 8.28

0
3050
Submitted by: Checked by: Verified by:
Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

3050
j Extra Bar at Grid B & C (2-16Ø) 16 2 2 3050 12.2 1.580 19.28

1900 7
k Extra Bar at Grid D (2-16Ø) 2 16 1 2 2620 5.24 1.580 8.28
0
2 Along Grid A, B, C & D 0.00

8850
7 7
a Top Main Bar(3-16Ø) 16 4 3 10290 123.48 1.580 195.13
2 2
0 0

b Bottom Bar (2-16Ø)


7 7 16 4 2 10290 82.32 1.580 130.09
2 8850 2
0 0

c Bottom Bar (2-20Ø)


1 1 20 4 2 10850 86.8 2.469 214.32
0 8850 0
0 0
0 0
d Torsion Bar (2-16Ø) 8850 16 4 2 8850 70.8 1.580 111.88

2010 1
e Extra Bar at Grid 1 (2-20Ø) 20 4 2 3010 24.08 2.469 59.46
0
0
0
7 4510
f Extra Bar at Grid 2 & 3 (2-16Ø) 16 4 2 5230 41.84 1.580 66.12
2
0

80
4
7
g Stirrups for Beam-Along Grid 1 & 2 5 10 100 2 81 1610 260.82 0.617 161.00

250

80
4
7
h " 5 10 150 2 41 1610 132.02 0.617 81.49

250

80
4
7
i Stirrups for Beam-Along Grid 3 5 10 100 1 82 1610 132.02 0.617 81.49

250

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

80
4
7
j Stirrups for Short Grid A, B, C & D 10 100 4 55 1610 354.2 0.617 218.64
5

250

80
4
7
k " 10 150 4 17 1610 109.48 0.617 67.58
5

250

L Secondary Beam (300*425) 0.00


1 Along Grid A1 & C1 0.00

8730
a Top Main Bars (3-16Ø)
8 8 16 2 3 10440 62.64 1.580 98.99
5 5
5 5

b Bottom Main Bars (3-16Ø)


8 8 16 2 3 10440 62.64 1.580 98.99
5 8730 5
5 5
2 Along Grid 1a 0.00

6230
8
a Top Main Bar (3-16Ø)
5 8 16 2 3 7940 47.64 1.580 75.28

5 5
5

b Bottom Main Bar (3-16Ø)


8 8 16 2 3 7940 47.64 1.580 75.28
5 6230 5
5 5
3 Along Grid 1b 0.00

3730
8
a Top Main Bar (3-16Ø)
5 8 12 1 3 5440 16.32 0.889 14.51

5 5
5

8 8
b Bottom Main Bar (4-12Ø) 12 1 4 5440 21.76 0.889 19.34
5 3730 5
5 5

80
3
7
c Stirrups for Secondary Beam-Along A1 & C1 8 100 2 55 1410 155.1 0.395 61.28
5

250

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

80
3
7
d " 8 150 2 17 1410 47.94 0.395 18.94
5

250

80
3
7
e Stirrups for Secondary Beam-Along Grid 1a 8 100 1 60 1410 84.6 0.395 33.42
5

250

80
3
7
f " 8 150 1 17 1410 23.97 0.395 9.47
5

250

80
3
7
g Stirrups for Secondary Beam-Along Grid 1b 8 100 1 18 1410 25.38 0.395 10.03
5

250

80
3
7
h " 8 150 1 10 1410 14.1 0.395 5.57
5

250

960
960

i U-Bent at the joint of Beam 16 12 2 3180 76.32 1.580 120.61


530
200 530

M STAIRCASE 0.00
200

3354 1560 330


a First Flight-Longitudional Bar 12 1 12 7409 88.908 0.889 79.03
1690
475

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

50
1150
b 12 1 12 2910 34.92 0.889 31.04
1410
300

c Distribution Bar- Top & Bottom 1460 10 150 1 14 1460 20.44 0.617 12.62

d First Flight- Top & Bottom Bar 1460 10 150 1 55 1460 80.3 0.617 49.57

e Landing 3200 10 150 1 18 3200 57.6 0.617 35.56

f 1800 12 150 1 2 1800 3.6 0.889 3.20

5
0
g Extra Bar 5 1 12 1 11 2100 23.1 0.889 20.53
0 1000 0
0
0
1840
850
h 220 12 1 12 2960 35.52 0.889 31.57

50

1000
1000 50
i 12 1 11 2100 23.1 0.889 20.53

50

900 3400
j Second Flight-Longitudional Bar 12 125 1 12 7320 87.84 0.889 78.08
450 2270

300

50 1150
k 2000 12 1 12 3420 41.04 0.889 36.48

220

5
l Extra Bar 0 12 1 11 2100 23.1 0.889 20.53
1000
5
1000 0

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
1000 (mm) (mm) (m) Meter (Kg) (Kg)

270 380 850


m 12 125 1 12 1550 18.6 0.889 16.53
5
5 0
0

350 270 1000


n 12 125 1 11 1670 18.37 0.889 16.33

5
0

o Distribution Bar-Top & Bottom Bar


1460 10 150 1 40 1460 58.4 0.617 36.05

p Nosing Bar 1460 10 1 20 1460 29.2 0.617 18.03

410 480
q Nosing Ties 8 4 6 1630 39.12 0.395 15.46
480 260

300 480

r 8 9 6 1410 76.14 0.395 30.08


480 150

410 480
s 8 3 6 1520 27.36 0.395 10.81
480 150

300 480

t 8 2 6 1520 18.24 0.395 7.21


480 260

480

u 8 2 6 1110 13.32 0.395 5.26


480 150

N First Floor Landing Beam (250*380) 0.00

a Top Bar 7 7 16 1 3 5290 15.87 1.580 25.08


1 3870 1
0
9 0 9
6 6
0 0

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
7 7 Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
1 1 (mm) (mm) (m) Meter (Kg) (Kg)
0
9 0 9
6 6
b Bottom Bar 7
0 7 0 16 1 3 5290 15.87 1.580 25.08
1 3870 1
0 0
200
80
c Stirrups for Landing Beam 8 125 1 27 1220 32.94 0.395 13.01
330

O SLAB REINFORCEMENT DETAILS 0.00

575
1500
80 1500
2375
a Along Short Span-Between Grid A-B & C-D 8 300 1 40 9985 399.4 0.395 157.79

1375 500
2000 80

575 500
b
8 8 8 300 1 36 9985 359.46 0.395 142.01
0 8750 0

500 1875
c Grid 1(b)-3 & B & C 80 8 300 1 11 4535 49.885 0.395 19.71
2000 8
0

500
d
8 8 8 300 1 11 4535 49.885 0.395 19.71
0 3875 0

575
575 1500
e 80 8 300 1 35 7560 264.6 0.395 104.53
2375 2375
8
0

575 575
f 8 8 8 300 1 35 7560 264.6 0.395 104.53
0 6250 0

575 575
8 8
g Grid A-D, 1b-3 0 8 300 1 9 17540 157.86 0.395 62.37
480 4405 0
11345

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

575
2125 1500 1500
80
1625 1625
h 1750 8 300 1 9 17540 157.86 0.395 62.37

575
2230 1500 2125 8
0
i Negative Bar 0.00

2050 50
j Along 1a 50 8 300 1 40 2150 86 0.395 33.98

k Along Grid 2 (A-B) & 2(C-D) 50 1950 50 8 300 2 20 2050 82 0.395 32.40

50 2050 50
l Along Grid 2 (B-C) 8 300 1 12 2150 25.8 0.395 10.19

50 2050
m Along Grid A1 & C1 50 8 300 2 28 2150 120.4 0.395 47.57

50 2250
n Along B & C 50 8 300 2 8 2350 37.6 0.395 14.86

o Distribution Bar 0.00

p Along 1, 1a 6260 8 150 1 16 6260 100.16 0.395 39.57

q Along 2 & 3 8 150 1 7 16240 113.68 0.395 44.91


12000 4240

r Along Grid A, A1, B, C, C1 & D 8760


6260 8 150 1 18 8760 157.68 0.395 62.29

P Truss Beam (300*400) 0.00


1 Along Grid 1, 2 & 3 0.00

3425 9000 3425


7 7
a Top Bars - Ends (2-16Ø) 2 960 16 3 2 19210 115.26 1.580 182.14
960 2
0 0

7445 8405
7 7
b Top Bars - Mid (1-16Ø) 2 16 3 1 18250 54.75 1.580 86.52
960 2
0 0

3 960 3
c Bottom Bars - Ends (2-16Ø) 7275 8575 16 3 2 17450 104.7 1.580 165.45
2 2
0 0

3 3
d Bottom Bars- Mid (2-12Ø) 2 1925 720 960 2 12 3 2 18170 109.02 0.889 96.91
0 0
12000 1925
2 Along Grid A, B, C & D 0.00

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

8850
7 7
a Top Main Bar(3-16Ø) 16 4 3 10290 123.48 1.580 195.13
2 2
0 0

b Bottom Bar (2-16Ø)


3 3 16 4 2 9550 76.4 1.580 120.73
5 8850 5
0 0

3 3
c Bottom Bar (2-12Ø) 12 4 2 9550 76.4 0.889 67.91
5 8850 5
0 0

80
3
d Stirrups for Main Beam-Along Short Grid (Grid A, B, C & D)
5 8 100 4 55 1650 363 0.395 143.41
0

250

80
3
e "
5 8 150 4 17 1650 112.2 0.395 44.33
0

250

8
0
3
5
f Stirrups for Main Beam-Along Long Grid (1, 2 & 3) 8 100 3 142 1650 702.9 0.395 277.69 14150.000
0

250
3 Lapping at Column Bars 0.00

6000

a GF-Along Grid 1 (A & D) 20 2 6 7200 86.4 2.469 213.33

1200

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

760
4253

b FF-Along Grid 1 (A & D) 16 2 6 5973 71.676 1.580 113.27

960

760
1253
c SF-Along Grid 1 (A & D) 16 2 6 2973 35.676 1.580 56.38

960

6000

d GF-Along Grid 1 (B & C) 25 2 4 7500 60 3.858 231.48

1500

6000

e GF-Along Grid 1 (B & C) 20 2 2 7200 28.8 2.469 71.11

1200

1040
4253

f FF-Along Grid 1 (B & C) 20 2 6 6493 77.916 2.469 192.39

1200

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

1040
1253

g SF-Along Grid 1 (B & C) 20 2 6 3493 41.916 2.469 103.50

1200

6000

h GF-Along Grid 2 - A 20 1 6 7200 43.2 2.469 106.67

1200

1040
4253

i FF-Along Grid 2 - A 20 1 6 6493 38.958 2.469 96.19

1200

480
1253

j SF-Along Grid 2 - A 12 1 6 2453 14.718 0.889 13.08

720

6000

k GF-Along Grid 2 - B, C & D 25 3 4 7500 90 3.858 347.22

1500

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

6000

l GF-Along Grid 2 - B, C & D 20 3 2 7200 43.2 2.469 106.67

1200

1040
4253

m FF-Along Grid 2 - B, C & D 20 3 6 6493 116.874 2.469 288.58

1200

1040
1253

n SF-Along Grid 2 - B, C & D 20 3 6 3493 62.874 2.469 155.25

1200

6000

o GF-Along Grid 3 - A 20 1 6 7200 43.2 2.469 106.67

1200

1040
4253

p FF-Along Grid 3 - A 20 1 6 6493 38.958 2.469 96.19

1200

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

480
1253

q SF-Along Grid 3 - A 12 1 6 2453 14.718 0.889 13.08

720

6000

r GF-Along Grid 3 - B, C & D 20 3 6 7200 129.6 2.469 320.00

1200

760
4253
s FF-Along Grid 3 - B, C & D 16 3 6 5973 107.514 1.580 169.90

960

480
1253
t SF-Along Grid 3 - B, C & D 12 3 6 2453 44.154 0.889 39.25

720

Q Sill Band
1 Ground Floor
Longitudinal Bars

4150 75
825
825
a Grid 1/A-B , Grid 1/C-D 10 2 2 7150 28.6 0.62 17.66
75
75 600 600

2950 75
200
200
b Grid 1/B-C 10 1 2 4700 9.4 0.62 5.81
75
75 600 600

2800 75
375
375
c Grid 2/A-B , Grid 2/C-D 10 2 2 3700 14.8 0.62 9.14
75
75

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

4150 75
825
825
d Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600

825

e Store Room Wall 600 700 10 1 2 3750 7.5 0.62 4.63

1250
375

Ties

65 65
f Grid 1/A-B , Grid 1/C-D 8 150 2 38 320 24.32 0.40 9.61

190

65 65
g Grid 1/B-C 8 150 1 22 320 7.04 0.40 2.79

190

65 65
h Grid 2/A-B , Grid 2/C-D 8 150 2 24 320 15.36 0.40 6.07

190

65 65
i Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22

190

50 50
j Store Room Wall 8 150 1 20 170 3.4 0.40 1.35

70
2 First Floor
Longitudinal Bars

4150 75
825
825
a Grid 1/A-B , Grid 1/C-D 10 2 2 7150 28.6 0.62 17.66
75
75 600 600

2950 75
200
200
b Grid 1/B-C 10 1 2 4700 9.4 0.62 5.81
75
75 600 600

2800 75
375
375
c Grid 2/A-B , Grid 2/C-D 10 2 2 3700 14.8 0.62 9.14
75
75

4150 75
825
825
d Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600
Ties

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

65 65
e Grid 1/A-B , Grid 1/C-D 8 150 2 38 320 24.32 0.40 9.61

190

65 65
f Grid 1/B-C 8 150 1 22 320 7.04 0.40 2.79

190

65 65
g Grid 2/A-B , Grid 2/C-D 8 150 2 24 320 15.36 0.40 6.07

190

65 65
h Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22

190
3 Second Floor
Longitudinal Bars

4150 75
825
825
a Grid 1/A-B , Grid 1/C-D 10 2 2 7150 28.6 0.62 17.66
75
75 600 600

2800 75
375
375
b Grid 2/A-B , Grid 2/C-D 10 2 2 3700 14.8 0.62 9.14
75
75

4150 75
825
825
c Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600

Ties

65 65
d Grid 1/A-B , Grid 1/C-D 8 150 2 38 320 24.32 0.40 9.61

190

65 65
e Grid 2/A-B , Grid 2/C-D 8 150 2 24 320 15.36 0.40 6.07

190

65 65
f Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22

190
R Lintel Band
1 Ground Floor
Longitudinal Bars

4150 75
825
825
a Grid 1/A-B , Grid 1/C-D,Grid 2/A-B & Grid 2/C-D 10 4 2 7150 57.2 0.62 35.31
75
75 600 600

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

4150 75
825
825
b Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600

Ties

65 65
c Grid 1/A-B , Grid 1/C-D,Grid 2/A-B , Grid 2/C-D 8 150 4 38 320 48.64 0.40 19.22

190

65 65
d Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22

190
2 First Floor
Longitudinal Bars

4150 75
825
825
a Grid 1/A-B , Grid 1/C-D,Grid 2/A-B & Grid 2/C-D 10 4 2 7150 57.2 0.62 35.31
75
75 600 600

4150 75
825
825
b Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600

Ties

65 65
c Grid 1/A-B , Grid 1/C-D,Grid 2/A-B , Grid 2/C-D 8 150 4 38 320 48.64 0.40 19.22

190

65 65
d Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22

190
3 Second Floor
Longitudinal Bars

4150 75
825
825
a Grid 1/A-B , Grid 1/C-D,Grid 2/A-B & Grid 2/C-D 10 4 2 7150 57.2 0.62 35.31
75
75 600 600

2950 75
200
200
b Grid 1/B-C 10 1 2 4700 9.4 0.62 5.81
75
75 600 600

4150 75
825
825
c Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600

Ties

65 65
d Grid 1/A-B , Grid 1/C-D,Grid 2/A-B , Grid 2/C-D 8 150 4 38 320 48.64 0.40 19.22
190

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)

65 65
e Grid 1/B-C 8 150 1 22 320 7.04 0.40 2.79
190

65 65
f Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22
190

S Slab of Bench at Corridor


2450
a At Long Direction 8 150 1 5 2450 12.25 0.40 4.84

b At Short Direction 8 150 1 17 550 9.35 0.40 3.7


550
550 Total of Reinforcement Work 22961.67 Kg
22.97 Mt.

