GENERAL
1. MOBILIZATION AND DEMOBILIZATION
1 L.S. 1.00 500,000.00 500,000.00 1.00 500,000.00 0.50 250,000.00 0.50 250,000.00 100.00%
Mobilization of the construction by constructing
temporary
2. SITE OFFICE acomodation for labours and site staff with
ESTABLISHMENT Per
2 required 19.00 25,000.00 475,000.00 19.00 475,000.00 14.00 350,000.00 5.00 125,000.00 100.00%
Providingsuitable facilities and
and Maintaining keeping
Site Officetheofsametwo in Rooms Month
good
having hygenic condition
total Area for entire
20 sq.m for the project completion
use of Client and
3. PROJECT INFORMATION BOARD
3 time. Demolition
Consultant of the
including samechair,
office and cleaning the site after
Table, Lockable file nos. 1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 - - 100.00%
Providing and Fixing of Project Information board with
completion
cabinet, of the construction
Stationery Items (Ink, activities
Paper, Pen,allPencils
complete.
approved
4. SAFETY TextSIGN in BOARD
appropriate location includingetc.), all
[Note:
1 50% payment
Computer and 1 Printershall be made
with after completion
set up.ofall nos.
4 required
Providingfixing and accessories
Fixing perall
ofas50%
Safety
necessary
drawing
Sign all complete.
Board with
1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 - - 100.00%
mobilization
complete asandper remaining
instruction after
of completion
engineer. ofThe
approved
5. BARRICADING
works Textcontract]
as per and Sinage
WORKS including required fixing
5 Specification of computer shall not be less than (19.5" R.m 179.00 2,000.00 358,000.00 175.00 350,000.00 175.00 350,000.00 - - 97.77%
accessories
Barricading asbetween
per drawing all complete.
led monitor with Core the School
i5, 7th Academic
Generation, 500areagb Hdd,and
Construction
6.
8gb ddr DISMANTLING area with
4 ram), Printer 1.8should
mOF highfunction
CGI Sheet
COMPLETELY fixed of
at least to
6 Bamboo support frame all complete as per instruction sq.m 350.33 3,000.00 1,050,990.00 346.45 1,039,350.00 346.45 1,039,350.00 - - 98.89%
DAMAGED
Printing, Scanning BUILDING and Photocopy of A4 size
of Engineer.
Demolition
documents. of existingand damaged building safelyitemsand
7. SAFETYProvidingMATERIALS Maintaining
& SITE all above
SAFETY
7 handover
on Rental Basis ofandthe reusable
forMaintaining
entire materials
project completionto the time.school L.S. 1.00 100,000.00 100,000.00 1.00 100,000.00 0.81 81,000.00 0.19 19,000.00 100.00%
Providing Construction Safety
authority,
Measures storing
in them to the
Construction Sitelocation
with shown by the
8. RELOCATING OF EXISTING TLCproper Safety
8 school
measures andtodisposing
person and debris
work including
area (Helmet,transportation
Shoes, of sq.m
First 191.28 3,000.00 573,840.00 186.30 558,900.00 186.30 558,900.00 - - 97.40%
Relocating of Existing Temporary Learning Centre
debrisKit,
Aid ,cleaning
Clothing, site Glove,
etc. as Guard per specification
Rail placefor edge and
(TLC),
9. LAB from
TEST(WATERconstruction TEST) site to other by
9 instruction of
protection, Engineer.
Safety Net, existing
Safety rope, Fall Protection etc.) job 1.00 - - - - - - - 0.00%
Demolition
Testing and and using
Providing Lab Testmaterials
Report forobtained
Quality fromof
as requiredof by
demolition TLC the
to theContract
place Clause byGCC SMC.24 and
Water
10. in Water
TEMPORARY Stream TOILET (Up anddecided
Down streem) located
10 Specification
near by Construction
division 1 "GENERAL REQUIREMENT nos.
site toilet
before Starting and fixed
after 2.00 150,000.00 300,000.00 2.00 300,000.00 2.00 300,000.00 - - 100.00%
Construction
CLAUSE 8(C)". of temporary
The number with CGI Sheet
of Safety Materials
completion
to Bamboo ofsupport
constructionframe work.
and This Test has items
all(PPE)
necesary to be
11. ROADProtecting
Personal REPAIR AND MAINTENANCE
Equipments shall be
11 done to
including mark the affect of construction work in water Km. 22.00 50,000.00 1,100,000.00 22.00 1,100,000.00 22.00 1,100,000.00 - - 100.00%
minimum Septic
Providing and not
but pit, Pipeline,
Maintaining
limited to the
35Toilet
roadsPan
sets. as etc.
Payment for
necessary entire
shall to
be
stream.
project completion time
avoid
made in blockage
Prorata by Basis forall
Landslides complete
entire and as of
Rockfall
duration perproject.
Instruction
for regular
of Engineer.
transport Rate shall include
of construction materials alland
Material cost with
site inspection - - - - - #DIV/0!
fixing,
during construction
overall constructioncharges and demolition
period. Rate shall & cleaning
include
CIVIL
of the WORKS-
samecost BUILDING
afterwith completion
all Material demolitionof charges,
the construction
cleaning, - - - - - - - #DIV/0!
activities&allconstruction
fixing complete. charges of the same after
1 EARTH WORKS - - - - - - - #DIV/0!
completion
SITE CLEARANCE of the construction activities all complete.
& MOBILIZATION:
1.1 Clearing and grubbing the site for construction by sq.m 1,110.32 100.00 111,032.00 1,137.14 113,714.12 1,081.28 108,128.25 55.86 5,585.86 102.42%
removing
1.2 EARTHWORK 150mm thick INtop soil including bushes,
EXCAVATION : small
1.2 trees, leveling of undulated ground, shorting and cu.m 490.54 400.00 196,216.00 484.60 193,841.26 427.25 170,898.27 57.36 22,942.99 98.79%
Excavation in foundations in all type of soils for
stacking/storing
foundation, selected toppitssoil forthereuse in
1.3 EARTHtrenches,
landscaping BACKdisposing
works,
footing,
FILLING : etc. tomaterials
unsuitable
required
from cu.m
1.3 depth including dewateringandby manual or mechanical 297.29 300.00 89,187.00 322.21 96,664.27 282.42 84,727.31 39.79 11,936.96 108.38%
Back filling
site, etc., in foundation
allascomplete sides
as per drawings, of foundation with
means
approved etc.soil per specifications
obtained with allspecifications
from the excavation contractor’s
at site and
and
owninstructions
machinery of the Engineer.
stacked at site and equipment's,
or brought from providing
outside incrossing
layer not of
track, shoring,
exceeding 15 cm strutting, timbering and
thick (compacted buttressing
thickness) with
including
appropriate materials
transportation of soil,and all suchinmeasures
spreading required necessary
line and
to retainsprinkling
level, in positionwater, the sides of the foundation
ramming, compactingpitwith and
including
Prepared by contractor refilling the
mechanical rammers, testing, excavated
Checked material
etc., all with watering,
complete as per
by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
ramming,specification
drawing, leveling the andsite and disposing
instructions off the
of the Engineer.
Description Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
%
Item Unit Quantity As Remarks
Rate Amount Quantity Amount Quantity Amount Quantity Amount completion
No. per Contract
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Description Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
%
Item Unit Quantity As Remarks
Rate Amount Quantity Amount Quantity Amount Quantity Amount completion
No. per Contract
7.4 18 W LED Recessed Mounted Square type Nos. 4 2,700.00 10,800.00 4.00 10,800.00 4.00 10,800.00 100.00%
7.5 12 W LED Surface Mounted Cylindrical type Nos. 30 2,400.00 72,000.00 30.00 72,000.00 30.00 72,000.00 100.00%
7.6 12 W LED Recessed Mounted Cylindrical type Nos. 8 2,400.00 19,200.00 8.00 19,200.00 8.00 19,200.00 100.00%
7.7 LED Wall Light made Nos. 4 1,800.00 7,200.00 4.00 7,200.00 4.00 7,200.00 100.00%
7.8 9 W LED Surface Mounted Cylindrical type Nos. 2 2,000.00 4,000.00 2.00 4,000.00 2.00 4,000.00 100.00%
7.9 6 W LED Recessed Circular type C Nos. 6 1,800.00 10,800.00 6.00 10,800.00 6.00 10,800.00 100.00%
7.10 7 W LED T5 Slim Mirror Light Nos 2 2,000.00 4,000.00 2.00 4,000.00 2.00 4,000.00 100.00%
8 Pull Box No 6 700.00 4,200.00 6.00 4,200.00 6.00 4,200.00 100.00%
9 External post top light pole No 6 7,500.00 45,000.00 6.00 45,000.00 6.00 45,000.00 100.00%
10 Post Top External Light Fixtures No 6 9,800.00 58,800.00 6.00 58,800.00 6.00 58,800.00 100.00%
- - - - - #DIV/0!
11 Earthing and Lightning protection - - - - - #DIV/0!
11.1 11.1. Chemical Earhting Nos. 6 45,000.00 270,000.00 6.00 270,000.00 6.00 270,000.00 100.00%
11.2 Earthing Bar Nos. 6 2,200.00 13,200.00 6.00 13,200.00 6.00 13,200.00 100.00%
GI Strip/Cu wire Earthing
12.1 12.1. 25 x 3 mm GI Strip Mtr. 130 300.00 39,000.00 127.00 38,100.00 127.00 38,100.00 97.69%
12.2 12 SWG Cu wire Mtr. 30 200.00 6,000.00 28.00 5,600.00 28.00 5,600.00 93.33%
13 Earth Test link No 2 1,500.00 3,000.00 2.00 3,000.00 2.00 3,000.00 100.00%
14 Lightning Arrester No. 1 7,500.00 7,500.00 1.00 7,500.00 1.00 7,500.00 100.00%
- - - - - #DIV/0!
C SOLAR PV SYSTEM - - - - - #DIV/0!
1. Solar PV Panel
1.1 1.1. 24V 250W PV Module No 8 26,000.00 208,000.00 8.00 208,000.00 8.00 208,000.00 100.00%
2. Tubular Deep cycle Battery
2.1 2.1. 12V, 200Ah@C10 Tubular Solar Battery No 4 30,000.00 120,000.00 4.00 120,000.00 4.00 120,000.00 100.00%
3 Hybrid Inverter No 1 100,000.00 100,000.00 1.00 100,000.00 1.00 100,000.00 100.00%
FIRE EXTINGUISHER
a) Supplying Fire extinguisher ABC stored Pressure
D 5.0kg size ABC stored pressure type Fire extinguisher. Nos. 6 8,000.00 48,000.00 6.00 48,000.00 6.00 48,000.00 100.00%
- - - - - #DIV/0!
Bill No. 4 Sanitary Works - - - - - #DIV/0!
A Piping Works - - - - - #DIV/0!
1 WATER SUPPLY INSTALLATION - - - - - #DIV/0!
a CPVC pipes SDR-11 - - - - - #DIV/0!
40 mm r.m 152.00 1,600.00 243,200.00 150.00 240,000.00 150.00 240,000.00 98.68%
20mm r.m 22.00 1,000.00 22,000.00 22.00 22,000.00 22.00 22,000.00 100.00%
15mm r.m 8.00 700.00 5,600.00 7.00 4,900.00 7.00 4,900.00 87.50%
c CPVC Ball Valve - - - - - #DIV/0!
40 mm nos. 5.00 2,000.00 10,000.00 5.00 10,000.00 5.00 10,000.00 100.00%
25 mm nos. 2.00 900.00 1,800.00 2.00 1,800.00 2.00 1,800.00 100.00%
d Electrical Centrifugal Water Pump nos. 1.00 12,500.00 12,500.00 1.00 12,500.00 1.00 12,500.00 100.00%
e 2000 litres Capacity Water Storage Tank nos. 1.00 3,400.00 3,400.00 1.00 3,400.00 1.00 3,400.00 100.00%
2 Sewer, Rain and Waste Water Installation - - - - - #DIV/0!
110 mm r.m 43.00 1,400.00 60,200.00 40.00 56,000.00 40.00 56,000.00 93.02%
75mm r.m 49.00 1,200.00 58,800.00 50.00 60,000.00 50.00 60,000.00 102.04%
50mm r.m 22.00 350.00 7,700.00 21.00 7,350.00 21.00 7,350.00 95.45%
- - - - - #DIV/0!
B School Blocks - - - - - #DIV/0!
1 Sanitary Installation - - - - - #DIV/0!
a Lab Sink set 5.00 30,000.00 150,000.00 5.00 150,000.00 5.00 150,000.00 100.00%
b PVC Multi Floor Trap nos. 10.00 600.00 6,000.00 10.00 6,000.00 10.00 6,000.00 100.00%
- - - - - #DIV/0!
2 Sanitary Installation - - - - - #DIV/0!
a Water Closet Set set 2.00 34,000.00 68,000.00 2.00 68,000.00 2.00 68,000.00 100.00%
b Orissa Pan set 4.00 3,100.00 12,400.00 4.00 12,400.00 4.00 12,400.00 100.00%
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Description Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
%
Item Unit Quantity As Remarks
Rate Amount Quantity Amount Quantity Amount Quantity Amount completion
No. per Contract
c Hand Wash Basin set 2.00 8,000.00 16,000.00 2.00 16,000.00 2.00 16,000.00 100.00%
d Ladies Urinal set 2.00 110,000.00 220,000.00 2.00 220,000.00 2.00 220,000.00 100.00%
e Self Closing Bib Cock nos. 12.00 4,000.00 48,000.00 12.00 48,000.00 12.00 48,000.00 100.00%
f CP Spreader in Urinal set 4.00 2,500.00 10,000.00 4.00 10,000.00 4.00 10,000.00 100.00%
g Toilet Paper Holder nos. 2.00 2,600.00 5,200.00 2.00 5,200.00 2.00 5,200.00 100.00%
h Commode Spray nos. 2.00 2,000.00 4,000.00 2.00 4,000.00 2.00 4,000.00 100.00%
i PVC Multi Floor Trap nos. 10.00 600.00 6,000.00 10.00 6,000.00 10.00 6,000.00 100.00%
j Waste Coupling and PVC Bottle Trap nos. 4.00 1,500.00 6,000.00 4.00 6,000.00 4.00 6,000.00 100.00%
k 40mm SS Grab Bar-Side nos. 2.00 4,500.00 9,000.00 2.00 9,000.00 2.00 9,000.00 100.00%
l 40mm SS Grab Bar-Rear nos. 2.00 4,500.00 9,000.00 2.00 9,000.00 2.00 9,000.00 100.00%
m CP Foldable Hinge nos. 4 5,500.00 22,000.00 4.00 22,000.00 4.00 22,000.00 100.00%
- - - - -
CIVIL WORKS - SITE DEVELOPMENT - - - - -
1 SITE CLEARANCE & MOBILIZATION: sq.m 149.07 100.00 14,907.00 220.18 22,018.00 220.18 22,018.00 147.70%
2 EARTHWORK IN EXCAVATION : cu.m 3079.63 400.00 1,231,852.00 126.16 50,464.81 126.16 50,464.81 4.10% 1,181,387.20
3 EARTH BACK FILLING : cu.m 245.00 300.00 73,500.00 56.15 16,844.22 56.15 16,844.22 22.92% 56,655.78
4 BOULDER SOLING : cu.m 56.98 6,000.00 341,880.00 46.54 279,232.19 46.54 279,232.19 81.68%
5 P.C.C (1:3:6) WORKS cu.m 7.23 14,000.00 101,220.00 7.54 105,610.40 7.54 105,610.40 104.34%
6 P.C.C (1:2:4) WORKS cu.m 24.08 16,000.00 385,280.00 28.87 461,857.78 28.87 461,857.78 119.88%
7 P.C.C. FOR R.C.C. WORKS : cu.m 0.99 20,000.00 19,800.00 0.99 19,766.20 0.99 19,766.20 99.83%
8 SILICA CEMENT ADMIXTURE Kg 9.90 300.00 2,970.00 9.88 2,964.93 9.88 2,964.93 99.83%
9 STEEL REINFORCEMENT Mt. 0.10 130,000.00 13,000.00 0.10 13,343.25 0.10 13,343.25 102.64%
10 FORM WORKS sq.m 9.12 800.00 7,296.00 30.32 24,256.00 30.32 24,256.00 332.46%
11 STONE MASONRY WORKS (1:6 c/s) cu.m 117.07 10,000.00 1,170,700.00 84.68 846,754.50 84.68 846,754.50 72.33% 323,945.50
13 BRICK MASONRY WORKS ( 1 : 4 c/s ) cu.m 0.22 18,000.00 3,960.00 0.72 13,032.72 0.72 13,032.72 329.11%
14 NEAT CEMENT SKIRTING r.m 4.72 100.00 472.00 4.40 440.00 4.40 440.00 93.22%
15 METAL WORKS FOR FENCE k.g 2726.47 220.00 599,823.40 2,707.00 595,539.12 2,707.00 595,539.12 99.29%
16 METAL WORKS FOR GATE k.g 130.78 220.00 28,771.60 123.31 27,128.09 123.31 27,128.09 94.29%
17 PLASTER ON OUTER WALL (1:6) sq.m 7.92 600.00 4,752.00 7.80 4,679.04 7.80 4,679.04 98.46%
18 EXTERIOR WEATHER COAT PAINT sq.m 8.87 350.00 3,104.50 8.27 2,895.20 8.27 2,895.20 93.26%
19 CHAIN LINK FENCE (50 x 50 MESH) sq.m 370.74 1,000.00 370,740.00 380.40 380,400.00 380.40 380,400.00 102.61%
20 FLAG POLE nos. 2.00 25,000.00 50,000.00 2.00 50,000.00 2.00 50,000.00 100.00%
21 50 DIA PVC WEEP PIPE sq.m 58.10 100.00 5,810.00 13.20 1,320.00 13.20 1,320.00 22.72%
22 GEOTEXTILE FABRIC sq.m 57.31 200.00 11,462.00 36.32 7,263.68 36.32 7,263.68 63.37%
- - - - -
CIVIL WORKS-RESERVOIR TANK - - - - -
1 EARTH WORK - - - - -
1.1 SITE CLEARANCE AND MOBILIZATION sq.m 22.31 100.00 2,231.00 22.31 2,231.00 22.31 2,231.00 - - 100.00%
1.2 EARTHWORK IN EXCAVATION cu.m 24.58 400.00 9,832.00 24.57 9,828.72 24.57 9,828.72 - - 99.97%
1.3 EARTH BACK FILLING cu.m 4.02 300.00 1,206.00 4.01 1,202.85 4.01 1,202.85 - - 99.74%
1.4 BOULDER SOLING cu.m 2.08 6,000.00 12,480.00 2.08 12,462.00 2.08 12,462.00 - - 99.86%
2 CONCRETE WORKS - - - - -
2.1 P.C.C (1:3:6) cu.m 0.78 14,000.00 10,920.00 0.78 10,904.25 0.78 10,904.25 - - 99.86%
2.2 P.C.C FOR R.C.C WORKS cu.m 7.42 20,000.00 148,400.00 7.41 148,295.00 7.41 148,295.00 - - 99.93%
2.3 SILICA CEMENT ADMIXTURE kg 74.2 300.00 22,260.00 74.15 22,244.25 74.15 22,244.25 - - 99.93%
2.4 STEEL REINFORCEMENT Mt 1.46 130,000.00 189,800.00 1.47 191,574.92 1.47 191,574.92 - - 100.94%
2.5 FORMWORKS sq.m 54.93 800.00 43,944.00 54.67 43,738.00 54.67 43,738.00 - - 99.53%
3 PLASTERING/WALL FINISHING WORKS - - - - -
INTERNAL PLASTER ON WALL (1:4) WITH
3.1.1 sq.m 33.66 700.00 23,562.00 33.66 23,565.25 33.66 23,565.25 - - 100.01%
CEMENT PUNNING
4 WATERPROOFING WORKS sq.m 33.66 550.00 18,513.00 33.66 18,515.55 33.66 18,515.55 - - 100.01%
- - #DIV/0!
Furniture Works lot 1 5,300,000.00 5,300,000.00 1.00 5,300,000.00 1.00 5,300,000.00 100.00%
Total 64,188,296.70 62,553,688.88 46,798,426.13 15,755,262.74
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block, 3-9C(XS)-A, 2LiAC(S1), Tc(S)