Submitted by: Checked by: Verified by:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-6C(S)-B
School Name : Shree Chandrodaya S.S
Location : Shreenathkot, Gorkha

Weight Length Total


S.N. Particulars Size Thickness Qty Total wt. Remarks
Per Metre (m) Length
1 TOP CHORD PIPE 50MM MID 5.03 5.641 12 67.69 340.49
2 BOTTOM CHORD PIPE 40MM MID 3.56 4.378 12 52.54 187.03
3 VERTICAL BRACING.1 40MM MID 3.56 1.351 12 16.21 57.71
4 VERTICAL BRACING.2 40MM MID 3.56 1.088 12 13.05 46.47
5 VERTICAL BRACING.3 40MM MID 3.56 0.825 12 9.90 35.24
6 VERTICAL BRACING.4 40MM MID 3.56 0.419 12 5.03 17.90
7 DIGONAL BRACING.1 32 MM MID 3.1 1.328 12 15.94 49.40
8 DIGONAL BRACING.2 32MM MID 3.1 1.123 12 13.48 41.78
9 DIGONAL BRACING.3 32MM MID 3.1 1.272 12 15.26 47.32
10 PURLIN 1 65MM MID 6.42 3.000 48 144.00 924.48
11 PURLIN 2 65MM MID 6.42 3.500 12 42.00 269.64
12 RUNNER 1 40MM MID 3.56 3.000 24 72.00 256.32
13 RUNNER2 40MM MID 3.56 3.500 8 28.00 99.68
15 END PURLIN 65MM MID 6.42 1.125 24 27.00 173.34
16 CROSS BRACING 40MM MID 3.56 1.380 32 44.16 157.21
17 BASE PLATE 250X250 10MM 4.9 18 88.20
18 BASE PLATE STIFFNER(L) 127X250 10MM 2.49 24 59.76
19 BASE PLATE STIFFNER(S) 50X75 10MM 0.29 24 6.96
20 PURLIN CLITE 200X90 10MM 1.41 144 203.04
21 TRUSS CLITE 200X90 10MM 1.41 72 101.52
22 RUNNER CLITE 175X70 10MM 0.96 40 38.40
23 R.CONNECTION BOX PLATE 175X160 10MM 2.19 12 26.28
24 TRUSS JOINT CLITE(C) 175X175 10MM 2.4 16 38.40
25 TRUSS JOINT CLITE(O) 175X175 10MM 2.4 8 19.20
26 STIPNER1. 100X63 10MM 0.49 16 7.84
27 STIPNER2. 63X63 10MM 0.31 64 19.84
28 WIND TIE PLATE 380X80 6MM 1.43 16 22.88
29 BRACING TIE STEPER 100X100 6MM 0.47 16 7.52
30 CROSS BRACING PIPE CLITE 165X80 6MM 0.62 64 39.68
31 TEMP PLATE 250X250 10MM 4.9 18 88.20
32 ANCHOR BOLT 16MM 1.58 0.45 72 32.40 51.19
33 NUT BOLT(16X60) 16MM 1.58 0.06 148 14.03
34 NUT BOLT(16X50) 16MM 1.58 0.05 48 3.79
35 NUT BOLT(16X40) 16MM 1.58 0.04 72 4.55
Total 3545.29 Kgs.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
ect Name : Emergency School Reconstruction Project (ESRP)
Block : 2-LaLiEC
School Name : Shree Chandrodaya S.S
Location : Shreenathkot, Gorkha

Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
1 EARTH WORKS
1.1 Site Clearance for Bldg 1 27.50 14.50 398.75
Soak pit 1 3.14 Area 3.14
Total 401.89 sq.m

1.2 Earth Work Excavation


For Isolated Foundation
F1 7 1.80 1.80 1.50 34.02
F2 4 2.00 2.00 1.50 24.00
F3 3 2.30 2.30 1.50 23.81
F4 1 2.50 2.50 1.50 9.38
For Lower Tie Beam
Along Grid A,E 2 5.70 0.50 0.90 5.13
Grid B 1 4.95 0.50 0.90 2.23
Grid C 1 5.30 0.50 0.90 2.39
Grid D 1 5.30 0.50 0.90 2.39
Along Grid 1 1 13.40 0.50 0.90 6.03
Along Grid 2 1 12.40 0.50 0.90 5.58
Along Grid 3 1 14.30 0.50 0.90 6.44
Side Drain 1 21.95 0.98 0.18 3.75
Drain 1 21.95 0.60 0.05 0.66
Below Exterior Steps 1 20.95 0.75 0.15 2.36
Ramp
For Slope 1 3.50 1.03 0.28 0.99
For Front wall 3-AB 1 6.50 0.55 0.45 1.61
For Side wall -3B 1 1.33 0.55 0.45 0.33
Soak Pit small 1 6.00 Area 3.10 18.60
Total 149.66 cu.m

1.3 EarthBack filling


Total Excavation Work 1 149.66 149.66
Deduction
Soling -1 12.10 -12.10
PCC Below Foundation Footing and Beam -1 6.05 -6.05
RCC Below Foundation Footing and Beam -1 23.36 -23.36
Tie beam(300 x 525)
Along grid 1,2,3 -3 19.70 0.30 0.08 -1.33
Along grid A,B,C,D,E -5 8.60 0.30 0.08 -0.97
RCC Column Below Ground Level -15 0.45 0.45 0.75 -2.28
Brick Work Below Ground Level
Grid 1,2, 3 -3 19.70 0.25 0.38 -5.54
Grid A,B,C,D & E -3 8.60 0.25 0.38 -2.42
Soak Pit small -1 6.16 Area 3.10 -19.10
Grid AB,BC,DE/1-2 3 5.70 6.70 0.18 20.05
Staircase 1 6.70 3.20 0.18 3.75
Corridor 3 5.70 2.20 0.18 6.58
1 3.20 2.20 0.18 1.23
Total 108.14 cu.m

1.4 Boulder Soling


F1 7 1.50 1.50 0.20 3.15
F2 4 1.70 1.70 0.20 2.31
F3 3 2.00 2.00 0.20 2.40
F4 1 2.20 2.20 0.20 0.97

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Below Foundation Beam
Along grid 1 1 18.10 0.35 0.10 0.63
Along grid 2 1 18.10 0.35 0.10 0.63
Along grid 3 1 18.10 0.35 0.10 0.63
Along Grid A, C, E 3 7.80 0.35 0.10 0.82
Grid B & D 2 7.80 0.35 0.10 0.55

Side Slope of Drain 1 21.95 0.98 0.10 2.14


Below exterior steps 1 20.95 0.60 0.10 1.26

Below ramp
For Slope 1 6.82 1.18 0.20 1.61
For Front wall 3-AB 1 6.50 0.45 0.10 0.29
For Side wall -3B 1 1.33 0.45 0.10 0.06
Building Floor
Grid AB,BC,DE/1-2 3 5.70 6.70 0.20 22.91
Staircase 1 6.70 3.20 0.20 4.29
Corridor 3 5.70 2.20 0.20 7.52
1 3.20 2.20 0.20 1.41
Inside of soak Pit 1 3.77 0.23 0.20 0.17
Total 53.76 cu.m

1.5 Sand Filling


Periphery ot Soak pit 1 2.07 Area 2.37 4.91
Total 4.91 cu.m

2 CONCRETE WORKS
2.1 P.C.C
2.1.1 P.C.C.(1:3:6) Works
F1 7 1.50 1.50 0.10 1.58
F2 4 1.70 1.70 0.10 1.16
F3 3 2.00 2.00 0.10 1.20
F4 1 2.20 2.20 0.10 0.48
Below Foundation Beam
Along grid 1 1 18.10 0.35 0.05 0.32
Along grid 2 1 18.10 0.35 0.05 0.32
Along grid 3 1 18.10 0.35 0.05 0.32
Along grid A,C and E 3 7.80 0.35 0.05 0.41
Along grid B & D 2 7.80 0.35 0.05 0.27
Total 6.05 cu.m

2.1.2 P.C.C.(1:2:4) Works


Under Suraface
Grid AB,BC,DE/1-2 3 5.70 6.70 0.08 8.59
Staircase 1 6.70 3.20 0.08 1.61
Corridor 3 5.70 2.20 0.08 2.82
1 3.20 2.20 0.08 0.53
Other Areas
Below ramp
For Slope 1 6.82 1.30 0.05 0.44
For Front wall 3-AB 1 6.50 0.45 0.05 0.15
For Side wall -3B 1 1.33 0.45 0.05 0.03
Above ramp
For Front wall 3-AB 1 6.52 0.13 0.05 0.04
For Side wall -3B 1 1.33 0.25 0.05 0.02

Below exterior steps 1 20.95 0.68 0.05 0.71


Above exterior steps 1 19.50 0.90 0.05 0.88
Pcc for plinth protection works
Below drain 1 40.50 0.575 0.075 1.75
Above drain 1 38.60 0.875 0.05 1.69

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
1 41.40 0.125 0.05 0.26
Total 19.51 cu.m

2.2 P.C.C For R.C.C. Works


Foundation
Isolated footing F1
Inclined Part 7 Area 1.49 0.25 2.60
Rectangular Base 7 1.50 1.50 0.20 3.15
Isolated footing F2 0.00
Inclined Part 4 Area 1.81 0.25 1.81
Rectangular Base 4 1.70 1.70 0.20 2.31
Isolated footing F3 0.00
Inclined Part 3 Area 2.36 0.25 1.77
Rectangular Base 3 2.00 2.00 0.20 2.40
Isolated footing F4
Inclined Part 1 Area 2.78 0.25 0.70
Rectangular Base 1 2.20 2.20 0.20 0.97

Beam
Footing beam(250x300)
Along grid 1,2,3 3 19.70 0.25 0.30 4.43
Along grid A,B,C,D,E 5 8.60 0.25 0.30 3.23
Tie beam(300 x 525)
Along grid 1,2,3 3 19.70 0.30 0.53 9.31
Along grid A,B,C,D,E 5 8.60 0.30 0.53 6.77
First floor level
Main beam(300x525)
Along grid 1,2,3 3 19.70 0.30 0.40 7.09
Along grid A,B,C,D,E 5 8.60 0.30 0.40 5.16 300
Secondary beam(250x425)
Along 1a 1 17.10 0.25 0.30 1.28
Along A1,B1,D1 3 8.65 0.25 0.30 1.95
Along 1b 1 3.20 0.25 0.30 0.24
Truss level
Main beam(300x400)
Along grid 1,2,3 3 19.70 0.30 0.40 7.09
Along grid A,B,C,D,E 5 8.60 0.30 0.40 5.16

Column
Column below Plinth level 15 0.45 0.45 1.20 3.65
Ground floor plan
Total columns(450x450) 15 0.45 0.45 3.00 9.11
First floor plan
Total columns(450x450) 15 0.45 0.45 3.00 9.11

Slab
First floor level 1 21.80 9.80 0.125 26.71

Deduction
Staircase Void -1 3.20 4.50 0.13 -1.80

Staircase
Bottom 1 2.29 1.50 0.15 0.51
Landing 1 3.20 1.50 0.15 0.72
Waist Slab 1 6.76 1.50 0.15 1.52
Steps 10 0.15 0.30 1.50 2.25
Landing Beam 1 3.05 0.25 0.38 1.16

Lintel Bands
Ground floor plan
Along grid 1 1 16.65 0.23 0.08 0.29

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Along grid 2 1 12.25 0.23 0.08 0.21
Along grid A,C,D,E 4 6.55 0.23 0.08 0.45
Between BC & 1-2 1 2.05 0.23 0.08 0.04
1 4.70 0.13 0.08 0.04

First floor plan


Along grid 1 1 16.65 0.23 0.08 0.29
Along grid 2 1 12.25 0.23 0.08 0.21
Along grid A,C,D,E 4 6.55 0.23 0.08 0.45
Between BC & 1-2 1 1.75 0.23 0.08 0.03
1 5.00 0.13 0.08 0.05

Sill Bands
Ground floor level
Along grid 1 1 19.70 0.23 0.08 0.34
Along grid 2 1 12.25 0.23 0.08 0.21
Along grid A,E 2 6.55 0.23 0.08 0.23
Along grid C,D 2 6.55 0.23 0.08 0.23
Between BC & 1-2 1 2.05 0.23 0.08 0.04
1 4.70 0.13 0.08 0.04
Below staircase 1 3.90 0.13 0.08 0.04

First floor plan


Along grid 1 1 19.70 0.23 0.08 0.34
Along grid 2 1 12.25 0.23 0.08 0.21
Along grid A,C,D,E 4 6.55 0.23 0.08 0.45
Between BC & 1-2 1 1.75 0.23 0.08 0.03
1 5.00 0.13 0.08 0.05

Vertical Band
Ground Floor 5 2.48 0.23 0.08 0.21
First Floor 4 2.60 0.23 0.08 0.18

Pedestal
Base Block 8 0.50 0.25 0.25 0.25

Bench
Bench Top Slab 1 2.40 0.50 0.08 0.09

Slab for In-built Furniture


Furniture Slab for Lab 4 1.80 0.90 0.10 0.65
Sink slab type-1 1 9.43 0.50 0.10 0.47
Sink slab type-2 1 5.75 0.50 0.10 0.29
Sink slab type-3 1 3.60 0.90 0.10 0.32
Furniture slab in preparation room 1 6.75 0.60 0.10 0.41
Sink Deduction
Sink slab type-1 -2 0.70 0.35 0.10 -0.05
Sink slab type-2 -2 0.70 0.35 0.10 -0.05
Sink slab type-3 -1 0.70 0.35 0.10 -0.02

Soak Pit
RCC slab 1 2.84 Area 0.15 0.43
Total 127.78 cu.m

2.3 Silicon Cement Admixture


10 Kg per cu.m. of R.C.C. M20 10 127.78 1,277.80
Total 1,277.80 Kg

2.5 Formworks
Foundation
Isolated footing

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Rectangular Base F1 7 6.00 0.20 8.40
F2 4 6.80 0.20 5.44
F3 3 8.00 0.20 4.80
F4 1 8.80 0.20 1.76
Beam
Footing beam(250x300)
Along grid 1,2,3 3 19.70 0.60 35.46
Along grid A,B,C,D,E 5 8.60 0.60 25.80

Tie beam(300 x 525)


Along grid 1,2,3 3 19.70 1.12 66.19
Along grid A,B,C,D,E 5 8.60 1.12 48.16

First floor level


Main beam(300x525)
Along grid 1,3 2 19.70 0.93 36.45
Along grid 2 1 19.70 0.80 15.76
Along grid A,E 2 8.60 0.93 15.91
Along grid B,C,D 3 8.60 0.80 20.64
Secondary beam(250x425)
Along 1a 1 16.35 0.60 9.81
Along A1,B1,D1 3 8.65 0.60 15.57
Along 1b 1 3.20 0.60 1.92
Truss level
Main beam(300x400)
Along grid 1,2,3 3 19.70 1.10 65.01
Along grid A,B,C,D,E 5 8.60 1.10 47.30

Column
Column below Plinth level 15 1.80 1.20 32.40
Ground floor plan
Total columns(450x450) 15 1.80 3.00 81.00
First floor plan
Total columns(450x450) 15 1.80 3.00 81.00

Slab
Base area 1 21.80 9.80 213.64
Staircase
Bottom 1 2.29 0.15 0.34
Waist Slab 1 6.76 1.80 12.18
Landing 1 1.50 1.50 2.25
1 1.95 0.20 0.39
1 1.94 1.50 2.90
Steps 20 0.30 0.15 0.90
Riser 20 1.50 0.15 4.50
Landing Beam 1 3.05 0.86 2.62

Lintel Bands
Ground floor plan
Along grid 1 1 16.65 0.25 4.16
Along grid 2 1 16.65 0.25 4.16
Along grid A,C,D,E 4 6.55 0.25 6.55
Between BC & 1-2 1 2.05 0.25 0.51
1 4.70 0.25 1.18

First floor plan


Along grid 1 1 19.70 0.25 4.93
Along grid 2 1 16.65 0.25 4.16
Along grid A,C,D,E 4 6.55 0.25 6.55
Between BC & 1-2 1 1.75 0.25 0.44
1 5.00 0.25 1.25

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)

Sill Bands
Ground floor level
Along grid 1 1 19.70 0.15 2.96
Along grid 2 1 16.65 0.15 2.50
Along grid A,E 2 6.55 0.15 1.97
Along grid C,D 2 6.55 0.15 1.97
Between BC & 1-2 1 2.05 0.15 0.31
1 4.70 0.15 0.71
Below staircase 1 3.90 0.15 0.59
Deduction of door
D1 -4 1.10 0.15 -0.66
D2 -1 1.00 0.15 -0.15

First floor plan


Along grid 1 1 19.70 0.15 2.96
Along grid 2 1 16.65 0.15 2.50
Along grid A,C,D,E 4 6.55 0.15 3.93
Between BC & 1-2 1 1.75 0.15 0.26
1 5.00 0.15 0.75