School Name : Shree Jhimrek Secondary School
Location : Thalajung, Gorkha
Abstract of Cost - Civil Works
Type Design
Pay
Quantity in Total
Item Description of Works Unit Rate (NRs.) Site Amount Remarks
BOQ 3-12C(MsF)-D 2-LaLi-EC Tc(S) Water Tank Quantity
No. Development
GENERAL
1 MOBILIZATION AND DEMOBILIZATION L.S. 1.00 500,000.00 1 500,000.00
2 SITE OFFICE ESTABLISHMENT Per Month 19.00 25,000.00 19.00 475,000.00
3 PROJECT INFORMATION BOARD nos. 1.00 10,000.00 1.00 10,000.00
4 SAFETY SIGN BOARD nos. 1.00 10,000.00 1.00 10,000.00
5 BARRICADING WORKS R.m 179.00 2,000.00 175 350,000.00
6 DISMANTLING OF COMPLETELY DAMAGED BUILDING sq.m 350.33 3,000.00 346.45 1,039,350.00
7 SAFETY MATERIALS & SITE SAFETY L.S. 1.00 100,000.00 1 100,000.00
8 RELOCATING OF EXISTING TLC sq.m 191.28 3,000.00 186.30 558,900.00
9 LAB TEST(WATER TEST) job 1.00 0.00 -
10 TEMPORARY TOILET nos. 2.00 150,000.00 2.00 300,000.00
11 ROAD REPAIR AND MAINTENANCE Km. 22.00 50,000.00 22.00 1,100,000.00
5 Barricading Works 1 45 45 Rm
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
1 EARTH WORKS
1.1 Site Clearance 1 34.50 14.50 500.25
Total 500.25 sq.m
Ramp
For Slope 1 1.30 0.52 Area 0.67
Wall Along Grid B 1 0.50 0.45 0.45 0.10
Wall Parallel to Ramp 1 6.80 0.45 0.41 1.25
Total 250.56 cu.m
Filling in Floor
Classroom 4 6.70 5.70 0.18 26.73
Staircase 1 6.70 4.20 0.18 4.92
Corridor 4 5.70 2.20 0.18 8.78
1 4.20 2.20 0.18 1.62
Total 147.01 cu.m
Ramp
Slopped Portion 1 1.30 1.36 Area 1.77
2 CONCRETE WORKS
2.1 P.C.C.
2.1.1 P.C.C.(1:3:6) Works
Footing
Isolated F1 2 2.50 2.50 0.10 1.25
Isolated F2 4 3.00 3.00 0.10 3.60
Combined CF1 3 1.80 5.00 0.10 2.70
Combined CF2 1 3.00 5.00 0.10 1.50
Combined CF3 2 2.80 5.00 0.10 2.80
Ramp
Sloped 1 1.30 0.51 Area 0.66
Wall Top 1 1.33 0.25 0.05 0.02
1 6.80 0.13 0.05 0.04
Beam
Foundation beam (300x400)
Along Grid A,B,C,D,E,F/ 1-2 6 6.50 0.30 0.40 4.68
Along Grid 1 1 26.00 0.30 0.40 3.12
Along Grid 2,3 2 26.00 0.30 0.40 6.24
Secondary Beam
Along grid 1a 2 11.40 0.25 0.30 1.71
Along grid 1b 1 4.20 0.25 0.30 0.32
Along grid A1,B1,D1 & E1 4 8.65 0.25 0.30 2.60
Secondary Beam
Along grid 1a 2.00 11.40 0.25 0.30 1.71
Along grid 1b 1.00 4.20 0.25 0.30 0.32
Along grid A1,B1,D1 & E1 4.00 8.65 0.25 0.30 2.60
Secondary beam(250x425)
Grid 1a 1 4.20 0.25 0.30 0.32
Column
Column below Plinth level
Total columns(500x500) 18 0.50 0.50 1.05 4.73
Slab
First floor level (+3.00m Lvl) 1 29.00 10.00 0.13 36.25
Deduction
Column deduction -18 0.50 0.50 0.13 -0.56
Staircase Void -1 4.78 4.20 0.13 -2.61
Projections
At Back 2 11.50 0.70 0.13 2.01
At Front 1 6.20 1.00 0.13 0.78
Projections
At Back 2 11.50 0.70 0.13 2.01
Projections
At Back 2 13.10 1.10 0.13 3.60
At Front 2 12.00 1.10 0.13 3.30
1 7.00 1.60 0.13 1.40
At Sides 2 9.80 1.10 0.13 2.70
Staircase
Ground floor level
Bottom 1 2.07 2.00 0.20 0.83
Landing 1 4.20 1.90 0.20 1.60
Waist Slab 1 6.75 2.00 0.21 2.77
Steps 20 0.02 Area 2.00 0.90
Landing Beam 1 4.05 0.25 0.38 0.38
Vertical Bands
Ground Floor level
Along Grid 2 8.00 0.08 0.23 2.48 0.34
First floor level
Along Grid 2 8.00 0.08 0.23 2.48 0.34
Second floor level
Along Grid 2 8.00 0.08 0.23 2.48 0.34
Partition Wall Principal/Administration 1.00 0.08 0.23 2.10 0.04
Lintel Bands
Ground floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.23 0.08 0.67
Along grid 1 1.00 22.20 0.23 0.08 0.38
Along grid 2 1.00 21.60 0.23 0.08 0.37
First floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.23 0.08 0.67
Along grid 1 1.00 22.20 0.23 0.08 0.38
Along grid 2 1.00 21.60 0.23 0.08 0.37
Sill Bands
Ground floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.23 0.08 0.67
Along grid 1 1.00 26.20 0.23 0.08 0.45
Along grid 2 1.00 21.60 0.23 0.08 0.37
Pedestal
Base Block 14 0.50 0.25 0.25 0.44
Parapet Wall
Top Floor 2.00 71.00 0.35 0.10 4.97
1.00 7.50 0.35 0.10 0.26
Roof Level 1.00 33.00 0.35 0.10 1.16
Bench
Bench Top Slab 2 2.40 0.50 0.08 0.18
Total 368.73 cu.m
2.4 Formworks
A Foundation
Isolated footing
Isolated F1 2 10.00 0.20 4.00
Isolated F2 4 12.00 0.20 9.60
Combined footing
Combined CF1 3 13.60 0.60 24.48
Combined CF2 1 16.00 0.60 9.60
Combined CF3 2 15.60 0.60 18.72
Beam
Foundation beam (300x400)
Along Grid A,B,C,D,E,F/ 1-2 6 6.50 0.80 31.20
Along Grid 1 1 26.00 0.80 20.80
Secondary beam(250x425)
Grid 1a 4 5.45 0.60 13.08
Grid 1b 1 4.20 0.60 2.52
Grid A1,B1,D1,E1 4 8.90 0.60 21.36
Edge Beam(125x525)
Grid B,C 1 7.90 0.93 7.31
Secondary beam(250x425)
Grid 1a 4 5.45 0.60 13.08
Grid 1b 1 4.20 0.60 2.52
Grid A1,B1,D1,E1 4 8.90 0.60 21.36
Secondary beam(250x425)
Grid 1a 4 5.45 0.60 13.08
Grid 1b 1 4.20 0.60 2.52
Grid A1,B1,D1,E1 4 8.90 0.60 21.36
Secondary beam(250x425)
Grid 1a 1 4.20 0.80 3.36
Column
Column below Plinth level
Total columns(500x500) 18 2.00 1.05 37.80
Slab
First floor level (+3.00m Lvl) 1 29.00 10.00 290.00
Deduction
Column deduction -18 0.50 0.50 -4.50
Staircase Void -1 4.78 4.20 -20.06
Projections
At Back 2 11.50 0.70 16.10
At Front 1 6.20 1.00 6.20
Projections
At Back 2 11.50 0.70 16.10
Projections
At Back 2 13.10 1.10 28.82
At Front 2 12.00 1.10 26.40
1 7.00 1.60 11.20
At Sides 2 9.80 1.10 21.56
Staircase
Ground floor level
Bottom 1 1.93 0.20 0.39
Waist Slab 1 6.75 2.00 13.50
Landing 1 4.20 1.90 7.98
1 1.08 0.21 0.22
Steps 20 0.02 Area 0.45
Riser 20 2.00 0.15 6.00
Lintel Bands
Ground floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.15 5.85
Along grid 1 1.00 22.20 0.15 3.33
Along grid 2 1.00 21.60 0.15 3.24
First floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.15 5.85
Along grid 1 1.00 22.20 0.15 3.33
Along grid 2 1.00 21.60 0.15 3.24
Second floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.15 5.85
Along grid 1 1.00 22.20 0.15 3.33
Along grid 2 1.00 21.60 0.15 3.24
Partition Wall Principal/Administration 1.00 4.25 0.15 0.64
1.00 1.50 0.15 0.23
Sill Bands
Ground floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.15 5.85
Along grid 1 1.00 26.20 0.15 3.93
Along grid 2 1.00 21.60 0.15 3.24
First floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.15 5.85
Along grid 1 1.00 26.20 0.15 3.93
Along grid 2 1.00 21.60 0.15 3.24
Second floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.15 5.85
Along grid 1 1.00 26.20 0.15 3.93
Along grid 2 1.00 21.60 0.15 3.24
Partition Wall Principal/Administration 1.00 4.25 0.15 0.64
1.00 1.50 0.15 0.23
Top floor level
Along grid C,D 2.00 8.50 0.15 2.55
Along grid 1,3 2.00 4.00 0.15 1.20
Pedestal
Base Block 14 1.25 0.25 4.38
Parapet Wall
Top Floor 2.00 36.53 0.30 21.92
3 BRICK WORKS
3.2 Brick Masonary Works (1:4 c/s)
Brick Works upto Plinth Beam
Along grid A,B,C,D,E,F/1-3 6 8.50 0.23 0.20 2.35
Along grid 1, 2, 3/A-F 3 26.20 0.23 0.20 3.62
Parapet Wall
Top Floor 2.00 71.00 0.23 0.80 26.13
1.00 7.50 0.23 1.40 2.42
Roof Level 1.00 33.00 0.23 0.90 6.83
5 FLOORING WORKS
5.1 Hardened Cement Concrete Flooring (40mm) With Neat Cement Punning
Ground floor plan
Class Room 2 5.75 6.75 77.63
2 5.78 6.75 77.96
Corridor 1 24.30 2.53 61.36
1 4.50 2.53 11.36
Staircase Below 1 4.75 2.25 10.69
Staircase
Staircase Tread 18 0.30 2.00 10.80
Riser 20 0.15 2.00 6.00
Staircase landing 1 2.00 2.20 4.40
1 2.13 2.00 4.25
Roof plan
Roof Floor Slab 1 5.50 10.50 57.75
Total 1219.24 sq.m
6 PLASTER/PAINTING WORKS
6.1 Cement Plaster
6.1.1 Internal Plaster on Wall (1:6)
First Floor
Classroom 2.00 25.35 2.88 145.76
2.00 25.30 2.88 145.48
Staircase 1.00 17.45 2.88 50.17
Column
Grid 2C,2D 2.00 1.23 2.88 7.04
Grid 2B,2E 2.00 0.75 2.88 4.31
Deductions
W1 -16.00 1.10 1.13 -19.80
V1 -16.00 1.10 0.53 -9.24
W2 -1.00 1.50 1.00 -1.50
D1 -8.00 1.10 2.44 -21.43
Second Floor
Class Room 2.00 25.30 2.88 145.48
2.00 25.35 2.88 145.76
Staircase 1.00 17.45 2.88 50.17
Column
Grid 2C,2D 2.00 1.23 2.88 7.04
Grid 2B,2E 2.00 0.75 2.88 4.31
Deductions
W1 -16.00 1.10 1.13 -19.80
V1 -16.00 1.10 0.53 -9.24
W2 -1.00 1.50 1.00 -1.50
D1 -8.00 1.10 2.44 -21.43
Top Floor
Along Grid 1&3/ C-D 2.00 4.00 2.50 20.00
Column Plaster
Ground Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 3
Grid 3A,3B,3C,3D,3E,3F 2.00 0.80 2.50 4.00
6.00 1.20 2.50 18.00
Grid 3A,3B,3C,3D 2.00 1.20 3.00 7.20
6.00 0.80 3.00 14.40
First Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 2
Grid 2A,2F 2.00 1.25 3.00 7.50
Grid 2C,2D 2.00 1.23 2.50 6.13
Grid 2B,2E 2.00 0.75 2.50 3.75
Along grid 3
Grid 3A,3F 2.00 1.20 3.00 7.20
Grid 3B,3C,3D,3E 4.00 0.70 3.00 8.40
Grid 3A,3F 2.00 0.80 2.50 4.00
Grid 3B,3C,3D,3E 4.00 1.30 2.50 13.00
Second Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 2
Grid 2A,2F 2.00 1.25 3.00 7.50
Grid 2C,2D 2.00 1.23 2.50 6.13
Grid 2B,2E 2.00 0.75 2.50 3.75
Along grid 3
Grid 3A,3F 2.00 1.20 3.00 7.20
Grid 3B,3C,3D,3E 4.00 0.70 3.00 8.40
Grid 3A,3F 2.00 0.80 2.50 4.00
Grid 3B,3C,3D,3E 4.00 1.30 2.50 13.00
Parapet Wall
Top Floor 2.00 35.90 0.80 57.44
1.00 7.50 1.40 10.50
Roof 1.00 32.00 0.90 28.80
Plaster on Walls
Ground floor level
Along grid A,B,C,D,E,F 6.00 6.50 2.48 96.53
Along grid 1 4.00 5.50 2.48 54.45
1.00 4.00 2.48 9.90
Along grid 2 4.00 5.50 2.48 54.45
Parapet Wall
Top Floor 2.00 36.53 2.28 166.58
1.00 7.50 2.88 21.60
Roof Level 1.00 33.00 0.23 2.28 17.31
8 MISCELLANOUS
8.2 Railing
Total
Staircase Railing length Kg/m
Length
Horizontal ISNB 40M 1 22.82 22.82 3.56 81.23
Horizontal ISNB 40M (Top Floor) 1 2.13 2.13 3.56 7.57
Vertical 38mm Square Pipe 6 0.92 5.52 2.82 15.57
Vertical 38mm Square Pipe 20 0.95 19.00 2.82 53.58
Horizontal 25mm Square Pipe 4 22.82 91.27 0.85 77.58
Horizontal 25mm Square Pipe (Top Floor) 4 2.13 8.50 0.85 7.23
Base plate 21 0.00 0.00 7850.00 15.45
12 mm dia. Anchor Bolt, Nut 84 0.13 10.92
Balcony Railing
First Floor
Horizontal ISNB 40M 1 30.20 30.20 3.56 107.51
Horizontal ISNB 32M 2 30.20 60.40 3.10 187.24
Vertical ISNB 32M 23 1.14 26.22 3.10 81.28
Inclined ISNB 32M 23 0.13 3.08 3.10 9.55
Vertical 25mm Square Pipe 208 0.82 170.56 0.85 144.98
Base plate 33 0.00 0.0031 7850.00 24.29
12 mm dia. Anchor Bolt, Nut 132 0.13 17.16
Second Floor
Horizontal ISNB 40M 1 30.20 30.20 3.56 107.51
Horizontal ISNB 32M 2 30.20 60.40 3.10 187.24
Vertical ISNB 32M 23 1.14 26.22 3.10 81.28
Inclined ISNB 32M 23 0.13 3.08 3.10 9.55
Vertical 25mm Square Pipe 208 0.82 170.56 0.85 144.98
Base plate 33 0.00 0.0031 7850.00 24.29
12 mm dia. Anchor Bolt, Nut 132 0.13 17.16
Parapet Wall
ISNB 40M(Horizontal Bars) 2 36.53 73.06 3.56 260.09
ISNB 32M(Horizontal Bars) 2 36.53 73.06 3.10 226.49
Vertical ISNB 32M 60 0.40 24.00 3.10 74.40
Inclined ISNB 32M 60 0.13 8.04 3.10 24.92
Vertical 25mm Square Pipe 492 0.30 147.60 0.85 125.46
Base plate 62 0.00 0.0058 7850.00 45.63
12 mm dia. Anchor Bolt, Nut 248 0.13 32.24
Pedestal
ISNB 40M Pedestal Bars 14 1.54 21.57 3.56 76.80
14 1.20 16.80 3.56 59.81
28 0.40 11.20 3.56 39.87
Base plate 42 0.00 0.0039 7850.00 30.91
12 mm dia. Anchor Bolt, Nut 168 0.13 21.84
Total 2431.61 k.g
2 Column
2.1 Grid 1 (A ,B,E &F) 4
Main Bar 16 6 3.59 86.11 1.59 136.92 16mm
16 6 6.59 158.11 1.59 251.40 6.18 3.18 16mm
0.10
0.31 0.31
2.2 Grid 1 ( C ) 1
Main Bar 20 4 4.07 16.27 2.47 40.19
16 2 3.59 7.18 1.59 11.41 20mm
16 6 6.59 39.53 1.59 62.85 16mm 6.18
3.42 3.18
0.12 0.1
0.53 0.31
2.3 Grid 1 ( D ) 1
Main Bar 20 6 4.07 24.42 2.47 60.32
20 6 7.07 42.41 2.47 104.75 20mm 20mm
0.12
0.53 0.53
0.12 0.10
0.53 0.53 0.53
0.12
0.53 0.53
2.6 Grid 3 (A,B,C,D,E & F) 6
Main Bar 20 6 4.07 146.52 2.47 361.90
20 6 7.26 261.23 2.47 645.23 20mm 20mm
3.42 6.42
0.12
0.53 0.53
2.7 Stirrups 18
For 18 columns 8 12 1.84 397.44 0.40 158.98 0.08
8 24 1.28 552.96 0.40 221.18 0.42 0.14 0.08
0.42
0.42
3 For Lower Tie Beam
3.1 Grid 1,2 & 3 3 8.73
Top Bar 16 2 10.04 60.24 1.59 95.78 0.96
0.35
End bar from both
direction
16 2 11.46 68.76 1.59 109.33 11.46
8.73
16 2 10.04 60.24 1.59 95.78 0.96
2.94
Middle bar 16 1 4.25 12.75 1.59 20.27 0.96
0.35
Bottom Bar
End bar from both direction 16 2 3.33 19.98 1.59 31.77
0.66
1.71 0.96
0.96 7.1
0.25
8.61
20 2 10.24 61.41 2.47 151.68 1.2
2.94
Middle bar 16 1 4.33 12.98 1.59 20.63 0.96
0.425
16 1 12.00 36.00 1.59 57.24 12
2.94
16 1 4.33 12.98 1.59 20.63 0.96
Bottom Bar
End bar from both 20 2 11.65 69.90 2.47 172.65
0.94
direction 9.51 1.2
0.25 0.25
5 Column ( Up To 1st Floor Level)
5.1 Grid 1 (A ,B,E & F) 4
Main Bar 16 6 6.96 167.04 1.59 265.59 16mm
6
0.96
5.2 Grid 1 ( C ) 1
Main Bar 20 4 7.20 28.80 2.47 71.14
16 2 6.96 13.92 1.59 22.13 20mm 16mm
0.12 0.96
5.3 Grid 1 ( D ) 1
Main Bar 20 6 7.20 43.20 2.47 106.70
6 20mm
2.47
1.2
1.20 0.96
1.2
1.20
5.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
1.59 0.42
0.42
6 For Staircase
(Plinth level to 1st floor level)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77
3.354
2.472
0.4
2.042 1.03
0.2
1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1
1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1
1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1
1
2.147
1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2
1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1
4.92
6.1 Landing Beam 1 20 3 5.62 16.86 2.47 41.64 0.35
4.46 1.5
7.2 Grid 1
0.94
Bottom Bar (end bar) 1 20 2 5.65 11.30 2.47 27.91 1.2
3.51
0.96 7.71
Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66
0.96 8.73
16 2 10.35 20.70 1.59 32.91
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12
0.96
16 1 12.00 12.00 1.59 19.08 11.04
3.06
20 2 5.20 10.40 2.47 25.69 .1.2
0.94
2.21
7.4 Extra Bar Along Grid 1,2 &3 3 25 4 3.65 43.80 3.86 169.07 0.15
1.29
4
3 25 4 4.30 51.60 3.86 199.18 0.15
3.5
3 25 4 3.80 45.60 3.86 176.02 0.15
grid 1b
bottom bar 1 12 4 5.45 21.80 0.89 19.40
0.35
4.75
4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45
250
7.9 Stirriups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425
0.25
7.10 For Secondry Beam 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375
0.2
between 2 & 3
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2
9 Bands
Ground Floor
9.1 Sill Bands 0.75 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.46 0.075 5.5
1 10 2 4.50 9.00 0.62 5.58 4.5
0.75 0.75
1 10 2 5.65 11.30 0.62 7.01 0.075 4
0.96
10.2 Grid 1 ( C ) 1
Main Bar 20 4 7.20 28.80 2.47 71.14
16 2 6.96 13.92 1.59 22.13 20mm 16mm
0.12 0.96
10.3 Grid 1 ( D ) 1
Main Bar 20 6 7.20 43.20 2.47 106.70
6 20mm
2.47
1.2
1.20 0.96
1.20
10.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
1.59 0.42
0.42
11 For Staircase
(1st Floor level to 2nd Floor Level)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77
3.354
2.472
0.4
2.042 1.03
0.2
1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1
1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1
1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1
1
2.147
1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2
1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1
0.2
12 Main Beam(Second Floor Level)
12.1 Grid A,B,C,D,E & F
Bottom bar (End Bar) 6 25 2 7.25 87.00 2.47 214.89 1.29
4.46 1.5
12.2 Grid 1
0.94
Bottom Bar (end bar) 1 20 2 5.65 11.30 2.47 27.91 1.2
3.51
0.96 7.71
Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66
0.96 8.73
16 2 10.35 20.70 1.59 32.91
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12
0.96
16 1 12.00 12.00 1.59 19.08 11.04
3.06
20 2 5.20 10.40 2.47 25.69 .1.2
0.94
2.21
12.4 Extra Bar Along Grid 1,2 &3 3 25 4 3.65 43.80 3.86 169.07 0.15
1.29
4
3 25 4 4.30 51.60 3.86 199.18 0.15
3.5
3 25 4 3.80 45.60 3.86 176.02 0.15
grid 1b
bottom bar 1 12 4 5.45 21.80 0.89 19.40
0.35
4.75
4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45
250
12.8 Stirrups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425
0.25
12.9 Stirrups ( For Secondry Beam) 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375
0.2
0.375
Infront of stair case
Straight bar 1 8 15 4.92 73.80 0.40 29.52 4.92