Deduction of door
D1 -4 1.10 0.15 -0.66
D2 -1 1.00 0.15 -0.15
Pedestal
Base Block 8 1.25 0.25 2.50
Bench
Bench Top Slab 2 5.80 0.125 1.45
Bottom 2 1.90 0.25 0.95

Slab for In-built Furniture


Furniture Slab for Lab 4 1.80 0.90 6.48
4 5.40 0.10 2.16
Sink slab type-1 1 9.43 0.50 4.71
1 10.43 0.10 1.04
2 2.10 0.10 0.42
Sink deduction -2 0.70 0.35 -0.49
Sink slab type-2 1 5.75 0.50 2.88
1 6.75 0.10 0.68
2 2.10 0.10 0.42
Sink Deduction -2 0.70 0.35 -0.49
Sink slab type-3 1 3.60 0.90 3.24
1 9.00 0.10 0.90
1 2.10 0.10 0.21
Sink deduction -1 0.70 0.35 -0.25
Furniture slab in preparation room 1 6.75 0.60 4.05
1 6.75 0.10 0.68
Soak Pit
RCC slab
Base Area 1 2.84 2.84
Along Sides 1 5.97 0.15 0.90
Total 947.41 sq.m

3 BRICK WORKS
3.2 Full Brick (230 mm) Works (1:4c/s)
Brick Masonry Work Below Plinth Beam
Along grid 1,2,3 3 19.70 0.23 0.38 5.10
Along grid A,B,C,D & E 5 8.60 0.23 0.38 3.71

Ground floor
Along grid 1 1 16.65 0.23 2.33 8.90

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
1 3.05 0.23 2.02 1.42
Along grid 2 1 16.28 0.23 2.33 8.70

Along grid A,B,C,D and E 5 6.55 0.23 2.28 17.14


Between B,C 1 2.05 0.23 2.68 1.26
Grid 2A 1 0.60 0.50 0.45 0.14
Grid 3A 1 0.53 0.40 0.45 0.09
Grid 2D 1 0.60 0.50 0.45 0.14
Deduction for doors and windows
Ground floor plan
W1 -14 1.10 0.23 1.13 -3.98
V1 -14 1.10 0.23 0.53 -1.86
W3 -1 1.50 0.23 0.37 -0.13
D1 -4 1.10 0.23 2.33 -2.35
D3 -1 1.00 0.23 2.03 -0.47
For In-built Furniture
Below Furniture Slab for Lab 4 1.20 0.23 0.65 0.72
Below Sink slab type-3 1 1.50 0.23 0.65 0.22

First floor level


Along grid 1 1 16.65 0.23 2.45 9.38
1 3.05 0.23 2.53 1.77
Along grid 2 1 16.35 0.23 2.45 9.21
Along grid A,B,C,D and E 5 6.55 0.23 2.28 17.14
Store 1 1.75 0.23 2.80 1.13
Partition Wall for Computer Lab 2 3.60 0.23 1.20 1.9872
Deduction
D3 -1 1.00 0.23 2.03 -0.47
Below ramp
For Front wall 3-AB 1 6.50 0.35 0.30 0.68
For Side wall -3B 1 1.33 0.35 0.30 0.14
Above ramp
For Front wall 3-AB 1 1.40 0.23 0.38 0.12
1 4.25 0.23 0.19 0.18
For Side wall -3B 1 1.33 0.23 0.59 0.18
For Drain 1 39.85 0.23 0.15 1.37
External steps 1 19.50 0.48 0.10 1.95
1 19.50 0.18 0.15 2.93
1 19.50 0.08 0.10 1.95
Soak Pit Brick work 1 1.71 0.50 0.86
Total 89.26 cu.m

3.3 Half Brick (125 mm) Works (1:4c/s)


Ground floor
Partition Wall 1 4.70 3.00 14.10
Below Staircase 1 1.83 1.35 2.46
1 1.50 1.82 2.73
1 0.58 1.59 0.91
Sill -1 3.90 0.08 -0.29
D4 -1 1.00 1.55 -1.55
For In-built Furniture
Below Sink slab type-1 1 2.98 0.65 1.93
1 0.33 0.65 0.21
Below Sink slab type-2 1 2.98 0.65 1.93
Below Sink slab type-3 1 0.75 0.65 0.49
Furniture slab in preparation room 1 1.58 0.65 1.02
First floor 0.00
Partition Wall 1 5.00 3.00 15.00

For Ramp
Grid 3AB 1 1.40 0.22 0.30

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
1 5.12 0.22 1.10
For Bench
2 2.30 0.53 2.42
2 0.15 0.53 0.16
For Drain 1 41.40 0.15 6.21
Total 49.15 sq.m

3.4 Honey Comb Brick (350 mm) Works (1:3c/s)


Soak Pit Brick work 1 1.71 2.50 4.28
Total 4.28 cu.m

4 DOORS & WINDOWS


4.1 Metal Frame
4.1.1 Door Frame
D1 4 7.15 28.60
D2 4 7.20 28.80
D3 2 5.20 10.40
D4 1 4.10 4.10
Total 71.90 r.m

4.1.2 Window Frame


W1 28 5.58 156.10
W2 1 5.00 5.00
V1 14 3.25 45.50
V2 14 3.50 49.00
Total 255.60 r.m

4.2 Metal Shutter


4.2.1 Window Shutter
W1 28 1.01 1.04 29.27
W2 1 1.41 0.91 1.28
V1 14 1.01 0.44 6.15
V2 14 1.01 0.56 7.92
Total 44.63 sq.m

4.3 Wooden Shutter


Flush Door Shutter
D1 4 1.01 2.39 9.64
D2 4 1.01 2.41 9.74
D3 2 0.91 2.01 3.66
D4 1 0.91 1.46 1.33
Total 24.36 sq.m

4.5 Window Grill


Shutter Area of Ventilation
V1 14 1.01 0.44 6.15
V2 14 1.01 0.56 7.92
Shutter Area of Window
W1 28 1.01 1.04 29.27
W2 1 1.41 0.91 1.28
W3 1 1.50 0.37 0.56
Total 45.18 sq.m

4.6 Collapsable Gate


1 3.05 2.475 7.55
Total 7.55 sq.m

5 FLOORING WORKS
5.1 Hardened Cement Concrete Flooring (40mm) With Neat Cement Punning
Ground floor plan

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Laboratory 1 9.43 6.75 63.62
Store 1 2.20 6.75 14.85
ECD 1 5.78 6.75 38.98
Staircase Lobby 1 7.00 3.20 22.40
Corridor 1 21.80 2.50 54.50
Staircase riser 20 1.50 0.15 4.50
Staircase tread 18 1.50 0.30 8.10
Staircase landing 1 3.20 1.80 5.76

First floor plan


Library 1 9.43 6.75 63.62
Store 1 2.20 6.75 14.85
Computer 1 5.78 6.75 38.98
Staircase Lobby 1 3.20 2.40 7.68
Corridor 1 21.80 2.50 54.50

Ramp 1 6.5 1.20 7.80


Exterior steps 1 19.50 0.90 17.55
Drainage 1 39.5 0.88 34.56
Total 452.25 sq.m

5.2 Neat Cement Skirting


Ground floor plan
Laboratory 1 32.75 32.75
Store 1 17.90 17.90
ECD 1 25.00 25.00
Below staircase 1 17.75 17.75
Store Below landing 1 5.80 5.80
Staircase Flight/Landing 1 12.90 12.90
Corridor and Lobby 1 18.00
Column 5 2.25 11.25
Deduction
D1 -8 1.10 -8.80
D3 -2 1.00 -2.00
D4 -2 1.00 -2.00
First floor plan
Library 1 32.75 32.75
Store 1 17.90 17.90
Computer 1 25.00 25.00
Corridor and Lobby 1 23.75 23.75
Column 5 1.35 6.75

Deduction
D2 -8 1.10 -8.80
D3 -2 1.00 -2.00
Total 205.90 r.m

5.3 25mm Terrazo Finishing


For In-built Furniture
Furniture Slab for Lab 4 1.80 0.90 6.48
Sink slab type-1 1 9.40 0.50 4.70
Sink slab type-2 1 5.80 0.50 2.90

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Sink slab type-3 1 3.60 0.90 3.24
Furniture slab in preparation room 1 6.80 0.60 4.08
Bench 1 2.40 0.50 1.20
Total 22.60 sq.m

6 ROOFING/TERRACING WORKS
6.1 Metal Works
A Truss 1 4,712.85
Total 4,712.85 Kg

6.2 CGI Sheet Roofing


24 Gauge colour CGI Sheet 2 23.75 6.23 295.74
Total For CGI Sheet Roofing Total 295.74 sq.m

6.3 CGI Ridge


Ridge Cover 1 23.75 23.75
Total 23.75 r.m
6.4 Eaves Board
Along Sides of Building 4 6.23 0.0003 7850.00 58.65
Along front and back 2 23.75 0.0003 7850.00 111.86
Total 170.52 Kg

6.5 Cement Board False Ceiling


Library 1 5.70 6.70 38.19
1 3.40 6.70 22.78
Store 1 2.18 6.70 14.57
Classroom 1 5.70 6.70 38.19
Staircase Lobby 3 3.20 6.70 64.32
Corridor 3 5.70 2.20 37.62
1 3.20 2.20 7.04
Outside Below Slope Roof 2 21.95 1.02 44.78
4 6.20 0.90 22.33
Total 289.83 sq.m

7 PLASTER/PAINTING WORKS
7.1 Internal Plaster
7.1.1 Internal Plaster on Wall (1:6)
Ground floor plan
Laboratory 1 32.35 Perimeter 2.91 94.14
Store 1 17.70 Perimeter 2.91 51.51
ECD 1 25.05 Perimeter 2.91 72.90
Staircase 1 17.75 3.00 53.25
For Strore Below Landing 1 3.53 1.25 4.39
2 0.70 1.44 2.01
1 2.88 1.60 4.60
Pedestal 5 1.25 0.25 1.56
5 0.50 0.25 0.63
Column
Grid 2A,2C,2D,2E 4 0.35 0.68 0.95
Grid 2B 1 0.45 0.68 0.30

Grid 2A,2C,2D,2E 4 0.45 2.20 3.96


Grid 2B 1 0.65 2.20 1.43

For In-built Furniture


Furniture Slab for Lab Edge 4 5.40 0.10 2.16
Bottom 4 1.80 0.90 6.48
-8 0.60 0.25 -1.20
Wall 8 1.70 0.65 8.84
Sink slab type-1 Edge & Bottom 1 9.43 0.60 5.66
Deduct Sink -2 0.95 0.43 -0.81

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
-4 0.43 0.13 -0.21
Wall 6 0.98 0.65 3.80
2 0.55 0.65 0.72
Sink slab type-2 1 6.75 0.10 0.68
Bottom 1 5.75 0.50 2.88
Deduct Sink -2 0.95 0.43 -0.81
-3 0.43 0.13 -0.16
Wall 7 0.98 0.65 4.44
Sink slab type-3 1 9.00 0.10 0.90
Bottom 1 3.60 0.90 3.24
Deduct Sink -1 0.75 0.35 -0.26
-2 0.75 0.25 -0.38
-1 0.75 0.13 -0.09
Wall 1 5.75 0.65 3.74
Furniture slab in Store room 1 6.75 0.70 4.73
Deduct Wall -3 0.53 0.13 -0.20
Wall 3 1.18 0.65 2.29

First floor plan


Library 1 32.35 Perimeter 3.00 97.05
Store 1 17.70 Perimeter 3.00 53.10
Computer 1 25.05 Perimeter 3.00 75.15
Computer Partition 2 7.45 1.20 17.88
Partition Top 2 3.60 0.25 1.80
Staircase 1 17.75 3.00 53.25
Pedestal 3 1.00 0.25 0.75
3 0.50 0.25 0.38
Column
Grid 2A,2E 2 0.48 3.00 2.85
Grid 2B 1 0.65 3.00 1.95
Grid 2C,2D 2 0.45 3.00 2.70

Deduction for Doors and Windows 0.00


Ground floor plan 0.00
W1 -14 1.10 1.13 -8.66
V1 -14 1.10 0.53 -4.04
W3 -1 1.50 0.37 -0.28
D1 -4 1.10 2.48 -5.45
D3 -2 1.00 2.10 -2.10
D4 -2 1.00 1.55 -1.55
First floor plan
W1 -14 1.10 1.13 -8.66
W2 -1 1.50 1.00 -0.75
V2 -14 1.10 0.65 -5.01
D2 -4 1.10 2.60 -5.72
D3 -2 1.00 2.10 -2.10
D4 -2 1.00 1.55 -1.55
Total 599.03 sq.m

7.1.2 Internal Plaster on Ceiling (1:4)


Ground floor plan
Laboratory 1 9.43 6.75 63.62
Store 1 2.20 6.75 14.85
ECD 1 5.78 6.75 38.98
Staircase Lobby 1 3.20 2.40 7.68
Corridor 1 21.80 2.50 54.50

Staircase
Waist slab 1 6.76 1.50 10.15
Landing 1 1.47 1.50 2.20
1 1.80 0.20 0.36

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
1 1.94 1.50 2.90
Beam plaster 0.00
First floor level
Along grid A,E 2 2.05 0.40 1.64
Along grid B 1 8.60 0.80 6.88
Along grid C,D 2 2.05 0.80 3.28
Along grid A1 ,B1,D1 3 8.65 0.60 15.57
Along grid 2 1 16.65 0.40 6.66
1 3.05 0.80 2.44
Along grid 3 1 19.70 0.40 7.88
Along grid 1a 1 16.35 0.60 9.81
Along grid 1b 1 3.20 0.60 1.92
0.00
Truss level 0.00
Main beam(300x400) 0.00
Along grid 2 1 16.65 0.40 6.66
1 3.05 1.10 3.36
Along grid 3 1 19.70 0.70 13.79
Along grid A,E 2 2.05 0.70 2.87
Along grid B 1 8.60 1.10 9.46
Along grid C,D 2 2.05 1.10 4.51
Total 291.97 sq.m

7.1.3 External Plaster


Outer Plaster
Beam Plaster
First floor Level
Main Beam(300 x 525)
Along grid 1 1.00 19.70 0.53 10.34
Along grid 3 1.00 19.70 0.53 10.34
Along grid A and E 2.00 8.60 0.53 9.03
Second floor Level
Main Beam(300 x 400)
Along grid 1 1.00 19.70 0.40 7.88
Along grid 3 1.00 19.70 0.40 7.88
Along grid A and E 2.00 8.60 0.40 6.88

Landing Beam 1.00 3.05 0.38 1.16


Column Plaster
Upto Plinth Level
Along grid 1
Grid 1A,1E 2.00 0.90 0.45 0.81
Grid 1B,1C,1D 3.00 0.45 0.45 0.61
Along grid 2
Grid 2A,2E 2.00 0.45 0.45 0.41
Along grid 3
Along grid 3A 1.00 0.08 0.38 0.03
1.00 0.45 0.40 0.18
Grid 3B 1.00 0.08 0.15 0.01
Grid 3C 1.00 0.60 0.15 0.09
Grid 3D 1.00 0.60 0.15 0.09
Grid 3E 1.00 1.05 0.15 0.16

Ground Floor
Along grid 1
Grid 1A,1E 2.00 1.10 2.33 5.12
Grid 1B,1C,1D 3.00 0.65 2.33 4.53
Along grid 2
Grid 2A,2E 2.00 0.65 2.33 3.02
Along grid 3
Grid 3A,3E 2.00 1.05 3.00 6.30

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
2.00 0.75 2.88 4.31
Grid 3B,3C,3D 3.00 1.20 2.88 10.35
3.00 0.60 3.00 5.40

First Floor
Along grid 1
Grid 1A,1E 2.00 1.10 3.00 6.60
Grid 1B,1C,1D 3.00 0.65 3.00 5.85
Along grid 2
Grid 2A,2E 2.00 0.65 3.00 3.90
Along grid 3
Grid 3A,3E 2.00 1.05 3.00 6.30
2.00 0.75 2.88 4.31
Grid 3B,3C,3D 3.00 1.20 2.88 10.35
3.00 0.60 3.00 5.40

For Drain 1.00 41.15 0.85 34.98


External Steps Side Wall
Grid 2A,2E 2.00 1.03 0.45 0.92
Grid 3A 1.00 0.93 0.45 0.42
Steps Edge 3.00 0.60 0.45 0.81
For Ramp
Top-3B 1.00 1.33 0.25 0.33
Top 3AB 1.00 6.47 0.13 0.81
Front 3-AB 1.00 1.60 0.60 0.96
1.00 5.10 0.38 1.91
Inner 1.00 7.52 0.15 1.13
Side-3B 1.00 1.33 0.60 0.80
For Bench
Top 1.00 2.40 0.50 1.20
Edge 1.00 5.80 0.13 0.73
Side 1.00 5.40 0.53 2.84