0.375 1.065 0.75
Distribution bars
Between Grid 1 &1a
along x-axis 1 8 96 2.72 261.12 0.40 104.45 2.72
along y- axis 1 8 80 3.20 256.00 0.40 102.40 3.2
between 2 & 3
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2
Negative Bars
along Grid 1 2 8 35 2.05 143.50 0.40 57.40 2.05
along grid 1a 2 8 35 2.35 164.50 0.40 65.80 2.35
along grid 1b 1 8 7 1.08 7.56 0.40 3.02 1.08
along grid 2 (except infront of
stair case) 2 8 35 2.10 147.00 0.40 58.80 2.1
along grid 2 in front of
staircase 1 8 14 1.38 19.32 0.40 7.73 1.38
along grid a1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid b 1 8 28 2.10 58.80 0.40 23.52 2.1
along b1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid c&d 2 8 9 2.55 45.90 0.40 18.36 2.55
along grid d1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid e 1 8 28 2.10 58.80 0.40 23.52 2.1
along grid e1 1 8 28 2.05 57.40 0.40 22.96 2.05
0.96
0.96
14.3 Grid 1 ( D ) 1
Main Bar 20 2 6.21 12.41 2.47 30.66
16 4 5.97 23.87 1.59 37.95 6 20mm 16mm
5.00625 5.00625
1.2 0.96
0.96
1.2 0.96
1.20 0.96
14.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
0.42
0.42
14.8 Band (Second Floor)
Sill Bands 0.75 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.46 0.075 5.5
1 10 2 4.50 9.00 0.62 5.58 4.5
0.75 0.75
1 10 2 5.65 11.30 0.62 7.01 0.075 4
15 For Staircase
(2nd Floor to Top Foor)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77
3.354
2.472
0.4
2.042 1.03
0.2
1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1
1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1
1
2.147
1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2
1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1
4.92
15.1 Landing Beam 1 20 3 5.62 16.86 2.47 41.64 0.35
0.2
16 Main Beam (Top Floor Level))
16.1 Grid A,B,E & F
Bottom bar (mid bar) 4 20 2 10.87 86.96 2.47 214.79 0.475
9.92
0.475
End Bar 4 25 2 10.87 86.96 3.86 335.67 9.92
0.94
Bottom Bar along C & D 2 20 2 11.80 47.20 2.47 116.58 0.92
16.4 Grid 1
0.475
Bottom Bar (end bar) 1 20 2 3.39 6.77 2.47 16.72 1.2
1.71
0.96 7.71
Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66
0.96 8.73
16 2 10.35 20.70 1.59 32.91
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12
0.96
16 1 12.00 12.00 1.59 19.08 11.04
16.5 Extra Bar Along Grid 1 1 25 4 3.65 14.60 3.86 56.36 0.15
1.29
3.5
1 25 4 3.80 15.20 3.86 58.67 0.15
1.2
Top Bar (end Bar) 20 4 10.75 43.00 2.47 106.21 8.61
0.94
3.06
middle bar 20 2 5.20 10.40 2.47 25.69 .1.2
0.94
2.21
16.7 Extra Bar Along Grid 1,2 &3 2 20 4 3.65 29.20 2.47 72.12 0.15
1.29
4
2 20 4 4.30 34.40 2.47 84.97 0.15
3.5
2 20 4 3.80 30.40 2.47 75.09 0.15
grid 1b
bottom bar 1 12 4 5.45 21.80 0.89 19.40
0.35
4.75
4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45
16.10 Bent up Bar (hunch bar) 1 16 36 3.02 108.72 1.59 172.86 0.96
0.425 0.425
0.25
16.11 Stirriups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425
0.25
16.12 For Secondry Beam 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375
0.2
7.215
2 12 4 8.41 67.28 0.89 59.88
1.64
7.195
2 12 4 9.09 72.68 0.89 64.69
6.325
2 12 4 7.97 63.72 0.89 56.71
10.15
Infront of Grid A & F 2 12 4 10.15 81.20 0.89 72.27
6.64
2 12 2 8.17 32.68 0.89 29.09
7.28
16.14 Stirriups( beam 250*150 ) 1 8 546 0.76 414.96 0.40 165.98 0.0 0.1
8
0.2
2.025 1.5
Cranked bar 1 8 76 11.66 886.16 0.40 354.46 0.08 0.08 0.08 0.08
1.25 1.075 1.75
0.08 0.08
1.75 1.45
1 8 76 1.45 110.20 0.40 44.08
0.525 0.95
cranked bar 1 8 36 4.04 145.26 0.40 58.10 0.08 0.08
2.4
0.95 1.5
1 8 36 4.75 170.82 0.40 68.33 0.08 1.5 0.08 0.08
1.5
0.08 0.08 2 0.08
1.5
17.3 along long span Grid 2 to 3
Straight bar 1 8 26 10.45 271.70 0.40 108.68 0.08 10.45
2 1.5
cranked bar 1 8 24 11.01 264.24 0.40 105.70 0.08 0.08 0.08 0.08
1.5 1.5
0.08 0.08 0.95
1.5
0.95 1.875
1 8 24 11.38 273.12 0.40 109.25 0.08 0.08 0.08 2.25
1.5
0.08 0.08 0.95
1.5
0.95 1.5
1 8 24 11.01 264.24 0.40 105.70 0.08 0.08 0.08 1.5
1.5 2
0.08 1.5 0.08
between 2 & 3
along x axis 1 8 8 4.20 33.60 0.40 13.44 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2
Top near grid A & F (in bottom) 2 10 5 12.00 120.00 0.62 74.40 12
Top near grid A & F (on top) 2 10 4 12.00 96.00 0.62 59.52 12
Top infront of grid 3 (in bottom) 2 10 5 11.98 119.80 0.62 74.28 11.98
Top infront of grid 3 (on top) 2 10 4 11.98 95.84 0.62 59.42 11.98
Top infront of staircase (in bottom) 1 10 6 8.24 49.44 0.62 30.65 8.24
1 10 5 8.24 41.20 0.62 25.54 8.24
7.215
7.195
2 10 2 9.09 36.34 0.62 22.53
6.325
2 10 2 7.97 31.86 0.62 19.75
10.15
Infront of Grid A & F 2 10 2 10.15 40.60 0.62 25.17
6.64
2 10 2 8.17 32.68 0.62 20.26
7.28
0.96
18.2 Grid 1 ( D ) 1
Main Bar 20 2 3.20 6.40 2.47 15.81
16 4 2.96 11.84 1.59 18.83 20mm 16mm
2 2
1.2 0.96
1.2 0.96
18.4 Stirrups 6
For 6 columns 8 26 1.84 287.04 0.40 114.82 0.08
8 52 1.28 399.36 0.40 159.74 0.42 0.14 0.08
0.42
0.42
18.5 Band under wall (Grid C&D) 2 10 2 6.50 26.00 0.62 16.12 6.5
1 10 2 4.50 9.00 0.62 5.58 4.5
0.06 0.06
1 8 30 0.30 9.00 0.40 3.60 0.18
Stirrups 2 8 44 0.30 13.20 0.40 5.28 0.06 0.06
19 Slab Beam 0.18
19.1 Grid C & D
Bottom bar 2 20 2 10.87 43.48 2.47 107.40 0.475
9.92
0.475
2 16 1 10.87 21.74 1.59 34.57 9.92
4.92
Top Bar
3 20 2 6.80 40.80 2.47 100.78 0.94 4.92
Top bar along grid 1a 1 16 3 5.65 16.95 1.59 26.95 0.35 4.75
19.4 Stirriups( For Main Beam) 1 10 180 1.65 297.00 0.62 184.14 0.10
0.425
0.25
19.5 For Secondry Beam 1 8 35 1.31 45.85 0.40 18.34
0.8
0.375
0.2
1.605 1.5
Cranked bar 1 8 13 11.94 155.22 0.40 62.09 0.08 0.08 0.08
1.25 1.855 1.75
0.08 0.08
1.75
Along Short Span
straight bar 1 8 29 6.62 191.98 0.40 76.79 0.08 6.46
2.105
Cranked bar 1 8 28 6.48 181.44 0.40 72.58 0.08 0.08 0.08
1.95
Bar Shape
0.1
0.1
0.1
0.1
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.1
16mm
0.1
0.31
Bar Shape
0.12
0.1
0.12
0.12
0.35
0.35
0.66
Bar Shape
0.66
0.35
0.35
0.425
0.425
0.94
0.66
0.625
0.625
0.94
0.66
Bar Shape
0.66
0.3
Bar Shape
0.15
2.497
0.3
0.15
0.15
0.35
Bar Shape
0.35
1.29
0.94
0.94
0.94
0.66
0.66
Bar Shape
0.66
0.94
0.94
0.94
0.94
0.94
0.15
0.15
Bar Shape
0.35
0.35
0.35
0.35
0.45
0.45
0.35
0.45
0.96
1.705
Bar Shape
1.9
1.15
1.15
1.5
0.525
2.35
Bar Shape
0.75
0.075
0.75
0.075
0.075
0.075
0.75
0.075
0.075
Bar Shape
0.75
0.075
0.75
0.075
0.075
0.075
0.75
0.075
0.075
0.3
0.15
Bar Shape
2.497
0.3
0.15
0.15
0.35
0.35
1.29
0.94
0.94
Bar Shape
0.94
0.66
0.66
0.66
0.94
0.94
Bar Shape
0.94
0.94
0.94
0.15
0.15
0.35
0.35
0.35
0.35
Bar Shape
0.45
0.45
0.35
0.45
0.96
1.705
1.9
1.15
1.15
1.5
0.525
2.35
Bar Shape
Bar Shape
0.75
0.075
0.75
0.075
0.075
0.075
0.75
0.075
0.075
0.3
0.15
Bar Shape
2.497
0.3
0.15
0.15
0.35
0.35
0.475
0.475
Bar Shape
1.29
0.94
0.94
0.475
0.475
0.66
0.66
Bar Shape
0.15
0.15
0.475
0.94
0.94
0.94
0.15
0.15
0.35
0.35
Bar Shape
0.35
0.35
0.35
0.45
0.45
0.35
0.45
0.96
1.89
1.64
Bar Shape
0.89
1.75
0.08
0.08
0.08
1.5
0.08
0.08
1.5
0.08
1.875
0.08
1.5
0.08
0.08
Bar Shape
0.08
0.91
0.08
Bar Shape
1.89
1.64
0.89
0.475
Bar Shape
0.475
0.94
0.66
0.45
0.45
0.94
0.66
0.35
0.45
0.08
1.75
0.08
0.08
2.105
0.08
Bar Shape
0.6
2-LaLiEC Total
S. No. Description Unit Remarks
GF FF SF TF Quantity
A Common Installation
1.1 Stand Alone 40 A DP MCB with Enclosure 1 1.00 No
B SCHOOL BLOCKS
1 DISTRIBUTION BOARDS
DB (DB-1) Incoming NEA: 1 x 40A DP MCB Incoming Solar:
1.2 1 x 16A DP MCB Outgoing NEA: 1 x 16 A DP MCB 2 x 25 A 1 1.00 No
DP MCB 2 x 16 A SP MCB 6 x 6 A SP MCB
DB ( DB-2) & DB ( DB-3) Incoming:
1.3 1 1.00 No
1 x 25A DP MCB
DB ( DB-3) Incoming NEA: 1 x 25A DP MCB Incoming Solar:
1.5 1 x 10A DP MCB 1 1.00 No
C SOLAR PV SYSTEM
1. Solar PV Panel
1.1 1.1. 24V 250W PV Module 8.00 No
2. Tubular Deep cycle Battery
2.1 2.1. 12V, 200Ah@C10 Tubular Solar Battery 4.00 No
3 Hybrid Inverter 1.00 No
FIRE EXTINGUISHER
D a) Supplying Fire extinguisher ABC stored Pressure 5.0kg size 2.00 Nos.
ABC stored pressure type Fire extinguisher.