Plaster on Outer Walls


Ground floor
Along grid 1 1 16.65 2.33 38.71
1 3.05 2.02 6.16
Along grid 2 1 16.28 2.33 37.84
Along grid A and E 2 6.55 2.33 30.46

First floor level


Along grid 1 1 16.65 2.45 40.79
1 3.05 2.53 7.70
Along grid 2 1 16.35 2.45 40.06
Along grid A and E 2 6.55 2.45 32.10

Deduction for doors and windows


Ground floor plan
W1 -14 1.10 1.13 -17.33
V1 -14 1.10 0.53 -8.09
W3 -1 1.50 0.37 -0.56
D1 -4 1.10 2.33 -10.23
First floor plan
W1 -14 1.10 1.13 -17.33
V2 -14 1.10 0.65 -10.01
W2 -1 1.50 1.00 -1.50

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
D2 -4 1.10 2.45 -10.78
Total 343.47 sq.m

7.2 Painting Works


7.2.1 Distemper Paint
As per Internal Plaster on Wall 1.00 599.03 599.03
As per Internal Plaster on Ceiling 1.00 291.97 291.97
On False Ceiling 1.00 289.83 289.83
Total 1,180.83 sq.m

7.2.2 Exterior Weather Coat Paint


As per External Plaster 1.00 343.47 343.47
Total 343.47 sq.m

7.2.4 Enamel Paint Factor


Collapsable Gate 1.00 3.05 2.48 2.00 15.10
Door D1 4 1.10 2.44 2.00 21.43
D2 4 1.10 2.56 2.00 22.53
D3 2 1.00 2.10 2.00 8.40
D4 2 1.00 1.55 2.00 6.20
Window W1 28 1.10 1.13 2.00 69.30
W2 1 1.50 1.00 2.00 3.00
V1 14 1.10 0.53 2.00 16.17
V2 14 1.10 0.65 2.00 20.02
Window Grill
W1 19 1.10 1.13 2.00 47.03
W2 1 1.50 1.00 2.00 3.00
W3 1 1.50 0.37 2.00 1.11
V1 14 1.10 0.53 2.00 16.17
V2 5 1.10 0.65 2.00 7.15
Total 256.60 sq.m

8 MISCELLANEOUS
8.2 Cement Board Wall
8.2.1 For partition
Gable Walls 4.00 7.26 Area 29.04
Total 29.04 sq.m

8.3 Railing
Staircase Railing
Horizontal ISNB 40M 1 8.43 8.43 3.56 30.01
Vertical 38mm Square Pipe 2 0.989 1.98 2.82 5.58
Vertical 38mm Square Pipe 6 0.969 5.81 2.82 16.40
Horizontal 25mm Square Pipe 4 8.34 33.37 0.85 28.37
Balcony Railing
First Floor
Horizontal ISNB 40M 1 23.80 23.80 3.56 84.73
Horizontal ISNB 32M 2 23.80 47.60 3.10 147.56
Vertical ISNB 32M 19 1.02 19.38 3.10 60.08
Inclined ISNB 32M 19 0.134 2.55 3.10 7.89
Vertical 25mm Square Pipe 163 0.82 133.66 0.85 113.61

Pedestal
ISNB 40M Pedestal Bars 8 1.91 15.28 3.56 54.40
8 1.49 11.92 3.56 42.44
16 0.40 6.40 3.56 22.78

Base plate 60 0.00009375 0.01 7850 44.16


12 mm dia. Anchor Bolt, Nut 240 0.13 31.20
Total 689.19 Kg

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Block : 2-LaLiEC
School Name : Shree Chandrodaya S.S
Location : Shreenathkot, Gorkha

Truss Calculation Details-2-LaLiEC


Total Total Wt.
S.N Description Notation Nos Length Breadth Thickness Wt/m Wt/m3
Length (Kg)
1 Top Chord TP dia 50 M 16 6.167 98.672 5.03 496.33
2 Bottom Chord BC dia 40 M 16 4.903 78.448 3.56 279.28
3 Vertical Strut VS dia 40 M 16 3.917 62.672 3.56 223.12
4 Cross bracing CB dia 40 M 32 1.7 54.4 3.56 193.67
5 Diagonal Strut DS dia 32 M 16 4.223 67.568 3.1 209.47
6 Purlin P dia 65 12 23.75 285 6.61 1883.85
7 Bottom Center Connection Plate T1 BCCP 10 mm 6 0.175 1.05 0.175 0.01 7850 14.43
8 Bottom Center Connection Plate T2 BCCP 10 mm 10 0.175 1.75 0.15 0.01 7850 20.61
9 Top Center Connection Plate (T1 & T2) CCP 10 mm 16 0.175 2.8 0.175 0.01 7850 38.47
10 Truss Base Plate TBP 10 mm 48 0.3 14.4 0.3 0.01 7850 339.12
11 Truss Cleat for Purlin TCP 10 mm 264 0.2 52.8 0.09 0.01 7850 373.04
12 Purlin Eves Plate PEP 3 mm 24 0.125 3 0.075 0.003 7850 5.30
13 Truss Eves Plate TEP 3 mm 16 0.125 2 0.06 0.003 7850 2.83
14 Cross Bracing Center Plate CBP 6 mm 16 0.38 6.08 0.08 0.006 7850 22.91
15 Cross Bracing Truss Cleat CBTC 6 mm 32 0.165 5.28 0.08 0.006 7850 19.90
16 Cross Bracing Truss Cleat-Wind Tie CTC 6 mm 32 0.1 3.2 0.1 0.006 7850 15.08
17 Wind Bracing Center Cleat DBCC 6 mm 32 0.17 5.44 0.08 0.006 7850 20.50
18 Anchor Bolt AB 16 dia 96 0.45 43.2 1.58 68.26
19 Stiffner Cleat Base Plate SC 10 mm 48 0.05 2.4 0.075 0.01 7850 14.13
20 Base Plate Truss Guide Cleat BPRGC 48 0.3 14.4 0.14 0.01 7850 158.26
21 Center Joint Cleat-T1 CJC 10 mm 78 0.062 4.836 0.13 0.01 7850 49.36
22 Center Joint Cleat-T2 CJC 10 mm 50 0.062 3.1 0.13 0.01 7850 31.64
23 Truss Runner Support Plate (C-Section) TRSP 10 mm 56 0.055 3.08 0.07 0.01 7850 16.93
24 Runner Purlin Cleat RPC 10 mm 56 0.175 9.8 0.07 0.01 7850 53.86
25 Runner Pipe NB 40 2 21.5 43 3.56 7850 153.08
26 Center Row Column (truss Support) CRC 10 mm 16 0.25 4 0.03 0.01 7850 9.42
Total of Truss Work 4712.85

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Block : 2-LaLiEC
School Name : Shree Chandrodaya S.S
Location : Shreenathkot, Gorkha
Detailed measurement Sheet : 2-LaLiEC
Piece
Dia. Spacing Wt./m Total Total Wt.
SN Description Bar Shape Lot Nos. Length Remarks
(mm) (mm) (Kg) Length (Kg)
(m)

Footing (5 Nos): 1500*1500mm, Bars 1.40


1 12 150 0.89 5.00 10 1.60 82.67 73.48
(X direction) 0.10

1.40
Bars (Y - direction) 12 150 0.89 5.00 10 1.60 82.67 73.48
0.10

2.10
Footing (2 Nos): 2200*2200mm, Bars
12 150 0.89 2.00 15 2.30 69.00 61.33
(X direction) 0.10

2.10
Bars (Y - direction) 12 150 0.89 2.00 15 2.30 69.00 61.33
0.10

2.30
Footing (3 Nos): 2400*2400mm, Bars
12 150 0.89 3.00 16 2.50 122.50 108.89
(X direction) 0.10

2.30
Bars (Y - direction) 12 150 0.89 3.00 16 2.50 122.50 108.89
0.10

2.40
Footing (1 Nos): 2500*2500mm, Bars
12 150 0.89 1.00 17 2.60 44.20 39.29
(X direction) 0.10

2.40
Bars (Y - direction) 12 150 0.89 1.00 17 2.60 44.20 39.29
0.10

2.70
Footing (1 Nos): 2800*2800mm, Bars
12 150 0.89 1.00 19 2.90 55.10 48.98
(X direction) 0.10

2.70
Bars (Y - direction) 12 150 0.89 1.00 19 2.90 55.10 48.98
0.10

2.90
Footing (2 Nos): 3000*3000mm, Bars
12 150 0.89 2.00 20 3.10 126.07 112.06
(X direction) 0.10

2.90
Bars (Y - direction) 12 150 0.89 2.00 20 3.10 126.07 112.06
0.10

3.00
Footing (1 Nos): 3100*3100mm, Bars
12 150 0.89 1.00 21 3.20 67.20 59.73
(X direction) 0.10

3.00
Bars (Y - direction) 12 150 0.89 1.00 21 3.20 67.20 59.73
0.10

3 Foundation Beams, 250*300


Main Bars (Long side beams); Along 21.5+0.45-2(0.05)
0.44 12 0.888 3 6 24.41 439.38 390.17
Grid 1-1, 2-2, 3-3

0.20 0.08
100 &
Stirrups (for 250*300) 8 0.395 3 171 0.81 416.56 164.54
150
0.15

Main Bars (Short side beams); Along


9.5+0.45-2(0.05) 12 0.888 5 6 10.73 321.90 285.85
Grid A,B,C,D,E 0.44

0.20 0.08
100 &
Stirrups (for 250*300) 8 0.395 5 75 0.81 304.50 120.28
150
0.15
Columns(450*450) upto plinth level

At Grid 1- A,B,C,D,E 16 1.58 5.00 12 2.16 129.60 204.80


0.08+0.51 0.37+0.75+0.45

At Grid 2- A,B,C,D,E 16 1.58 5.00 8 2.16 86.40 136.53


0.08+0.51 0.37+0.75+0.45

20 2.47 5.00 4 2.40 48.00 118.52


0.08+0.75 0.37+0.75+0.45

At Grid 3- A,B,E 16 1.58 3.00 8 2.16 51.84 81.92


0.08+0.51 0.37+0.75+0.4
5

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU, Engineer
Piece
Dia. Spacing Wt./m Total Total Wt.
SN Description Bar Shape Lot Nos. Length Remarks
(mm) (mm) (Kg) Length (Kg)
(m)

20 2.47 3.00 4 2.40 28.80 71.11


0.08+0.75 0.37+0.75+0.45

At Grid 3- C,D 20 2.47 2.00 12 2.40 57.60 142.22


0.08+0.75 0.37+0.75+0.45

0.37 0.08
Stirrups for 15 columns 8 100 0.395 15.00 14 1.59 334.32 132.06
0.37
0.08
0.14
8 100 0.395 15.00 17 1.13 288.66 114.02
0.37
4 Plinth Tie Beams, 300*525mm
Main Bars (Long side beams); Along Grid 1-1, 2-2, 3-3

Top (T/O) 0.72 16 1.58 3 3 24.41 219.69 347.11


21.5+0.45-2(0.05)

Bottom (T/O) 21.5+0.45-2(0.07) 20 2.47 3 4 25.25 303.00 747.50


1.0

Extra Bars (at 2 ends) 1.37 25 3.86 3 4 3.45 41.40 159.60


0.38+1.70

Extra Bars above Grid B-B 0.45+1.7*2 25 3.86 3 2 3.85 23.10 89.05

Extra Bars above Grid C-C, D-D 1.05+0.45+1.7 25 3.86 3 4 3.20 38.40 148.03

Torsion Bar 16 1.58 3 2 22.30 133.80 211.40

0.475 0.1`2
Stirrups (for 300*525) 12 100&150 0.89 3 201 1.64 990.13 879.23
0.25
Main Bars (Short side beams); Along Grid A,B,C,D,E 0.00 0.00

Top (T/O) 0.72


9.5+0.45-2(0.05) 16 1.58 5 3 11.29 169.35 267.57

Bottom (T/O) 9.5+0.45-2(0.05) 20 2.467 5 4 11.85 237.00 584.68


1.0

Extra Bars (at 2 ends) 1.12


0.38+2.5+1.75 25 3.855 5 2 6.00 60.00 231.30

1.12 25 3.855 5 2 3.50 35.00 134.93


0.38+1.75

Torsion Bar 16 1.58 5 2 10.40 104.00 164.32

0.475 0.12

Stirrups (for 300*525) 12 100&150 0.888 5 79 1.62 639.11 567.53


0.25

G.F. Columns

FFL

Grid-1 (A,B,C,D,E) 3000 16 1.58 5 6 3.00 90.00 142.22

GFL

FFL

3000 16 1.58 5 6 3.96 118.80 187.73

GFL

FFL

Grid-2(A,B,C,D,E) 3000 16 1.58 5 6 3.00 90.00 142.22

GFL

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU, Engineer
Piece
Dia. Spacing Wt./m Total Total Wt.
SN Description Bar Shape Lot Nos. Length Remarks
(mm) (mm) (Kg) Length (Kg)
(m)

FFL

3000 16 1.58 5 2 3.96 39.60 62.58

GFL

FFL

3000 20 2.47 5 4 4.20 84.00 207.41

GFL

FFL

Grid-3(A,B,E) 3000 16 1.58 3 6 3.00 54.00 85.33

GFL

FFL

3000 16 1.58 3 2 3.96 23.76 37.55

GFL

FFL

20 2.47 3 4 4.20 50.40 124.44


3000

GFL

FFL

Grid-3(C,D) 3000 20 2.47 2 6 3.00 36.00 88.89

GFL

FFL

3000 20 2.47 2 6 4.20 50.40 124.44

GFL

0.37 0.08
100 &
Stirrups for 15 columns 8 0.40 15 29 1.59 686.55 271.23
0.37 150

0.08
0.14 100 &
4 8 0.40 15 52 1.13 874.47 345.47
150
0.37
Main Beams at F.F. Level
Main Bars (Long side beams); Along Grid 1-1, 2-2, 3-3

Top (T/O) 0.72 16 1.58 3 3 24.41 219.69 347.16


21.5+0.45-2(0.05)

21.5+0.45-2(0.07)
Bottom (T/O) 1.0 20 2.47 3 4 25.25 303.00 748.15

Extra Bars (at 2 ends) 1.37


0.38+1.70
25 3.86 3 4 3.45 41.40 159.72

Extra Bars above Grid B-B 0.45+1.7*2 25 3.86 3 2 3.85 23.10 89.12

Extra Bars above Grid C-C, D-D 1.05+0.45+1.7 25 3.86 3 4 3.20 38.40 148.15

Torsion bar 16 1.58 3 2 21.90 131.40 207.64

0.475 0.12
100 &
Stirrups (for 300*525) 10 0.62 3 232 1.64 1142.83 705.45
150
0.25

Main Bars (Short side beams); Along Grid A,B,C,D,E

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU, Engineer
Piece
Dia. Spacing Wt./m Total Total Wt.
SN Description Bar Shape Lot Nos. Length Remarks
(mm) (mm) (Kg) Length (Kg)
(m)

Top (T/O) 0.72


9.5+0.45-2(0.05) 16 1.58 5 3 11.29 169.35 267.61

Bottom (T/O) 9.5+0.45-2(0.05) 20 2.47 5 4 11.85 237.00 585.19


1.0

Extra Bars (at 2 ends) 1.35 25 3.86 5 2 6.00 60.00 231.48


4.65

1.35 25 3.86 5 2 3.50 35.00 135.03


0.38+1.75

Along grid B,C,D 16 1.58 2 3 5.25 31.50 49.78

Torsion bar 16 1.58 5 2 9.90 99.00 156.44

0.47 0.12
100 &
Stirrups (for 300*525) 10 0.62 5 78 1.58 616.20 382.04
150
0.25
Secondary Beam -

Along Grid A1,B1,D1 0.4


9.8-2(0.05) 16 1.58 3 3 102.96 162.70
11.44

0.4 9.8-2(0.05) 16 1.58 3 3 102.96 162.70


11.44
0.375 0.10
100 &
Stirrups (for 425*250) 8 0.40 3 1.30 313.78 123.96
150
0.20 80

Along Grid 1b 0.4 16 1.58 1 3 5.44 16.32 25.79


3.8-2(0.05)

0.4 3.8-2(0.05)
16 1.58 1 3 5.44 16.32 25.79

0.4 0.10
100 &
Stirrups (for 425*250) 8 0.40 1 1.30 35.37 13.97
150
0.20 27

Along Grid 1a 0.4


11.7+.3*2-.05*2+.96 16 1.58 1 3 14.90 44.70 70.64

0.4
16 1.58 1 3 14.90 44.70 70.64
11.7+.3*2-.05*2+.96

0.375 0.10
100 &
Stirrups (for 425*250) 8 0.40 1 147 1.30 191.39 75.61
150
0.20

0.4
5.7+.5
16 1.58 1 3 7.94 23.82 37.64

0.4 5.7+.5 16 1.58 1 3 7.94 23.82 37.64

0.375 0.10
100 &
Stirrups (for 425*250) 8 0.40 1 49 1.30 63.80 25.20
150
0.20

960 960
Hunge bar(at secondary beam
420 16 1.58 2 16 3.01 96.32 152.21
intersection) 420
250
First floor slab (First floor level) - -
Along Y-axis - -
600
GRID 1-3: between A-C 75 8 300 0.40 1 37 10.96 409.17 161.65
9800-40
450 600
75 8 300 0.40 1 37 11.12 415.15 164.01
9800-40

2350 8 150 0.40 1 47 2.50 117.50 46.42


75 75

2100 8 150 0.40 1 45 2.25 102.00 40.30


75 75

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU, Engineer
Piece
Dia. Spacing Wt./m Total Total Wt.
SN Description Bar Shape Lot Nos. Length Remarks
(mm) (mm) (Kg) Length (Kg)
(m)

450
GRID 2-3: between C-D 75 8 300 0.40 1 12 5.49 63.99 25.28
4925-40

450
75 8 300 0.40 1 12 5.57 64.93 25.65
4925-40

3080 8 150 0.40 1 13 3.23 43.07 17.01


75 75

450 600
GRID 1-3: between D-E 75 8 300 0.40 1 19 10.96 210.07 82.99
9800-40

600
75 8 300 0.40 1 19 11.12 213.13 84.20
9800-40

2350 8 150 0.40 1 26 2.50 64.17 25.35


75 75

2100 8 150 0.40 1 24 2.25 54.00 21.33


75 75
Along X-axis - - -
525
GRID A-C: between 1-1a 75 75 8 300 0.40 1 15 13.94 214.91 84.90
12300-40

525
75 75 8 300 0.40 1 15 14.18 218.61 86.36
12300-40

2050 8 300 0.40 1 14 2.20 30.43 12.02


75 75

2100 8 300 0.40 1 14 2.25 31.13 12.30


75 75

2050 8 300 0.40 1 14 2.20 30.43 12.02


75 75

525
GRID A-E: between 1a-3 75 75 8 300 0.40 1 16 23.44 365.27 144.31
21800-40
525
75 75 8 300 0.40 1 16 23.92 372.75 147.26
21800-40

2050 8 150 0.40 3 11 2.20 74.80 29.55


75 75

2100 8 150 0.40 1 11 2.25 25.50 10.07


75 75

2250 8 150 0.40 2 11 2.40 54.40 21.49


75 75

525
GRID D-E: between 1-1a 75 75 8 300 0.40 3 15 7.46 345.03 136.31
6300-40
525
75 75 8 300 0.40 3 15 7.54 348.73 137.77
6300-40

2050 8 150 0.40 2 15 2.20 67.47 26.65


75 75
Dstribution Bars - -

Along Short Span on A-C/1-1a 75 75 8 150 0.40 1 19 12.89 247.06 97.60


12300-40

Along Short Span on A-E/1a-3 75 75 8 150 0.40 1 17 22.39 369.44 145.95


21800-40

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU, Engineer
Piece
Dia. Spacing Wt./m Total Total Wt.
SN Description Bar Shape Lot Nos. Length Remarks
(mm) (mm) (Kg) Length (Kg)
(m)

Along Short Span on D-E/1-1a 75 75 8 150 0.40 1 19 6.41 122.86 48.54


6300-40

Along Long Span on 1-3/A-C 75 8 150 0.40 1 46 9.91 459.16 181.40


9800-40

Along Long Span on 1b-3/C-D 75 8 150 0.40 1 15 5.04 75.53 29.84


4925-40

Along Long Span on 1-3/D-E 75 8 150 0.40 1 19 9.91 184.99 73.08


9800-40
Staircase on G.F. - - -

1200
First Flight 12 125 0.89 1 13 3.80 49.34 43.85
2260
335
1450

3354 270
12 125 0.89 1 13 8.20 106.65 94.80
2700
430

1000
12 125 0.89 1 13 2.00 26.00 23.11
1000

1000
1000 12 125 0.89 1 13 2.00 26.00 23.11

1870
780 180 12 125 0.89 1 13 2.83 36.79 32.70

855
75
Second Flight 3354 12 125 0.89 1 13 8.05 104.64 93.01
2315
145
2260
240 780 12 125 0.89 1 13 3.28 42.64 37.90

2035
330 1000
12 125 0.89 1 13 3.37 43.75 38.88

1000
1880 12 125 0.89 1 13 4.68 60.84 54.08

180

1000
12 125 0.89 1 13 2.00 26.00 23.11
1000

450
Nosing ties 122 8 300 0.40 1 120 2.20 264.00 104.30
150

Nosing Bar 10 0.62 1 20 1.63 32.50 20.06


75 1475 75

First flight distribution bar 10 150 0.62 1 91 1.63 147.88 91.28


75 1475 75

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU, Engineer
Piece
Dia. Spacing Wt./m Total Total Wt.
SN Description Bar Shape Lot Nos. Length Remarks
(mm) (mm) (Kg) Length (Kg)
(m)

Second Flight distribution bar 75 1475 10 150 0.62 1 56 1.63 91.00 56.17
75

F.F. Columns

SFL

Grid-1 (A,B,C,D,E) 3000 16 1.58 5 6 3.60 107.85 170.43

FFL

SFL

3000 16 1.58 5 6 4.56 136.65 215.94

FFL

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU, Engineer
Piece
Dia. Spacing Wt./m Total Total Wt.
SN Description Bar Shape Lot Nos. Length Remarks
(mm) (mm) (Kg) Length (Kg)
(m)

SFL

Grid-2(A,B,C,D,E) 3000 20 2.47 5 4 3.88 77.50 191.36

FFL

SFL

3000
16 1.58 5 2 3.60 35.95 56.81

FFL

SFL

3000 16 1.58 5 6 4.56 136.65 215.94

FFL

SFL

Grid-3(A,B,E) 3000 16 1.58 3 6 3.60 64.71 102.26

FFL

SFL

3000 16 1.58 3 6 4.56 81.99 129.56

FFL

SFL

Grid-3(C,D) 3000 16 1.58 2 6 3.60 43.14 68.17

FFL

SFL

3000 20 2.47 2 6 5.08 60.90 150.37

FFL

0.37 0.08
100 &
Stirrups for 15 columns 8 0.40 15 29 1.59 692.52 273.59
150
0.37

0.08
0.14 100 &
8 0.40 15 52 1.13 882.96 348.82
150
0.37
Main Beams at Truss Level
Main Bars (Long side beams); Along Grid 1-1, 2-2, 3-3

0.72
Top (T/O) 21.5+0.45-2(0.05) 16 1.58 3 3 24.41 219.69 347.16

Bottom (T/O) 0.72


21.5+0.45-2(0.05)
16 1.58 3 2 24.41 146.46 231.44

21.5+0.45-2(0.07)
0.42 12 0.889 3 2 23.57 141.42 125.71

0.35 0.12
100 &
Stirrups (for 300*400) 8 0.395 3 232 1.39 968.83 382.75
150
0.25
Main Bars (Short side beams); Along Grid A,B,C,D,E 0.00 0.00

Top (T/O) 0.72


9.5+0.45-2(0.05) 16 1.58 5 3 11.29 169.35 267.61

Bottom (T/O) 0.72


9.5+0.45-2(0.05) 16 1.58 5 2 11.29 112.90 178.41

0.42
9.5+0.45-2(0.05) 12 0.889 5 2 10.73 107.30 95.38

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU, Engineer
Piece
Dia. Spacing Wt./m Total Total Wt.
SN Description Bar Shape Lot Nos. Length Remarks
(mm) (mm) (Kg) Length (Kg)
(m)

0.35 0.12
100 &
Stirrups (for 300*525) 8 0.395 5 79 1.39 549.84 217.22
150
0.25
G.F Sill band
600 600
At grid 1 10 0.62 3 2 7.29 43.74 27.00
5550

8 150 0.40 3 38 0.26 29.64 11.71

600 600
10 0.62 1 2 4.55 9.10 5.62
3050

8 150 0.40 1 21 0.26 5.55 2.19

600 600
At grid 2 10 0.62 2 2 5.95 23.80 14.69
5550
8 150 0.40 2 33 0.26 17.25 6.81

600 600
10 0.62 1 2 4.61 9.22 5.69
5550
8 150 0.40 1 25 0.26 6.59 2.60

600 600
At grid A,C,D,E 10 0.62 4 2 8.05 64.40 39.75
6550

8 150 0.40 4 45 0.26 46.45 18.35

At store partition wall


10 0.62 1 2 1.88 3.75 2.31
10 0.62 1 2 4.13 8.25 5.09

Lintel Band
600 600
At grid 1 10 0.62 3 2 7.05 42.30 26.11
5550
8 150 0.40 3 38 0.26 29.64 11.71

600 600
10 0.62 1 2 4.55 9.10 5.62
3050

8 150 0.40 1 21 0.26 5.55 2.19

600 600
At grid 2 10 0.62 2 2 5.95 23.80 14.69
5550
8 150 0.40 2 31 0.26 15.95 6.30

600 600
10 0.62 1 2 4.85 9.70 5.99
5550
8 150 0.40 1 0.26 6.59 2.60
25
600 600
At grid A,C,D,E 10 0.62 4 2 8.05 64.40 39.75
6550

8 150 0.40 4 45 0.26 46.45 18.35

Vertical Band 10 0.62 4 2 2.48 19.80 12.22


2475

8 150 0.40 4 18 0.26 18.20 7.19

At store partition wall


10 0.62 1 2 1.88 3.75 2.31
10 0.62 1 2 4.13 8.25 5.09
F.F. Sill Band
600 600
At grid 1 10 0.62 3 2 7.05 42.30 26.11
5550

8 150 0.40 3 38 0.26 29.64 11.71

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU, Engineer
Piece
Dia. Spacing Wt./m Total Total Wt.
SN Description Bar Shape Lot Nos. Length Remarks
(mm) (mm) (Kg) Length (Kg)
(m)

600 600
At grid 2 10 0.62 2 2 5.95 23.80 14.69
5550

8 150 0.40 2 31 0.26 15.95 6.30

600 600
10 0.62 1 2 4.85 9.70 5.99
5550

8 150 0.40 1 25 0.26 6.59 2.60

600 600
At grid A,C,D,E 10 0.62 4 2 8.05 64.40 39.75
6550
8 150 0.40 4 45 0.26 46.45 18.35

At store partition wall


10 0.62 1 2 1.88 3.75 2.31
10 0.62 1 2 4.13 8.25 5.09
Lintel Band
600 600
At grid 1 10 0.62 3 2 7.05 42.30 26.11
5550

8 150 0.40 3 38 0.26 29.64 11.71

600 600
10 0.62 1 2 4.55 9.10 5.62
3050

8 150 0.40 1 21 0.26 5.55 2.19

600 600
At grid 2 10 0.62 2 2 5.95 23.80 14.69
5550

8 150 0.40 2 33 0.26 17.16 6.78

600 600
10 0.62 1 2 4.85 9.70 5.99
5550

8 150 0.40 1 25 0.26 6.50 2.57

600 600
At grid A,C,D,E 10 0.62 4 2 8.05 64.40 39.75
6550

8 150 0.40 4 44 0.26 45.76 18.08

Vertical Band 10 0.62 4 2 2.60 20.80 12.84


2600

8 150 0.40 4 18 0.26 19.07 7.53

At store partition wall


10 0.62 1 2 1.88 3.75 2.31

10 0.62 1 2 4.13 8.25 5.09

Soak Pit 8 200 0.40 1 1 3.77 3.77 1.49


8 200 0.40 1 1 2.51 2.51 0.99
8 200 0.40 1 1 1.26 1.26 0.50
Main Bar 8 200 0.40 1 1 1.15 1.15 0.45
8 200 0.40 1 1 1.08 1.08 0.43
8 200 0.40 1 1 0.84 0.84 0.33
Distribution Bar 8 200 0.40 1 1 1.15 1.15 0.45
8 200 0.40 1 1 1.08 1.08 0.43
8 200 0.40 1 1 0.84 0.84 0.33
Negative Bar 8 200 0.40 1 1 0.45 0.45 0.18
Distribution Bar 8 200 0.40 1 21 1.08 22.70 8.97
8 200 0.40 1 8 0.84 6.75 2.67
built in furniture
At store room
6700 X 600 built in furniture(2 nos) - -
long bar 8 0.40 2.00 5 7.00 35.00 13.83
short bar 8 0.40 2.00 46 0.73 33.11 13.08
Practical room - -
3600 X 900 built in furniture(1nos) - -
long bar 8 0.40 1.00 7 3.25 22.75 8.99
short bar 8 0.40 1.00 22 1.00 22.00 8.69

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU, Engineer
Piece
Dia. Spacing Wt./m Total Total Wt.
SN Description Bar Shape Lot Nos. Length Remarks
(mm) (mm) (Kg) Length (Kg)
(m)
around basin 8 0.40 1.00 2 2.75 5.50 2.17
8 0.40 1.00 19 0.22 4.18 1.65
1800 X 900 built in furniture(4nos) - -
long bar 8 0.40 4.00 7 1.90 53.20 21.02
short bar 8 0.40 4.00 13 1.00 52.00 20.54
at grid 2 - -
long bar 8 0.40 1.00 4 0.93 4.01 1.58
8 0.40 1.00 4 1.38 5.96 2.35
8 0.40 1.00 4 2.35 10.18 4.02
short bar 8 0.40 1.00 32 0.60 19.20 7.59
at grid 1 - - -
long bar 8 0.40 1.00 4 4.38 18.96 7.49
8 0.40 1.00 4 3.30 14.30 5.65
8 0.40 1.00 4 0.65 2.82 1.11
short bar 8 0.40 1.00 57 0.60 33.90 13.39
at corridor - -
long bar 8 0.40 2.00 5 2.65 26.50 10.47
short bar 8 0.40 2.00 17 0.50 17.00 6.72
TOTAL 21,919.44 KG
21.92 Mt.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU, Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: 2-LaLiEC
School Name : Shree Chandrodaya S.S
Location : Shreenathkot, Gorkha

2-LaLiEC Total
S. No. Description Unit Remarks
GF FF Total Quantity
A. Common Installation
1.1 Stand Alone 40 A DP MCB with Enclosure 1.00 1.00 1.00 nos.
2 CABLES & WIRES
2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded
2.1 50.00 r.m
copper conductor wires

2.2 2 Nos 2.5 Sq.mm mutistranded copper conductor 51.00 r.m


wires + 1 Nos. 1.5sq mm multistranded Cu wire

B School Blocks
1 DISTRIBUTION BOARDS 1.00 1.00 2.00 2.00 nos.
2 CABLES & WIRES
2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4
2.1 8.00 r.m
Sq mm Multistranded Cu wire
2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5
2.2 5.00 r.m
Sq mm Multistranded Cu wire
2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No
2.3 14.00 r.m
1.5 Sq mm Multistranded Cu wire
3 General Service Light Point Wiring
3.1 One Way Light Point 18.00 17.00 35.00 35.00 pts.
3.2 Two Way Light Point 1.00 1.00 1.00 pts.
3.3 Ceiling Fan Point 2.00 2.00 2.00 pts.
4 6A Universal Pin Light Power Socket Wiring 17.00 32.00 49.00 49.00 pts.
5 Switch Socket Outlets
5.1 6A Universal Power Switch Socket 17.00 32.00 49.00 49.00 nos.
6 Sweep Ceiling/ Exhaust Fan/Wall Fan
6.2 225mm dia M/D exhaust Fan nos.
6 Wall Fan 1.00 1.00 1.00 nos.
7 Light Fixtures/Luminaires & Accessories
7.1 24 W LED Surface Mounted Square type 6.00 6.00 6.00 nos.
7.2 24 W LED Recessed Mounted Square type 6.00 6.00 6.00 nos.
7.3 18 W LED Surface Mounted Square type 4.00 4.00 4.00 nos.
7.4 18 W LED Recessed Mounted Square type 4.00 4.00 4.00 nos.
7.5 12 W LED Surface Mounted Cylindrical type 7.00 7.00 7.00 nos.
7.6 12 W LED Recessed Mounted Circular type 8.00 8.00 8.00 nos.
7.7 LED Wall Light 1.00 1.00 1.00 nos.
8 Pull Box nos.
Junction Box At External Post Top Light 3.00 no.
9 External Post Top Light Pole 3.00 3.00 no.
10 Post Top External Light Fixtures 3.00 3.00 no.
11 Earthing & Lighting Protection
11.1 Chemical Earthing 3.00 3.00 no.
11.2 Earthing Bar 3.00 3.00 no.
12 Earthing Strip/Wires
12.3.1 25 x 3 mm GI strip 61.00 r.m
12.3.2 12 SWG Cu wire 16.00 r.m
13 Earth Test link 1.00 nos.
C Solar PV System
1 Solar PV Panel 8.00 nos.
2 Tubular Deep Cycle Battery 4.00 4.00 4.00 nos.
3 Hybrid Inverter 1.00 1.00 1.00 nos.
D Fire Extinguisher
a ABC Stored Pressure 5.0kg size 1 2 3.00 3.00 nos.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Toilet Block,Tc(S)
School Name : Shree Chandrodaya S.S
Location : Shreenathkot, Gorkha
S. No. Description No. Length Breadth Height Qty Unit Remarks
1 Earthworks
1.1 Site Clearance
Toilet Block 1 14.30 12.30 175.89
Septic Tank 1 8.75 3.95 34.56
Soak Pit 1 8.55 Area 8.55
Sewer Manhole (Rectangular) 4 2.00 2.00 16.00
Total 235.00 sq.m