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
1 EARTH WORKS
1.1 Site Clearance for Bldg 1 27.50 14.50 398.75
Soak pit 1 3.14 Area 3.14
Total 401.89 sq.m
Below ramp
For Slope 1 6.82 1.18 0.20 1.61
For Front wall 3-AB 1 6.50 0.45 0.10 0.29
For Side wall -3B 1 1.33 0.45 0.10 0.06
Building Floor
Grid AB,BC,DE/1-2 3 5.70 6.70 0.20 22.91
Staircase 1 6.70 3.20 0.20 4.29
Corridor 3 5.70 2.20 0.20 7.52
1 3.20 2.20 0.20 1.41
Inside of soak Pit 1 3.77 0.23 0.20 0.17
Total 53.76 cu.m
2 CONCRETE WORKS
2.1 P.C.C
2.1.1 P.C.C.(1:3:6) Works
F1 7 1.50 1.50 0.10 1.58
F2 4 1.70 1.70 0.10 1.16
F3 3 2.00 2.00 0.10 1.20
F4 1 2.20 2.20 0.10 0.48
Below Foundation Beam
Along grid 1 1 18.10 0.35 0.05 0.32
Along grid 2 1 18.10 0.35 0.05 0.32
Along grid 3 1 18.10 0.35 0.05 0.32
Along grid A,C and E 3 7.80 0.35 0.05 0.41
Along grid B & D 2 7.80 0.35 0.05 0.27
Total 6.05 cu.m
Beam
Footing beam(250x300)
Along grid 1,2,3 3 19.70 0.25 0.30 4.43
Along grid A,B,C,D,E 5 8.60 0.25 0.30 3.23
Tie beam(300 x 525)
Along grid 1,2,3 3 19.70 0.30 0.53 9.31
Along grid A,B,C,D,E 5 8.60 0.30 0.53 6.77
First floor level
Main beam(300x525)
Along grid 1,2,3 3 19.70 0.30 0.40 7.09
Along grid A,B,C,D,E 5 8.60 0.30 0.40 5.16 300
Secondary beam(250x425)
Along 1a 1 17.10 0.25 0.30 1.28
Along A1,B1,D1 3 8.65 0.25 0.30 1.95
Along 1b 1 3.20 0.25 0.30 0.24
Truss level
Main beam(300x400)
Along grid 1,2,3 3 19.70 0.30 0.40 7.09
Along grid A,B,C,D,E 5 8.60 0.30 0.40 5.16
Column
Column below Plinth level 15 0.45 0.45 1.20 3.65
Ground floor plan
Total columns(450x450) 15 0.45 0.45 3.00 9.11
First floor plan
Total columns(450x450) 15 0.45 0.45 3.00 9.11
Slab
First floor level 1 21.80 9.80 0.125 26.71
Deduction
Staircase Void -1 3.20 4.50 0.13 -1.80
Staircase
Bottom 1 2.29 1.50 0.15 0.51
Landing 1 3.20 1.50 0.15 0.72
Waist Slab 1 6.76 1.50 0.15 1.52
Steps 10 0.15 0.30 1.50 2.25
Landing Beam 1 3.05 0.25 0.38 1.16
Lintel Bands
Ground floor plan
Along grid 1 1 16.65 0.23 0.08 0.29
Sill Bands
Ground floor level
Along grid 1 1 19.70 0.23 0.08 0.34
Along grid 2 1 12.25 0.23 0.08 0.21
Along grid A,E 2 6.55 0.23 0.08 0.23
Along grid C,D 2 6.55 0.23 0.08 0.23
Between BC & 1-2 1 2.05 0.23 0.08 0.04
1 4.70 0.13 0.08 0.04
Below staircase 1 3.90 0.13 0.08 0.04
Vertical Band
Ground Floor 5 2.48 0.23 0.08 0.21
First Floor 4 2.60 0.23 0.08 0.18
Pedestal
Base Block 8 0.50 0.25 0.25 0.25
Bench
Bench Top Slab 1 2.40 0.50 0.08 0.09
Soak Pit
RCC slab 1 2.84 Area 0.15 0.43
Total 127.78 cu.m
2.5 Formworks
Foundation
Isolated footing
Column
Column below Plinth level 15 1.80 1.20 32.40
Ground floor plan
Total columns(450x450) 15 1.80 3.00 81.00
First floor plan
Total columns(450x450) 15 1.80 3.00 81.00
Slab
Base area 1 21.80 9.80 213.64
Staircase
Bottom 1 2.29 0.15 0.34
Waist Slab 1 6.76 1.80 12.18
Landing 1 1.50 1.50 2.25
1 1.95 0.20 0.39
1 1.94 1.50 2.90
Steps 20 0.30 0.15 0.90
Riser 20 1.50 0.15 4.50
Landing Beam 1 3.05 0.86 2.62
Lintel Bands
Ground floor plan
Along grid 1 1 16.65 0.25 4.16
Along grid 2 1 16.65 0.25 4.16
Along grid A,C,D,E 4 6.55 0.25 6.55
Between BC & 1-2 1 2.05 0.25 0.51
1 4.70 0.25 1.18
Sill Bands
Ground floor level
Along grid 1 1 19.70 0.15 2.96
Along grid 2 1 16.65 0.15 2.50
Along grid A,E 2 6.55 0.15 1.97
Along grid C,D 2 6.55 0.15 1.97
Between BC & 1-2 1 2.05 0.15 0.31
1 4.70 0.15 0.71
Below staircase 1 3.90 0.15 0.59
Deduction of door
D1 -4 1.10 0.15 -0.66
D2 -1 1.00 0.15 -0.15
Deduction of door
D1 -4 1.10 0.15 -0.66
D2 -1 1.00 0.15 -0.15
Pedestal
Base Block 8 1.25 0.25 2.50
Bench
Bench Top Slab 2 5.80 0.125 1.45
Bottom 2 1.90 0.25 0.95
3 BRICK WORKS
3.2 Full Brick (230 mm) Works (1:4c/s)
Brick Masonry Work Below Plinth Beam
Along grid 1,2,3 3 19.70 0.23 0.38 5.10
Along grid A,B,C,D & E 5 8.60 0.23 0.38 3.71
Ground floor
Along grid 1 1 16.65 0.23 2.33 8.90
For Ramp
Grid 3AB 1 1.40 0.22 0.30
5 FLOORING WORKS
5.1 Hardened Cement Concrete Flooring (40mm) With Neat Cement Punning
Ground floor plan
Deduction
D2 -8 1.10 -8.80
D3 -2 1.00 -2.00
Total 205.90 r.m
6 ROOFING/TERRACING WORKS
6.1 Metal Works
A Truss 1 4,712.85
Total 4,712.85 Kg
7 PLASTER/PAINTING WORKS
7.1 Internal Plaster
7.1.1 Internal Plaster on Wall (1:6)
Ground floor plan
Laboratory 1 32.35 Perimeter 2.91 94.14
Store 1 17.70 Perimeter 2.91 51.51
ECD 1 25.05 Perimeter 2.91 72.90
Staircase 1 17.75 3.00 53.25
For Strore Below Landing 1 3.53 1.25 4.39
2 0.70 1.44 2.01
1 2.88 1.60 4.60
Pedestal 5 1.25 0.25 1.56
5 0.50 0.25 0.63
Column
Grid 2A,2C,2D,2E 4 0.35 0.68 0.95
Grid 2B 1 0.45 0.68 0.30
Staircase
Waist slab 1 6.76 1.50 10.15
Landing 1 1.47 1.50 2.20
1 1.80 0.20 0.36
Ground Floor
Along grid 1
Grid 1A,1E 2.00 1.10 2.33 5.12
Grid 1B,1C,1D 3.00 0.65 2.33 4.53
Along grid 2
Grid 2A,2E 2.00 0.65 2.33 3.02
Along grid 3
Grid 3A,3E 2.00 1.05 3.00 6.30
First Floor
Along grid 1
Grid 1A,1E 2.00 1.10 3.00 6.60
Grid 1B,1C,1D 3.00 0.65 3.00 5.85
Along grid 2
Grid 2A,2E 2.00 0.65 3.00 3.90
Along grid 3
Grid 3A,3E 2.00 1.05 3.00 6.30
2.00 0.75 2.88 4.31
Grid 3B,3C,3D 3.00 1.20 2.88 10.35
3.00 0.60 3.00 5.40
8 MISCELLANEOUS
8.2 Cement Board Wall
8.2.1 For partition
Gable Walls 4.00 7.26 Area 29.04
Total 29.04 sq.m
8.3 Railing
Staircase Railing
Horizontal ISNB 40M 1 8.43 8.43 3.56 30.01
Vertical 38mm Square Pipe 2 0.989 1.98 2.82 5.58
Vertical 38mm Square Pipe 6 0.969 5.81 2.82 16.40
Horizontal 25mm Square Pipe 4 8.34 33.37 0.85 28.37
Balcony Railing
First Floor
Horizontal ISNB 40M 1 23.80 23.80 3.56 84.73
Horizontal ISNB 32M 2 23.80 47.60 3.10 147.56
Vertical ISNB 32M 19 1.02 19.38 3.10 60.08
Inclined ISNB 32M 19 0.134 2.55 3.10 7.89
Vertical 25mm Square Pipe 163 0.82 133.66 0.85 113.61
Pedestal
ISNB 40M Pedestal Bars 8 1.91 15.28 3.56 54.40
8 1.49 11.92 3.56 42.44
16 0.40 6.40 3.56 22.78
1.40
Bars (Y - direction) 12 150 0.89 5.00 10 1.60 82.67 73.48
0.10
2.10
Footing (2 Nos): 2200*2200mm, Bars
12 150 0.89 2.00 15 2.30 69.00 61.33
(X direction) 0.10
2.10
Bars (Y - direction) 12 150 0.89 2.00 15 2.30 69.00 61.33
0.10
2.30
Footing (3 Nos): 2400*2400mm, Bars
12 150 0.89 3.00 16 2.50 122.50 108.89
(X direction) 0.10
2.30
Bars (Y - direction) 12 150 0.89 3.00 16 2.50 122.50 108.89
0.10
2.40
Footing (1 Nos): 2500*2500mm, Bars