1.2 Earthwork in excavation


Footing
F1 9 1.30 1.30 1.20 18.25
Excavation for lower tie beam
Grid 1 2 3.70 0.60 0.7 3.11
Grid 2 2 3.70 0.50 0.7 2.59
Grid 3 2 3.70 0.60 0.7 3.11
Between grid 2 and 3 2 4.45 0.60 0.7 3.74
Grid A-12 , B-12 and C-12 3 2.20 0.60 0.7 2.77
Along grid A-23 and C-23 2 1.20 0.50 0.7 0.84
Along grid B-23 1 1.20 0.60 0.7 0.50
Ramp
For Slope 2 1.58 1.03 0.28 0.89
Drain 1 11.45 0.63 0.23 1.61
1 11.45 0.58 0.38 2.52
Outside Steps 2 1.20 0.68 0.15 0.24

Septic Tank 1 6.75 1.95 2.72 35.78


Soak Pit 1 4.15 Area 1.55 6.44
For Sewer Manhole (Rectangular) 4 1.00 1.00 0.50 2.00
Total 84.39 cum

1.3 Earth Back filling


Total earthwork 84.39
Deduction
Boulder soling -1 19.26 Vol. -19.26
PCC work -1 2.03 Vol. -2.03
RCC work -1 5.16 Vol. -5.16

Inside the room(Compacted) 2 4.70 3.20 0.18 5.41


Along lobby(Compacted) 2 4.70 2.20 0.18 3.72
Total 67.07 cum

1.4 Boulder soling


For Footing
F1 9 1.00 1.00 0.20 1.80
For Lower Tie Beam
Grid 1 and Grid 3 2 9.40 0.45 0.10 0.85

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
S. No. Description No. Length Breadth Height Qty Unit Remarks
Grid 2 2 4.70 0.35 0.10 0.33
Between grid 2 and 3 2 4.45 0.45 0.10 0.40
Along grid A-12,B-12 & C-12 3 3.20 0.45 0.10 0.43
Along grid A-23 & C-23 2 2.20 0.35 0.10 0.15
Along grid B-23 1 2.20 0.45 0.10 0.10
Toilet Floors 2 4.75 3.25 0.20 6.18
Corridor Floors 2 4.75 0.88 0.20 1.66
Ramp
below ramp 2 6.77 1.03 0.20 2.78
For Outer Steps 2 1.20 0.60 0.1 0.14
Drain 1 11.45 1.20 0.10 1.37
Septic tank 1 6.75 1.95 0.1 1.32
For Sewer Manhole (Rectangular) 4 1.00 1.00 0.1 0.40
Soak pit ( Boulder packing) 1 1.13 Area 1.20 1.36
Total 19.26 cum

2 Concrete Works
2.1 PCC
2.1.1 PCC work (1:3:6)
For Footing
F1 9 1.00 1.00 0.10 0.90
For Lower Tie Beam
Grid 1 and Grid 3 2 9.40 0.45 0.05 0.42
Grid 2 2 4.70 0.35 0.05 0.16
Between grid 2 and 3 2 4.45 0.45 0.05 0.20
Along grid A-12,B-12 & C-12 3 3.20 0.45 0.05 0.22
Along grid A-23 & C-23 2 2.20 0.35 0.05 0.08
Along grid B-23 1 2.20 0.45 0.05 0.05
Septic Tank 1 0.83 1.45 0.08 0.09
Sewer Manhole (Rectangular)
Bottom 4 1.00 1.00 0.10 0.40
PCC Benching 4 0.07 Area 1.00 0.30
Total 2.82 cum

Sand Filling
Periphery of Soak pit 1 1.88 Area 1.55 2.92
Total 2.93 cu.m

2.1.2 P.C.C.(1:2:4) Works


Toilet 2 3.20 4.75 0.20 6.08
Corridor 2 1.20 4.75 0.20 2.28
Ramp
Below Ramp 2 6.77 1.03 0.08 1.04
For Outer Steps 2 1.20 0.60 0.05 0.07
2 1.20 0.30 0.05 0.04
Drain 1 11.45 0.58 0.075 0.49

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
S. No. Description No. Length Breadth Height Qty Unit Remarks
Total 10.01 cu.m

2.2 RCC Work 1:1.5:3


For Footing
F1 9
Square portion 1.00 1.00 0.20 1.80
Trapazoid portion Area 0.63 0.15 0.84
Lower Tie Beam
Grid 1,2,3 3 9.40 0.25 0.25 1.76
Grid A-12,C-12 2 3.20 0.25 0.25 0.40
Grid B-13 1 5.70 0.25 0.25 0.36
Plinth Tie Beam
Grid 1,2,3 3 9.40 0.25 0.30 2.12
Grid A-12,C-12 2 3.20 0.25 0.30 0.48
Grid A-23,C-23 2 2.20 0.25 0.59 0.65
Grid B-13 1 5.70 0.25 0.30 0.43
Column
From lower to plinth tie beam 9 0.30 0.30 1.00 0.81
Ground Floor Column 9 0.30 0.30 3.00 2.43
Truss Beam
Grid 1 1 9.40 0.25 0.40 0.94
Grid 2-3 2 9.40 0.25 0.45 2.12
Grid A-12,B-12,C-12 3 3.20 0.25 0.40 0.96
Grid A-23,B-23,C-23 3 2.20 0.25 0.45 0.74
Slab
Corridor Slab 2 4.75 2.25 0.150 3.21
Lintel Bands,
Ground floor level
Grid 1,2,3 3 9.40 0.23 0.13 0.81
Grid A& C 2 3.20 0.23 0.13 0.18
Grid B 1 5.40 0.23 0.13 0.16
Partition Wall
Partition Wall for disable toilet 2 3.27 0.23 0.13 0.19
Partition wall for toilet short wall 2 1.32 0.13 0.13 0.04
Partition wall for toilet long wall 2 2.50 0.13 0.13 0.08
Sill Bands
Ground floor level
Grid 1,2,3 3 9.40 0.23 0.08 0.49
Grid A& C 2 3.20 0.23 0.08 0.11
Grid B 1 5.40 0.23 0.08 0.09
Partition Wall
Partition Wall for disable toilet 2 3.27 0.23 0.08 0.11
Partition wall for toilet short wall 2 1.32 0.13 0.08 0.02
Partition wall for toilet long wall 2 2.50 0.13 0.08 0.05
Along the incinerator 3 1.95 0.13 0.08 0.05
Deduction of Doors For Sill
Ground floor level
D1 -2 1.00 0.23 0.08 -0.03
D2 -2 0.90 0.23 0.08 -0.03
D3 -4 0.75 0.13 0.08 -0.03

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
S. No. Description No. Length Breadth Height Qty Unit Remarks
Along the water trough 2 3.75 0.60 0.10 0.45
Water trough edge 2 5.40 0.20 0.10 0.22
at both end 2 0.48 0.20 0.10 0.02
at Center 1 0.50 0.20 0.10 0.01
Incinerators Slab 1 0.83 1.05 0.08 0.06
Septic Tank
At Bottom 1 6.30 2.25 0.15 2.13
Concealed Beam CB1 1 1.95 0.25 0.12 0.06
Concealed Beam CB 1 2.25 0.15 0.12 0.04
Top Cover 1 5.75 1.95 0.12 1.35
Deduction of Manhole -2 0.60 0.60 0.12 -0.09
Manhole Cover Slab 2 0.60 0.60 0.15 0.11
Manhole Cover Slab 1 0.75 0.75 0.15 0.08
Soak Pit
RCC slab 1 4.15 Area 0.13 0.52
Manhole/Waste Chamber
Top Cover 4 1.00 1.00 0.15 0.60
Total 27.89 cu.m

2.3 Silica Cement Admixture


10 Kg per cu.m. of R.C.C. M20 10 27.89 278.90
Total 278.90 Kg

2.5 Form Work


For Footing
F1 9 4.00 0.20 7.20
Lower Tie Beam
Grid 1,2,3 3 9.40 0.50 14.10
Grid A-12,C-12 2 3.20 0.50 3.20
Grid B-13 1 5.70 0.50 2.85
Pedestal column 9 1.00 1.20 10.80
Deduction1 at beam and column junction at LTB -24 0.25 0.25 -1.50
Deduction1 at beam and column junction at UTB -24 0.25 0.30 -1.80
Plinth Tie Beam
Grid 1,2,3 3 9.40 0.60 16.92
Grid A-12,C-12 2 3.20 0.60 3.84
Grid A-23,C-23 2 2.20 1.18 5.18
Grid B-13 1 5.70 0.60 3.42
Ground Floor Column 9 1.20 3.00 32.40
Deduction for Beam opening part -24 0.25 0.40 -2.40
Truss Beam
Grid 1-2-3 3 9.40 1.15 32.43
Grid A-12,B-12,C-12 3 3.20 1.05 10.08
Grid A-23,B-23,C-23 3 2.20 1.15 7.59
G.F. Slab
Corridor Slab 2 4.75 2.25 21.38
Lintel Bands,
Ground floor level
Grid 1,2,3 3 9.40 0.25 7.05
Grid A & C 2 3.20 0.25 1.60

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
S. No. Description No. Length Breadth Height Qty Unit Remarks
Grid B 1 5.40 0.25 1.35
Partition Wall
Partition Wall for disable toilet 2 3.27 0.25 1.64
Partition wall for toilet short wall 2 1.32 0.25 0.66
Partition wall for toilet long wall 2 2.50 0.25 1.25
Sill Bands
Ground floor level
Grid 1,2,3 3 9.40 0.15 4.23
Grid A & C 2 3.20 0.15 0.96
Grid B 1 5.40 0.15 0.81
Partition Wall
Partition Wall for disable toilet 2 3.27 0.15 0.98
Partition wall for toilet short wall 2 1.32 0.15 0.40
Partition wall for toilet long wall 2 2.50 0.15 0.75
Along the incinerator 3 1.95 0.08 0.44
Deduction of Doors For Sill
Ground floor level
D1 -2 1.00 0.08 -0.15
D2 -2 0.90 0.08 -0.14
D3 -4 0.75 0.08 -0.23
Along the water trough
Along the water trough 2 3.75 0.60 4.50
Water trough edge 2 3.75 0.50 3.75
at both end 2 0.48 0.50 0.48
at Center 1 0.50 0.50 0.25
Incinerators Slab 1 0.53 0.90 0.47
1 2.70 0.08 0.20
Septic Tank
At Bottom 1 17.10 0.15 2.57
Concealed Beam CB1 1 1.95 0.49 0.96
Concealed Beam CB 1 2.25 0.24 0.54
Top Cover 1 5.75 1.95 11.21
1 15.40 0.12 1.85
Deduction of Manhole -2 2.40 0.12 -0.58
Manhole Cover Slab 2 2.40 0.15 0.72
Manhole Cover Slab 1 3.00 0.15 0.45
Side Formwork for void 2 2.40 0.15 0.72
Soak Pit
RCC slab 1 4.15 Area 4.15
1 7.22 0.13 0.90
Manhole/Waste Chamber 0.00
Top Cover 4 4.00 0.15 2.40
Total 222.83 cu.m

3 Brickworks

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
S. No. Description No. Length Breadth Height Qty Unit Remarks
3.2 Brick Masonary Works (1:4 c/s)
Below Plinth tie beam
Grid 1,2,3 3 9.40 0.35 0.40 3.95
9.40 0.10 0.55 1.55
Grid A-12, B-12 & C-12 3 3.20 0.35 0.40 1.34
3.20 0.10 0.55 0.53
Grid B-23 1 2.20 0.35 0.40 0.31
2.20 0.10 0.55 0.12
Along the ramp 2 4.70 0.35 0.68 2.22

Brick Work above Tie Beam


Ground floor
Grid A-12, B-12& C-12 3 3.20 0.23 2.40 5.30
Grid B-23 1 2.20 0.23 2.35 1.19
Grid 1&2 2 9.40 0.23 2.40 10.38
Grid 3 1 9.40 0.23 1.30 2.81
Partition Wall for disable toilet 2 3.27 0.23 2.80 4.21
Cross wall at Water trough 2 0.58 0.23 0.30 0.08
2 0.58 0.23 0.45 0.12
Drain 1 11.45 0.25 0.20 0.57
Outer Steps 2 1.20 0.60 0.15 0.22
2 1.20 0.30 0.15 0.11
Deduction for doors and windows
Ground floor
D1 -2 1.00 0.23 2.10 -0.97
D2 -2 0.90 0.23 2.10 -0.87
V1 -2 3.48 0.23 0.38 -0.60
V2 -2 3.48 0.23 0.33 -0.52
V3 -2 1.98 0.23 0.38 -0.34
V4 -2 1.98 0.23 0.33 -0.30
Incinerators 2 0.65 0.23 0.30 0.09
1 0.65 0.23 0.30 0.04
Septic Tank
Outer Wall 2 6.00 0.38 2.72 12.23
1 1.20 0.38 2.72 1.24
1 1.20 0.38 1.70 0.78
1 1.20 0.25 1.02 0.31
2 0.50 0.25 1.02 0.26
Baffle wall 1 1.20 0.25 2.72 0.82
Deduct openings -1 1.20 0.25 0.57 -0.17
Soak Pit 1 1.14 Area 0.55 0.63
Total 47.63 Cu.m.

3.3 Half Brick Work (1:4 c/s)


Toilet Room
Partition wall for toilet short wall 2 1.32 2.80 3.70
Partition wall for toilet long wall 2 2.50 2.80 14.00
Low wall Beside Urinal 2 0.60 1.20 1.44
Cross wall at Water trough 2 0.30 0.60 0.36
Incinerators 1 1.95 1.20 2.34

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
S. No. Description No. Length Breadth Height Qty Unit Remarks
Drain 1 11.45 0.20 2.29
Deduction for doors and windows
D3 -4 0.75 2.10 -6.30
Septic Tank
Inlet wall 1 0.70 1.17 0.82
Manhole Cover wall 2 1.20 0.35 0.84
Manhole/Waste Chamber
Rectangular 4 4.00 0.60 9.60
Total 29.08 Sq.m.

3.4 Honey Comb Brick (350 mm) Works (1:3c/s)


Soak pit 1 1.14 Area 1.40 1.59
Total 1.59 Cu.m.

4 DOORS & WINDOWS WORKS


4.4 UPVC Door
UPVC Door Shutter
D1 2 1.0 2.05 4.10
D2 2 0.9 2.05 3.69
D3 4 0.70 2.05 5.74
Total 13.53 sq.m

4.5 Window Grill


Ventilation
Ventilation V1 2 2.48 0.38 1.86
Ventilation V2 2 2.48 0.33 1.61
Ventilation V3 2 1.98 0.38 1.48
Ventilation V4 2 1.98 0.33 1.28
Total 6.23 sq.m

5 FLOORING WORKS
5.1 Hard Concrete Flooring (40mm) With Neat Cement Punning
Toilet Floors 2 4.75 3.25 30.88
Corridor Floors 2 4.75 1.27 12.07
Outside Staircase 2 1.20 1.05 2.52
Ramp
Slanted Portion 1 5.45 1.03 5.59
Horizontal Portion 1 1.20 1.03 1.23
Drain 1 11.45 1.48 16.95
Along the terrace 2 4.75 2.25 21.38
Water Trough 2 0.60 3.75 4.50
Total 95.10 sq.m

5.2 Cement Finishing Skirting works


Along the corridor and ramp 2 13.97 27.94
Deduction -2 1.90 -3.80
Total 24.14 r.m

5.3 Terrazo cast in Situ Dado (Tile works)


Along grid 1 2 4.84 1.20 11.62

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
S. No. Description No. Length Breadth Height Qty Unit Remarks
Along grid 2 2 4.84 1.20 11.62
Deduction
D1 -2 0.98 1.20 -2.35
D2 -2 0.86 1.20 -2.06
Along grid A 1 3.34 1.20 4.01
Along grid B 2 3.34 1.20 8.02
Along grid C 1 3.34 1.20 4.01
Partition Wall for disable toilet 2 3.30 1.20 7.92
Partition wall for toilet short wall 4 1.35 1.20 6.48
Partition wall for toilet long wall 2 2.50 1.20 6.00
Urinal 4 1.30 1.35 7.02
Deduction
D3 -4 0.73 1.20 -3.50
Water trough 2 1.85 0.90 3.33
2 1.85 0.75 2.78
Total 64.87 sq.m

6 ROOFING/TERRACING WORKS
6.1 Metal Works
Truss 1 999.81
Total 999.81 kgs

6.2 CGI Sheet Roofing


Sheet Area 1 12.10 2.13 25.77
Sheet Area 1 12.10 2.74 33.15
Total 58.93 sq.m

6.3 CGI Sheet Roofing Ridge


Top Ridge cover 1 12.10 12.10
Total 12.10 r.m

6.4 GI facia (Eaves) Volume Density


Front and back sides 2 0.006 7850 98.78
Sides 4 0.001 7850 44.74
Total 143.52 k.g

6.5 False Ceiling


Inside portion 1 9.40 3.20 30.08
Outside portion 1 12.10 0.79 9.55
2 4.87 0.90 8.77
Total 48.40 sq.m

7 PLASTERING WALL FINISHING WORKS


7.1 Plaster Works
7.1.1 CEMENT PLASTER WORKS ON INNER WALL (1:6)
Grid 1 & Grid 2 2 9.40 1.20 22.56
Grid 2 1 9.40 2.40 22.56
Grid 3 1 9.40 1.50 14.10
Grid A-12, B-12& C-12 4 3.20 1.40 17.92
Grid B-23 2 2.20 2.55 11.22

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
S. No. Description No. Length Breadth Height Qty Unit Remarks
Partition Wall for disable toilet 4 3.27 1.80 23.54
Partition wall for toilet short wall 4 1.32 1.80 9.50
Partition wall for toilet long wall 4 2.50 1.80 18.00
Cross wall at Water trough 4 0.58 0.30 0.69
4 0.58 0.45 1.04
4 0.30 0.58 0.69
Deduction
D1 -2 1.00 2.10 -2.10
D2 -2 0.90 2.10 -1.89
V1 -2 3.48 0.38 -1.30
V2 -2 3.48 0.33 -1.13
V3 -2 1.98 0.38 -0.74
V4 -2 1.98 0.33 -0.64
Total 134.02 sq.m

7.1.2 CEMENT PLASTER WORKS ON CEILING (1:4)


Main Beam
Grid 1 & Grid 2 2 9.50 0.45 8.55
Grid A-12, B-12& C-12 3 3.25 0.40 3.90
Slab
Corridor Slab 1 9.50 2.25 21.38
Column Copla 8 0.05 3.00 1.20
Total 35.03 Sq.m.

7.1.3 External Plaster


Grid 1 1 9.40 2.60 24.44
Grid 3 1 9.40 1.50 14.10
Grid A-12 & C-12 2 3.20 1.85 11.84
Plinth Beam
Grid 1 & Grid 3 2 9.40 0.45 8.46
Grid A-12 & C-12 2 3.20 0.45 2.88

Main Beam Outer


Grid 1 1 9.40 0.40 3.76
Grid 2 1 9.40 0.55 5.17
Grid 3 1 9.40 1.00 9.40
Grid A-12 & C-12 2 3.20 0.40 2.56
Grid A-23 & C-23 2 2.20 1.00 4.40
Grid B-23 1 2.20 0.85 1.87
Column Outer
Grid 1 2 0.60 3.00 3.60
1 0.30 3.00 0.90
Grid 2 3 0.60 3.00 5.40
Grid 3 2 0.90 3.00 5.40
1 0.30 3.00 0.90
Column Copla 12 0.07 3.00 1.26
Total 106.34 Sq.m.

7.1.4 Internal Plaster on Wall (1:4) with Cement Punning


Inside Septic Tank Wall 1.00 11.30 2.25 25.43

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
S. No. Description No. Length Breadth Height Qty Unit Remarks
Inner Wall of manhole 2.00 2.40 0.25 1.20
Inner Wall of Inlet 1.00 2.25 0.70 1.58
1.00 0.75 1.00 0.75
Baffle wall 2.00 1.20 1.45 3.48

Sewer Manhole (Rectangular)


Inside Sewer Manhole 2.00 3.00 0.30 1.80
Sewer Manhole (Circular)
Inside Sewer Manhole 2.00 2.36 0.30 1.41
Total 35.65 sq.m

7.2 Painting Works


7.2.1 Distemper Paint
Total of Interior Wall Plaster 1 134.02 Area 134.02
Total of Ceiling Plaster 1 35.03 Area 35.03
False Ceiling 1 48.40 Area 48.40
Total 217.44 sq.m

7.2.2 Exterior Weather Coat Paint


Total of External Wall Beam and Column Plain Plaster 1 106.34 Area 106.34
Total 106.34 sq.m

7.2.4 Enamel Painting


ForVentilation Coefficient
V1 2 2.48 0.38 2.00 3.71
V2 2 2.48 0.33 2.00 3.22
V3 2 1.98 0.38 2.00 2.96
V4 2 1.98 0.33 2.00 2.57
Total 12.46 sq.m

8 Miscellaneous
8.2 Cement Board Wall
For Partition
Gabel wall 2 1.09 Area 2.17
Total 2.18 sq.m

8.4 Pump Shed


1 1.00 1.00
Total 1.00 Nos.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Toilet Block,Tc(S)
School Name : Shree Chandrodaya S.S
Location : Shreenathkot, Gorkha
Length Breadth Height Quantity
S.N Material Description Nos. Quantity Units kg/unit
(m) (m) (m) (kg)
1 Truss
10mm thick plate Base Plate 12 0.3 0.3 0.01 0.011 cu.m. 7,850.00 84.78
10mm thick plate Truss stiffener 12 0.3 0.05 0.01 0.002 cu.m. 7,850.00 14.13
10mm thick plate 12 0.3 0.0865 0.01 0.003 cu.m. 7,850.00 24.44
10mm thick plate 12 0.05 0.085 0.01 0.001 cu.m. 7,850.00 4.00

16mm dia rod Anchor bolt 24 0.45 10.800 r.m. 1.58 17.07
16mm dia nut nut 24 24.000 no. 0.03 0.75

NB 40(M) Bottom Chord 5 3.9 19.500 r.m. 3.61 70.40


NB 40(M) Verticle Struts 5 0.561 2.805 r.m. 3.61 10.13
NB 40(M) Runner 1 10 10.000 r.m. 3.61 36.10

NB 50(M) Top Chord 5 2.036 10.180 r.m. 5.10 51.92


NB 50(M) 5 2.629 13.145 r.m. 5.10 67.04

NB 32(M) Inclined Struts 10 0.912 9.120 r.m. 3.15 28.73

NB65 (M) Purlins 6 10.1 60.600 r.m. 6.53 395.72

10mm thick plate Top chord cleat 30 0.2 0.09 0.01 0.005 cu.m. 7,850.00 42.39
10mm thick plate Purlin Cleat 60 0.2 0.09 0.01 0.011 cu.m. 7,850.00 84.78

10mm dia nut bolt (50mm) nut bolt 60 60.000 no. 0.05 2.91

10mm thick plate Runner plate 16 0.175 0.07 0.01 0.002 cu.m. 7,850.00 15.39
10mm thick plate Runner box 32 0.175 0.07 0.01 0.004 cu.m. 7,850.00 30.77
10mm thick plate 32 0.08 0.07 0.01 0.002 cu.m. 7,850.00 14.07

16mm dia nut bolt (50mm) Runner box 32 32.000 no. 0.13 4.30

Total Truss 999.81

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Toilet Block,Tc(S)
School Name : Shree Chandrodaya S.S
Location : Shreenathkot, Gorkha
BAR BENDING SCHEDULE
Piece
Dia. Spacing Wt./m Total Wt.
SN Description Bar Shape Nos. Length Weight (Kg) Remarks
(mm) (mm) (Kg) (Kg)
(m)

0.9
1 F1 Footing: Main bars 12 150 0.888 7 1.06 6.59
0.08

0.9
Distribution bars 12 150 0.888 7 1.06 6.59
0.08

for One footing = 13.18


for Nine footings = 118.60
2 Column C1, (300*300mm) (9 Columns)
0.42
Ld= d*60, Top= (Ld+10
Main Bars 12 0.888 8 5.12 36.34 327.03
(0.27+0.55+0.45+2.975) dia.)
0.06+0.39

0.22 0.08
100 &
Stirrups 8 0.395 30 1.04 12.32 110.92 Total height
150
0.22 for Stirrups= 3.25
0.15 0.08 & Ht. for 150 1.65
100 & spacing=
8 0.395 30 0.76 9.01 81.05
150
0.15
0.08 3 Nos. in
U shaped Stirrups & ties (total) 8 each 0.395 9 1.20 4.27 38.39
0.22
member
for One Column = 61.93
for Nine Columns = 557.40
3 Foundation Beams, 250*250

Main Bars (Long side beams); Along 10.0+0.3-2(0.06)


0.6 12 0.888 6 12.10 64.47 193.41 3 beams 1 Lap
Grid 1-1, 2-2, 3-3

0.15 0.08
100 &
Stirrups (for 250*250) 8 0.395 203 0.76 61.04 61.04 5 Stretches
150
0.15

0.15 0.08
8 150 0.395 32 0.76 9.71 9.71 1 Stretch (Section 2)
0.15

Main Bars (Short side beam); Along


0.6 6.0+0.3-2(0.06) 12 0.888 6 7.38 39.32 39.32 1 beam
Grid B-B

0.15 0.08
100 &
Stirrups (for 250*250) 8 0.395 48 0.76 14.41 14.41
150
0.15

Main Bars (Short side beams); Along


0.6 3.5+0.3-2(0.06) 12 0.888 6 4.88 26.00 52.00 2 beams
Grid A-A, C-C [Stretch 1-2]

0.15 0.08
100 &
Stirrups (for 250*250) 8 0.395 28 0.76 8.46 16.91
150
0.15

Main Bars (Short side beam); Along


2.5+0.3-2(0.06) 16 1.580 4 4.44 28.06 56.12 2 beams
Grid A-A, C-C [Stretch 2-3] 0.88

0.6 2.5+0.3-2(0.06) 12 0.888 2 3.88 6.89 13.78 2 beams

0.40 0.08
100 &
Stirrups (for 250*501) 8 0.395 20 1.26 9.87 19.74
150
0.15

4 Tie Beams, 250*300mm

Main Bars (Long side beams); Along 10.0+0.3-2(0.06)


0.6 12 0.888 6 12.10 64.47 193.41 3 beams 1 Lap
Grid 1-1, 2-2, 3-3

0.25 0.08
100 &
Stirrups (for 250*300) 8 0.395 203 1.06 85.14 85.14 5 Stretches
150
0.20

0.25 0.08
8 150 0.395 32 1.06 13.54 13.54 1 Stretch (Section 2)
0.20

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Main Bars (Short side beam); Along
0.6 6.0+0.3-2(0.06) 12 0.888 6 7.38 39.32 39.32 1 beam
Grid B-B

0.25 0.08
100 &
Stirrups (for 250*300) 8 0.395 48 1.06 20.10 20.10
150
0.20

Main Bars (Short side beams); Along


0.6 3.5+0.3-2(0.062) 12 0.888 6 4.88 25.98 51.96 2 beams
Grid A-A, C-C [Stretch 1-2]

0.25 0.08
100 &
Stirrups (for 250*300) 8 0.395 28 1.06 11.79 23.59
150
0.20

Main Beams:
5 Long Beams: 250*450

Bottom Bars (Long side); Along 10.0+0.3-2(0.06)


0.4+0.2 12 0.888 2 12.10 21.49 64.47 3 beams 1 Lap
Grid 1-1, 2-2, 3-3

10.0+0.3-2(0.06)
0.4+0.48 16 1.580 2 12.90 40.76 122.29 1 Lap

0.88
Top Bars 10.0+0.3-2(0.06) 16 1.580 3 12.90 61.15 183.44 1 Lap

0.40 0.08
100 &
Stirrups (for 250*450) 8 0.395 244 1.36 131.08 131.08 6 Stretches
150
0.20
Short side beams:

6.0+0.3-2(0.06)
Bottom Bars 0.4+0.2 12 0.888 4 7.38 26.21 78.64 3 beams

0.6
Top Bars 6.0+0.3-2(0.062) 12 0.888 3 7.38 19.66 58.98

0.40 0.08
Stirrups (for 250*450) 8 100 0.395 23 1.36 12.36 37.07
0.20

0.35 0.08
100 &
Stirrups (for 250*400) 8 0.395 28 1.26 14.02 42.06
150
0.20

0.86
6 SLAB: Short Span 0.11 2.71 10 150 0.617 65 4.65 186.49 186.49 65

1.48
Long Span 10.21 10 300 0.617 9 13.95 77.46 77.46 1 Lapping 9
0.09

1.48
1 Lapping, & Cranked
10.21 10 300 0.617 9 14.17 78.69 78.69
0.09 over middle beam

3.25
Top Extra (Negative) Bar 8 300 0.395 9 3.25 11.55 11.55

10.21
Distribution Bar, Long Span 8 150 0.395 10 10.21 41.40 41.40

2.71
Distribution Bar, Short Span 8 150 0.395 41 2.71 43.53 43.53

Grand Total 2736.63 Kg


Grand Total 2.74 Mt.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Toilet Block,Tc(S)
School Name : Shree Chandrodaya S.S
Location : Shreenathkot, Gorkha
Reinforcement of Septic and Soak pit tank
Total Total
S. No Item Description Dia Lot No length m wt/m Remarks
length Quantity
1 Septic tank
Beam
Long span

16 2 2 8.34 33.36 1.58 52.71


695 6950 695

12 2 1 7.78 15.56 0.89 13.82


415 6950 415

85 85 16 2 2 7.12 28.48 1.58 45.00


6950

85 85 12 2 1 7.12 14.24 0.89 12.65


6950
200

8 2 70 1.06 148.40 0.40 58.62


80
250

short span

16 1 2 5.79 11.58 1.58 18.30


695 4400 695

12 1 1 5.23 5.23 0.89 4.64


415 4400 415

85 85 16 2 2 4.57 18.28 1.58 28.88


4400

85 85 12 2 1 4.57 9.14 0.89 8.12

4400
200

8 1 45 1.06 47.70 0.40 18.84


80
250

slab
Along Y axis

110 8 1 45 5.12 230.40 0.40 91.01 Main Bar


5010

distribution bar 8 2 13 4.91 127.66 0.40 50.43


negetive bar 8 1 47 5.06 237.82 0.40 93.94
along X axis

1915
110 8 1 34 9.03 306.85 0.40 121.21 Main Bar
7000

distribution bar 8 2 10 7.00 140.00 0.40 55.30


Corner bars 10 12 3 0.60 21.60 0.62 13.33
Concealed beam

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
main bars 10 2 4 6.60 52.80 0.62 32.58
stirrups 8 2 41 0.56 45.92 0.40 18.14
Steps at septic tank 16 2 5 0.60 6.00 1.58 9.48
2 Soak pit
Beam 16 1 4 12.74 50.94 1.58 80.49
12 1 2 12.50 24.99 0.89 22.19
Slab 8 1 2 1.17 2.33 0.40 0.92
8 1 2 1.80 3.60 0.40 1.42
8 1 2 2.23 4.45 0.40 1.76
8 1 2 2.55 5.09 0.40 2.01
8 1 2 2.80 5.60 0.40 2.21
8 1 2 3.00 6.00 0.40 2.37
8 1 2 3.16 6.32 0.40 2.50
8 1 2 3.28 6.56 0.40 2.59
8 1 2 3.38 6.76 0.40 2.67
8 1 4 1.35 5.40 0.40 2.13
8 1 4 1.37 5.47 0.40 2.16
8 1 4 1.38 5.50 0.40 2.17
negetive bar 8 1 23 0.60 13.80 0.40 5.45
distribution bar 8 1 4 10.99 43.96 0.40 17.36
Total 897.38 Kg
Grand Total 0.90 Mt.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Tc(S)
School Name : Shree Chandrodaya S.S
Location : Shreenathkot, Gorkha