12 150 0.89 1.00 17 2.60 44.20 39.29
(X direction) 0.10
2.40
Bars (Y - direction) 12 150 0.89 1.00 17 2.60 44.20 39.29
0.10
2.70
Footing (1 Nos): 2800*2800mm, Bars
12 150 0.89 1.00 19 2.90 55.10 48.98
(X direction) 0.10
2.70
Bars (Y - direction) 12 150 0.89 1.00 19 2.90 55.10 48.98
0.10
2.90
Footing (2 Nos): 3000*3000mm, Bars
12 150 0.89 2.00 20 3.10 126.07 112.06
(X direction) 0.10
2.90
Bars (Y - direction) 12 150 0.89 2.00 20 3.10 126.07 112.06
0.10
3.00
Footing (1 Nos): 3100*3100mm, Bars
12 150 0.89 1.00 21 3.20 67.20 59.73
(X direction) 0.10
3.00
Bars (Y - direction) 12 150 0.89 1.00 21 3.20 67.20 59.73
0.10
0.20 0.08
100 &
Stirrups (for 250*300) 8 0.395 3 171 0.81 416.56 164.54
150
0.15
0.20 0.08
100 &
Stirrups (for 250*300) 8 0.395 5 75 0.81 304.50 120.28
150
0.15
Columns(450*450) upto plinth level
0.37 0.08
Stirrups for 15 columns 8 100 0.395 15.00 14 1.59 334.32 132.06
0.37
0.08
0.14
8 100 0.395 15.00 17 1.13 288.66 114.02
0.37
4 Plinth Tie Beams, 300*525mm
Main Bars (Long side beams); Along Grid 1-1, 2-2, 3-3
Extra Bars above Grid B-B 0.45+1.7*2 25 3.86 3 2 3.85 23.10 89.05
Extra Bars above Grid C-C, D-D 1.05+0.45+1.7 25 3.86 3 4 3.20 38.40 148.03
0.475 0.1`2
Stirrups (for 300*525) 12 100&150 0.89 3 201 1.64 990.13 879.23
0.25
Main Bars (Short side beams); Along Grid A,B,C,D,E 0.00 0.00
0.475 0.12
G.F. Columns
FFL
GFL
FFL
GFL
FFL
GFL
FFL
GFL
FFL
GFL
FFL
GFL
FFL
GFL
FFL
GFL
FFL
GFL
FFL
GFL
0.37 0.08
100 &
Stirrups for 15 columns 8 0.40 15 29 1.59 686.55 271.23
0.37 150
0.08
0.14 100 &
4 8 0.40 15 52 1.13 874.47 345.47
150
0.37
Main Beams at F.F. Level
Main Bars (Long side beams); Along Grid 1-1, 2-2, 3-3
21.5+0.45-2(0.07)
Bottom (T/O) 1.0 20 2.47 3 4 25.25 303.00 748.15
Extra Bars above Grid B-B 0.45+1.7*2 25 3.86 3 2 3.85 23.10 89.12
Extra Bars above Grid C-C, D-D 1.05+0.45+1.7 25 3.86 3 4 3.20 38.40 148.15
0.475 0.12
100 &
Stirrups (for 300*525) 10 0.62 3 232 1.64 1142.83 705.45
150
0.25
0.47 0.12
100 &
Stirrups (for 300*525) 10 0.62 5 78 1.58 616.20 382.04
150
0.25
Secondary Beam -
0.4 3.8-2(0.05)
16 1.58 1 3 5.44 16.32 25.79
0.4 0.10
100 &
Stirrups (for 425*250) 8 0.40 1 1.30 35.37 13.97
150
0.20 27
0.4
16 1.58 1 3 14.90 44.70 70.64
11.7+.3*2-.05*2+.96
0.375 0.10
100 &
Stirrups (for 425*250) 8 0.40 1 147 1.30 191.39 75.61
150
0.20
0.4
5.7+.5
16 1.58 1 3 7.94 23.82 37.64
0.375 0.10
100 &
Stirrups (for 425*250) 8 0.40 1 49 1.30 63.80 25.20
150
0.20
960 960
Hunge bar(at secondary beam
420 16 1.58 2 16 3.01 96.32 152.21
intersection) 420
250
First floor slab (First floor level) - -
Along Y-axis - -
600
GRID 1-3: between A-C 75 8 300 0.40 1 37 10.96 409.17 161.65
9800-40
450 600
75 8 300 0.40 1 37 11.12 415.15 164.01
9800-40
450
GRID 2-3: between C-D 75 8 300 0.40 1 12 5.49 63.99 25.28
4925-40
450
75 8 300 0.40 1 12 5.57 64.93 25.65
4925-40
450 600
GRID 1-3: between D-E 75 8 300 0.40 1 19 10.96 210.07 82.99
9800-40
600
75 8 300 0.40 1 19 11.12 213.13 84.20
9800-40
525
75 75 8 300 0.40 1 15 14.18 218.61 86.36
12300-40
525
GRID A-E: between 1a-3 75 75 8 300 0.40 1 16 23.44 365.27 144.31
21800-40
525
75 75 8 300 0.40 1 16 23.92 372.75 147.26
21800-40
525
GRID D-E: between 1-1a 75 75 8 300 0.40 3 15 7.46 345.03 136.31
6300-40
525
75 75 8 300 0.40 3 15 7.54 348.73 137.77
6300-40
1200
First Flight 12 125 0.89 1 13 3.80 49.34 43.85
2260
335
1450
3354 270
12 125 0.89 1 13 8.20 106.65 94.80
2700
430
1000
12 125 0.89 1 13 2.00 26.00 23.11
1000
1000
1000 12 125 0.89 1 13 2.00 26.00 23.11
1870
780 180 12 125 0.89 1 13 2.83 36.79 32.70
855
75
Second Flight 3354 12 125 0.89 1 13 8.05 104.64 93.01
2315
145
2260
240 780 12 125 0.89 1 13 3.28 42.64 37.90
2035
330 1000
12 125 0.89 1 13 3.37 43.75 38.88
1000
1880 12 125 0.89 1 13 4.68 60.84 54.08
180
1000
12 125 0.89 1 13 2.00 26.00 23.11
1000
450
Nosing ties 122 8 300 0.40 1 120 2.20 264.00 104.30
150
Second Flight distribution bar 75 1475 10 150 0.62 1 56 1.63 91.00 56.17
75
F.F. Columns
SFL
FFL
SFL
FFL
SFL
FFL
SFL
3000
16 1.58 5 2 3.60 35.95 56.81
FFL
SFL
FFL
SFL
FFL
SFL
FFL
SFL
FFL
SFL
FFL
0.37 0.08
100 &
Stirrups for 15 columns 8 0.40 15 29 1.59 692.52 273.59
150
0.37
0.08
0.14 100 &
8 0.40 15 52 1.13 882.96 348.82
150
0.37
Main Beams at Truss Level
Main Bars (Long side beams); Along Grid 1-1, 2-2, 3-3
0.72
Top (T/O) 21.5+0.45-2(0.05) 16 1.58 3 3 24.41 219.69 347.16
21.5+0.45-2(0.07)
0.42 12 0.889 3 2 23.57 141.42 125.71
0.35 0.12
100 &
Stirrups (for 300*400) 8 0.395 3 232 1.39 968.83 382.75
150
0.25
Main Bars (Short side beams); Along Grid A,B,C,D,E 0.00 0.00
0.42
9.5+0.45-2(0.05) 12 0.889 5 2 10.73 107.30 95.38
0.35 0.12
100 &
Stirrups (for 300*525) 8 0.395 5 79 1.39 549.84 217.22
150
0.25
G.F Sill band
600 600
At grid 1 10 0.62 3 2 7.29 43.74 27.00
5550
600 600
10 0.62 1 2 4.55 9.10 5.62
3050
600 600
At grid 2 10 0.62 2 2 5.95 23.80 14.69
5550
8 150 0.40 2 33 0.26 17.25 6.81
600 600
10 0.62 1 2 4.61 9.22 5.69
5550
8 150 0.40 1 25 0.26 6.59 2.60
600 600
At grid A,C,D,E 10 0.62 4 2 8.05 64.40 39.75
6550
Lintel Band
600 600
At grid 1 10 0.62 3 2 7.05 42.30 26.11
5550
8 150 0.40 3 38 0.26 29.64 11.71
600 600
10 0.62 1 2 4.55 9.10 5.62
3050
600 600
At grid 2 10 0.62 2 2 5.95 23.80 14.69
5550
8 150 0.40 2 31 0.26 15.95 6.30
600 600
10 0.62 1 2 4.85 9.70 5.99
5550
8 150 0.40 1 0.26 6.59 2.60
25
600 600
At grid A,C,D,E 10 0.62 4 2 8.05 64.40 39.75
6550
600 600
At grid 2 10 0.62 2 2 5.95 23.80 14.69
5550
600 600
10 0.62 1 2 4.85 9.70 5.99
5550
600 600
At grid A,C,D,E 10 0.62 4 2 8.05 64.40 39.75
6550
8 150 0.40 4 45 0.26 46.45 18.35
600 600
10 0.62 1 2 4.55 9.10 5.62
3050
600 600
At grid 2 10 0.62 2 2 5.95 23.80 14.69
5550
600 600
10 0.62 1 2 4.85 9.70 5.99
5550
600 600
At grid A,C,D,E 10 0.62 4 2 8.05 64.40 39.75
6550
2-LaLiEC Total
S. No. Description Unit Remarks
GF FF Quantity
A Common Installation
1.1 Stand Alone 40 A DP MCB with Enclosure 1 1.00 No
B SCHOOL BLOCKS
1 DISTRIBUTION BOARDS
DB (DB-1) Incoming: 1 x 40A DP MCB Outgoing: 2 x 25
1.1 A DP MCB 7 x 6 A SP MCB 3 x 16 A SP MCB 1 1.00 No
DB ( DB-2) & DB ( DB-3) Incoming:
1.3 1 x 25A DP MCB 1 1.00 No
FIRE EXTINGUISHER
D a) Supplying Fire extinguisher ABC stored Pressure 5.0kg size 1 3 4.00 Nos.
ABC stored pressure type Fire extinguisher.
2 Concrete Works
2.1 PCC
2.1.1 PCC work (1:3:6)
For Footing
F1 9 1.00 1.00 0.10 0.90
For Lower Tie Beam
Grid 1 and Grid 3 2 9.40 0.45 0.05 0.42
Grid 2 2 4.70 0.35 0.05 0.16
Between grid 2 and 3 2 4.45 0.45 0.05 0.20
Along grid A-12,B-12 & C-12 3 3.20 0.45 0.05 0.22
Along grid A-23 & C-23 2 2.20 0.35 0.05 0.08
Along grid B-23 1 2.20 0.45 0.05 0.05
Septic Tank 1 0.83 1.45 0.08 0.09
Sewer Manhole (Rectangular)
Bottom 4 1.00 1.00 0.10 0.40
PCC Benching 4 0.07 Area 1.00 0.30
Total 2.82 cum
Sand Filling
Periphery of Soak pit 1 1.88 Area 1.55 2.92
Total 2.93 cu.m
3 Brickworks
5 FLOORING WORKS
5.1 Hard Concrete Flooring (40mm) With Neat Cement Punning
Toilet Floors 2 4.75 3.25 30.88
Corridor Floors 2 4.75 1.27 12.07
Outside Staircase 2 1.20 1.05 2.52
Ramp
Slanted Portion 1 5.45 1.03 5.59
Horizontal Portion 1 1.20 1.03 1.23
Drain 1 11.45 1.48 16.95
Along the terrace 2 4.75 2.25 21.38
Water Trough 2 0.60 3.75 4.50
Total 95.10 sq.m
6 ROOFING/TERRACING WORKS
6.1 Metal Works
Truss 1 999.81
Total 999.81 kgs
8 Miscellaneous
8.2 Cement Board Wall
For Partition
Gabel wall 2 1.09 Area 2.17
Total 2.18 sq.m
16mm dia rod Anchor bolt 24 0.45 10.800 r.m. 1.58 17.07
16mm dia nut nut 24 24.000 no. 0.03 0.75
10mm thick plate Top chord cleat 30 0.2 0.09 0.01 0.005 cu.m. 7,850.00 42.39
10mm thick plate Purlin Cleat 60 0.2 0.09 0.01 0.011 cu.m. 7,850.00 84.78
10mm dia nut bolt (50mm) nut bolt 60 60.000 no. 0.05 2.91
10mm thick plate Runner plate 16 0.175 0.07 0.01 0.002 cu.m. 7,850.00 15.39
10mm thick plate Runner box 32 0.175 0.07 0.01 0.004 cu.m. 7,850.00 30.77
10mm thick plate 32 0.08 0.07 0.01 0.002 cu.m. 7,850.00 14.07
16mm dia nut bolt (50mm) Runner box 32 32.000 no. 0.13 4.30
0.9
1 F1 Footing: Main bars 12 150 0.888 7 1.06 6.59
0.08
0.9
Distribution bars 12 150 0.888 7 1.06 6.59
0.08
0.22 0.08
100 &
Stirrups 8 0.395 30 1.04 12.32 110.92 Total height
150
0.22 for Stirrups= 3.25
0.15 0.08 & Ht. for 150 1.65
100 & spacing=
8 0.395 30 0.76 9.01 81.05
150
0.15
0.08 3 Nos. in
U shaped Stirrups & ties (total) 8 each 0.395 9 1.20 4.27 38.39
0.22
member
for One Column = 61.93
for Nine Columns = 557.40
3 Foundation Beams, 250*250
0.15 0.08
100 &
Stirrups (for 250*250) 8 0.395 203 0.76 61.04 61.04 5 Stretches
150
0.15
0.15 0.08
8 150 0.395 32 0.76 9.71 9.71 1 Stretch (Section 2)
0.15
0.15 0.08
100 &
Stirrups (for 250*250) 8 0.395 48 0.76 14.41 14.41
150
0.15
0.15 0.08
100 &
Stirrups (for 250*250) 8 0.395 28 0.76 8.46 16.91
150
0.15
0.40 0.08
100 &
Stirrups (for 250*501) 8 0.395 20 1.26 9.87 19.74
150
0.15
0.25 0.08
100 &
Stirrups (for 250*300) 8 0.395 203 1.06 85.14 85.14 5 Stretches
150
0.20
0.25 0.08
8 150 0.395 32 1.06 13.54 13.54 1 Stretch (Section 2)
0.20
0.25 0.08
100 &
Stirrups (for 250*300) 8 0.395 48 1.06 20.10 20.10
150
0.20
0.25 0.08
100 &
Stirrups (for 250*300) 8 0.395 28 1.06 11.79 23.59
150
0.20
Main Beams:
5 Long Beams: 250*450
10.0+0.3-2(0.06)
0.4+0.48 16 1.580 2 12.90 40.76 122.29 1 Lap
0.88
Top Bars 10.0+0.3-2(0.06) 16 1.580 3 12.90 61.15 183.44 1 Lap
0.40 0.08
100 &
Stirrups (for 250*450) 8 0.395 244 1.36 131.08 131.08 6 Stretches
150
0.20
Short side beams:
6.0+0.3-2(0.06)
Bottom Bars 0.4+0.2 12 0.888 4 7.38 26.21 78.64 3 beams
0.6
Top Bars 6.0+0.3-2(0.062) 12 0.888 3 7.38 19.66 58.98
0.40 0.08
Stirrups (for 250*450) 8 100 0.395 23 1.36 12.36 37.07
0.20
0.35 0.08
100 &
Stirrups (for 250*400) 8 0.395 28 1.26 14.02 42.06
150
0.20
0.86
6 SLAB: Short Span 0.11 2.71 10 150 0.617 65 4.65 186.49 186.49 65
1.48
Long Span 10.21 10 300 0.617 9 13.95 77.46 77.46 1 Lapping 9
0.09
1.48
1 Lapping, & Cranked
10.21 10 300 0.617 9 14.17 78.69 78.69
0.09 over middle beam
3.25
Top Extra (Negative) Bar 8 300 0.395 9 3.25 11.55 11.55
10.21
Distribution Bar, Long Span 8 150 0.395 10 10.21 41.40 41.40
2.71
Distribution Bar, Short Span 8 150 0.395 41 2.71 43.53 43.53
short span
4400
200
slab
Along Y axis
1915
110 8 1 34 9.03 306.85 0.40 121.21 Main Bar
7000
Total
S. No. Description Tc(S) Unit Remarks
Quantity
A. Common Installation
1.2 Stand Alone 6 A DP MCB with Enclosure 2 2.00 nos.
B School Blocks
1 DISTRIBUTION BOARDS
1.5 6A DP MCB with Enclosure 2.00 2.00 nos.
3 General Service Light Point Wiring
3.1 One Way Light Point 12 12.00 pts.
3.3 Ceiling and Exhaust Fan Point Wiring 4 4.00 pts.
6 Sweep Ceiling/ Exhaust Fan/Wall Fan
6.2 225mm dia M/D exhaust Fan 4 4.00 nos.
7 Light Fixtures/Luminaires & Accessories
7.6 LED Wall Light 2 2.00 nos.
7.7 9 W LED Surface Mounted Cylindrical type 2 2.00 nos.
7.8 6 W LED Recessed Circular type 6 6.00 nos.
7.9 7 W LED T5 Slim Mirror Light 2 2.00 nos.
B School Blocks
1 Sanitary Installation
a Lab Sink 5 5.00 set
b PVC Multi Floor Trap 10 10.00 nos.
2 Sanitary Installation
a Water Closet Set 2 2.00 set
b Orissa Pan 4 4.00 set
c Hand Wash Basin 2 2.00 set
d Ladies Urinal 2 2.00 set
e Self Closing Bib Cock 12 12.00 nos.
f CP Spreader in Urinal 4 4.00 set
g Toilet Paper Holder 2 2.00 nos.
h Commode Spray 2 2.00 nos.
i PVC Multi Floor Trap 10 10.00 nos.
j Waste Coupling and PVC Bottle Trap 4 4.00 nos.
k 40mm SS Grab Bar-Side 2 2.00 nos.
l 40mm SS Grab Bar-Rear 2 2.00 nos.
m CP Foldable Hinge 4 4.00 nos.
Building: 2-LaLiEC
S.N Furniture Description Symbol Qty Unit Remarks
Classroom
1 ECD Student Desk (6 Seater) D-03 3 nos.
4 Soft Board F-01 1 nos.
5 Book Shelf F-02 3 nos.
6 Teacher's Table T-01 3 nos.
7 Teacher's Chair C-01 3 nos.
8 White Board F-03 3 nos.
Library
6 Student Bench G6-12 (3 Seater) B-02C 14 nos.
4 Library Table T-02 7 nos.
5 Library Shelf F-04 5 nos.
Computer nos.
7 Computer Table T-04 12 nos.
8 Computer Shelf C-02 24 nos.
9 White Board with Stand F-05 1 nos.
Laboratory
10 Equipment Shelf F-07 3 nos.
11 Lab Stool F-08 31 nos.
Miscellaneous
12 Equipment Cabinet F-09 4 nos.
13 Cusions F-16 18 nos.
14 Carpet 27.43 sq.m
Total 135 nos.
Office
10 Cabinet F-06 7 nos.
11 Office Table (2 Sides Drawer) T-05 1 nos.
12 Office Table (1 Side Drawer) T-06 2 nos.
13 Office Table T-07 12 nos.
14 Office Chair C-03 16 nos.
15 Office Chair-Headmaster C-04 1 nos.
16 Office Visitors Chair C-05 7 nos.
17 File Cabinet F-10 2 nos.
Miscellaneous
Length Breadth
S.No Description No. Height (m) Qty. Unit Remarks
(m) (m)
1 Site Clearance
For Pavement
Infront of 3-12C(MsF)-D 1 29.25 2.70 78.98
Infront of 2-LaLi EC 1 24.15 2.70 65.21
5 P.C.C.(1:3:6) Works
PCC For Gate Column
Column 2 0.90 0.90 0.08 0.12
PCC For Flag Pole
Flag Pole 2 0.30 0.30 1.20 0.22
1 2.40 0.80 0.10 0.19
2 0.30 0.30 0.08 0.01
6 P.C.C.(1:2:4) Works
For Concrete Pavements
Infront of 3-12C(MsF)-D 1 22.55 2.70 0.08 4.57
1 6.70 1.50 0.08 0.75
Infront of 2-LaLi EC 1 17.45 2.70 0.08 3.53
1 6.70 1.50 0.08 0.75
1 2.90 1.50 0.08 0.33
Side of Toilet Block 1 2.95 1.80 0.08 0.40
1 7.00 0.90 0.08 0.47
1 Area 2.27 0.08 0.17
Retaining wall 3m height 1 13.52 0.50 0.10 0.68
Retaining wall 1m height 1 8.40 0.50 0.10 0.42
Protection Wall Infront of 2LaLiEC 1 21.75 0.45 0.08 0.73
Protection wall Infront of 3-12C(MsF)-D 1 14.20 0.45 0.08 0.48
Protection Wall Between 2 LaLiEC and 3 1 15.60 0.45 0.08 0.53
B Column
Gate Column 2 0.30 0.30 2.95 0.53
Top RCC Coping 2 0.59 0.59 0.05 0.03
2 0.175 0.05 0.02
Total 0.99 cu.m
10 Formworks
A Entrance Gate-Foundation 2 3.60 0.35 2.52
Gate Column 2 1.20 3.15 7.56
Flag Pole Steps 2 0.25 0.80 0.4
Flag Pole Masonry Top Surface 1 1.70 0.50 0.85
Infront of 3-12C(MsF)-D Through The Face 1 29.25 0.23 6.59
Infront of 2-LaLiEC Through The Face Of 1 24.15 0.23 5.44
Between 3-12C(MsF)-D and Toilet 2 5.89 0.23 2.71
1 8.50 0.23 1.96
Side of Tc(S) 1 7.00 0.23 1.61
1 2.95 0.23 0.68
Total 30.32 sq.m
17 External Plaster
Column Inside face 4 0.54 1.64 3.54
Column Outside face 2 1.2 0.20 0.48
4 0.54 1.70 3.67
Deduct -2 0.3 1.40 -0.84
Top Coping 2 2.36 0.05 0.24
4 0.59 0.30 0.71
Total 7.80 sq.m
20 Flag Pole
75 Dia GI Pipe 2.00 1 2.00
Total 2.00 nos
2 Concrete Works
2.1 PCC
2.1.1 PCC Work (1:3:6)
Below Water Tank 1 3.35 3.1 0.075 0.78
Total 0.78 Cu.m.
1.915 1.915
3.02
1.915 1.915
3.29
1.884 1.884
0.05
0.49 0.49
1.884 1.884
0.05
0.49 0.49
0.592
0.592 0.6 0.6
D. Horizontal Bars(outer 4
0.3 0.3
1 Shorter Span 10 20 3.62 289.6 0.62 179.552
3.02 3.02
0.3 0.3
3.27 3.27
0.3 0.3
E. Base Slab bar 4
1 Shorter Span 10 32 3.14 401.92 0.62 249.19 3.045
0.05 0.05