Total
S. No. Description Tc(S) Unit Remarks
Quantity
A. Common Installation
1.2 Stand Alone 6 A DP MCB with Enclosure 2 2.00 nos.
B School Blocks
1 DISTRIBUTION BOARDS
1.5 6A DP MCB with Enclosure 2.00 2.00 nos.
3 General Service Light Point Wiring 0.00
3.1 One Way Light Point 11 11.00 pts.
6 Sweep Ceiling/ Exhaust Fan/Wall Fan 0.00
6.2 225mm dia M/D exhaust Fan 4 4.00 nos.
7 Light Fixtures/Luminaires & Accessories 0.00
7.6 LED Wall Light 2 2.00 nos.
7.7 9 W LED Surface Mounted Cylindrical type 2 2.00 nos.
7.8 6 W LED Recessed Circular type 6 6.00 nos.
7.9 7 W LED T5 Slim Mirror Light 2 2.00 nos.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Toilet Block,Tc(S)
School Name : Shree Chandrodaya S.S
Location : Shreenathkot, Gorkha
Length
S. No. Description No. Quantity Unit Remarks
(m)
1 WATER SUPPLY INSTALLATION
a CPVC pipes SDR-11
40 mm 1 142 142.00 r.m
20mm 1 23 23.00 r.m
15mm 1 7 7.00 r.m
c CPVC Ball Valve
40 mm 4 4.00 nos.
25 mm 2 2.00 nos.
d 40mm dia Gun Metal Check Valve 1 1.00 nos.
e Electrical Centrifugal Water Pump 1 1.00 nos.
f 2000 litres Capacity Water Storage Tank 1 1.00 nos.
2 Sewer, Rain and Waste Water Installation
110 mm 1 61 61.00 r.m
75mm 1 50 50.00 r.m
50mm 1 21 21.00 r.m
B School Blocks
1 Sanitary Installation
a Lab Sink 5 5.00 set
2 Sanitary Installation
a Water Closet Set 2 2.00 set
b Orissa Pan 4 4.00 set
c Hand Wash Basin 2 2.00 set
d Ladies Urinal 2 2.00 set
e Self Closing Bib Cock 12 12.00 nos.
f CP Spreader in Urinal 4 4.00 set
g Toilet Paper Holder 2 2.00 nos.
h Commode Spray 2 2.00 nos.
i PVC Multi Floor Trap 10 10.00 nos.
j Waste Coupling and PVC Bottle Trap 4 4.00 nos.
k 40mm SS Grab Bar-Side 2 2.00 nos.
l 40mm SS Grab Bar-Rear 2 2.00 nos.
m CP Foldable Hinge 4 4.00 nos.

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Job: Site Development
School Name : Shree Chandrodaya S.S
Location : Shreenathkot, Gorkha

Length Breadth
S.No Description No. Height (m) Qty. Unit Remarks
(m) (m)
1 Earthworks
1.1 Site Clearance
Column 2 0.90 0.90 1.62
Concrete Pavement
Infront of 3-6C(S) 1 10.00 3.00 30.00
6.70 2.30 15.41
6.00 1.50 9.00
Infront of 2-LaLi 1 7.00 1.50 10.50
16.00 3.00 48.00
6.00 1.50 9.00
Infront of Toilet 1 15.00 1.50 22.50
Side of Toilet 2 6.00 1.90 22.80
In Betn Two Bldgs 1 12.00 2.50 30.00
At Gate 1 4.00 2.50 10.00
Total 208.83 sq.m

1.2 Earth Work Excavation


Concrete Pavement
Infront of 3-6C(S) 1 10.00 3.00 0.15 4.50
6.70 2.30 0.15 2.31
6.00 1.50 0.15 1.35
Infront of 2-LaLi 1 7.00 1.50 0.15 1.58
16.00 3.00 0.15 7.20
6.00 1.50 0.15 1.35
Infront of Toilet 1 15.00 1.50 0.15 3.38
Side of Toilet 2 6.00 1.90 0.15 3.42
In Betn Two Bldgs 1 12.00 2.50 0.15 4.50
At Gate 1 4.00 2.50 0.15 1.50

Excavation For Boundary Wall


Chain Link Fence 89 0.15 0.15 0.60 1.20
Excavation For Gate Column
Column 2 1.20 1.20 1.50 4.32
Excavation For Flag Pole
Flag Pole 2 0.60 0.60 1.00 0.72
2 1.10 0.50 0.15 0.17
2 1.60 0.25 0.15 0.12
1 0.60 0.40 0.15 0.04
Total 37.64 cu.m

1.3 Earth Back Filling


Total Excavation Work 1 37.64 37.64
Deduction 0.00
Soling -1 31.60 -31.60
PCC -1 0.54 -0.54
RCC -1 0.41 -0.41
Total 5.09 cu.m

1.4 Boulder Soling


Concrete Pavement
Infront of 3-6C(S) 1 10.00 3.00 0.15 4.50
6.70 2.30 0.15 2.31

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU Engineer
Length Breadth
S.No Description No. Height (m) Qty. Unit Remarks
(m) (m)
6.00 1.50 0.15 1.35
Infront of 2-LaLi 1 7.00 1.50 0.15 1.58
16.00 3.00 0.15 7.20
6.00 1.50 0.15 1.35
Infront of Toilet 1 15.00 1.50 0.15 3.38
Side of Toilet 2 6.00 1.90 0.15 3.42
In Betn Two Bldgs 1 12.00 2.50 0.15 4.50

At Gate 1 4.00 2.50 0.15 1.50


Column 2 0.90 0.90 0.20 0.32
Stone Soling for Flag Pole 1 0.70 0.80 0.35 0.20
Total 31.60 cu.m
2 Concrete Works
2.1 PCC
2.1.1 P.C.C.(1:3:6) Works
PCC For Gate Column
Column 2 0.90 0.90 0.08 0.12
PCC For Flag Pole
Flag Pole 2 0.30 0.30 1.20 0.22
1 2.40 0.80 0.10 0.19
2 0.30 0.30 0.08 0.01
Total 0.54 cu.m
2.1.2 P.C.C.(1:2:4) Works
Concrete Pavement
Infront of 3-6C(S) 1 10.00 3.00 0.08 2.25
6.70 2.30 0.08 1.16
6.00 1.50 0.08 0.68
Infront of 2-LaLi 1 7.00 1.50 0.08 0.79
16.00 3.00 0.08 3.60
6.00 1.50 0.08 0.68
Infront of Toilet 1 15.00 1.50 0.08 1.69
Side of Toilet 2 6.00 1.90 0.08 1.71
In Betn Two Bldgs 1 12.00 2.50 0.08 2.25

At Gate 1 4.00 2.50 0.08 0.75


Total 15.54 cu.m

2.2 P.C.C For R.C.C. Works


R.C.C. Works M20
A Foundation
Gate Column Footing
Footing 2 0.90 0.90 0.25 0.41

B Column
Gate Column 2 0.30 0.30 2.95 0.53
Top RCC Coping 2 0.59 0.59 0.05 0.03
2 0.175 0.05 0.02
Total 0.99 cu.m

2.3 Silica Cement Admixture


10 Kg per cu.m. of R.C.C. M20 10.00 0.98831 9.88
Total 9.88 Kg
2.4 Steel Reinforcement
For gate
Total
At base of the footing kg per m
length
Main bar(10mm) 12 0.90 10.80 0.62 6.70

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU Engineer
Length Breadth
S.No Description No. Height (m) Qty. Unit Remarks
(m) (m)
Distribution bar(10mm) 12 0.90 10.80 0.62 6.70
For column Ld (12mm) 16 0.48 7.68 0.89 6.84
For column (12mm) 16 2.80 44.80 0.89 39.87
For stirrups (external) 8mm 54 1.30 70.20 0.39 27.38
For stirrups (Internal)) 8mm 54 0.72 38.88 0.39 15.16
Total 102.64 Kg
0.10 Tons
2.5 Formworks
A Entrance Gate-Foundation 2 3.60 0.35 2.52
Gate Column 2 1.20 3.15 7.56
Flag Pole Steps 2 0.25 0.80 0.4
Flag Pole Masonry Top Surface 1 1.70 0.50 0.85
Total 11.33 sq.m

3.2 Full Brick (230 mm) Works (1:4c/s)


Gate Column 2 0.54 0.23 1.85 0.46
2 0.30 0.23 0.45 0.06
Flag Pole Base 2 0.80 0.23 0.55 0.20
Total 0.72 cu.m

4.1 Neat Cement Skirting works


Gate Column 2 2.20 4.40
Total 4.40 r.m

5.1 Metal Works (Fence)


Total
Description Nos length Kg/m Total
Length
Chain Link Fence
ISA 40x40x4mm 2 210 420.00 2.40 1,008.00
ISA 50x50x5mm 89 1.90 169.10 3.80 642.58
Bracing ISA 50x50x5mm 13 2.00 26.00 3.80 98.80
Incinerator Vent Pipe 1 2.416 17.5 42.28 M=17.5 Kg/m
Total 1,791.66 k.g

5.2 Metal work (Entrance Gate)


Metal Gate
50mm Dia MS Pipe 2 7.13 14.26 3.61 51.48
25mm Dia MS Pipe 56 0.7 39.2 1.58 61.94
Middle sheet 1 0.74 0.0012 7850 6.97
Hole Fast 4 0.45 1.8 3.61 2.92
Total 123.31 k.g

5.3 Chain Link Fence(50x50 Mesh)


Fencing 1.00 210 1.20 252.00
Total 252.00 sq.m

6.1 External Plaster


Column Inside face 4 0.54 1.64 3.54
Column Outside face 2 1.2 0.20 0.48
4 0.54 1.70 3.67
Deduct -2 0.3 1.40 -0.84
Top Coping 2 2.36 0.05 0.24
4 0.59 0.30 0.71
Total 7.80 sq.m

7 Exterior Weather Coat Paint


As per Outside Plaster 1 7.8 7.80

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU Engineer
Length Breadth
S.No Description No. Height (m) Qty. Unit Remarks
(m) (m)
Gate Column Skirting 2 2.36 0.10 0.47
Total 8.27 sq.m

8 Flag Pole
75 Dia GI Pipe 2.00 1 2.00
Total 2.00 nos

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
School Name : Shree Chandrodaya S.S
Location : Shreenathkot, Gorkha

Building: 2-LaLiEC
S.N Furniture Description Symbol Qty Unit Remarks
Classroom
1 ECD Student Desk (6 Seater) D-03 3 nos.
4 Soft Board F-01 1 nos.
5 Book Shelf F-02 3 nos.
6 Teacher's Table T-01 3 nos.
7 Teacher's Chair C-01 3 nos.
8 White Board F-03 3 nos.
Library
6 Student Bench G6-12 (3 Seater) B-02C 14 nos.
4 Library Table T-02 7 nos.
5 Library Shelf F-04 5 nos.
Computer nos.
7 Computer Table T-04 12 nos.
8 Computer Shelf C-02 24 nos.
9 White Board with Stand F-05 1 nos.
Laboratory
10 Equipment Shelf F-07 3 nos.
11 Lab Stool F-08 31 nos.
Miscellaneous
12 Equipment Cabinet F-09 4 nos.
13 Cusions F-16 18 nos.
14 Carpet 27.43 sq.m
Total 135 nos.

Building: Academic Block,3-6C(S)


S.N Furniture Description Symbol Qty Unit Remarks
1 Student Desk G3-5 (2 Seater) D-01B 15 nos.
2 Student Desk G6-12 (2 Seater) D-01C 75 nos.
3 Student Bench G3-5 (2 Seater) B-01B 15 nos.
4 Student Bench G6-12 (3 Seater) B-01C 75 nos.
5 Teacher's Table T-01 6 nos.
6 Teacher's Chair C-01 6 nos.
7 White Board F-03 6 nos.
8 Notice Board F-14 1 nos.
Total 199 nos.

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Job : Reservoir Water Tank
School Name : Shree Chandrodaya S.S
Location : Shreenathkot, Gorkha

Description Length Breadth Height


S. No. No. Quantity Unit Remarks
(m) (m) (m)
1 Earthworks
1.1 Site Clearance & Mobilization
For Water Tank 1 4.85 4.6 22.31
Total 22.31 sq.m

1.2 Earthwork in excavation


For Water Tank 1 3.65 3.40 1.98 24.57
Total 24.57 Cu.m.

1.3 Earthback Filling


Total Earthwork Excavated 24.57
Water Tank Volume -1 3.35 3.1 1.98 -20.56
Total 4.01 Cu.m.

1.4 Boulder soling


Below Water Tank 1 3.35 3.1 0.2 2.077
Total 2.08 Cu.m.

2 Concrete Works
2.1 PCC
2.1.1 PCC Work (1:3:6)
Below Water Tank 1 3.35 3.1 0.075 0.78
Total 0.78 Cu.m.

2.2 PCC for RCC Work 1:1.5:3


For Base Slab 1 3.35 3.10 0.18 1.82
For Water Tank Wall
Long Wall 2 3.35 0.18 1.68 1.96
Short Wall 2 2.75 0.18 1.68 1.61
Trianagle Portion
Long Wall 2 3.00 0.05 Area 0.27
Short Wall 2 2.75 0.05 Area 0.25
Slab 1 3.35 3.1 0.15 1.56
Manhole openings -1 0.6 0.6 0.15 -0.05
Total 7.41 Cu.m.

2.3 Silica Admixture


10 Kg per cu.m. of R.C.C. M20 10 7.41 74.15
Total 74.15 kg

2.5 Form works


For Base Slab 1 12.9 0.18 2.26
For Water Tank Wall
Outer Side
Long Wall 2 3.35 1.83 12.23 23.18
Short Wall 2 3.00 1.83 10.95
Inside wall
Long Wall 2 3.00 1.53 9.15
Short Wall 2 2.75 1.53 8.39
Trianagle Portion

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Description Length Breadth Height
S. No. No. Quantity Unit Remarks
(m) (m) (m)
Long Wall 2 3.00 0.30 1.80
Short Wall 2 2.75 0.30 1.65
Slab 1 3 2.75 8.25
Side for Manhole openings 1 2.4 0.15 0.36
Deduct Manhole openings -1 0.6 0.60 -0.36
Total 54.67 Sq.m.

3 PLASTERING WALL FINISHING WORKS


3.1.1 CEMENT PLASTER WORKS WITH PUNNING
Base Slab 1 2.30 2.13 4.90
For Water Tank Wall
Long Wall 2 3.05 1.37 8.36
Short Wall 2 2.78 1.37 7.62
Triangle Portion
Long Wall 2 3.00 0.42 2.54
Short Wall 2 2.78 0.42 2.36
Top Slab 1 3.00 2.75 8.25
Deduct Manhole openings -1 0.6 0.60 -0.36
Total 33.66 Sq.m.

4 Water Proof Coating


Inside Water tank 1 33.66
Total 33.66 sq.m

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Job : Reservoir Water Tank
School Name : Shree Chandrodaya S.S
Location : Shreenathkot, Gorkha
Bar Bending Schedule
Cut Total
Dia. of No. of Wt/m Weight
S. No. Description No. Length Length Bar Shape
Bar (mm) Bars (Kg) (Kg)
(m) (m)
A Outer Vertical Bars 1
1 Shorter Span 10 33 7.01 231.33 0.62 143.42 0.083 0.083

1.915 1.915

3.02

2 Longer span 10 28 7.286 204.008 0.62 126.48


0.083 0.083

1.915 1.915

3.29

B Inner Vertical Bars 2


1 Shorter Span 10 33 2.503 165.198 0.62 102.4228 0.079 0.079

1.884 1.884

0.05
0.49 0.49

2 Longer Span 10 28 2.503 170.204 0.62 105.5265 0.079 0.079

1.884 1.884

0.05
0.49 0.49

C. Extra Bars 2 10 62 1.79 221.96 0.62 137.62 0.6 0.6

0.592
0.592 0.6 0.6

D. Horizontal Bars(outer 4
0.3 0.3
1 Shorter Span 10 20 3.62 289.6 0.62 179.552

3.02 3.02

0.3 0.3

2 Longer Span 10 20 3.87 309.6 0.62 191.952 0.3 0.3

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Cut Total
Dia. of No. of Wt/m Weight
S. No. Description No. Length Length Bar Shape
Bar (mm) Bars (Kg) (Kg)
(m) (m)

3.27 3.27

0.3 0.3
E. Base Slab bar 4
1 Shorter Span 10 32 3.14 401.92 0.62 249.19 3.045
0.05 0.05

2 Longer Span 10 28 3.42 383.04 0.62 237.48 3.32


0.05 0.05
1473.65 Kg
1.47 Mt.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer