National Reconstruction Authority


Central Level Project Implementation Unit (Education)
District Level Project Implementation Unit (Education),Gorkha
Emergency School Reconstruction Project (ESRP), JICA Loan No. : NE-P11
Contract Bills
Final Interim Payment Certificate
Period: 15th November 2018 to 14th August 2020
Name of School: Shree Chaturmala Secondary School Payment Voucher no:
Name of Contractor:Sharma-A.M Joint Venture Date of payment:
Contract Number:ESRP/MOE/CLPIU/074/075-GORKHA-15 Page no of measurement book:
Serial no. of previous payment bills: 6
Voucher no.of previous payment bills:
Date of order for commencement of work: 3rd October,2018
Date of work to be completed: 2nd February,2020
Date of completion of work:
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work

Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract

GENERAL
1. MOBILIZATION AND DEMOBILIZATION
1 L.S. 1.00 500,000.00 500,000.00 1.00 500,000.00 0.50 250,000.00 0.50 250,000 100.00%
Mobilization of the construction by constructing
temporary
2. SITE OFFICE acomodation for labours and site staff with Per
ESTABLISHMENT
2 required 21.00 25,000.00 525,000.00 21.00 525,000.00 18.00 450,000.00 3.00 75,000 100.00%
Providingsuitable facilities andSite
and Maintaining keeping
Officetheofsame
two inRoomsgood Month
hygenic
having condition
total Area for sq.m
20 entireforproject
the use completion
of Clienttime. and
3. PROJECT INFORMATION BOARD
3 Demolition including
Consultant of the same and cleaning
Table, the site after
file nos. 1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 - - 100.00%
Providing and Fixing office of Projectchair,
Information Lockable
board with
completion
cabinet, of the Items
Stationery construction activities all complete.
approved
4. SAFETY Text
SIGN appropriate location including all1
in BOARD (Ink, Paper, Pen, Pencils etc.),
4 [Note: 50% and
Computer payment shallwith
1 Printer be made
all after completion
necessary set up. all of nos. 1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 - - 100.00%
required
Providingfixing
and and accessories
Fixing as per
of Safety drawing
Sign Board all complete.
with approved
mobilization
complete as per remaining
instruction 50%
of engineer.afterThecompletion
Specification of
Text
5.
works and
SAFETYas Sinage
per including required
MATERIALS
contract] & SITE fixing
SAFETY accessories as
5 of computer shall not be less than (19.5" led monitor with L.S. 1.00 100,000.00 100,000.00 1.00 100,000.00 0.95 95,000.00 0.05 5,000 100.00%
per drawing
Providing andallMaintaining
complete. Construction Safety Measures
Core i5, 7th Generation, 500 gb Hdd, 8gb ddr 4 ram),
in
6. Construction
LAB
Printer TEST(WATER
should Site with
function atTEST)proper
least Safety Scanning
of Printing, measuresand to
6 person and work areasize(Helmet, Shoes, Providing
First Aid Kit, job 1.00 - - - - - - - 0.00%
Testing
Photocopy and of Providing
A4 Lab Test Report
documents. for Quality andof
Clothing,
Water
Maintaining Glove,
in Water Guard
Stream
all above Rail
(Up and
items for edge protection,
Down Basis
on Rental streem) Safety
forlocated
entire
7. TEMPORARY TOILET
7 Net,
near Safety rope, Fall
bycompletion
Construction Protection
sitetoilet etc.) as required
before byafter
the nos. 2.00 150,000.00 300,000.00 2.00 300,000.00 2.00 300,000.00 - - 100.00%
project
Construction time.
of temporary with Starting
CGI Sheetand fixed to
Contract Clause
completion GCC 24 and
of construction work.Specification
Test division
This items has to be 1
Bamboo
8. ROAD support
REPAIR frame
AND and all necesary
MAINTENANCE including
8 "GENERAL
done to mark REQUIREMENT
the affect of CLAUSEwork
construction 8(C)".in The Km.
water 30.00 50,000.00 1,500,000.00 30.00 1,500,000.00 30.00 1,500,000.00 - - 100.00%
Septic pit, and
Providing Pipeline, Toilet Pan
Maintaining the etc. for
roads as entire
necessary projectto
number of Safety Materials Personal Protecting
stream.
completion
avoid blockage timeby all completeandasRockfall
Landslides per Instruction of
Equipments (PPE) shall be minimum but notfor regular
limited to - - - - - -
Engineer.
transport Rate
of shall include
construction all Material
materials and cost
site with fixing,
inspection
35 sets.
CIVIL Payment
WORKS- shall be
BUILDING made in Prorata Basis for entire - - - - - - -
construction
during charges and demolition & cleaning of the
durationoverall construction period. Rate shall include all
of project.
1 same
Material
EARTH after
costcompletion
WORKS with demolitionof thecharges,
construction activities
cleaning, fixing all
& - - - - - - -
complete. charges of the same after completion of the
construction
SITE CLEARANCE & MOBILIZATION:
1.1 construction
Clearing andactivities
grubbing the site for construction by sq.m
all complete. 1,211.02 100.00 121,102.00 1,284.25 128,424.61 587.77 58,776.75 696.48 69,648 106.05%
removing
1.2 EARTHWORK150mm thick top soil including: bushes, small
IN EXCAVATION
1.2 trees, leveling of undulated ground, shorting and cu.m 628.72 400.00 251,488.00 606.65 242,661.88 734.08 293,631.88 - 127.42 (50,970) 96.49%
Excavation in foundations in all type of soils for
stacking/storing
foundation, selected
trenches, top soilpits
footing, for reusetointhelandscaping
1.3 EARTH
works, BACK
disposing FILLING
unsuitable : etc.from
materials
required
1.3 depth
Back including
filling in dewatering
foundation andbysides
manual
of or site, etc., all
mechanical
foundation with
cu.m 376.45 300.00 112,935.00 378.36 113,509.01 343.34 103,000.72 35.03 10,508 100.51%
complete
means etc.asasper
per drawings,
specifications specifications
with all and instructions
contractor’s own
approved
1.4
of BOULDER
the soil obtained
Engineer. SOLING from
: the excavation at site and
machinery
1.4 stacked at and
site equipment's,
or brought providing
from crossing
outside in of track,
layer not cu.m 191.35 6,000.00 1,148,100.00 236.60 1,419,585.45 163.68 982,108.50 72.91 437,477 123.65%
Providing and laying uncoursed hand packed Dry Rubble
shoring, strutting,
exceeding 15 in timbering
cmfoundation,
thick (compacted andthickness)
buttressing with
Stone
1.5 SANDsolingFILLING : under floor plinth including
with out
appropriate materials
transportation
1.5 any of soil,of and all such
spreading measuresline
in required necessary
and level,to cu.m 5.44 6,000.00 32,640.00 9.62 57,695.40 - - 9.62 57,695 176.76%
specialand
Providing dressing
filling stone including allfilling interstices
retain in position
sprinkling water, thesand
ramming,
in soak
sides pit.foundation
of the
compacting
complete
withquarry pitas and
mechanical
per
with suitable
drawings, quarry
specifications waste andorinstruction
stone chipsof orthe Engineer.sand,
2. CONCRETE
including refilling
rammers, testing, WORKS
the excavated
etc., using
all completematerial with watering,
as permechanical
drawing,
2.1 watering, compacting appropriate cu.m 33.40 14,000.00 467,600.00 33.06 462,867.56 28.42 397,904.06 4.64 64,964 98.99%
2.1 P.C.C leveling
ramming,
specification the siteof the andEngineer.
disposing off the
compaction and meansinstructions
with all contractors materials,
2.1.1 P.C.C (1:3:6)earth to outside the construction
surplus/unusable
handling, placing etc. all complete as per drawings,
Providing
premises, etc.andall laying
complete machine mixed Plain
as per drawings, Cement
specifications
specifications and instruction of the Engineer. The
Concrete of nominal
and instructions of the mix 1:3:6 (1 cement : 3 sand : 6
Engineer.
complete item including all lead & lift.
coarse
Prepared by contractor aggregate ) for Checked by Consultant, DSC and
leveling course in foundations Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
under floor of building, etc. in all level with broken stone
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work

Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract

2.1.2 P.C.C (1:2:4) WORKS


2.1.2 cu.m 51.45 16,000.00 823,200.00 51.70 827,141.94 36.04 576,640.00 15.66 250,502 100.48%
Providing and laying machine mixed Plain Cement
Concrete
2.2 P.C.C.ofFOR nominalR.C.C. mixWORKS1:2:4 (1 : cement : 2 sand : 4
2.2 coarse aggregate ) for leveling course in foundations and cu.m 754.88 20,000.00 15,097,600.00 771.39 15,427,822.86 746.51 14,930,113.98 24.89 497,709 102.19%
Providing and laying in position machine mixed and
under floorvibrated
machine of building, cement etc. concrete
in all levelofwith mixbroken1:1.5:3 stone
(1
2.3 SILICA CEMENT ADMIXTURE
2.3 aggregate
cement:1.5of size not
sand: 3 coarsemore aggregate)
than 25 mm M20 of grade
approved kg 7,548.80 300.00 2,264,640.00 7,713.92 2,314,177.27 7,465.06 2,239,517.10 248.87 74,660 102.19%
Providing and mixing Silica Cement Admixture of for
in
quality including
reinforcedconcrete
cement concrete formwork work wherever
using approved necessary,
structural
2.4 STEEL REINFORCEMENT at the rate of 2.50% by weightcement of the
dewatering,
2.4 with 20 mm batching,
graded mixing,
machine crushed transporting,
stone placing,
aggregate of Mt. 120.80 130,000.00 15,704,000.00 119.69 15,559,451.07 119.41 15,522,703.22 0.28 36,748 99.08%
cement for and
Providing promotingfixing workability,
in position improvingFe lift,500 strength,
steel
compacting,quality
approved curing, inincluding
various alllocations
lead and etc. all
achieving waterproofing
reinforcement ofpervarious properties,
diameter bleedingand
confirming toand
heights
prevention,
relevant
2.5 FORMtransportation
complete
including WORKS
as drawings,
of specifications
concrete to site of the
placing,
etc. Silica Cement Admixture shall
2.5 IS code in R.C.C. works including straightening, cutting, be the product of sq.m 5,033.10 800.00 4,026,480.00 5,165.19 4,132,148.12 4,827.30 3,861,841.04 337.88 270,307 102.62%
Supplying
instructions
compaction, and
of the laying
finished Engineer. centering,
to required line shuttering
andthe level, of various
protection
Silica
bending, Japan or superior
binding with 20andSWG shall meet
annealed requirements
wire for tying
pattern
3.
andBRICK formworks
curing, MASONRY with
etc.in all 19/12
WORKS mm
complete of thick
as per water proof
drawings, ply
as mentioned
the reinforcement barsspecification
at each materials and
wood
3.1 3.1 & steel adjustable
BRICK MASONRY props forjunctions
allofkinds 1 :of
(binding
4RCC
wire
c/s ) works
specifications
Workmanship,
shall
and
Division
not be measured – 4:WORKS
the instructions
Concrete
separately)
(the
Works, Engineer,
allArticle
ONEbut
2.4 cu.m 226.43 20,000.00 4,528,600.00 - - - - - - 0.00%
for foundations,
SIDE
excludingFAIRFACEthe cost columns, shearincluding
of centering, walls, beams,
shuttering,
wasteslab,and
and
cut pieces, provision
staircase, lintel, sill, for adequate
pergola, numbers of spacers,
Providing
reinforcement,
CLEAR and laying
SILICON first classincluding
all WATER-REPELLANT
complete selected
as per nails,
factory propping
pressed
drawings,
COATNG
chairs, providing
scaffolding, staging, andsupporting
placing cement mortar
andEngineer.
bracing (1:1)
in onecover
proper
wire cut Fair
specifications
7.2.3 Providing Face
andand brick (machine
instructions
Applying of the made brick) or
blocksand
lines to level,
keep the bars the
sealing in Water
intended
joints Repellant
withposition
heavy Coating
at
duty all brown on
levels sq.m 1,069.62 550.00 588,291.00 - - - - - - 0.00%
more brick
Exposed thickSurface
Brick wall inusing cement mortarBase
Silicone 1:4 (1 cement :
MC-Nisiwa
all adhesive
self complete tape, as aligning
per drawings,to line andspecifications
levels including and
4coarse
SH sand)
or equivalent in ,superstructure and other specified places
instructions
POINTING of
WORKthe or INsuperior
Engineer. BRICK including
(Authorized
MASONRY cleaning
lap length brick
and
Ties,
in all PVC
surface heightsSpacer,
using and Providing
brick level openings/
including
cleaning chemical,the costcutouts/of Providing
pockets,
single or
for
8.1.1 and the
applying bar
applying length
at all exceeding
De-shuttering 10
levelschemical, meterWorks
Pointing insingle
lengthinorshall
De-shuttering multi-
Cement be
as sq.m 1,069.92 400.00 427,968.00 - - - - - - 0.00%
multi
stage stage self
scaffolding, standing
etc. all scaffolding,
complete soaking bricks,
measured
Mortar
approved for
1:2
by the
(1
the payment,
cement
Engineer :2 except
fine
etc., to as
sand)
completeon per
column).
the manufacturer's
at face
all of
levelsbrick
as
curing, raking
instruction, joints,
project provision for
specification recesses,
andinstructions
instruction openings,
of the
the
masonry
per
toothing wall
drawing,
BOQ Total including
etc.,ofallspecifications
items mixing
3.1., 7.2.3
complete as per mortar,
and
& drawing, laying
8.1.1: specifications in perfect
of - - - - - - -
Engineer.
line, level and plumb
Engineer. and finishing in regular and even
and instructions of the Engineer.
surface ,allitems
Replaced complete
3.1, 7.2.3as peranddrawing
8.1.1 with , specification
following and
instruction of the Engineer. - - - - - - -
items for 3-LaLiEACCr(F)-A and 3-12C(MsF)

Brick Masonry Works (1:4 c/s) cu.m 18,000.00 - - - - - -


Cement Plaster Works on Outer Wall (1:6) sq.m 600.00 - - - - - - -
Exterior Weather Coat Paint sq.m 350.00 - - - - - - -
- - - - - - -
3.2 BRICK MASONRY WORKS ( 1 : 4 c/s )
3.2 cu.m 138.14 18,000.00 2,486,520.00 349.48 6,290,618.86 325.70 5,862,668.95 23.77 427,950 252.99%
Providing and laying first class chimney fired brick one
or more
3.3 HALF brickBRICK
thick wall WORKSin cement( mortar1 : 4 c/s 1:4 )(1Providing
cement :
3.3 4 coarse sand) in foundation up to plinth, superstructure sq.m 84.62 1,500.00 126,930.00 96.34 144,510.71 69.42 104,123.63 26.92 40,387 113.85%
and laying non-fairfaced half brick work masonry in
and other
cement mortarspecified
1:4 (1BRICK places
cement:4 in sand)
all heights and level
in(1:3superstructure
3.4 HONEY COMB WORKS c/s)
3.4 including
with approved the cost first of
classsingle or bricks
multi in
firedProviding stage scaffolding,
perfect cu.m 3.52 9,000.00 31,680.00 5.28 47,478.83 - 5.28 47,479 149.87%
and layingline honey &
soaking
level, brick bricks,
required sizecuring,
andbrick raking
shapethick joints,
at any provision for
comb
4. one
DOORSopenings, or more
& WINDOWS WORKS wall height
in cement andmortar
level,
4.1
recesses,
including the cost oftoothing
single oretc.,
multiall stage
complete as per
scaffolding,
4.1 METAL
1:3 (1 cement FRAME : 3 coarse sand) in soak pit in all heights - - - - - - -
drawing, specifications
cleaning, andbricks,
instructions of the of Engineer.
and level soaking
Providing
WINDOW including
and
ofthe
fixing in
SHUTTER
the
position
packing
cost ofinsoaking
required
the curing,
bricks,
lineand
joints,
and level
4.1.1 raking
Door
rakingFrame joints,
joints, provision Providing,
provision for recesses,
for recesses,fabrication
openings,
openings, curing,
toothing rm. 354.48 1,100.00 389,928.00 362.65 398,915.00 356.74 392,411.80 5.91 6,503 102.30%
pressed
installation (folded)
in Steel door
position 35 mmandthick
window glazed frame of size
providing
4.1.2 etc., 25x3mm GI as Straps columns at and
window
Fixed tospecifications every
shownallinDOOR
Window
FLUSH
ventilator complete
Frame
drawings
shutter SHUTTER per 1.2mm
manufacture
made drawing,
(32MM)
from galvanized
Providing iron
& fixing and rm. 1,020.65 1,100.00 1,122,715.00 909.68 1,000,648.00 916.03 1,007,627.50 - 6.34 (6,979) 89.13%
5th courseSHUTTER
4.2 instructions
METAL ofofbrick
the and with
Engineer.60mm widththick14 gaugegalvanized
welded iron
GI - - - - - - -
32mm
sheet ofthick
1.20solid
folded inmm thick
core flush
required including
size door
and shutters,
hinges,
shape jamb,
in single
including lock leaf
glazing
mesh anchored to GI strap, all complete as per design,
jamb,
or
with 5head,
doublemm base
leaf
thick ties detailed
as clear
per offloat
1.2 glass
mm pressed
drawing.
with TheGI flush
welded doorson
4.2.1 drawing, specifications instructions of glazing
the Engineer.beads,
sq.m 190.50 7,500.00 1,428,750.00 169.83 1,273,698.38 190.10 1,425,732.75 - 20.27 (152,034) 89.15%
rigidly
shall
washer befixed
factory
and together
specialmade by
solid
glazing mechanical
core block
putty, means,
requiredboard adjustable
shuttersand
numbers
lugs
4.3 bonded
sizes
WOODEN with split
with
hardware end
liketail
phenol
SHUTTER to each
formaldehyde
hinges, jambresin.
tower-bolts, including
handles, steel
The lipping eye-butt
shall - - - - - - -
hinges
be
hook, of teakwood
2.5 mm thick
applying all-round
priming with the
coatmortar
flushguards,
with doorRich
Zinc with
reinforcing
a minimum
Primer ofto
4.3.1 thickness
door hardware,
approved of 12mm.
make, strike-plate,
etc.,The following
all completeshock as absorbers
C.P.
perfittings as required,
drawings, shall be sq.m 135.61 8,000.00 1,084,880.00 129.25 1,033,984.40 133.52 1,068,187.20 - 4.28 (34,203) 95.31%
factory
used: (a)applied
specification andZinc
- 2-150 mm Rich
Handles
instruction Primer
ofinthe etc.,
each all complete
leaf;
Engineer. as per
(b) Tower-bolt
4.4 UPVC
–drawings,
300 DOOR
mm specification
long at top 1 and in eachinstruction
leaf andof200 theatEngineer.
bottom in
4.4.1 SHUTTER/FRAME
4.4 each leaf; ( c ) 1 no. 300 mm long C.P. Aldrops with sq.m 17.43 9,000.00 156,870.00 17.43 156,870.00 - 17.43 156,870 100.00%
Godrej made Providingpadlock; (d) and125 fixing
mmtoheavy door duty frames GI 24Butmm
thick
Hinges factory
3 nos.made in each PVC leaf.door(rateshutter
shall made
include ofall
styles and
required
rails
door of
WINDOW UPVC
hardware). GRILLhollowProviding,
section ofMS sizesolid
59 xbars 24 mm and
of required
4.5 size
wall and
thickness
fixing 2inmm � 0.2mild
position mmsteel withgrille
inbuilt edging
made withon sq.m 155.13 2,500.00 387,825.00 178.01 445,016.13 184.15 460,368.75 - 6.14 (15,353) 114.75%
both sides.
required MSThe styles
flats, andbars
strips, railsfabricated
motred and as jointed at the
per drawings,
4.6 COLLAPSIBLE
corners by means of GATE
galvanized/plastic brackets of size2 75
4.6 fixing in position using approved fasteners including sq.m 19.80 10,000.00 198,000.00 19.80 198,000.00 - 19.80 198,000 100.00%
xcoat
220ofmmenamel and Zinc Rich Primer base coat, etc., local
having Supplying
wall thickness and 1.0fixing
mm in
and position
stainless all
make collapsible
steel screws.
complete The gate
as detailed inofdrawing,
styles ofapproved
the shutter sizereinforced
and make
specification andbyproperly
5. FLOORING
fabricated with WORKS
vertical double 20HARDENED
inserting
5.1 instructions galvanized
of the tube
Engineer. of sizechannels
20 x20 mm xand
10 x1 2mmmm � at sq.m 2570.35 900.00 2,313,315.00 2,537.15 2,283,439.23 2,336.13 2,102,515.88 201.03 180,923 98.71%
CEMENT
100mm CONCETE
centers and braced FLOORwith M.S. flat diagonal 20 x
0.1 mm wall thickness. The lock rail made of 'H' section,
5mm, withProviding,
top and laying in
bottom required
rails of Txironline,40level 40and
xand
a UPVC hollow section of size 100 24 mm 2x mm�
6mm
pattern
with 38mm40 mm thick
steel IPS floor finish with withcement concrete
0.2 mm walldia thickness pulleys
fixed complete
to the shutter bolts by
styles nuts
of mix 1:2:4 (1 cementsteppers
locking : 2 sandhandles
: 4 crushed stone applying
means ofarrangements
a plastic/galvanized iron including
'U' cleats. The shutter
aggregate
aframe
priming 12 mm and down grade) laid in alternate panel
shallcoat of Zinc
be filled withRich UPVC Primer carriage
multichambered hoisting all
single
or providing
complete glass
as per dividing strips
specification andby and finished with
panel of required
Prepared by contractor size Checked
having over all thickness ofDSC
Consultant, 20 mm Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
approved
direction floor hardener (Dreitop FH of equivalent floor
and 1 mmof�the 0.1Engineer.
mm wall thickness. The panel filled
hardener) applied as per manufacturer's instructions
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work

Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract

NEAT CEMENT SKIRTING


5.2 - do - as above, but for 100 mm high skirting. r.m 1404.92 100.00 140,492.00 1,261.41 126,141.40 571.46 57,146.00 689.95 68,995 89.79%

TERRAZZO CAST-IN SITU DADO


5.3 Providing and laying 25 mm thick terrazzo cast-in-situ sq.m 86.77 1,500.00 130,155.00 116.35 174,524.25 - 116.35 174,524 134.09%
dado up to the height shown in drawing with marble chips
6 ROOFING/
rubbed TERRACING
and polished to granolithic WORKS finish under layer of - - - - - - -
METAL
19 mm thick WORKS(TRUSS)
cement concrete 1:2:4 (1 cement : 2 sand : 4
6.1 Providing and fixing tubular roof trusses with rafters, kg 1131.39 220.00 248,905.80 1,163.75 256,024.17 1,163.75 256,024.17 - - 102.86%
crushed stone aggregate 10 mm and down grade) base
purlins,
and wind of ties, brackets thicketc., withmade withcolor required grade
CGItop SHEET layer 6 mm
ROOFING required marble
6.2 mild
chipssteel
Providingof sizes tubes
& from
fixing
and1mild mm steel
precoated
sections
to 4 galvanized
mm nominal of required
iron size laidsizes,
profile in sq.m 68.69 2,000.00 137,380.00 74.14 148,275.60 69.09 138,180.00 5.05 10,096 107.93%
including
cement hoisting,
marble powder fixing mix in3:1 position
(3 cement with :MS bed plates,
1 marble
Terracota
shoe angles, colouranchor sheetsbolts (size,
etc., shape
andvolume and pitch
concrete of
grouting,
powder
CGI SHEET mix : 7ROOFING
marble chips) RIDGE by including
6.3 corrugation
concreting
Providing
cement &
as approved
nut
slurry, bolts, prefinished
laying
required
by Engineer)
fabrication,
pigment, fixing
plain
grinding,
0.52 mm
andpolishing,
(colour treated +/- 5%
matching withto rm. 14.25 1,200.00 17,100.00 14.10 16,920.00 14.10 16,920.00 - - 98.95%
total
two coated
coats ofthickness
anticorrosive (TCT), paints Base all Material
complete Thickness
as peras
buffing
roofing
(BMT) and
sheet)
of 0.50 applying
CGI Sheet
mm, Zincand sealer Ridgecoat,
coating Cover
etc., all
of
120gsmofasthe complete
0.52 mm IS:+/-
perEngineer. 277per
5% ,
GI FACIA
drawings,
drawing,
total coated (EAVES)
specifications
specification
thickness (TCT),
and on instructions
instruction
Base Material
ofofthe Thickness
Engineer.
6.4 5-7 microns
Providing,
Rate shall epoxypreparing
fabrication
include primer to required bothsize
shop side
drawings, and the
shape sheet
obtainingand and kg 98.83 250.00 24,707.50 158.04 39,509.68 94.82 23,705.81 63.22 15,804 159.91%
(BMT) oftop
polyester 0.50coat mm15-18 (Coating microns. and PrimerSheet as above)
should have over
fixing
Engineer's
ridge in position
with or
all Client's 1.2 mm
required thickaccessories
approval, GI folded like
supplying, plates oftapping
fabricating, size
CEMENT
protective BOARD
guard site,film offixing
FALSE 25and CEILING
microns minimum self
to avoid
6.5 shown
delivering
screw,
scratches
in drawing
clips,
Providing
at clamps,
while
including
hoisting
andtransportation
fixing washer the
at all etc.all
height
and
costcomplete
fixing fixing
in position,
6 mm
should be
brackets,
thick on Cement
suppliedbuildingflats,
in sq.m 53.72 1,500.00 80,580.00 56.38 84,570.00 56.37 84,556.35 0.01 14 104.95%
screws,
temporary
floors as painting
perstaging,
design, with enamel
preparation
drawing, with Zinc Rich
of surface, applying
specifications Primer,
instructions Zinc
Board
required false
singlePrimer
length ceiling,
upone
scaffolding including
to 6coat meter
to work providing
oratasandanydesired
height, and
by etc., fixing
Engineer. of The
Rich
7.
of PLASTERING/
theshall
Engineer. of WALL before FINISHING one coat WORKS afterallerection
frame
sheet
7.1.1 7.1
complete work as bemade fixed
percoats of
design, special
using self
drawing, sections
drilling power
/self
specifications pressed
tapping from
screws sq.m 2,237.76 600.00 1,342,656.00 2,303.26 1,381,958.83 2,672.61 1,603,563.96 - 369.34 (221,605) 102.93%
including
CEMENT two PLASTER of synthetic WORKS enamel paint of approved
MS
of sheet
size (5.5xGalvanized
55mm) withEPDM
with zinc coating
seal andall consisting
instructions
make
7.1.1 and
ON color
INNERof the
etc.Engineer.
all
WALL complete
(1:6) as peretc.,drawing, complete up
angle
to any
7.1.2 hanger
ON pitch in
CEILING ofhorizontal/
25x25x0.55 (1:4) of required
vertical or curvedlength at
surfaces
7.1.2 specification
1250mm c/c
excluding
and
thefixedcost of
12.5.mm,
instruction
Providing
to purlins
purlins,
and of
thickplasterwith
the Engineer.
applying
rafters
cement nutand at all
anstrusses levels
boltsplaster
sand and and
andother sq.m 1,174.24 500.00 587,120.00 1,865.52 932,758.03 1,281.99 640,996.45 583.52 291,762 158.87%
shape
end of 20
anglemmhanger thick cementbeing fixed with in building
nut and inside
bolts toinGI
including
work of cutting
mix 1:4 tocement
(1 size and&shape 4 sand) wherever
in concrete required.
surface,
specified
7.1.3
main ON
channel cement
OUTER mortar
45x18x0.6 WALL in two
(1:6):
running layers
at the asrate
6 toof8 900mm mm thick c/c
7.1.3.1 ceiling
final coat
EXTERNAL
to which
surface
with
ceiling
at all
1:6
PLASTER (1
section
height
cement0.55mm
including
:6 fine mixing
sand)
thick and bottom cementmortar, mortar
wedgeinof sq.m 1,364.20 600.00 818,520.00 2,379.19 1,427,512.05 2,210.47 1,326,282.30 168.72 101,230 174.40%
laying
over the in12 perfect
to 14 line,
mm level
thick and
1:6 plumb
(1 cement : finishing
6 coarse sand)
45mm with Providing
tapered and
flanges applyingofCEMENT
26mm atall alleach
levels andsingle
having shape
clips orof
7.1.4 regular
ONmm
under INNER and ineven
WALL surface WITH including necessary
PUNNING sq.m 52.99 700.00 37,093.00 52.74 36,918.00 42.43 29,698.17 10.31 7,220 99.53%
2.3mmcoat
20
multi-stage thick
at 613mm all surface
cement
scaffolding, with plasterat
ceilingallin
providing
height
building
section and
including
exterior
and
fixing perimeter
200
mixing
inmm
mortar, laying
specified
channels cement
of 0.5mm in perfect
mortar
thick line,
with
25mm level
1:6 (1
high and
cement plumb
having :6 and
fine
flanges sand)
of - - - - - -
wide 24 gauge
finishing in30mm
regular GI Chicken
and even wiresurfacemeshincludingat junction all of
7.2 in7.2
20mm PAINTING
all surface
and at all WORKS
height
long, theincluding
perimeter mixing
of mortar,
ceiling fixed laying
to - - - - - -
R.C.C.
necessary andsingle
masonry, or the making
multi-stage grooves
scaffolding, and recesses,
making
in perfect
7.2.1 DISTEMPER
wall/partition
throating, line,
dusting, level
with and
PAINT
help
dripping, plumb of rawandplugs
wetting, finishingat 450mm
curing, in regular
protection, c/c
grooves
and even
withallfinishedand
surfacerecesses, including
Providing
25mm longthroating,
and all
drive applyingdusting,
necessary
all screws dripping,
twosingle
or more
@ or multi-
230mm coats
7.2.1 etc.
wetting, complete
curing, as per
protection, drawing providing , specification
chicken and
wire mesh sq.m 3,409.00 200.00 681,800.00 4,168.78 833,756.15 - 4,168.78 833,756 122.29%
stage
of
interval,scaffolding,
washable
instruction. jointingdistemper
[Rate making
and
shall alsogrooves
paint
fixing ofinapproved
to
include andfor recesses,
required manufacturer
pattern,
providing throating,
drips
at the
dusting,
and junction
shade
finished dripping,
over
with of
a concrete
wetting,
coat
recommended of and
curing,
alkali masonry protection,
resistant
filler, making etc.,
cement all
openings complete
providing
primer forof
band, moulds,
as perfittings,
drawing groove,
, specification chicken andwire mesh
instruction at junction
of the ofof
chicken
approved
light
7.2.2 andwire
RCC EXTERIOR masonry,mesh
manufacturer
access at theas
panel,
WEATHER
etc., tojunction
per
cutouts
complete of
COAT concrete
manufacturer's
made
the with
PAINT
works and
frame
atdrips
any
Engineer.
masonry
perimeteretc., [Rate all shall
complete also include
asfixed
ofper for
drawing providing, specification
7.2.2 specifications
heights. channels to the surface
suitably Providing wall, all ceiling,
complete
and applying beams
as per two or sq.m 2,139.49 250.00 534,872.50 2,379.19 594,796.69 - 2,379.19 594,797 111.20%
band,
and
drawing
more moulds,
instruction
columns, coats canopies,
and groove,
of the
ofspecification
first chicken
Engineer.
staircase,
quality and
hundred wire
[Rate
lobbies
direction mesh shall
etc.,
percent atthe
ofall junction
also include
complete
acrylicEngineerpaint ofas
RCC
for
per and
providing
drawings,
butapproved
of masonry,
excludingshade drips etc.,
band,
specifications
the cost and of to complete
moulds,
and
painting.
pattern the
groove,
to instruction.
the exteriorThe works
chicken at
walls any
wire
rates
of
7.2.4
shall ENAMEL
heights].
mesh at junction
include for PAINT
ofrates
RCCshall
scraping, and
washingmasonry, thefor etc.,
surface to complete
with ,water,
7.2.4 buildings
the works
surface
etc.,
Providing
at
The
any heights.
preparation, and applying
scaffolding
include byall scrapping
spray/brush two or sq.m 938.41 400.00 375,364.00 1,104.06 441,622.00 - 1,104.06 441,622 117.65%
washing
more coats the of surface
1st quality water, etc.,
with synthetic applying
enamel
complete
apaint
coat of as
of by
per
the manufacturer's
approved quality recommendations
water base cement and as approved
primer, surface
8 approved
MISCELLANEOUS
the Engineer. manufacturer (Asian, Berger or equivalent) over - - - - - - -
preparation,
wooden or metal scaffolding
surface etc., all complete
in required shadeasatper anythe height,
CEMENT
manufacturer's BOARD WALL
8.2 shape, includingrecommendations
surface
Supplying, preparation, and fillers/putty,
fabrication,
as approved by the
fixing of sq.m 3.38 6,500.00 21,970.00 2.18 14,170.00 2.17 14,126.54 0.01 43 64.50%
Engineer.
scaffolding, protection etc. all complete as per drawings,
cement board in position for internal and external made
specifications
with 9mm thick and instructions.
cement board (Shera The finished or Siamsurface Cement shall
PUMP SHED
give
Boardeven and uniform
orfabrication,
equivalent) fromsurface.
both sides fixed toand 75mm
8.3 Supply, installation of 2mx1.5m 1m X high nos 1.00 80,000.00 80,000.00 1.00 80,000.00 - 1.00 80,000 100.00%
0.6mm
pump shed thickmade C-stud with fixed50x50x6to U-Track MS Angle with framespacing,
300mm
covered o/c of
outside horizontal
and roof frame,
with
RAILING Providing, fabrication as per design drawings CGI central
sheet, core filled
locakable with
door,
cement
8.4 including mortar
and installation pad lock, with PE granules
base
in position PCC Mild having
(1:2:4)
Steel 75mm combined
railing all density
in complete
staircase, kg 4,821.80 220.00 1,060,796.00 4,855.68 1,068,250.20 4,558.80 1,002,935.68 296.88 65,315 100.70%
approximately
as per design,
verandah and other 900 kg/m3,
drawing, areasand including
instructions
including sealing
cutting of thetojoints with
Engineer.
required
SEWER,
fiber tapes
shape RAIN
and size,and joint AND
welding WASTE
sealing joints, compound, WATER
installation filling
of base screw anchor
8.5 INSTALLATION
heads as per manufacturer's installation guidelines, R.m 90.10 1,500.00 135,150.00 83.60 125,400.00 87.00 130,500.00 - 3.40 (5,100) 92.79%
plates of appropriate size with required numbers of
PVC
sealing SWR
expansion (Soil,ofWaste,
perimeter
bolts gaps
required withRain) silicon
size, pipes with all
sealant,
providing necessary
etc.,
required all size
ring gaskets,
complete
bends, as per
finishing PVC fittings,
drawing,
weld joints including
specifications
to produce MS clamps,
and
smooth hangers,
instructions
surface, - - - - - -
cutting,
of
BILL
applying NO. jointing,
the Engineer.one 3. coat sealing,
Rate
ELECTRICAL
of Metalshallinstallation
include
Primer WORKS theofcost
and pipes
two or and
of morespecials
metal coats - - - - - -
A including
framing,
enameljoint
Common
of making
paintand
Installation holes
of screw
required and
head cutting
shade,sealing, grooves
etc.,required on
all complete walls asor
additional - - - - - -
floor
1.1 per
Stand and
strengthening
drawings, repairing
Alone 40 member the
specifications
A DP MCB and same
for the to its
wall Enclosure of the 3 to
original
length
withinstruction finish.
exceeding Pipes No 2 12,000.00 24,000.00 2.00 24,000.00 - 2.00 24,000 100.00%
be installed
meter in length on trenches
or aroundordoor wallsand or window
floor or duct opening, as per
1.2 Engineer.
Stand Alone 6 A DP MCB with Enclosure No 2 8,500.00 17,000.00 2.00 17,000.00 - 2.00 17,000 100.00%
drawings,
sealing specifications,
perimeter with silicon manufacturer's
sealant. Total finished wall
recommendations,
thickness 93 mm. instructions, cleaning of the system, - - - - - -
2 Cables
testing
8.2.1 FOR andPARTITION
and Wiresfor operation. The rate shall include for
ready - - - - - -
all labour and materials required. The measurement shall
be done for running meters, fittings etc not payable
seperately.
- 110 mm ED 6 kg/sqcm
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work

Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract

2 Nos 10 Sq mm Multistranded Cu Wire + 1 No 6 Sq mm


2.1 Multistranded Cu wire Rm 100 800.00 80,000.00 94.00 75,200.00 - 94.00 75,200 94.00%

2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No 1.5 Sq


2.2 Rm 90 250.00 22,500.00 95.00 23,750.00 - 95.00 23,750 105.56%
mm Multistranded Cu wire
- - - - - -
B SCHOOL BLOCKS - - - - - -
1 DISTRIBUTION BOARDS - - - - - -
1.1 DB (DB-1) No 1 32,000.00 32,000.00 1.00 32,000.00 - 1.00 32,000 100.00%
1.2 DB (DB-1) No 1 22,000.00 22,000.00 1.00 22,000.00 - 1.00 22,000 100.00%
1.3 DB ( DB-2) No 1 30,000.00 30,000.00 1.00 30,000.00 - 1.00 30,000 100.00%
1.4 DB ( DB-2) No 1 22,000.00 22,000.00 1.00 22,000.00 - 1.00 22,000 100.00%
1.5 DB ( DB-3) No 1 32,000.00 32,000.00 1.00 32,000.00 - 1.00 32,000 100.00%
1.6 DB ( DB-3) No 1 22,000.00 22,000.00 1.00 22,000.00 - 1.00 22,000 100.00%
1.7 6A DP MCB with Enclosure No 2 8,500.00 17,000.00 2.00 17,000.00 - 2.00 17,000 100.00%
- - - - - -
2 CABLES & WIRES - - - - - -
2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4 Sq mm
2.1 Multistranded Cu wire Rm 20 600.00 12,000.00 17.00 10,200.00 - 17.00 10,200 85.00%
2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5 Sq
2.2 mm Multistranded Cu wire Rm 15 500.00 7,500.00 14.00 7,000.00 - 14.00 7,000 93.33%
2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No 1.5 Sq
2.3 Rm 25 250.00 6,250.00 24.00 6,000.00 - 24.00 6,000 96.00%
mm Multistranded Cu wire
- - - - - -
3 General service light point wiring - - - - - -
3.1 One way light point Pts 158 700.00 110,600.00 158.00 110,600.00 - 158.00 110,600 100.00%
3.2 Two Way Light Point Pts 5 900.00 4,500.00 4.00 3,600.00 - 4.00 3,600 80.00%
3.3 Ceiling and Exhaust Fan Point Wiring Pts 4 900.00 3,600.00 4.00 3,600.00 - 4.00 3,600 100.00%
4 6A Universal pin Light power point wiring Pts 169 900.00 152,100.00 169.00 152,100.00 - 169.00 152,100 100.00%
- - - - - -
5 Switch Socket Outlets - - - - - -
5.1 6A Universal power Switch Socket No 169 700.00 118,300.00 169.00 118,300.00 - 169.00 118,300 100.00%
6 Sweep Ceiling/Exhaust Fan/Wall Fan - - - - - -
6.1 225 mm dia M/D exhaust fan No 4 6,000.00 24,000.00 4.00 24,000.00 - 4.00 24,000 100.00%
- - - - - -
7 Light Fixtures/Luminaires & Accessories - - - - - -
7.1 24 W LED Surface Mounted Square type Nos. 12 4,500.00 54,000.00 12.00 54,000.00 - 12.00 54,000 100.00%
7.3 18 W LED Surface Mounted Square type Nos. 80 2,700.00 216,000.00 80.00 216,000.00 - 80.00 216,000 100.00%
7.5 12 W LED Surface Mounted Cylindrical type Nos. 50 2,400.00 120,000.00 50.00 120,000.00 - 50.00 120,000 100.00%
7.7 LED Wall Light made Nos. 4 1,800.00 7,200.00 4.00 7,200.00 - 4.00 7,200 100.00%
7.8 9 W LED Surface Mounted Cylindrical type Nos. 2 2,000.00 4,000.00 2.00 4,000.00 - 2.00 4,000 100.00%
7.9 6 W LED Recessed Circular type C Nos. 8 1,800.00 14,400.00 8.00 14,400.00 - 8.00 14,400 100.00%
7.10 7 W LED T5 Slim Mirror Light Nos 2 2,000.00 4,000.00 2.00 4,000.00 - 2.00 4,000 100.00%
8 Pull Box No 6 700.00 4,200.00 6.00 4,200.00 - 6.00 4,200 100.00%
9 External post top light pole No 6 7,500.00 45,000.00 6.00 45,000.00 - 6.00 45,000 100.00%
10 Post Top External Light Fixtures No 6 9,800.00 58,800.00 6.00 58,800.00 - 6.00 58,800 100.00%
- - - - - -
11 Earthing and Lightning protection - - - - - -
11.1 11.1. Chemical Earhting Nos. 6 45,000.00 270,000.00 6.00 270,000.00 - 6.00 270,000 100.00%
11.2 Earthing Bar Nos. 6 2,200.00 13,200.00 6.00 13,200.00 - 6.00 13,200 100.00%
GI Strip/Cu wire Earthing
12.1 12.1. 25 x 3 mm GI Strip Mtr. 130 300.00 39,000.00 128.00 38,400.00 - 128.00 38,400 98.46%
12.2 12 SWG Cu wire Mtr. 30 200.00 6,000.00 29.00 5,800.00 - 29.00 5,800 96.67%
13 Earth Test link No 2 1,500.00 3,000.00 2.00 3,000.00 - 2.00 3,000 100.00%
14 Lightning Arrester No. 2 7,500.00 15,000.00 2.00 15,000.00 - 2.00 15,000 100.00%

Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work

Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract

- - - - - -
C SOLAR PV SYSTEM - - - - - -
1. Solar PV Panel
1.1 1.1. 24V 250W PV Module No 8 26,000.00 208,000.00 8.00 208,000.00 - 8.00 208,000 100.00%
2. Tubular Deep cycle Battery
2.1 2.1. 12V, 200Ah@C10 Tubular Solar Battery No 4 30,000.00 120,000.00 4.00 120,000.00 - 4.00 120,000 100.00%
3 Hybrid Inverter No 1 100,000.00 100,000.00 1.00 100,000.00 - 1.00 100,000 100.00%
FIRE EXTINGUISHER
a) Supplying Fire extinguisher ABC stored Pressure
D 5.0kg size ABC stored pressure type Fire extinguisher. Nos. 6 8,000.00 48,000.00 6.00 48,000.00 - 6.00 48,000 100.00%

b) Dry Powder Fire Extinguisher Nos. 1.00 8,000.00 8,000.00 1.00 8,000.00 - 1.00 8,000 100.00%
- - - - - -
Bill No. 4 Sanitary Works - - - - - -
A Piping Works - - - - - -
1 WATER SUPPLY INSTALLATION - - - - - -
a CPVC pipes SDR-11 - - - - - -
50mm r.m 10.00 1,600.00 16,000.00 10.00 16,000.00 - 10.00 16,000 100.00%
40 mm r.m 190.00 700.00 133,000.00 185.00 129,500.00 - 185.00 129,500 97.37%
20mm r.m 26.00 500.00 13,000.00 25.00 12,500.00 - 25.00 12,500 96.15%
15mm r.m 2.00 1,500.00 3,000.00 1.50 2,250.00 - 1.50 2,250 75.00%
c CPVC Ball Valve - - - - - -
50mm nos. 1.00 2,000.00 2,000.00 1.00 2,000.00 - 1.00 2,000 100.00%
40 mm nos. 3.00 900.00 2,700.00 3.00 2,700.00 - 3.00 2,700 100.00%
25 mm nos. 2.00 400.00 800.00 2.00 800.00 - 2.00 800 100.00%
d 40mm dia Gun Metal Check Valve nos. 1.00 4,500.00 4,500.00 1.00 4,500.00 - 1.00 4,500 100.00%
e Electrical Centrifugal Water Pump nos. 1.00 12,500.00 12,500.00 1.00 12,500.00 - 1.00 12,500 100.00%
f 1000 litres Capacity Water Storage Tank nos. 2.00 3,400.00 6,800.00 2.00 6,800.00 - 2.00 6,800 100.00%
2 Sewer, Rain and Waste Water Installation - - - - - -
110 mm r.m 88.00 1,400.00 123,200.00 85.00 119,000.00 - 85.00 119,000 96.59%
75mm r.m 61.00 1,200.00 73,200.00 60.00 72,000.00 - 60.00 72,000 98.36%
50mm r.m 25.00 350.00 8,750.00 24.00 8,400.00 - 24.00 8,400 96.00%
- - - - - -
B School Blocks - - - - - -
1 Sanitary Installation - - - - - -
a Lab Sink set 5.00 30,000.00 150,000.00 5.00 150,000.00 - 5.00 150,000 100.00%
b Kitchen Sink set 1.00 35,000.00 35,000.00 1.00 35,000.00 - 1.00 35,000 100.00%
c PVC Multi Floor Trap nos. 1.00 600.00 600.00 1.00 600.00 - 1.00 600 100.00%
- - - - - -
2 Sanitary Installation - - - - - -
a Water Closet Set set 2.00 34,000.00 68,000.00 2.00 68,000.00 - 2.00 68,000 100.00%
b Orissa Pan set 6.00 3,100.00 18,600.00 6.00 18,600.00 - 6.00 18,600 100.00%
c Hand Wash Basin set 2.00 8,000.00 16,000.00 2.00 16,000.00 - 2.00 16,000 100.00%
d Ladies Urinal set 2.00 110,000.00 220,000.00 3.00 330,000.00 - 3.00 330,000 150.00%
e Self Closing Bib Cock nos. 14.00 4,000.00 56,000.00 14.00 56,000.00 - 14.00 56,000 100.00%
f CP Spreader in Urinal set 6.00 2,500.00 15,000.00 6.00 15,000.00 - 6.00 15,000 100.00%
g Toilet Paper Holder nos. 2.00 2,600.00 5,200.00 2.00 5,200.00 - 2.00 5,200 100.00%
h Commode Spray nos. 2.00 2,000.00 4,000.00 2.00 4,000.00 - 2.00 4,000 100.00%
i PVC Multi Floor Trap nos. 10.00 600.00 6,000.00 10.00 6,000.00 - 10.00 6,000 100.00%
j Waste Coupling and PVC Bottle Trap nos. 4.00 1,500.00 6,000.00 4.00 6,000.00 - 4.00 6,000 100.00%
k 40mm SS Grab Bar-Side nos. 2.00 4,500.00 9,000.00 2.00 9,000.00 - 2.00 9,000 100.00%
l 40mm SS Grab Bar-Rear nos. 2.00 4,500.00 9,000.00 2.00 9,000.00 - 2.00 9,000 100.00%
m CP Foldable Hinge nos. 4.00 5,500.00 22,000.00 4.00 22,000.00 - 4.00 22,000 100.00%
- - - - - -

Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work

Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract

CIVIL WORKS - SITE DEVELOPMENT - - - - - -


1 SITE CLEARANCE & MOBILIZATION: sq.m 434.77 50.00 21,738.50 265.44 13,272.00 - 265.44 13,272 61.05%
2 EARTHWORK IN EXCAVATION : cu.m 883.44 400.00 353,376.00 46.72 18,686.40 - 46.72 18,686 5.29%
3 EARTH BACK FILLING : cu.m 16.25 300.00 4,875.00 45.85 13,753.80 - 45.85 13,754 282.13%
4 BOULDER SOLING : cu.m 45.09 6,000.00 270,540.00 39.90 239,400.00 - 39.90 239,400 88.49%
5 P.C.C (1:3:6) WORKS cu.m 0.54 14,000.00 7,560.00 0.54 7,602.00 - 0.54 7,602 100.56%
6 P.C.C (1:2:4) WORKS cu.m 22.34 16,000.00 357,440.00 19.79 316,584.00 - 19.79 316,584 88.57%
7 P.C.C. FOR R.C.C. WORKS : cu.m 0.99 20,000.00 19,800.00 0.99 19,766.20 - 0.99 19,766 99.83%
8 SILICA CEMENT ADMIXTURE Kg 9.90 300.00 2,970.00 9.88 2,964.93 - 9.88 2,965 99.83%
9 STEEL REINFORCEMENT Mt. 0.11 130,000.00 14,300.00 0.11 13,897.00 - 0.11 13,897 97.18%
10 FORM WORKS sq.m 9.12 800.00 7,296.00 11.33 9,064.00 - 11.33 9,064 124.23%
12 BRICK MASONRY WORKS ( 1 : 4 c/s ) cu.m 0.22 18,000.00 3,960.00 0.72 13,032.72 - 0.72 13,033 329.11%
13 NEAT CEMENT SKIRTING r.m 9.44 100.00 944.00 4.40 440.00 - 4.40 440 46.61%
14 METAL WORKS FOR FENCE k.g 3580.06 220.00 787,613.20 2,770.36 609,479.20 - 2,770.36 609,479 77.38%
15 METAL WORKS FOR GATE k.g 130.78 220.00 28,771.60 123.31 27,128.20 - 123.31 27,128 94.29%
16 PLASTER ON OUTER WALL (1:6) sq.m 3.96 600.00 2,376.00 7.80 4,679.04 - 7.80 4,679 196.93%
17 EXTERIOR WEATHER COAT PAINT sq.m 4.44 350.00 1,554.00 8.27 2,895.20 - 8.27 2,895 186.31%
18 CHAIN LINK FENCE (50 x 50 MESH) sq.m 343.57 1,000.00 343,570.00 393.60 393,600.00 - 393.60 393,600 114.56%
19 FLAG POLE nos. 2.00 25,000.00 50,000.00 2.00 50,000.00 - 2.00 50,000 100.00%
- -
CIVIL WORKS-RESERVOIR TANK - -
1 EARTH WORK - -
1.1 SITE CLEARANCE AND MOBILIZATION sq.m 22.31 100.00 2,231.00 22.31 2,231.00 22.31 2,231.00 - - 100.00%
1.2 EARTHWORK IN EXCAVATION cu.m 24.58 400.00 9,832.00 24.57 9,828.72 24.57 9,828.72 - - 99.97%
1.3 EARTH BACK FILLING cu.m 4.02 300.00 1,206.00 4.01 1,202.85 4.01 1,202.85 - - 99.74%
1.4 BOULDER SOLING cu.m 2.08 6,000.00 12,480.00 2.08 12,462.00 2.08 12,462.00 - - 99.86%
2 CONCRETE WORKS - - - - - -
2.1 P.C.C (1:3:6) cu.m 0.78 14,000.00 10,920.00 0.78 10,904.25 0.78 10,904.25 - - 99.86%
2.2 P.C.C FOR R.C.C WORKS cu.m 7.42 20,000.00 148,400.00 7.41 148,295.00 7.41 148,295.00 - - 99.93%
2.3 SILICA CEMENT ADMIXTURE kg 74.2 300.00 22,260.00 74.15 22,244.25 74.15 22,244.25 - - 99.93%
2.4 STEEL REINFORCEMENT Mt 1.46 130,000.00 189,800.00 1.47 191,574.92 1.58 204,902.61 - 0.10 (13,328) 100.94%
2.5 FORMWORKS sq.m 54.93 800.00 43,944.00 54.67 43,738.00 56.46 45,170.80 - 1.79 (1,433) 99.53%
3 PLASTERING/WALL FINISHING WORKS - - - - - -
INTERNAL PLASTER ON WALL (1:4) WITH
3.1.1 sq.m 33.66 700.00 23,562.00 33.66 23,565.25 35.46 24,824.45 - 1.80 (1,259) 100.01%
CEMENT PUNNING
4 WATERPROOFING WORKS sq.m 33.66 550.00 18,513.00 33.66 18,515.55 35.46 19,504.93 - 1.80 (989) 100.01%
- - - - - -
Furniture Works lot 1 5,500,000.00 5,500,000.00 1.00 5,500,000.00 - 1.00 5,500,000.00 100.00%
Total 76,140,551.10 75,676,278.23 59,831,079.97 15,845,198.26

Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block, 3-LaLiEACCr(F)-A, 3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
Abstract of Cost

Pay Type Design


Quantity in Total
Item Description of Works Unit Rate (NRs.) Amount Remarks
BOQ Quantity
No. Site Water
3-LaliEACCr(F)-A 3-12C(MsF) Tc(M)
Development Tank
GENERAL
1 1. MOBILIZATION AND DEMOBILIZATION L.S. 1.00 500,000.00 1 500,000.00
2 2. SITE OFFICE ESTABLISHMENT Per Month 21.00 25,000.00 21.00 525,000.00
3 3. PROJECT INFORMATION BOARD nos. 1.00 10,000.00 1.00 10,000.00
4 4. SAFETY SIGN BOARD nos. 1.00 10,000.00 1.00 10,000.00
5 5. SAFETY MATERIALS & SITE SAFETY L.S. 1.00 100,000.00 1 100,000.00
6 6. LAB TEST(WATER TEST) job 1.00 -
7 7. TEMPORARY TOILET nos. 2.00 150,000.00 2 300,000.00
8 8. ROAD REPAIR AND MAINTENANCE Km. 30.00 50,000.00 30.00 1,500,000.00
-
CIVIL WORKS- BUILDING 0.00 -
1 EARTH WORKS 0.00 -
1.1 SITE CLEARANCE & MOBILIZATION: sq.m 1,211.02 100.00 550.65 500.25 233.35 1,284.25 128,424.61
1.2 1.2 EARTHWORK IN EXCAVATION cu.m 628.72 400.00 249.69 249.69 107.28 606.65 242,661.88
1.3 1.3 EARTH BACK FILLING : cu.m 376.45 300.00 171.13 127.36 79.88 378.36 113,509.01
1.4 1.4 BOULDER SOLING : cu.m 191.35 6,000.00 107.98 105.72 22.90 236.60 1,419,585.45
1.5 1.5 SAND FILLING : cu.m 5.44 6,000.00 4.91 4.71 9.62 57,695.40
2. CONCRETE WORKS
2.1 2.1 P.C.C cu.m 33.40 14,000.00 15.19 15.19 2.69 33.06 462,867.56
2.1.1 P.C.C (1:3:6)
2.1.2 2.1.2 P.C.C (1:2:4) WORKS cu.m 51.45 16,000.00 22.41 22.41 6.87 51.70 827,141.94
2.2 2.2 P.C.C. FOR R.C.C. WORKS : cu.m 754.88 20,000.00 374.40 365.18 31.81 771.39 15,427,822.86
2.3 2.3 SILICA CEMENT ADMIXTURE kg 7,548.80 300.00 3,744.04 3651.77 318.11 7,713.92 2,314,177.27
2.4 2.4 STEEL REINFORCEMENT Mt. 120.80 130,000.00 58.15 58.05 3.49 119.69 15,559,451.07
2.5 2.5 FORM WORKS sq.m 5,033.10 800.00 2,433.42 2484.56 247.20 5,165.19 4,132,148.12
3. BRICK MASONRY WORKS
3.1 3.1 BRICK MASONRY WORKS ( 1 : 4 c/s ) ONE SIDE cu.m 226.43 20,000.00 0.00 -
FAIRFACE
7.2.3 CLEAR SILICON WATER-REPELLANT COATNG sq.m 1,069.62 550.00 0.00 -
8.1.1 POINTING WORK IN BRICK MASONRY sq.m 1,069.92 400.00 0.00 -
BOQ Total of items 3.1., 7.2.3 & 8.1.1: 0.00 -
Replaced items 3.1, 7.2.3 and 8.1.1 with following items for 3-
0.00 -
LaLiEACCr(F)-A and 3-12C(MsF)
Brick Masonry Works (1:4 c/s) cu.m 18,000.00 0.00 -
Cement Plaster Works on Outer Wall (1:6) sq.m 600.00 0.00 -
Exterior Weather Coat Paint sq.m 350.00 0.00 -
0.00 -
3.2 3.2 BRICK MASONRY WORKS ( 1 : 4 c/s ) cu.m 138.14 18,000.00 154.40 146.82 48.25 349.48 6,290,618.86
3.3 3.3 HALF BRICK WORKS ( 1 : 4 c/s ) sq.m 84.62 1,500.00 51.43 9.30 35.61 96.34 144,510.71
3.4 3.4 HONEY COMB BRICK WORKS (1:3 c/s) cu.m 3.52 9,000.00 3.21 2.06 5.28 47,478.83
4. DOORS & WINDOWS WORKS
4.1 4.1 METAL FRAME 0.00 -
4.1.1 Door Frame rm. 354.48 1,100.00 177.97 184.68 362.65 398,915.00
4.1.2 Window Frame rm. 1,020.65 1,100.00 468.08 441.60 909.68 1,000,648.00

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU
Pay Type Design
Quantity in Total
Item Description of Works Unit Rate (NRs.) Amount Remarks
BOQ Quantity
No. Site Water
3-LaliEACCr(F)-A 3-12C(MsF) Tc(M)
Development Tank
4.2 METAL SHUTTER 0.00 -
4.2.1 WINDOW SHUTTER sq.m 190.50 7,500.00 97.07 72.76 169.83 1,273,698.38
4.3 WOODEN SHUTTER 0.00 -
4.3.1 FLUSH DOOR SHUTTER (32MM) sq.m 135.61 8,000.00 68.28 60.97 129.25 1,033,984.40
4.4 UPVC DOOR
4.4 4.4.1 SHUTTER/FRAME sq.m 17.43 9,000.00 17.43 156,870.00
17.43
4.5 WINDOW GRILL sq.m 155.13 2,500.00 97.62 72.76 7.63 178.01 445,016.13
4.6 COLLAPSIBLE GATE sq.m 19.80 10,000.00 9.90 9.90 19.80 198,000.00
5. FLOORING WORKS
5.1 HARDENED CEMENT CONCETE FLOOR sq.m 2,570.35 900.00 1206.32 1219.24 111.60 2,537.15 2,283,439.23
5.2 NEAT CEMENT SKIRTING r.m 1,404.92 100.00 564.86 675.71 20.84 1,261.41 126,141.40
5.3 TERRAZZO CAST-IN SITU DADO sq.m 86.77 1,500.00 28.66 2.40 85.29 116.35 174,524.25
6 ROOFING/ TERRACING WORKS 0.00 -
6.1 METAL WORKS(TRUSS) kg 1,131.39 220.00 1,163.75 1,163.75 256,024.17
6.2 CGI SHEET ROOFING sq.m 68.69 2,000.00 74.14 74.14 148,275.60
6.3 CGI SHEET ROOFING RIDGE rm. 14.25 1,200.00 14.10 14.10 16,920.00
6.4 GI FACIA (EAVES) kg 98.83 250.00 158.04 158.04 39,509.68
6.5 CEMENT BOARD FALSE CEILING sq.m 53.72 1,500.00 56.38 56.38 84,570.00
7. PLASTERING/ WALL FINISHING WORKS
7.1.1 7.1 CEMENT PLASTER WORKS sq.m 2,237.76 600.00 1,178.52 965.90 158.84 2,303.26 1,381,958.83
7.1.1 ON INNER WALL (1:6)
7.1.2 7.1.2 ON CEILING (1:4) sq.m 1,174.24 500.00 833.56 991.36 40.60 1,865.52 932,758.03
7.1.3 ON OUTER WALL (1:6):
7.1.3.1 sq.m 1,364.20 600.00 966.72 1,291.66 120.81 2,379.19 1,427,512.05
EXTERNAL PLASTER
7.1.4 ON INNER WALL WITH CEMENT PUNNING sq.m 52.99 700.00 52.74 52.74 36,918.00
0.00 -
7.2 PAINTING WORKS 0.00 -
7.2.1 DISTEMPER PAINT sq.m 3,409.00 200.00 2,012.08 1,957.25 199.44 4,168.78 833,756.15
7.2.2 EXTERIOR WEATHER COAT PAINT sq.m 2,139.49 250.00 966.72 1,291.66 120.81 2,379.19 594,796.69
7.2.4 ENAMEL PAINT sq.m 938.41 400.00 545.73 543.07 15.26 1,104.06 441,622.00
8 MISCELLANEOUS 0.00 -
8.2 CEMENT BOARD WALL sq.m 3.38 6,500.00 2.18 2.18 14,170.00
8.3 PUMP SHED nos 1.00 80,000.00 1.00 1.00 80,000.00
8.4 RAILING kg 4,821.80 220.00 2,424.07 2,431.61 4,855.68 1,068,250.20
8.5 SEWER, RAIN AND WASTE WATER INSTALLATION R.m 90.10 1,500.00 41.80 41.80 83.60 125,400.00
0.00 -
BILL NO. 3. ELECTRICAL WORKS 0.00 -
A Common Installation 0.00 -
1.1 Stand Alone 40 A DP MCB with Enclosure No 2.00 12,000.00 1.00 1.00 2.00 24,000.00
1.2 Stand Alone 6 A DP MCB with Enclosure No 2.00 8,500.00 2.00 2.00 17,000.00
0.00 -
2 Cables and Wires 0.00 -
2 Nos 10 Sq mm Multistranded Cu Wire + 1 No 6 Sq mm
2.1 Multistranded Cu wire Rm 100.00 800.00 94.00 75,200.00
49.00 45.00
2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No 1.5 Sq mm
2.2 Rm 90.00 250.00 95.00 23,750.00
Multistranded Cu wire 50.00 45.00
0.00 -
B SCHOOL BLOCKS 0.00 -
1 DISTRIBUTION BOARDS 0.00 -

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU
Pay Type Design
Quantity in Total
Item Description of Works Unit Rate (NRs.) Amount Remarks
BOQ Quantity
No. Site Water
3-LaliEACCr(F)-A 3-12C(MsF) Tc(M)
Development Tank
1.1 DB (DB-1) No 1.00 32,000.00 1 1.00 32,000.00
1.2 DB (DB-1) No 1.00 22,000.00 1.00 1.00 22,000.00
1.3 DB ( DB-2) No 1.00 30,000.00 1 1.00 30,000.00
1.4 DB ( DB-2) No 1.00 22,000.00 1.00 1.00 22,000.00
1.5 DB ( DB-3) No 1.00 32,000.00 1 1.00 32,000.00
1.6 DB ( DB-3) No 1.00 22,000.00 1.00 1.00 22,000.00
1.7 6A DP MCB with Enclosure No 2.00 8,500.00 2.00 2.00 17,000.00
0.00 -
2 CABLES & WIRES 0.00 -
2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4 Sq mm Multistranded Rm 20.00 600.00
2.1 17.00 10,200.00
Cu wire 11.00 6.00
2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5 Sq mm Rm 15.00 500.00
2.2 Multistranded Cu wire 14.00 7,000.00
8.00 6.00
2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No 1.5 Sq mm Rm 25.00 250.00
2.3 24.00 6,000.00
Multistranded Cu wire 12.00 12.00
0.00 -
3 General service light point wiring 0.00 -
3.1 One way light point Pts 158.00 700.00 72.00 72.00 14.00 158.00 110,600.00
3.2 Two Way Light Point Pts 5.00 900.00 2.00 2.00 4.00 3,600.00
3.3 Ceiling and Exhaust Fan Point Wiring Pts 4.00 900.00 4.00 4.00 3,600.00
4 6A Universal pin Light power point wiring Pts 169.00 900.00 97.00 72.00 169.00 152,100.00
0.00 -
5 Switch Socket Outlets 0.00 -
5.1 6A Universal power Switch Socket No 169.00 700.00 97.00 72.00 169.00 118,300.00
6 Sweep Ceiling/Exhaust Fan/Wall Fan 0.00 -
6.1 225 mm dia M/D exhaust fan No 4.00 6,000.00 4.00 4.00 24,000.00
0.00 -
7 Light Fixtures/Luminaires & Accessories 0.00 -
7.1 24 W LED Surface Mounted Square type Nos. 12.00 4,500.00 12.00 12.00 54,000.00
7.3 18 W LED Surface Mounted Square type Nos. 80.00 2,700.00 32.00 48.00 80.00 216,000.00
7.5 12 W LED Surface Mounted Cylindrical type Nos. 50.00 2,400.00 27.00 23.00 50.00 120,000.00
7.7 LED Wall Light made Nos. 4.00 1,800.00 1.00 1.00 2.00 4.00 7,200.00
7.8 9 W LED Surface Mounted Cylindrical type Nos. 2.00 2,000.00 2.00 2.00 4,000.00
7.9 6 W LED Recessed Circular type C Nos. 8.00 1,800.00 8.00 8.00 14,400.00
7.10 7 W LED T5 Slim Mirror Light Nos 2.00 2,000.00 2.00 2.00 4,000.00
8 Pull Box No 6.00 700.00 3.00 3.00 6.00 4,200.00
9 External post top light pole No 6.00 7,500.00 3.00 3.00 6.00 45,000.00
10 Post Top External Light Fixtures No 6.00 9,800.00 3.00 3.00 6.00 58,800.00
0.00 -
11 Earthing and Lightning protection 0.00 -
11.1 11.1. Chemical Earhting Nos. 6.00 45,000.00 3.00 3.00 6.00 270,000.00
11.2 Earthing Bar Nos. 6.00 2,200.00 3.00 3.00 6.00 13,200.00
GI Strip/Cu wire Earthing
12.1 12.1. 25 x 3 mm GI Strip Mtr. 130.00 300.00 128.00 38,400.00
65.00 63.00
12.2 12 SWG Cu wire Mtr. 30.00 200.00 15.00 14.00 29.00 5,800.00
13 Earth Test link No 2.00 1,500.00 1.00 1.00 2.00 3,000.00
14 Lightning Arrester No. 2.00 7,500.00 1.00 1.00 2.00 15,000.00
0.00 -
C SOLAR PV SYSTEM 0.00 -

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU
Pay Type Design
Quantity in Total
Item Description of Works Unit Rate (NRs.) Amount Remarks
BOQ Quantity
No. Site Water
3-LaliEACCr(F)-A 3-12C(MsF) Tc(M)
Development Tank
1. Solar PV Panel No 8.00 26,000.00
1.1 1.1. 24V 250W PV Module 8.00 208,000.00
8.00
2. Tubular Deep cycle Battery No 4.00 30,000.00
2.1 2.1. 12V, 200Ah@C10 Tubular Solar Battery 4.00 120,000.00
4.00
3 Hybrid Inverter No 1.00 100,000.00 1.00 1.00 100,000.00
FIRE EXTINGUISHER Nos. 6.00 8,000.00
D a) Supplying Fire extinguisher ABC stored Pressure 5.0kg size ABC 6.00 48,000.00
stored pressure type Fire extinguisher. 6.00
b) Dry Powder Fire Extinguisher Nos. 1.00 8,000.00 1.00 1.00 8,000.00
0.00 -
Bill No. 4 Sanitary Works 0.00 -
A Piping Works 0.00 -
1 WATER SUPPLY INSTALLATION 0.00 -
a CPVC pipes SDR-11 0.00 -
50mm r.m 10.00 1,600.00 10.00 10.00 16,000.00
40 mm r.m 190.00 700.00 185.00 185.00 129,500.00
20mm r.m 26.00 500.00 25.00 25.00 12,500.00
15mm r.m 2.00 1,500.00 1.50 1.50 2,250.00
c CPVC Ball Valve 0.00 0.00 -
50mm nos. 1.00 2,000.00 1.00 1.00 2,000.00
40 mm nos. 3.00 900.00 3.00 3.00 2,700.00
25 mm nos. 2.00 400.00 2.00 2.00 800.00
d 40mm dia Gun Metal Check Valve nos. 1.00 4,500.00 1.00 1.00 4,500.00
e Electrical Centrifugal Water Pump nos. 1.00 12,500.00 1.00 1.00 12,500.00
f 1000 litres Capacity Water Storage Tank nos. 2.00 3,400.00 2.00 2.00 6,800.00
2 Sewer, Rain and Waste Water Installation 0.00 0.00 -
110 mm r.m 88.00 1,400.00 85.00 85.00 119,000.00
75mm r.m 61.00 1,200.00 60.00 60.00 72,000.00
50mm r.m 25.00 350.00 24.00 24.00 8,400.00
0.00 0.00 -
B School Blocks 0.00 0.00 -
1 Sanitary Installation 0.00 0.00 -
a Lab Sink set 5.00 30,000.00 5.00 5.00 150,000.00
b Kitchen Sink set 1.00 35,000.00 1.00 1.00 35,000.00
c PVC Multi Floor Trap nos. 1.00 600.00 1.00 1.00 600.00
0.00 0.00 -
2 Sanitary Installation 0.00 0.00 -
a Water Closet Set set 2.00 34,000.00 2.00 2.00 68,000.00
b Orissa Pan set 6.00 3,100.00 6.00 6.00 18,600.00
c Hand Wash Basin set 2.00 8,000.00 2.00 2.00 16,000.00
d Ladies Urinal set 2.00 110,000.00 3.00 3.00 330,000.00
e Self Closing Bib Cock nos. 14.00 4,000.00 14.00 14.00 56,000.00
f CP Spreader in Urinal set 6.00 2,500.00 6.00 6.00 15,000.00
g Toilet Paper Holder nos. 2.00 2,600.00 2.00 2.00 5,200.00
h Commode Spray nos. 2.00 2,000.00 2.00 2.00 4,000.00
i PVC Multi Floor Trap nos. 10.00 600.00 10.00 10.00 6,000.00
j Waste Coupling and PVC Bottle Trap nos. 4.00 1,500.00 4.00 4.00 6,000.00
k 40mm SS Grab Bar-Side nos. 2.00 4,500.00 2.00 2.00 9,000.00
l 40mm SS Grab Bar-Rear nos. 2.00 4,500.00 2.00 2.00 9,000.00

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU
Pay Type Design
Quantity in Total
Item Description of Works Unit Rate (NRs.) Amount Remarks
BOQ Quantity
No. Site Water
3-LaliEACCr(F)-A 3-12C(MsF) Tc(M)
Development Tank
m CP Foldable Hinge nos. 4.00 5,500.00 4.00 4.00 22,000.00
0.00 -
CIVIL WORKS - SITE DEVELOPMENT 0.00 -
1 SITE CLEARANCE & MOBILIZATION: sq.m 434.77 50.00 265.44 265.44 13,272.00
2 EARTHWORK IN EXCAVATION : cu.m 883.44 400.00 46.72 46.72 18,686.40
3 EARTH BACK FILLING : cu.m 16.25 300.00 45.85 45.85 13,753.80
4 BOULDER SOLING : cu.m 45.09 6,000.00 39.90 39.90 239,400.00
5 P.C.C (1:3:6) WORKS cu.m 0.54 14,000.00 0.54 0.54 7,602.00
6 P.C.C (1:2:4) WORKS cu.m 22.34 16,000.00 19.79 19.79 316,584.00
7 P.C.C. FOR R.C.C. WORKS : cu.m 0.99 20,000.00 0.99 0.99 19,766.20
8 SILICA CEMENT ADMIXTURE Kg 9.90 300.00 9.88 9.88 2,964.93
9 STEEL REINFORCEMENT Mt. 0.11 130,000.00 0.11 0.11 13,897.00
10 FORM WORKS sq.m 9.12 800.00 11.33 11.33 9,064.00
12 BRICK MASONRY WORKS ( 1 : 4 c/s ) cu.m 0.22 18,000.00 0.72 0.72 13,032.72
13 NEAT CEMENT SKIRTING r.m 9.44 100.00 4.40 4.40 440.00
14 METAL WORKS FOR FENCE k.g 3,580.06 220.00 2,770.36 2,770.36 609,479.20
15 METAL WORKS FOR GATE k.g 130.78 220.00 123.31 123.31 27,128.20
16 PLASTER ON OUTER WALL (1:6) sq.m 3.96 600.00 7.80 7.80 4,679.04
17 EXTERIOR WEATHER COAT PAINT sq.m 4.44 350.00 8.27 8.27 2,895.20
18 CHAIN LINK FENCE (50 x 50 MESH) sq.m 343.57 1,000.00 393.60 393.60 393,600.00
19 FLAG POLE nos. 2.00 25,000.00 2.00 2.00 50,000.00
0.00 -
CIVIL WORKS-RESERVOIR TANK 0.00 -
1 EARTH WORK 0.00 -
1.1 SITE CLEARANCE AND MOBILIZATION sq.m 22.31 100.00 22.31 22.31 2,231.00
1.2 EARTHWORK IN EXCAVATION cu.m 24.58 400.00 24.57 24.57 9,828.72
1.3 EARTH BACK FILLING cu.m 4.02 300.00 4.01 4.01 1,202.85
1.4 BOULDER SOLING cu.m 2.08 6,000.00 2.08 2.08 12,462.00
2 CONCRETE WORKS 0.00 -
2.1 P.C.C (1:3:6) cu.m 0.78 14,000.00 0.78 0.78 10,904.25
2.2 P.C.C FOR R.C.C WORKS cu.m 7.42 20,000.00 7.41 7.41 148,295.00
2.3 SILICA CEMENT ADMIXTURE kg 74.20 300.00 74.15 74.15 22,244.25
2.4 STEEL REINFORCEMENT Mt 1.46 130,000.00 1.47 1.47 191,574.92
2.5 FORMWORKS sq.m 54.93 800.00 54.67 54.67 43,738.00
3 PLASTERING/WALL FINISHING WORKS 0.00 -
3.1.1 INTERNAL PLASTER ON WALL (1:4) WITH CEMENT PUNNING sq.m 33.66 700.00 33.66 33.66 23,565.25
4 WATERPROOFING WORKS sq.m 33.66 550.00 33.66 33.66 18,515.55
0.00 -
Furniture Works lot 1.00 5,500,000.00 0.5 0.5 1.00 5,500,000.00
75,676,278.23

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU
Project Name : Emergency School Reconstruction Project (ESRP)
Block :3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha

Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
1 EARTH WORKS
1.1 Site Clearance 1 34.50 14.50 500.25
Total 500.25 sq.m

1.2 Earth Work Excavation


For Isolated Foundation
F1 2 2.80 2.80 1.50 23.52
F2 4 3.30 3.30 1.50 65.34
For Combined Foundation
CF1 3 2.10 5.30 1.50 50.09
CF2 1 3.30 5.30 1.50 26.24
CF3 2 3.10 5.30 1.50 49.29

Along Lower Tie Beam


Along Grid A & F 2 3.50 0.55 0.75 2.89
Along Grid B 1 3.30 0.55 0.75 1.36
Grid C & D 2 3.55 0.55 0.75 2.93
Along Grid E 1 3.25 0.55 0.75 1.34
Along Grid 1 1 12.50 0.55 0.75 5.16
Along Grid 2,3 2 15.10 0.55 0.75 12.46

Drain 1 29.00 0.60 0.05 0.87


Pavement Along Drain 1 29.00 0.75 0.15 3.26
External Steps 1 27.90 0.70 0.15 2.93

Ramp
For Slope 1 1.30 0.52 Area 0.67
Wall Along Grid B 1 0.50 0.45 0.45 0.10
Wall Parallel to Ramp 1 6.80 0.45 0.41 1.25
Total 249.69 cu.m

1.3 Earth Back Filling


Total Excavation 1 249.69 249.69
Deduction
Boulder Soling -1 49.83 -49.83
PCC (1:3:6) -1 15.19 -15.19
RCC -1 93.40 -93.40
Brick Masonry -1 5.96 -5.96

Filling in Floor
Classroom 4 6.70 5.70 0.18 26.73
Staircase 1 6.70 4.20 0.18 4.92
Corridor 4 5.70 2.20 0.18 8.78
1 4.20 2.20 0.18 1.62
Total 127.36 cu.m

1.4 Boulder Soling


Footing
Isolated F1 2 2.50 2.50 0.20 2.50
Isolated F2 4 3.00 3.00 0.20 7.20
Combined CF1 3 1.80 5.00 0.20 5.40
Combined CF2 1 3.00 5.00 0.20 3.00
Combined CF3 2 2.80 5.00 0.20 5.60

Below Foundation Beam


Along Grid A & F 2 3.50 0.55 0.75 2.89
Along Grid B 1 3.30 0.55 0.75 1.36
Grid C & D 2 3.55 0.55 0.75 2.93
Along Grid E 1 3.25 0.55 0.75 1.34
Along Grid 1 1 12.50 0.55 0.75 5.16

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Along Grid 2,3 2 15.10 0.55 0.75 12.46

Pavement along Drain 1 29.00 1.00 0.10 2.90


Pebbels along Drain 1 29.00 0.60 0.05 0.87
External Steps 1 28.58 0.70 0.10 2.00

Ramp
Slopped Portion 1 1.30 1.36 Area 1.77
Wall Along Grid B 1 0.50 0.45 0.10 0.02
Wall Parallel to Ramp 1 6.80 0.45 0.10 0.31
Classroom
Class Room 4 5.70 6.70 0.20 30.55
Corridor 4 5.70 2.20 0.20 10.03
1 4.20 2.20 0.20 1.85
Below Staircase 1 4.20 6.65 0.20 5.59
Total 105.72 cu.m

2 CONCRETE WORKS
2.1 P.C.C.
2.1.1 P.C.C.(1:3:6) Works
Footing
Isolated F1 2 2.50 2.50 0.10 1.25
Isolated F2 4 3.00 3.00 0.10 3.60
Combined CF1 3 1.80 5.00 0.10 2.70
Combined CF2 1 3.00 5.00 0.10 1.50
Combined CF3 2 2.80 5.00 0.10 2.80

Below Foundation Beam


Along Grid A,B,C,D,E,F/ 1-2 6 4.55 0.40 0.10 1.09
Along Grid 1 1 23.50 0.40 0.10 0.94
Along Grid 2,3 2 16.30 0.40 0.10 1.30
Total 15.19 cu.m

2.1.2 P.C.C.(1:2:4) Works


Pavement along Drain 1 29.00 1.00 0.05 1.45
Below External Steps 1 28.58 0.70 0.05 1.00
Above External Steps 1 27.08 0.90 0.05 1.22

Ramp
Sloped 1 1.30 0.51 Area 0.66
Wall Top 1 1.33 0.25 0.05 0.02
1 6.80 0.13 0.05 0.04

Class Room 4 5.70 6.70 0.08 11.46


Corridor 4 5.70 2.20 0.08 3.76
1 4.20 2.20 0.08 0.69
Below Staircase 1 4.20 6.70 0.08 2.11
Total 22.41 cu.m

2.2 P.C.C For R.C.C. Works


A Foundation
Isolated F1 Base 2 2.50 2.50 0.25 3.13
Isolated F1 Slope 2 3.63 Area 0.35 2.54
Isolated F2 Base 4 3.00 3.00 0.25 9.00
Isolated F2 Slope 4 5.00 Area 0.35 7.00
Combined CF1 3 1.80 5.00 0.60 16.20
Combined CF2 1 3.00 5.00 0.60 9.00
Combined CF3 2 2.80 5.00 0.60 16.80

Beam
Foundation beam (300x400)
Along Grid A & F 2 3.50 0.30 0.40 0.84
Along Grid B 1 3.30 0.30 0.40 0.40
Grid C & D 2 3.55 0.30 0.40 0.85
Along Grid E 1 3.25 0.30 0.40 0.39
Along Grid 1 1 12.50 0.30 0.40 1.50
Along Grid 2,3 2 15.10 0.30 0.40 3.62

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Plinth Tie beam(300x450)
Along grid 1,2,3 3 26.00 0.30 0.45 10.53
Along Grid A,B,C,D,E,F 6 8.50 0.30 0.45 6.89

First floor level


Main beam(300x525)
Along grid 1,2,3 3 26.00 0.30 0.40 9.36
Along Grid A,B,C,D,E,F 6 8.50 0.30 0.40 6.12
Secondary beam(250x425)
Grid 1a 4 10.98 0.25 0.30 3.29
Grid 1b 1 4.20 0.25 0.30 0.32
Grid A1,B1,D1,E1 4 8.65 0.25 0.30 2.60

Conceal beam (125*525) 6.00 0.13 0.40 0.30

Second floor level


Main beam
Along grid 1,2,3 3 26.00 0.30 0.40 9.36
Along grid A,B,C,D,E & F 6 8.50 0.30 0.40 6.12

Secondary Beam
Along grid 1a 2 10.98 0.25 0.30 1.65
Along grid 1b 1 4.20 0.25 0.30 0.32
Along grid A1,B1,D1 & E1 4 8.65 0.25 0.30 2.60

Top floor Beam


Main beam
Along grid 1,2,3 3.00 26.00 0.30 0.40 9.36
Along grid A,B,C,D,E & F 6.00 8.50 0.30 0.40 6.12

Secondary Beam
Along grid 1a 2.00 10.98 0.25 0.30 1.65
Along grid 1b 1.00 4.20 0.25 0.30 0.32
Along grid A1,B1,D1 & E1 4.00 8.65 0.25 0.30 2.60

Roof floor level


Main beam(300x525)
Along grid 1,2,3 3 4.00 0.30 0.40 1.44
Along Grid C,D 2 8.50 0.30 0.40 2.04

Secondary beam(250x425)
Grid 1a 1 4.20 0.25 0.30 0.32

Column
Column below Plinth level
Total columns(500x500) 18 0.50 0.50 1.05 4.73

Ground floor plan


Total columns(500x500) 18 0.50 0.50 3.00 13.50

First floor plan


Total columns(500x500) 18 0.50 0.50 3.00 13.50

Second floor plan


Total columns(500x500) 18 0.50 0.50 3.00 13.50

Top Floor Plan


Total columns(500x500) 6 0.50 0.50 2.63 3.94

Slab
First floor level (+3.00m Lvl) 1 305.15 Area 0.13 38.14
Deduction
Column deduction -18 0.50 0.50 0.13 -0.56
Staircase Void -1 4.78 4.20 0.13 -2.61

Projections
At Back 2 11.50 0.70 0.13 2.01

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
At Front 1 6.20 1.00 0.13 0.78

Second floor level (+6.00m Lvl) 1 29.00 10.00 0.13 36.25


Deduction
Column deduction -18 0.50 0.50 0.13 -0.56
Staircase Void -1 4.78 4.20 0.13 -2.61

Projections
At Back 2 11.50 0.70 0.13 2.01

Top floor level (+9.00m Lvl) 1 29.00 10.00 0.13 36.25


Deduction
Column deduction -18 0.50 0.50 0.13 -0.56
Staircase Void -1 4.78 4.20 0.13 -2.61

Projections
At Back 2 13.10 1.10 0.13 3.60
At Front 2 12.00 1.10 0.13 3.30
1 7.00 1.60 0.13 1.40
At Sides 2 9.80 1.10 0.13 2.70

Roof floor level (+11.625m Lvl) 1 11.50 6.50 0.13 9.34


Column deduction -6 0.50 0.50 0.13 -0.19

Staircase
Ground floor level
Bottom 1 2.07 2.00 0.20 0.83
Landing 1 2.20 2.00 0.20 0.88
1 2.00 2.10 0.20 0.84
Waist Slab 1 6.75 2.00 0.20 2.70
Steps 20 0.03 Area 2.00 1.20
Landing Beam 1 4.00 0.25 0.38 0.38

First floor level


Bottom 1 2.07 2.00 0.20 0.83
Landing 1 2.20 2.00 0.20 0.88
1 2.00 2.10 0.20 0.84
Waist Slab 1 6.75 2.00 0.20 2.70
Steps 20 0.03 Area 2.00 1.20
Landing Beam 1 4.00 0.25 0.38 0.38

Second floor level


Bottom 1 2.07 2.00 0.20 0.83
Landing 1 2.20 2.00 0.20 0.88
1 2.00 2.10 0.20 0.84
Waist Slab 1 6.75 2.00 0.20 2.70
Steps 20 0.03 Area 2.00 1.20
Landing Beam 1 4.00 0.25 0.38 0.38
Projections 3 4.00 0.70 0.13 1.05

Vertical Bands
Ground Floor level
Along Grid 2 8.00 0.08 0.23 2.48 0.34
First floor level
Along Grid 2 8.00 0.08 0.23 2.48 0.34
Second floor level
Along Grid 2 8.00 0.08 0.23 2.48 0.34

Lintel Bands
Ground floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.23 0.08 0.67
Along grid 1 1.00 22.20 0.23 0.08 0.38
Along grid 2 1.00 21.60 0.23 0.08 0.37
First floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.23 0.08 0.67
Along grid 1 1.00 22.20 0.23 0.08 0.38
Along grid 2 1.00 21.60 0.23 0.08 0.37

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Second floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.23 0.08 0.67
Along grid 1 1.00 22.20 0.23 0.08 0.38
Along grid 2 1.00 21.60 0.23 0.08 0.37
1.00 1.50 0.23 0.08 0.03
Deduction of Doors/Windows for Lintels
Ground floor level
D1 -8 1.10 0.23 0.08 -0.15
First floor level
D1 -8 1.10 0.23 0.08 -0.15
Second floor level
D1 -8 1.10 0.23 0.08 -0.15
D3 -1 1.00 0.23 0.08 -0.02

Sill Bands
Ground floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.23 0.08 0.67
Along grid 1 1.00 26.20 0.23 0.08 0.45
Along grid 2 1.00 21.60 0.23 0.08 0.37

First floor level


Along grid A,B,C,D,E,F 6.00 6.50 0.23 0.08 0.67
Along grid 1 1.00 26.20 0.23 0.08 0.45
Along grid 2 1.00 21.60 0.23 0.08 0.37

Second floor level


Along grid A,B,C,D,E,F 6.00 6.50 0.23 0.08 0.67
Along grid 1 1.00 26.20 0.23 0.08 0.45
Along grid 2 1.00 21.60 0.23 0.08 0.37

Top floor level


Along grid C,D 2.00 8.50 0.23 0.08 0.29
Along grid 1,3 2.00 4.00 0.23 0.08 0.14

Deduction of Doors For Sill


Ground floor level
D1 -8 1.10 0.23 0.08 -0.15
D4 -1 1.00 0.13 0.08 -0.01
First floor level
D1 -8 1.10 0.23 0.08 -0.15
Second floor level
D1 -8 1.10 0.23 0.08 -0.15
Top floor level
D2 -2 1.10 0.23 0.08 -0.04
D3 -1 1.00 0.23 0.08 -0.02

Pedestal
Base Block 14 0.50 0.25 0.25 0.44

Parapet Wall
Top Floor 2.00 36.53 0.35 0.10 2.56
1.00 7.50 0.35 0.10 0.26
Roof Level 1.00 33.00 0.35 0.10 1.16

Bench
Bench Top Slab 2 2.40 0.50 0.08 0.18
Total 365.18 cu.m

2.3 Silica Cement Admixture


10 Kg per cu.m. of R.C.C. M20 10 365.18 3651.76
Total 3651.77 Kg

2.4 Formworks
A Foundation
Isolated footing
Isolated F1 2 10.00 0.25 5.00
Isolated F2 4 12.00 0.25 12.00
Combined footing

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Combined CF1 3 13.60 0.60 24.48
Combined CF2 1 16.00 0.60 9.60
Combined CF3 2 15.60 0.60 18.72

Beam
Foundation beam (300x400)
Along Grid A & F 2 3.50 0.80 5.60
Along Grid B 1 3.30 0.80 2.64
Grid C & D 2 3.55 0.80 5.68
Along Grid E 1 3.25 0.80 2.60
Along Grid 1 1 12.50 0.80 10.00
Along Grid 2,3 2 15.10 0.80 24.16
Along Grid 1 1 26.00 0.80 20.80
Along Grid 2,3 2 26.00 0.80 41.60

Plinth Tie beam(300x450)


Along grid 1,2,3 3 26.00 0.90 70.20
Along Grid A,B,C,D,E,F 6 8.50 0.90 45.90

First floor level (+3.00m Lvl)


Main beam(300x525)
Along grid 1 1 22.00 1.23 26.95
1 4.00 1.45 5.80
Along grid 2 1 26.00 1.10 28.60
Along grid 3 1 20.80 1.23 25.48
1 5.20 1.10 5.72
Along Grid A & F 2 8.50 1.23 20.83
Along Grid B & E 2 8.50 1.10 18.70
Along Grid C,D 2 4.50 1.10 9.90

Secondary beam(250x425)
Grid 1a 4 5.45 0.85 18.53
Grid 1b 1 4.20 0.70 2.94
Grid A1,B1,D1,E1 4 8.90 0.85 30.26

Edge Beam(125x525)
Grid B,C 1 7.90 1.05 8.30

Second floor level (+6.00m Lvl)


Main beam(300x525)
Along grid 1 1 22.00 1.23 26.95
1 4.00 1.45 5.80
Along grid 2 1 26.00 1.10 28.60
Along grid 3 1 20.80 1.23 25.48
1 5.20 1.10 5.72
Along Grid A & F 2 8.50 1.23 20.83
Along Grid B & E 2 8.50 1.10 18.70
Along Grid C,D 2 4.50 1.10 9.90

Secondary beam(250x425)
Grid 1a 4 5.45 0.85 18.53
Grid 1b 1 4.20 0.70 2.94
Grid A1,B1,D1,E1 4 8.90 0.85 30.26

Top floor level (+9.00m Lvl)


Main beam(300x525)
Along grid 1 1 22.00 1.23 26.95
1 4.00 1.45 5.80
Along grid 2 1 26.00 1.10 28.60
Along grid 3 1 20.80 1.23 25.48
1 5.20 1.10 5.72
Along Grid A & F 2 8.50 1.23 20.83
Along Grid B & E 2 8.50 1.10 18.70
Along Grid C,D 2 4.50 1.10 9.90

Secondary beam(250x425)
Grid 1a 4 5.45 0.85 18.53
Grid 1b 1 4.20 0.70 2.94

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Grid A1,B1,D1,E1 4 8.90 0.85 30.26

Roof floor level (+11.625m Lvl)


Main beam(300x525)
Along grid 1,2,3 3 4.00 1.10 13.20
Along Grid C,D 2 8.50 1.10 18.70

Secondary beam(250x425)
Grid 1a 1 4.20 0.85 3.57

Landing beam 3 0.85 4.00 10.20

Column
Column below Plinth level
Total columns(500x500) 18 2.00 2.88 103.50

Ground floor plan


Total columns(500x500) 18 2.00 2.88 103.50

First floor plan


Total columns(500x500) 18 2.00 2.88 103.50

Second floor plan


Total columns(500x500) 18 2.00 2.88 103.50

Top Floor Plan


Total columns(500x500) 6 2.00 2.50 30.00

Column below Plinth level


Total columns(500x500) 18 2.00 1.05 37.80

Slab
First floor level (+3.00m Lvl) 1 28.80 9.80 282.24
Cantilever slab back side 2 11.75 0.70 16.45
Cantilever slab front side 1 6.15 1.00 6.15
Deduction
Void deduction -1 4.75 4.20 -19.95

Main beam(300x500)
Along grid 1,2,3 -3 26.00 0.30 -23.40
Along Grid A,B,E,F -4 8.50 0.30 -10.20
Along Grid C,D -2 9.25 0.30 -5.55

Secondary beam(250x425)
Grid 1a -4 5.45 0.25 -5.45
Grid 1b -1 4.20 0.25 -1.05
Grid A1,B1,D1,E1 -4 8.90 0.25 -8.90

Edge Beam(125x525)
Grid B,C -1 7.90 0.13 -0.99

Second floor level (+6.00m Lvl) 1 28.80 9.80 282.24


Cantilever slab 2 11.75 0.70 16.45
Deduction
Void deduction -1 4.75 4.20 -19.95

Main beam(300x525)
Along grid 1,2,3 -3 26.00 0.30 -23.40
Along Grid A,B,E,F -4 8.50 0.30 -10.20
Along Grid C,D -2 8.50 0.30 -5.10

Secondary beam(250x425)
Grid 1a -4 5.45 0.25 -5.45
Grid 1b -1 4.20 0.25 -1.05
Grid A1,B1,D1,E1 -4 8.90 0.25 -8.90

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Top floor level (+9.00m Lvl) 1 370.45 Area 370.45
Edge around slab 1 84.70 0.15 12.71
Deduction
Void deduction -1 4.75 4.20 -19.95

Main beam(300x525)
Along grid 1,2,3 -3 26.00 0.30 -23.40
Along Grid A,B,E,F -4 8.50 0.30 -10.20
Along Grid C,D -2 8.50 0.30 -5.10

Secondary beam(250x425)
Grid 1a -4 5.45 0.25 -5.45
Grid 1b -1 4.20 0.25 -1.05
Grid A1,B1,D1,E1 -4 8.90 0.25 -8.90

Roof floor level (+11.625m Lvl) 1 6.50 11.50 74.75


Slab Edge 1 36.00 0.13 4.50
Deduction
Main beam(300x525)
Along grid 1,2,3 -3 4.00 0.30 -3.60
Along Grid C,D -2 8.50 0.30 -5.10

Secondary beam(250x425)
Grid 1a -1 4.20 0.25 -1.05

Staircase
Ground floor level
Bottom 1 2.07 0.20 0.41
Waist Slab 1 6.75 2.00 13.50
Side 1 6.75 0.20 1.35
Landing 1 2.20 1.65 3.64
1 2.00 2.15 4.29
Side 1 3.80 0.15 0.57
Riser 20 2.00 0.15 6.00
Landing Beam 1 4.00 0.86 3.44

First floor level


Bottom 1 2.07 0.20 0.41
Waist Slab 1 6.75 2.00 13.50
Side 1 6.75 0.20 1.35
Landing 1 2.20 1.65 3.64
1 2.00 2.15 4.29
Side 1 3.80 0.15 0.57
Riser 20 2.00 0.15 6.00
Landing Beam 1 4.00 0.86 3.44

Second floor level


Bottom 1 2.07 0.20 0.41
Waist Slab 1 6.75 2.00 13.50
Side 1 6.75 0.20 1.35
Landing 1 2.20 1.65 3.64
1 2.00 2.15 4.29
Side 1 3.80 0.15 0.57
Riser 20 2.00 0.15 6.00
Landing Beam 1 4.00 0.86 3.44

Vertical support bands


Ground Floor level
Along Grid 2 8.00 0.40 2.48 7.92
First floor level
Along Grid 2 8.00 0.40 2.48 7.92
Second floor level
Along Grid 2 8.00 0.40 2.48 7.92

Lintel Bands
Ground floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.15 5.85
Along grid 1 1.00 22.20 0.15 3.33

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Along grid 2 1.00 21.60 0.15 3.24
First floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.15 5.85
Along grid 1 1.00 22.20 0.15 3.33
Along grid 2 1.00 21.60 0.15 3.24
Second floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.15 5.85
Along grid 1 1.00 22.20 0.15 3.33
Along grid 2 1.00 21.60 0.15 3.24
1.00 1.50 0.15 0.23

Deduction of Doors/Windows for Lintels


Ground floor level
D1 -8 1.10 0.15 -1.32
First floor level
D1 -8 1.10 0.15 -1.32
Second floor level
D1 -8 1.10 0.15 -1.32

Sill Bands
Ground floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.15 5.85
Along grid 1 1.00 26.20 0.15 3.93
Along grid 2 1.00 21.60 0.15 3.24
Below staircase 1.00 4.23 0.15 0.63

First floor level


Along grid A,B,C,D,E,F 6.00 6.50 0.15 5.85
Along grid 1 1.00 26.20 0.15 3.93
Along grid 2 1.00 21.60 0.15 3.24

Second floor level


Along grid A,B,C,D,E,F 6.00 6.50 0.15 5.85
Along grid 1 1.00 26.20 0.15 3.93
Along grid 2 1.00 21.60 0.15 3.24

Top floor level


Along grid C,D 2.00 8.50 0.15 2.55
Along grid 1,3 2.00 4.00 0.15 1.20

Deduction of Doors For Sill


Ground floor level
D1 -8 1.10 0.15 -1.32
D4 -1 1.00 0.15 -0.15
First floor level
D1 -8 1.10 0.15 -1.32
Second floor level
D1 -8 1.10 0.15 -1.32
Top floor level
D2 -2 1.10 0.15 -0.33
D3 -1 1.00 0.15 -0.15

Pedestal
Base Block 14 1.25 0.25 4.38

Parapet Wall
Top Floor 2.00 36.53 0.25 18.27
1.00 7.50 0.25 1.88
Roof Level 1.00 33.00 0.25 8.25

Bench
Bench Top Slab 2 5.80 Perimeter 0.08 0.87
Bottom 2 5.80 0.60 6.96
Deduction -4 0.13 0.50 -0.25
Total 2484.56 sq.m

3 BRICK WORKS
3.2 Brick Masonary Works (1:4 c/s)

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Brick Works upto Plinth Beam
Along grid A,B,C,D,E,F/1-3 6 8.50 0.23 0.20 2.35
Along grid 1, 2, 3/A-F 3 26.20 0.23 0.20 3.62

Ground floor level


Along grid A,B,C,D,E,F 6 6.50 0.23 2.33 20.86
Along grid 1 4 5.50 0.23 2.33 11.76
1 4.00 0.23 2.02 1.86
Along grid 2 4 5.50 0.23 2.33 11.76

External Steps 1 0.09 Area 26.48 2.45


3 0.60 0.50 0.30 0.27
Ramp
Wall Along -B 1 1.33 0.25 Area 0.33
1 6.91 0.17 Area 1.19

First floor level


Along grid A,B,C,D,E,F 6 6.50 0.23 2.33 20.86
Along grid 1 4 5.50 0.23 2.33 11.76
1 4.00 0.23 2.02 1.86
Along grid 2 4 5.50 0.23 2.33 11.76

Second floor level


Along grid A,B,C,D,E,F 6 6.50 0.23 2.33 20.86
Along grid 1 4 5.50 0.23 2.33 11.76
1 4.00 0.23 2.02 1.86
Along grid 2 4 5.50 0.23 2.33 11.76

Top floor level


Along grid C,D/1-3 2.00 8.50 0.23 2.03 7.92
Along grid 1 1.00 4.00 0.23 2.03 1.86
Along grid 3 1.00 4.00 0.23 2.03 1.86

Parapet Wall
Top Floor 2.00 36.53 0.23 0.80 13.44
1.00 7.50 0.23 1.40 2.42
Roof Level 1.00 33.00 0.23 0.90 6.83

Deduction for doors and windows


Ground floor level
W1 -16 1.10 0.23 1.13 -4.55
V1 -16 1.10 0.23 0.53 -2.13
W3 -1 1.50 0.23 0.37 -0.13
D1 -8 1.10 0.23 2.29 -4.62
First floor level
W1 -16 1.10 0.23 1.13 -4.55
V1 -16 1.10 0.23 0.53 -2.13
W2 -1 1.50 0.23 1.00 -0.35
D1 -8 1.10 0.23 2.29 -4.62
Second floor level
W1 -16 1.10 0.23 1.13 -4.55
V1 -16 1.10 0.23 0.53 -2.13
W2 -1 1.50 0.23 1.00 -0.35
D1 -8 1.10 0.23 2.29 -4.62
D3 -1.00 1.00 0.23 1.95 -0.45
Third floor level
W2 -1.00 1.50 0.23 1.00 -0.35
D2 -2.00 1.10 0.23 1.83 -0.92
Total 146.82 cu.m

3.3 Half Brick (125 mm) Works (1:4c/s)


Below Staircase(Store)
1 1.57 Area 1.57
1 1.42 Area 1.42
1 2.00 1.59 3.18
Ramp
Grid 3AB

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
1 1.40 0.22 0.31
1 5.12 0.22 1.13
Bench
Below external bench 8 0.50 0.43 1.70
Total 9.30 Sq.m

4 DOORS & WINDOWS


4.1 Metal Frame
4.1.1 Doors Frame
Ground floor
D1 8 7.07 Perimeter 56.56
D3 1 5.20 Perimeter 5.20
First floor
D1 8 7.07 Perimeter 56.56
Second floor
D1 8 7.07 Perimeter 56.56
Top floor
D2 2 4.90 Perimeter 9.80
Total 184.68 r.m

4.1.2 Windows Frame


Ground floor
W1 16 5.58 Perimeter 89.20
V1 16 3.25 Perimeter 52.00
First Floor
W1 16 5.58 Perimeter 89.20
W2 1 6.00 Perimeter 6.00
V1 16 3.25 Perimeter 52.00
Second Floor
W1 16 5.58 Perimeter 89.20
W2 1 6.00 Perimeter 6.00
V1 16 3.25 Perimeter 52.00
Top floor
W2 1 6.00 Perimeter 6.00
Total 441.60 r.m

4.2 Metal Shutter


4.2.1 Windows shutter
W1 48 0.97 1.04 47.94
W2 3 1.37 0.91 3.73
V1 48 1.01 0.44 21.09
Total 72.76 sq.m

4.3 Wooden Shutter


4.3.1 Flush Door Shutter
D1 24 0.97 2.39 55.35
D2 2 1.01 1.86 3.75
D3 1 0.91 2.06 1.87
Total 60.97 sq.m
4.4 Window Grill
Shutter Area of Window
W1 48 0.97 1.04 47.94
W2 3 1.37 0.91 3.73
V1 48 1.01 0.44 21.09
Total 72.76 sq.m

4.5 Collapsable Gate


1.00 4.00 2.48 9.90
Total 9.90 Sq.m

5 FLOORING WORKS
5.1 Hardened Cement Concrete Flooring (40mm) With Neat Cement Punning
Ground floor plan
Class Room 2 5.75 6.75 77.63
2 5.78 6.75 77.96
Corridor 1 24.30 2.53 61.36
1 4.50 2.53 11.36

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Staircase Below 1 4.75 2.25 10.69
Staircase
Staircase Tread 18 0.30 2.00 10.80
Riser 20 0.15 2.00 6.00
Staircase landing 1 2.00 2.20 4.40
1 2.13 2.00 4.25

Pavement along Drain 1 29.00 1.00 29.00


Ramp 1 6.52 1.30 8.48
Exterior Steps 1 26.48 1.05 27.80
3 0.60 0.50 0.90
First floor plan
Class Room 2 5.75 6.75 77.63
2 5.78 6.75 77.96
Corridor 1 24.30 2.53 61.36
1 4.50 2.53 11.36
Staircase
Staircase Tread 18 0.30 2.00 10.80
Riser 20 0.15 2.00 6.00
Staircase landing 1 2.00 2.20 4.40
1 2.13 2.00 4.25
Second floor plan
Class Room 2 5.75 6.75 77.63
2 5.78 6.75 77.96
Corridor 1 24.30 2.53 61.36
1 4.50 2.53 11.36
Staircase
Staircase Tread 18 0.30 2.00 10.80
Riser 20 0.15 2.00 6.00
Staircase landing 1 2.00 2.20 4.40
1 2.13 2.00 4.25
Top floor plan
Corridor 1 4.45 4.20 18.69
Top Floor Slab 2 12.94 11.54 298.66
1 4.00 1.50 6.00

Roof plan
Roof Floor Slab 1 5.50 10.50 57.75
Total 1219.24 sq.m

5.2 Neat Cement Skirting works


Ground floor plan
Class Room 2 25.30 50.60
2 25.35 50.70
Column 6 2.00 12.00
Corridor 1 30.23 30.23
Store Below Landing 1 17.00 17.00
1 4.00 4.00
Staircase/Landing 1 14.25 14.25
Staircase Waist Slab 2 3.00 6.00
Deduction
D1 -16 1.10 -17.60
D3 -1 1.00 -1.00

First floor plan


Class Room 2 25.30 50.60
2 25.35 50.70
Corridor 1 30.23 30.23
Column 2 0.80 1.60
4 0.70 2.80
Staircase/Landing 1 14.25 14.25
Staircase Waist Slab 2 3.00 6.00
Deduction
D1 -16 1.10 -17.60

Second floor plan


Class Room 2 25.30 50.60
2 25.35 50.70

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Column 2 0.80 1.60
4 0.70 2.80
Corridor 1 30.23 30.23
Staircase/Landing 1 14.25 14.25
Staircase Waist Slab 2 3.00 6.00
Deduction
D1 -16 1.10 -17.60

Top floor Plan


Corridor 2 13.80 27.60
Top Floor inner wall 2 26.00 52.00
Top Floor Outer wall 2 26.00 52.00
On Parapet Walls 2 35.00 70.00
Deduction
D1 -2 1.10 -2.20
Roof Plan
Along Wall 1 33.00 33.00
Total 675.71 r.m

5.3 25mm Terrazo Finishing


Bench 2 2.40 0.50 2.40
Total 2.40 sq.m

7 PLASTER/PAINTING WORKS
7.1 Cement Plaster
7.1.1 Internal Plaster on Wall (1:6)
Ground Floor
Classroom 2.00 25.35 2.88 145.76
2.00 25.30 2.88 145.48
Staircase 1.00 17.45 2.88 50.17
Column
Grid 2C,2D 2.00 1.23 2.88 7.04
Grid 2B,2E 2.00 0.75 2.88 4.31

Deductions
W1 -16.00 1.10 1.13 -19.80
V1 -16.00 1.10 0.53 -9.24
D1 -8.00 1.10 2.44 -21.43
W3 -1.00 1.50 0.37 -0.56

First Floor
Classroom 2.00 25.35 2.88 145.76
2.00 25.30 2.88 145.48
Staircase 1.00 17.45 2.88 50.17
Column
Grid 2C,2D 2.00 1.23 2.88 7.04
Grid 2B,2E 2.00 0.75 2.88 4.31

Deductions
W1 -16.00 1.10 1.13 -19.80
V1 -16.00 1.10 0.53 -9.24
W2 -1.00 1.50 1.00 -1.50
D1 -8.00 1.10 2.44 -21.43

Second Floor
Class Room 2.00 25.30 2.88 145.48
2.00 25.35 2.88 145.76
Staircase 1.00 17.45 2.88 50.17
Column
Grid 2C,2D 2.00 1.23 2.88 7.04
Grid 2B,2E 2.00 0.75 2.88 4.31

Deductions
W1 -16.00 1.10 1.13 -19.80
V1 -16.00 1.10 0.53 -9.24
W2 -1.00 1.50 1.00 -1.50
D1 -8.00 1.10 2.44 -21.43
Top Floor

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Along Grid 1&3/ C-D 2.00 4.00 2.50 20.00
Along Grid C&D/ 1-3 2.00 9.65 2.50 48.25
Deductions
W2 -1.00 1.50 1.00 -1.50
D2 -2.00 1.10 1.90 -4.18
Total 965.90 sq.m

7.1.2 Internal Plaster on Ceiling (1:4)


Ground Floor (+3.00m Lvl)
Class Room 2.00 5.75 6.75 77.63
2.00 5.78 6.75 77.96
Corridor 1.00 28.80 2.63 75.60
1.00 2.07 4.20 8.70
Staircase 1.00 6.75 2.00 13.50
Staircase Landing 1.00 1.90 4.20 7.98

Main Beam (300x525)


Grid 2/C-D 1.00 4.00 0.68 2.70
Grid 3/A-F 4.00 5.55 0.93 20.54
1.00 4.00 0.93 3.70
Grid A,B,C,D,E,F /2-3 6.00 2.00 0.80 9.60

Secondary Beam (250x425)


Grid A1,B1,D1,E1 1.00 8.90 0.60 5.34
Grid 1a 1.00 18.20 0.60 10.92
Grid 1b 1.00 4.20 0.60 2.52

First Floor (+6.00m Lvl)


Class Room 2.00 5.75 6.75 77.63
2.00 5.78 6.75 77.96
Corridor 1.00 28.80 2.63 75.60
1.00 2.07 4.20 8.70
Staircase 1.00 6.75 2.00 13.50
Staircase Landing 1.00 1.90 4.20 7.98

Main Beam (300x525)


Grid 2/C-D 1.00 4.00 0.68 2.70
Grid 3/A-F 4.00 5.55 0.93 20.54
1.00 4.00 0.93 3.70
Grid A,B,C,D,E,F /2-3 6.00 2.00 0.80 9.60

Secondary Beam (250x425)


Grid A1,B1,D1,E1 1.00 8.90 0.60 5.34
Grid 1a 1.00 18.20 0.60 10.92
Grid 1b 1.00 4.20 0.60 2.52

Top Floor Level (+9.00m Lvl)


Class Room 2.00 5.75 6.75 77.63
2.00 5.78 6.75 77.96
Corridor 1.00 28.80 2.63 75.60
1.00 2.07 4.20 8.70
Staircase 1.00 6.75 2.00 13.50
Staircase Landing 1.00 1.90 4.20 7.98

Main Beam (300x525)


Grid 2/C-D 1.00 4.00 0.68 2.70
Grid 3/A-F 4.00 5.55 0.80 17.76
1.00 4.00 0.80 3.20
Grid A,B,C,D,E,F /2-3 6.00 2.00 0.80 9.60

Secondary Beam (250x425)


Grid A1,B1,D1,E1 1.00 8.90 0.60 5.34
Grid 1a 1.00 18.20 0.60 10.92
Grid 1b 1.00 4.20 0.60 2.52

Roof Floor Level (+11.625m Lvl)


Staircase with Corridor 1.00 4.20 9.25 38.85

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Main Beam (300x525)
Grid 2/C-D 1.00 4.00 0.80 3.20

Secondary Beam (250x425)


Grid 1a/C-D 1.00 4.20 0.60 2.52
Total 991.36 sq.m

7.1.3 External Plaster


Outer Plaster
Beam Plaster
Ground Floor
Main Beam (300x525)
Along grid 1 1.00 26.20 0.53 13.76
Slab Extension 1.00 23.50 1.23 28.79
Landing Beam 1.00 4.00 0.56 2.24
Along grid A,F 2.00 6.50 0.53 6.83

First Floor
Main Beam (300x525)
Along grid 1 1.00 26.20 0.53 13.76
Slab Extension 1.00 23.50 1.23 28.79
Landing Beam 1.00 4.00 0.81 3.24
Landing Beam Extension 1.00 4.00 1.23 4.90
Along grid A and F 2.00 6.50 0.53 6.83

Top Floor
Main Beam (300x525)
Along grid 1 1.00 26.20 0.53 13.76
Slab Extension (All Sides) 1.00 88.77 Area 88.77
Slab Extension (Top Side) 1.00 20.45 Area 20.45
Landing Beam 1.00 4.00 0.81 3.24
Landing Beam Extension 1.00 4.00 1.23 4.90
Along grid A and F 2.00 6.50 0.53 6.83

Roof Floor Level


Main Beam (300x525)
Along Perimeter 1.00 25.00 0.53 13.13
Slab Extension (All Sides) 1.00 28.30 Area 28.30
Slab Extension (Top Side) 1.00 8.75 Area 8.75

Column Plaster
Ground Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 3
Grid 3A,3B,3C,3D,3E,3F 2.00 0.80 2.50 4.00
6.00 1.20 2.50 18.00
Grid 3A,3B,3C,3D 2.00 1.20 3.00 7.20
6.00 0.80 3.00 14.40
First Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 2
Grid 2A,2F 2.00 1.25 3.00 7.50
Grid 2C,2D 2.00 1.23 2.50 6.13
Grid 2B,2E 2.00 0.75 2.50 3.75
Along grid 3
Grid 3A,3F 2.00 1.20 3.00 7.20
Grid 3B,3C,3D,3E 4.00 0.70 3.00 8.40
Grid 3A,3F 2.00 0.80 2.50 4.00
Grid 3B,3C,3D,3E 4.00 1.30 2.50 13.00
Second Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 2

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Grid 2A,2F 2.00 1.25 3.00 7.50
Grid 2C,2D 2.00 1.23 2.50 6.13
Grid 2B,2E 2.00 0.75 2.50 3.75
Along grid 3
Grid 3A,3F 2.00 1.20 3.00 7.20
Grid 3B,3C,3D,3E 4.00 0.70 3.00 8.40
Grid 3A,3F 2.00 0.80 2.50 4.00
Grid 3B,3C,3D,3E 4.00 1.30 2.50 13.00

Parapet Wall
Top Floor 2.00 35.90 0.80 57.44
1.00 7.50 1.40 10.50
Roof 1.00 32.00 0.90 28.80

Plaster on Walls
Ground floor level
Along grid A,B,C,D,E,F 6.00 6.50 2.48 96.53
Along grid 1 4.00 5.50 2.48 54.45
1.00 4.00 2.48 9.90
Along grid 2 4.00 5.50 2.48 54.45
First floor level
Along grid A,B,C,D,E,F 6.00 6.50 2.48 96.53
Along grid 1 4.00 5.50 2.48 54.45
1.00 4.00 2.48 9.90
Along grid 2 4.00 5.50 2.48 54.45
Second floor level
Along grid A,B,C,D,E,F 6.00 6.50 2.48 96.53
Along grid 1 4.00 5.50 2.48 54.45
1.00 4.00 2.48 9.90
Along grid 2 4.00 5.50 2.48 54.45

Top floor level


Along grid C,D/1-3 2.00 8.50 0.23 2.03 7.92
Along grid 1 1.00 4.00 0.23 2.03 1.86
Along grid 3 1.00 4.00 0.23 2.03 1.86

Parapet Wall
Top Floor 2.00 36.53 2.28 166.58
1.00 7.50 2.88 21.60
Roof Level 1.00 33.00 0.23 2.28 17.31

Deduction for doors and windows


Ground floor level
W1 -16.00 1.10 1.13 -19.80
V1 -16.00 1.10 0.53 -9.24
W3 -1.00 1.50 0.37 -0.56
D1 -8.00 1.10 2.29 -20.11
First floor level
W1 -16.00 1.10 1.13 -19.80
V1 -16.00 1.10 0.53 -9.24
W2 -1.00 1.50 1.00 -1.50
D1 -8.00 1.10 2.29 -20.11
Second floor level
W1 -16.00 1.10 1.13 -19.80
V1 -16.00 1.10 0.53 -9.24
W2 -1.00 1.50 1.00 -1.50
D1 -8.00 1.10 2.29 -20.11
D3 -1.00 1.00 1.95 -1.95
Top floor level
W2 -1.00 1.50 1.00 -1.50
D2 -2.00 1.10 1.83 -4.02
Total 1291.66 sq.m

7.2 Painting Works


7.2.1 Distemper Painting Works
As per Internal plaster on wall 1.00 965.90 Area 965.90
As per Internal plaster on ceiling 1.00 991.36 991.36
Total 1957.25 sq.m

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
7.2.2 Exterior Weather Coat Paint
As per External plaster 1.00 1291.66 Area 1291.66
Total 1291.66 sq.m

7.2.4 Enamel Painting Factor


Collapsable Gate 1.00 4.00 2.48 2.00 19.80
Doors
D1 24 1.10 2.44 2.00 128.57
D2 2 1.10 1.90 2.00 8.36
D3 1 1.00 2.10 2.00 4.20
Window
W1 48 1.10 1.13 2.00 118.80
W2 3 1.50 1.00 2.00 9.00
V1 48 1.10 0.53 2.00 55.44
Window Grill
W1 48 0.97 1.04 2.00 92.64
W2 3 1.37 0.91 2.00 8.19
W3 1 1.50 0.37 2.00 1.11
V1 48 1.01 0.44 2.00 96.96
Total 543.07 sq.m

8 MISCELLANOUS
8.4 Railing
Total
Staircase Railing length Kg/m
Length
Horizontal ISNB 40M 1 22.82 22.82 3.56 81.23
Horizontal ISNB 40M (Top Floor) 1 2.13 2.13 3.56 7.57
Vertical 38mm Square Pipe 6 0.92 5.52 2.82 15.57
Vertical 38mm Square Pipe 20 0.95 19.00 2.82 53.58
Horizontal 25mm Square Pipe 4 22.82 91.27 0.85 77.58
Horizontal 25mm Square Pipe (Top Floor) 4 2.13 8.50 0.85 7.23
Base plate 21 0.00 0.00 7850.00 15.45
12 mm dia. Anchor Bolt, Nut 84 0.13 10.92

Balcony Railing
First Floor
Horizontal ISNB 40M 1 30.20 30.20 3.56 107.51
Horizontal ISNB 32M 2 30.20 60.40 3.10 187.24
Vertical ISNB 32M 23 1.14 26.22 3.10 81.28
Inclined ISNB 32M 23 0.13 3.08 3.10 9.55
Vertical 25mm Square Pipe 208 0.82 170.56 0.85 144.98
Base plate 33 0.00 0.00 7850.00 24.29
12 mm dia. Anchor Bolt, Nut 132 0.13 17.16

Second Floor
Horizontal ISNB 40M 1 30.20 30.20 3.56 107.51
Horizontal ISNB 32M 2 30.20 60.40 3.10 187.24
Vertical ISNB 32M 23 1.14 26.22 3.10 81.28
Inclined ISNB 32M 23 0.13 3.08 3.10 9.55
Vertical 25mm Square Pipe 208 0.82 170.56 0.85 144.98
Base plate 33 0.00 0.00 7850.00 24.29
12 mm dia. Anchor Bolt, Nut 132 0.13 17.16

Parapet Wall
ISNB 40M(Horizontal Bars) 2 36.53 73.06 3.56 260.09
ISNB 32M(Horizontal Bars) 2 36.53 73.06 3.10 226.49
Vertical ISNB 32M 60 0.40 24.00 3.10 74.40
Inclined ISNB 32M 60 0.13 8.04 3.10 24.92
Vertical 25mm Square Pipe 492 0.30 147.60 0.85 125.46
Base plate 62 0.00 0.01 7850.00 45.63
12 mm dia. Anchor Bolt, Nut 248 0.13 32.24

Pedestal
ISNB 40M Pedestal Bars 14 1.54 21.57 3.56 76.80

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
14 1.20 16.80 3.56 59.81
28 0.40 11.20 3.56 39.87
Base plate 42 0.00 0.00 7850.00 30.91
12 mm dia. Anchor Bolt, Nut 168 0.13 21.84
Total 2431.61 k.g

8.3 Sewer, Rain and Waste Water Installation


- 110 mm ED 6 kg/sqcm 4 9.00 36.00
2 2.90 5.80
Total 41.80 R.m

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
1 For Footing
1.1 Footing (F1) 2
X- direction 16 17 2.60 88.40 1.59 140.56 0.1 2.4 0.1

Y- direction 16 17 2.60 88.40 1.59 140.56 0.1 2.4 0.1

1.2 Footing (F2) 4


X- direction 16 20 3.10 248.00 1.59 394.32 0.1 2..9 0.1

Y- direction 16 20 3.10 248.00 1.59 394.32 0.1 2.9 0.1

1.3 Combine Footing (CF1) 3


(BLL) 12 33 2.10 207.90 0.89 185.03 0.2 1.7 0.2

(BUL) 16 12 5.30 190.80 1.59 303.37 0.2 4.9 0.2

(TUL) 12 33 2.10 207.90 0.89 185.03 0.2 1.7 0.2

(TLL) 12 12 5.30 190.80 0.89 169.81 0.2 4.9 0.2

1.4 Stirrups 10 98 3.95 1161.30 0.62 720.01 1.375


0.1
0.5

1.5 Combine Footing (CF2) 1


(BLL) 12 33 3.30 108.90 0.89 96.92 0.2 2.9 0.2

(BUL) 16 20 5.30 106.00 1.59 168.54 0.2 4.9 0.2

(TLL) 16 20 5.30 106.00 1.59 168.54 0.2 4.9 0.2

(TUL) 12 33 3.30 108.90 0.89 96.92 0.2 2.9 0.2

1.6 Stirrups 10 98 5.15 504.70 0.62 312.91 1.975


0.1
0.5

1.7 Combine Footing (CF3) 2


(BLL) 12 33 3.10 204.60 0.89 182.09 0.2 2.7 0.2

(BUL) 16 19 5.30 201.40 1.59 320.23 0.2 4.9 0.2

(TLL) 12 19 5.30 201.40 0.89 179.25 0.2 2.7 0.2

(TUL) 12 33 3.10 102.30 0.89 91.05 0.2 4.9 0.2

1.8 Stirrups 10 98 5.10 999.60 0.62 619.75 0.1


0.5
1.95

2 Column
2.1 Grid 1 (A ,B,E &F) 4
Main Bar 16 6 3.59 86.11 1.59 136.92 16mm
16 6 6.59 158.11 1.59 251.40 6.18 3.18 16mm

0.10 0.1
0.31 0.31
2.2 Grid 1 ( C ) 1
Main Bar 20 4 4.07 16.27 2.47 40.19
16 2 3.59 7.18 1.59 11.41 20mm 16mm
16 6 6.59 39.53 1.59 62.85 16mm 6.18
3.42 3.18

0.12 0.1 0.1


0.53 0.31 0.31

2.3 Grid 1 ( D ) 1
Main Bar 20 6 4.07 24.42 2.47 60.32
20 6 7.07 42.41 2.47 104.75 20mm 20mm
6.42 3.42

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)

0.12 0.12
0.53 0.53

2.4 Grid 2(A,B,E & F) 4


Main Bar 20 4 4.07 65.12 2.47 160.85
16 2 3.59 28.72 1.59 45.66 16mm
16 6 6.59 158.16 1.59 251.47 20mm 16mm 6.18
3.42 3.18

0.12 0.10 0.1


0.53 0.53 0.53

2.5 Grid 2 ( C &D) 2


20 6 4.07 48.84 2.47 120.63
20 6 7.07 84.82 2.47 209.50 20mm 20mm
3.42 6.42

0.12 0.12
0.53 0.53
2.6 Grid 3 (A,B,C,D,E & F) 6
Main Bar 20 6 4.07 146.52 2.47 361.90
20 6 7.26 261.23 2.47 645.23 20mm 20mm
3.42 6.42

0.12 0.12
0.53 0.53

2.7 Stirrups 18
For 18 columns 8 12 1.84 397.44 0.40 158.98 0.08
8 24 1.28 552.96 0.40 221.18 0.42 0.14 0.08
0.42
0.42
3 For Lower Tie Beam
3.1 Grid 1,2 & 3 3 8.73
Top Bar 16 2 10.04 60.24 1.59 95.78 0.96
0.35
End bar from both
direction
16 2 11.46 68.76 1.59 109.33 11.46
8.73
16 2 10.04 60.24 1.59 95.78 0.96
0.35
2.94
Middle bar 16 1 4.25 12.75 1.59 20.27 0.96
0.35

16 1 12.00 36.00 1.59 57.24


12

16 1 12.00 36.00 1.59 57.24


12
2.94
16 1 4.25 12.75 1.59 20.27 0.96
0.35
Bottom Bar
End bar from both direction 16 2 3.33 19.98 1.59 31.77
0.66
1.71 0.96

16 2 9.00 54.00 1.59 85.86 9

16 2 11.46 68.76 1.59 109.33 0.96 10.5

16 2 9.33 55.98 1.59 89.01


0.66
0.96 7.1

Middle Bar 16 1 5.37 16.11 1.59 25.61


0.66
3.75 0.96

16 1 11.84 35.51 1.59 56.45 11.835

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
16 1 10.55 31.64 1.59 50.30 9.585
0.96
0.66
16 1 5.37 16.11 1.59 25.61
0.96 3.75

3.2 Grid A,B,C, D,E & F 6


Top Bar 16 3 8.12 146.16 1.59 232.39 7.42
0.35 0.35

Bottom Bar 16 3 8.74 157.32 1.59 250.14


0.35 0.35
7.42

3.3 Stirrups (LTB)


1 8 1113 1.36 1513.68 0.40 605.47 0.8
0.35

0.25

4 Plinth tie beam


4.1 Grid 1,2 & 3 3 8.61 1.2
Top Bar 20 2 10.24 61.41 2.47 151.68
0.425
End bar from both
direction 20 2 11.70 70.20 2.47 173.39 11.7

8.61
20 2 10.24 61.41 2.47 151.68 1.2
0.425
2.94
Middle bar 16 1 4.33 12.98 1.59 20.63 0.96
0.425
16 1 12.00 36.00 1.59 57.24 12

16 1 12.00 36.00 1.59 57.24 12

2.94
16 1 4.33 12.98 1.59 20.63 0.96
0.425

Bottom Bar
End bar from both 20 2 11.65 69.90 2.47 172.65
0.94
direction 9.51 1.2

20 2 11.70 70.20 2.47 173.39 11.7

20 2 9.85 59.10 2.47 145.98


0.94
1.2 7.71

Middle Bar 16 1 9.33 27.99 1.59 44.50


0.66
7.71 0.96

16 1 11.46 34.38 1.59 54.66 11.46

0.66
16 1 11.37 34.11 1.59 54.23 0.96 9.75

4.2 Grid A,B,C,D,E & F 6


Top bar 20 2 11.17 134.04 2.47 331.08
9.92
0.625 0.625

16 1 11.17 67.02 1.59 106.56 9.92


0.625 0.625

Bottom bar 20 2 11.80 141.60 2.47 349.75


0.94 0.94
9.92

16 1 11.24 67.44 1.59 107.23


0.66 0.66
9.92

4.3 Stirrups 1 12 126 1.54 194.04 0.89 172.70 0.12 0.1


0.4 0.4

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
10 1113 1.50 1669.50 0.62 1035.09 0.4 0.4

0.25 0.25
5 Column ( Up To 1st Floor Level)
5.1 Grid 1 (A ,B,E & F) 4
Main Bar 16 6 6.96 167.04 1.59 265.59 16mm
6

0.96

5.2 Grid 1 ( C ) 1
Main Bar 20 4 7.20 28.80 2.47 71.14
16 2 6.96 13.92 1.59 22.13 20mm 16mm

0.12 0.96

5.3 Grid 1 ( D ) 1
Main Bar 20 6 7.20 43.20 2.47 106.70
6 20mm
2.47

1.2

5.4 Grid 2(A,B,E & F) 4


Main Bar 20 4 7.20 115.20 2.47 284.54
16 2 6.96 55.68 1.59 88.53 6 6.00 16mm
20mm

1.20 0.96

5.5 Grid 2 ( C &D) 2


20 6 7.20 86.40 2.47 213.41
20mm
6

1.2

5.6 Grid 3 (A,B,C,D,E & F) 6


Main Bar 20 6 7.20 259.20 2.47 640.22
20mm
6

1.20

5.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
1.59 0.42
0.42
6 For Staircase
(Plinth level to 1st floor level)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77 0.3

3.354
2.472
0.4

Bottom Bar 1 16 21 3.27 68.71 1.59 109.25

2.042 1.03
0.2

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)

1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1

1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1 0.15

1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1

Distribution Bar 1 10 23 4.16 95.68 0.62 59.32 4.16

Bar in middle of landing 1 16 4 1.84 7.34 1.59 11.67 1.8


(20cm gap)
1 10 65 1.96 127.40 0.62 78.99 1.96

Top Bar 1 16 21 8.13 170.81 1.59 271.59


1.54
0.4
3.397
2.497
0.3
Bottom Bar 1 16 21 3.30 69.24 1.59 110.09

1
2.147 0.15

1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2

1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1

Extra Bar 1 16 21 2.00 42.00 1.59 66.78 1


1

Distribution Bar 1 10 100 1.96 196.00 0.62 121.52 1.96

1 10 42 4.16 174.72 0.62 108.33 4.16


0.15 0.565 0.15
Nosing Ties(Plinth Level To 0.112 0.162 0.112
First Floor Level ) 0.15 0.15
First type 8 35 0.67 23.59 0.40 9.44 0.565 0.15
Second type 8 7 0.98 6.84 0.40 2.74 0.412
Third type 8 14 1.13 15.86 0.40 6.34 0.268 0.112
Forth type 8 7 0.83 5.81 0.40 2.32 0.15
Fifth type 8 7 0.67 4.72 0.40 1.89 0.268 0.15 0.15
0.262
0.15
Nosing Bar 2 10 10 1.96 39.20 0.62 24.30 1.96

4.92
6.1 Landing Beam 1 20 3 5.62 16.86 2.47 41.64 0.35 0.35

1 20 3 5.62 16.86 2.47 41.64 0.35 0.35


4.92
6.2 Sturriups 1 8 35 1.22 42.70 0.40 17.08
0.08
0.375

7 Main Beam (First Floor Level) 0.2

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)

7.1 Grid A,B,C,D,E & F


Bottom bar (End Bar) 6 25 2 7.25 87.00 2.47 214.89 1.29

4.46 1.5

1.29
6 25 2 6.75 81.00 3.86 312.66 5.46

Bottom Bar (mid-bars) 6 20 2 11.80 141.60 2.47 349.75


0.94
0.94
9.92

Top Bar 6 20 3 11.80 212.40 2.47 524.63 9.92


0.94
0.94

Extra Bar 6 25 2 6.50 78.00 3.86 301.08 5.06 0.15


1.29

6 25 2 4.00 48.00 3.86 185.28 2.56 0.15


1.29

Torsion Bars (T/O) 6 16 2 9.80 117.60 1.59 186.98 9.8

7.2 Grid 1
0.94
Bottom Bar (end bar) 1 20 2 5.65 11.30 2.47 27.91 1.2
3.51

20 2 11.40 22.80 2.47 56.32 10.2 1.2

20 2 7.50 15.00 2.47 37.05 7.5

0.94
20 2 9.85 19.70 2.47 48.66
1.2 7.71

Middle Bar 16 2 3.33 6.66 1.59 10.59


0.66
1.71 0.96
16 2 9.00 18.00 1.59 28.62
9

16 2 11.46 22.92 1.59 36.44 10.5


0.96

16 2 9.33 18.66 1.59 29.67


0.66
0.96 7.71

Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66

16 2 11.46 22.92 1.59 36.44 11.46

0.96 8.73
16 2 10.35 20.70 1.59 32.91
0.66
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12

0.96
16 1 12.00 12.00 1.59 19.08 11.04
0.66
16 1 4.56 4.56 1.59 7.25 2.94
0.96

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
7.3 Grid 2 & 3
Bottom Bar 2 20 4 5.65 22.60 2.47 55.82
0.94
3.51 1.2

20 4 11.40 45.60 2.47 112.63 10.2


1.2

20 4 7.50 30.00 2.47 74.10 7.5

0.94
20 4 9.85 39.40 2.47 97.32
1.2 7.71
0.94
Middle Bar 20 4 3.85 15.40 2.47 38.04
1.2 1.71
20 4 9.00 36.00 2.47 88.92
9

20 4 9.90 39.60 2.47 97.81 8.7


1.2
0.94
20 4 11.65 46.60 2.47 115.10
1.2 9.51
1.2
Top Bar 20 4 10.75 43.00 2.47 106.21 8.61
0.94

20 4 11.70 46.80 2.47 115.60 11.7

20 4 10.75 43.00 2.47 106.21 1.2 8.61


0.94
3.06
20 2 5.20 10.40 2.47 25.69 .1.2
0.94

20 2 12.00 24.00 2.47 59.28 10.8


1.2
20 2 12.00 24.00 2.47 59.28
12
1.2
20 2 5.20 10.40 2.47 25.69 3.06
0.94
2.21
7.4 Extra Bar Along Grid 1,2 &3 3 25 4 3.65 43.80 3.86 169.07 0.15
1.29
4
3 25 4 4.30 51.60 3.86 199.18 0.15 0.15

3.5
3 25 4 3.80 45.60 3.86 176.02 0.15 0.15

7.5 Torision bars along grid 1,2 &3


1st arrangement 3 16 1 3.69 11.07 1.59 17.60 3.69

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 4.11 12.33 1.59 19.60 4.11

2nd arrangement 3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 6.84 20.52 1.59 32.63 6.84

7.6 Secondry Beam


Along Grid A1,B1,D1 & E1
0.35 0.35
Bottom Bar 4 16 3 10.45 125.40 1.59 199.39
9.75

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
Top Bar 4 16 3 10.45 125.40 1.59 199.39 9.75
0.35 0.35

Grid 1a (end bottom bar) 2 16 2 2.94 11.74 1.59 18.67


0.35
1.625 0.96
0.35
2 16 2 10.85 43.40 1.59 69.01
10.5

middle bar 2 16 1 8.81 17.62 1.59 28.02


0.35
7.5 0.96
0.35
2 16 1 4.98 9.95 1.59 15.82
4.625
top bar (end bar) 2 16 2 4.06 16.22 1.59 25.79
2.645 0.96
0.45

2 16 2 10.55 42.20 1.59 67.10 9.605


0.45

middle bar 2 16 1 4.06 8.11 1.59 12.89 2.645 0.96


0.45

2 16 1 10.06 20.11 1.59 31.97 9.605


0.45
grid 1b
bottom bar 1 12 4 5.45 21.80 0.89 19.40 0.35
0.35
4.75

4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45 0.45

7.7 Conceal Beam 2 20 6 1.61 19.32 0.89 17.19 1.21


0.4

7.8 Bent up Bar (hunch bar) 1 16 36 3.02 108.72 1.59 172.86


0.96 0.425 0.425 0.96

250

7.9 Stirriups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425

0.25
7.10 For Secondry Beam 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375

0.2

8 For Slab (First Floor)


8.1 Main Bars 0.375
Along short span 0.07
straight bar 1 8 76 10.93 830.30 0.40 332.12 10.48
0.375 1.5 1.75 1.705
Cranked bar 1 8 76 11.09 842.46 0.40 336.98 0.05
1.975 1.75 1.75
0.525
Along Long Span (grid 1 to grid2)
Straight bar 1 8 45 12.00 540.00 0.40 216.00 11.475
1 8 45 2.22 99.90 0.40 39.96 1.695 0.525
0.525 1.5 1.9
cranked bar 1 8 44 11.03 485.10 0.40 194.04 0.07 1.5
2.25 0.525
1 8 44 4.75 208.78 0.40 83.51 1.9 0.07
2.25
along long span Grid 2 to 3 0.525

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
Straight bar 1 8 7 12.00 84.00 0.40 33.60 11.475

1 8 7 12.00 84.00 0.40 33.60 12


0.525
1 8 7 7.20 50.40 0.40 20.16 6.675
0.525 1.5 1.15
cranked bar 1 8 7 10.38 72.63 0.40 29.05 1.5 1.5
2.35 1.5
1.15 1.875 1.875 1.15
1 8 7 11.72 82.04 0.40 32.82 1.5 2.25
1.5
1.15 1.5 0.525
1 8 7 10.38 72.63 0.40 29.05 1.5 1.5 1.5
2.35

Infront of stair case


Straight bar 1 8 15 5.69 85.35 0.40 34.14 6.33
1.875 1.095 0.75
Cranked bar 1 8 13 5.97 77.61 0.40 31.04 1.125 0.845 0.07

8.2 Distribution bars


Between Grid 1 &1a
along x-axis 1 8 96 2.72 261.12 0.40 104.45 2.72
along y- axis 1 8 80 3.20 256.00 0.40 102.40 3.2

Between grid 1a & 2


along x axis 1 8 96 2.72 261.12 0.40 104.45 2.72
along y axis 1 8 84 3.20 268.80 0.40 107.52 3.2

Between grid 2 & 3


except infront of staircas 2.72
along x axis 1 8 64 2.72 174.08 0.40 69.63 2.2
along y axis 1 8 88 2.20 193.60 0.40 77.44
Between grid 1b & 2 infront of
staicase
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 1.29 23.22 0.40 9.29 1.29

between 2 & 3
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2

Cantilever Slab beyond grid 1


bottom bar 1 10 3 11.46 34.38 0.62 21.32 11.46
top bar 1 10 3 11.46 34.38 0.62 21.32 11.46

Cantilever slab at the front


top bar ( horizontal portion) 1 10 3 7.10 21.30 0.62 13.21 7.1
bottom bar 1 10 3 7.10 21.30 0.62 13.21 7.1

Vertical portion 1 10 4 7.86 31.44 0.62 19.49 7.86


1 10 4 7.86 31.44 0.62 19.49 7.86

8.3 Negative Bars


along Grid 1 2 8 35 2.05 143.50 0.40 57.40 2.05
along grid 1a 2 8 35 2.35 164.50 0.40 65.80 2.35
along grid 1b 1 8 7 1.08 7.56 0.40 3.02 1.08
along grid 2 (except infront of
stair case) 2 8 35 2.10 147.00 0.40 58.80 2.1
along grid 2 in front of
staircase 1 8 14 1.38 19.32 0.40 7.73 1.38
along grid a1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid b 1 8 28 2.10 58.80 0.40 23.52 2.1
along b1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid c&d 2 8 9 2.55 45.90 0.40 18.36 2.55
along grid d1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid e 1 8 28 2.10 58.80 0.40 23.52 2.1
along grid e1 1 8 28 2.05 57.40 0.40 22.96 2.05

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
9 Bands
Ground Floor
9.1 Sill Bands 0.75 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.46 0.075 5.5 0.075
1 10 2 4.50 9.00 0.62 5.58 4.5
0.75 0.75
1 10 2 5.65 11.30 0.62 7.01 0.075 4 0.075

Grid 2 4 10 2 1.81 14.48 0.62 8.98 1.81

Grid A,B,C,D,E&F 6 10 2 8.15 97.80 0.62 60.64 0.75 6.5 0.75


0.075 0.075
9.2 Lintel Band 0.75 5.5 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.46 0.075 0.075
Grid 2 4 10 2 1.81 14.48 0.62 8.98 0.75 1.81 0.75
Grid A,B,C,D,E&F 5 10 2 8.15 81.50 0.62 50.53 0.075 6.5 0.075
9.3 Vertical Band 8 10 2 4.13 66.00 0.62 40.92 0.75 0.75
0.075 2.475 0.075
9.4 Sturriups 1 8 1020 0.30 306.00 0.40 36.72 0.06 0.06
0.18

10 Column ( Up To 2nd Floor Level)


10.1 Grid 1 (A ,B,E & F) 4
Main Bar 16 6 6.96 167.04 1.59 265.59 16mm
6

0.96

10.2 Grid 1 ( C ) 1
Main Bar 20 4 7.20 28.80 2.47 71.14
16 2 6.96 13.92 1.59 22.13 20mm 16mm

0.12 0.96

10.3 Grid 1 ( D ) 1
Main Bar 20 6 7.20 43.20 2.47 106.70
6 20mm
2.47

1.2

10.4 Grid 2(A,B,E & F) 4


Main Bar 20 4 7.20 115.20 2.47 284.54
16 2 6.96 55.68 1.59 88.53 6 6.00 16mm
20mm

1.20 0.96

10.5 Grid 2 ( C &D) 2


20 6 7.20 86.40 2.47 213.41
20mm
6

1.2

10.6 Grid 3 (A,B,C,D,E & F) 6


Main Bar 20 6 7.20 259.20 2.47 640.22
20mm
6

1.20

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
10.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
1.59 0.42
0.42

10.8 Band (First Floor)


Sill Bands 0.75 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.46 0.075 5.5 0.075
1 10 2 4.50 9.00 0.62 5.58 4.5
0.75 0.75
1 10 2 5.65 11.30 0.62 7.01 0.075 4 0.075

Grid 2 4 10 2 1.81 14.48 0.62 8.98 1.81

Grid A,B,C,D,E&F 6 10 2 8.15 97.80 0.62 60.64 0.75 6.5 0.75


0.075 0.075
Lintel Band 0.75 5.5 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.46 0.075 0.075
Grid 2 4 10 2 1.81 14.48 0.62 8.98 0.75 1.81 0.75
Grid A,B,C,D,E&F 5 10 2 8.15 81.50 0.62 50.53 0.075 6.5 0.075
Vertical Band 8 10 2 4.13 66.00 0.62 40.92 0.75 0.75
0.075 2.475 0.075

Sturriups 1 8 1020 0.30 306.00 0.40 36.72 0.06 0.06


0.18

11 For Staircase
(1st Floor level to 2nd Floor Level)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77 0.3

3.354
2.472
0.4

Bottom Bar 1 16 21 3.27 68.71 1.59 109.25

2.042 1.03
0.2

1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1

1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1 0.15

1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1

Distribution Bar 1 10 23 4.16 95.68 0.62 59.32 4.16

Bar in middle of landing 1 16 4 1.84 7.34 1.59 11.67 1.8


(20cm gap)
1 10 65 1.96 127.40 0.62 78.99 1.96

Landing Level to First Floor level


Top Bar 1 16 21 8.13 170.81 1.59 271.59
1.54
0.4
3.397
2.497
0.3
Bottom Bar 1 16 21 3.30 69.24 1.59 110.09

1
2.147 0.15

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2

1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1

Extra Bar 1 16 21 2.00 42.00 1.59 66.78 1


1

Distribution Bar 1 10 100 1.96 196.00 0.62 121.52 1.96

1 10 42 4.16 174.72 0.62 108.33 4.16


0.15 0.565 0.15
Nosing Ties(Plinth Level To 0.112 0.162 0.112
First Floor Level ) 0.15 0.15
First type 8 35 0.67 23.59 0.40 9.44 0.565 0.15
Second type 8 7 0.98 6.84 0.40 2.74 0.412
Third type 8 14 1.13 15.86 0.40 6.34 0.268 0.112
Forth type 8 7 0.83 5.81 0.40 2.32 0.15
Fifth type 8 7 0.67 4.72 0.40 1.89 0.268 0.15 0.15
0.262
0.15
Nosing Bar 2 10 10 1.96 39.20 0.62 24.30 1.96

11.1 Beam 4.92


Landing Beam 1 20 3 5.62 16.86 2.47 41.64 0.35 0.35

1 20 3 5.62 16.86 2.47 41.64 0.35 0.35


4.92
Sturriups 1 8 35 1.22 42.70 0.40 17.08
0.08
0.375

0.2
12 Main Beam(Second Floor Level)
12.1 Grid A,B,C,D,E & F
Bottom bar (End Bar) 6 25 2 7.25 87.00 2.47 214.89 1.29

4.46 1.5

1.29
6 25 2 6.75 81.00 3.86 312.66 5.46

Bottom Bar (mid-bars) 6 20 2 11.80 141.60 2.47 349.75


0.94
0.94
9.92

Top Bar 6 20 3 11.80 212.40 2.47 524.63 9.92


0.94
0.94

Extra Bar 6 25 2 6.50 78.00 3.86 301.08 5.06 0.15


1.29

6 25 2 4.00 48.00 3.86 185.28 2.56 0.15


1.29

Torsion Bars (T/O) 6 16 2 9.80 117.60 1.59 186.98 9.8

12.2 Grid 1
0.94
Bottom Bar (end bar) 1 20 2 5.65 11.30 2.47 27.91 1.2
3.51

20 2 11.40 22.80 2.47 56.32 10.2 1.2

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)

20 2 7.50 15.00 2.47 37.05 7.5

0.94
20 2 9.85 19.70 2.47 48.66
1.2 7.71

Middle Bar 16 2 3.33 6.66 1.59 10.59


0.66
1.71 0.96
16 2 9.00 18.00 1.59 28.62
9

16 2 11.46 22.92 1.59 36.44 10.5


0.96

16 2 9.33 18.66 1.59 29.67


0.66
0.96 7.71

Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66

16 2 11.46 22.92 1.59 36.44 11.46

0.96 8.73
16 2 10.35 20.70 1.59 32.91
0.66
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12

0.96
16 1 12.00 12.00 1.59 19.08 11.04
0.66
16 1 4.56 4.56 1.59 7.25 2.94
0.96

12.3 Grid 2 & 3


Bottom Bar 2 20 4 5.65 22.60 2.47 55.82
0.94
3.51 1.2

20 4 11.40 45.60 2.47 112.63 10.2


1.2

20 4 7.50 30.00 2.47 74.10 7.5

0.94
20 4 9.85 39.40 2.47 97.32
1.2 7.71
0.94
Middle Bar 20 4 3.85 15.40 2.47 38.04
1.2 1.71
20 4 9.00 36.00 2.47 88.92
9

20 4 9.90 39.60 2.47 97.81 8.7


1.2
0.94
20 4 11.65 46.60 2.47 115.10
1.2 9.51
1.2
Top Bar 20 4 10.75 43.00 2.47 106.21 8.61
0.94

20 4 11.70 46.80 2.47 115.60 11.7

20 4 10.75 43.00 2.47 106.21 1.2 8.61


0.94

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
3.06
20 2 5.20 10.40 2.47 25.69 .1.2
0.94

20 2 12.00 24.00 2.47 59.28 10.8


1.2
20 2 12.00 24.00 2.47 59.28
12
1.2
20 2 5.20 10.40 2.47 25.69 3.06
0.94
2.21
12.4 Extra Bar Along Grid 1,2 &3 3 25 4 3.65 43.80 3.86 169.07 0.15
1.29
4
3 25 4 4.30 51.60 3.86 199.18 0.15 0.15

3.5
3 25 4 3.80 45.60 3.86 176.02 0.15 0.15

12.5 Torision bars along grid 1,2 &3


1st arrangement 3 16 1 3.69 11.07 1.59 17.60 3.69

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 4.11 12.33 1.59 19.60 4.11

2nd arrangement 3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 6.84 20.52 1.59 32.63 6.84

12.6 Secondry Beam


Along Grid A1,B1,D1 & E1
0.35 0.35
Bottom Bar 4 16 3 10.45 125.40 1.59 199.39
9.75

Top Bar 4 16 3 10.45 125.40 1.59 199.39 9.75


0.35 0.35

Grid 1a (end bottom bar) 2 16 2 2.94 11.74 1.59 18.67


0.35
1.625 0.96
0.35
2 16 2 10.85 43.40 1.59 69.01
10.5

middle bar 2 16 1 8.81 17.62 1.59 28.02


0.35
7.5 0.96
0.35
2 16 1 4.98 9.95 1.59 15.82
4.625
top bar (end bar) 2 16 2 4.06 16.22 1.59 25.79
2.645 0.96
0.45

2 16 2 10.55 42.20 1.59 67.10 9.605


0.45

middle bar 2 16 1 4.06 8.11 1.59 12.89 2.645 0.96


0.45

2 16 1 10.06 20.11 1.59 31.97 9.605


0.45
grid 1b
bottom bar 1 12 4 5.45 21.80 0.89 19.40 0.35
0.35
4.75

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45 0.45

12.7 Bent up Bar (hunch bar) 1 16 36 3.02 108.72 1.59 172.86


0.96 0.425 0.425 0.96

250

12.8 Stirrups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425

0.25
12.9 Stirrups ( For Secondry Beam) 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375

0.2

13 For Slab (2nd Floor Level)


Main Bars 0.375
Along short span 0.07
straight bar 1 8 76 10.93 830.30 0.40 332.12 10.48
0.375 1.5 1.75 1.705
Cranked bar 1 8 76 11.09 842.46 0.40 336.98 0.05
1.975 1.75 1.75
0.525
Along Long Span (grid 1 to grid2)
Straight bar 1 8 45 12.00 540.00 0.40 216.00 11.475
1 8 45 2.22 99.90 0.40 39.96 1.695 0.525
0.525 1.5 1.9
cranked bar 1 8 44 11.03 485.10 0.40 194.04 0.07 1.5
2.25 0.525
1 8 44 4.75 208.78 0.40 83.51 1.9 0.07
2.25
along long span Grid 2 to 3 0.525
Straight bar 1 8 7 12.00 84.00 0.40 33.60 11.475

1 8 7 12.00 84.00 0.40 33.60 12


0.525
1 8 7 7.20 50.40 0.40 20.16 6.675
0.525 1.5 1.15
cranked bar 1 8 7 10.38 72.63 0.40 29.05 1.5 1.5
2.35 1.5
1.15 1.875 1.875 1.15
1 8 7 11.72 82.04 0.40 32.82 1.5 2.25
1.5
1.15 1.5 0.525
1 8 7 10.38 72.63 0.40 29.05 1.5 1.5 1.5
2.35

0.375
Infront of stair case
Straight bar 1 8 15 4.92 73.80 0.40 29.52 4.92
0.375 1.065 0.75
Cranked bar 1 8 13 5.12 66.56 0.40 26.62 1.875 0.845 0.07

Distribution bars
Between Grid 1 &1a
along x-axis 1 8 96 2.72 261.12 0.40 104.45 2.72
along y- axis 1 8 80 3.20 256.00 0.40 102.40 3.2

Between grid 1a & 2


along x axis 1 8 96 2.72 261.12 0.40 104.45 2.72
along y axis 1 8 84 3.20 268.80 0.40 107.52 3.2

Between grid 2 & 3


except infront of staircas 2.72
along x axis 1 8 64 2.72 174.08 0.40 69.63 2.2
along y axis 1 8 88 2.20 193.60 0.40 77.44
Between grid 1b & 2 infront of

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
staicase
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 1.29 23.22 0.40 9.29 1.29

between 2 & 3
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2

Cantilever Slab beyond grid 1


bottom bar 1 10 3 11.46 34.38 0.62 21.32 11.46
top bar 1 10 3 11.46 34.38 0.62 21.32 11.46

Negative Bars
along Grid 1 2 8 35 2.05 143.50 0.40 57.40 2.05
along grid 1a 2 8 35 2.35 164.50 0.40 65.80 2.35
along grid 1b 1 8 7 1.08 7.56 0.40 3.02 1.08
along grid 2 (except infront of
stair case) 2 8 35 2.10 147.00 0.40 58.80 2.1
along grid 2 in front of
staircase 1 8 14 1.38 19.32 0.40 7.73 1.38
along grid a1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid b 1 8 28 2.10 58.80 0.40 23.52 2.1
along b1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid c&d 2 8 9 2.55 45.90 0.40 18.36 2.55
along grid d1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid e 1 8 28 2.10 58.80 0.40 23.52 2.1
along grid e1 1 8 28 2.05 57.40 0.40 22.96 2.05

14 Column ( Up to 3rd Floor Level)


14.1 Grid 1 (A ,B,E & F) 4
Main Bar 16 6 3.34 80.19 1.59 127.50 16mm
2.38

0.96

14.2 Grid 1 (C ) 1 16 6 5.97 35.82 1.59 56.95


5.00625 16mm

0.96

14.3 Grid 1 ( D ) 1
Main Bar 20 2 6.21 12.41 2.47 30.66
16 4 5.97 23.87 1.59 37.95 6 20mm 16mm
5.00625 5.00625

1.2 0.96

14.4 Grid 2(A,B,E & F) 4


Main bar 16 6 3.34 80.16 1.59 127.45 16mm
2.38

0.96

14.5 Grid 2 ( C &D) 2


20 2 6.21 24.83 2.47 61.32
16 4 5.97 47.73 1.59 75.89 20mm 5.00625 16mm
5.00625

1.2 0.96

14.6 Grid 3 (A,B,C,D,E & F) 6


Main Bar 20 2 3.58 42.98 2.47 106.15
16 4 3.34 80.16 1.59 127.45 2.38 20mm 2.38

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
16mm

1.20 0.96

14.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
0.42
0.42
14.8 Band (Second Floor)
Sill Bands 0.75 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.46 0.075 5.5 0.075
1 10 2 4.50 9.00 0.62 5.58 4.5
0.75 0.75
1 10 2 5.65 11.30 0.62 7.01 0.075 4 0.075

Grid 2 4 10 2 1.81 14.48 0.62 8.98 1.81

Grid A,B,C,D,E&F 6 10 2 8.15 97.80 0.62 60.64 0.75 6.5 0.75


0.075 0.075
Lintel Band 0.75 5.5 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.46 0.075 0.075
Grid 2 4 10 2 1.81 14.48 0.62 8.98 0.75 1.81 0.75
Grid A,B,C,D,E&F 5 10 2 8.15 81.50 0.62 50.53 0.075 6.5 0.075
Vertical Band 8 10 2 4.13 66.00 0.62 40.92 0.75 0.75
0.075 2.475 0.075

Sturriups 1 8 1020 0.30 306.00 0.40 36.72 0.06 0.06


0.18

15 For Staircase
(2nd Floor to Top Foor)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77 0.3

3.354
2.472
0.4

Bottom Bar 1 16 21 3.27 68.71 1.59 109.25

2.042 1.03
0.2

1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1

1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1 0.15

1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1

Distribution Bar 1 10 23 4.16 95.68 0.62 59.32 4.16

Bar in middle of landing 1 16 4 1.84 7.34 1.59 11.67 1.8


(20cm gap)
1 10 65 1.96 127.40 0.62 78.99 1.96

Landing Level to +9000 level


Top Bar 1 16 21 8.13 170.81 1.59 271.59
1.54
0.4
3.397
2.497
0.3
Bottom Bar 1 16 21 3.30 69.24 1.59 110.09

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)

1
2.147 0.15

1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2

1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1

Extra Bar 1 16 21 2.00 42.00 1.59 66.78 1


1

Distribution Bar 1 10 100 1.96 196.00 0.62 121.52 1.96

1 10 42 4.16 174.72 0.62 108.33 4.16


0.15 0.565 0.15
Nosing Ties(Plinth Level To 0.112 0.162 0.112
First Floor Level ) 0.15 0.15
First type 8 35 0.67 23.59 0.40 9.44 0.565 0.15
Second type 8 7 0.98 6.84 0.40 2.74 0.412
Third type 8 14 1.13 15.86 0.40 6.34 0.268 0.112
Forth type 8 7 0.83 5.81 0.40 2.32 0.15
Fifth type 8 7 0.67 4.72 0.40 1.89 0.268 0.15 0.15
0.262
0.15
Nosing Bar 2 10 10 1.96 39.20 0.62 24.30 1.96

4.92
15.1 Landing Beam 1 20 3 5.62 16.86 2.47 41.64 0.35 0.35

1 20 3 5.62 16.86 2.47 41.64 0.35 0.35


4.92
15.2 Sturriups 1 8 35 1.22 42.70 0.40 17.08
0.08
0.375

0.2
16 Main Beam (Top Floor Level))
16.1 Grid A,B,E & F
Bottom bar (mid bar) 4 20 2 10.87 86.96 2.47 214.79 0.475 0.475

9.92

0.475
0.475
End Bar 4 25 2 10.87 86.96 3.86 335.67 9.92

Bottom bar along C & D 2 25 2 7.25 29.00 3.86 111.94


1.29
4.46 1.5

2 20 2 6.75 27.00 3.86 104.22


5.46 1.29

0.94 0.94
Bottom Bar along C & D 2 20 2 11.80 47.20 2.47 116.58 0.92

6 20 3 11.80 212.40 2.47 524.63 0.94 9.92 0.94

16.2 Extra Bar 6 25 2 6.50 78.00 3.86 301.08 5.06 0.15


1.29

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
6 25 2 4.00 48.00 3.86 185.28 2.56 0.15
1.29

16.3 Torsion Bars (T/O) 6 16 2 9.80 117.60 1.59 186.98 9.8

16.4 Grid 1
0.475
Bottom Bar (end bar) 1 20 2 3.39 6.77 2.47 16.72 1.2
1.71

20 2 9.00 18.00 2.47 44.46 9

20 2 11.70 23.40 2.47 57.80 1.2 10.5

0.475
20 2 9.39 18.77 2.47 46.36
1.2 7.71

Middle Bar 16 2 3.15 6.29 1.59 10.00


0.475
1.71 0.96
16 2 9.00 18.00 1.59 28.62
9

16 2 11.46 22.92 1.59 36.44 10.5


0.96

16 2 9.15 18.29 1.59 29.08


0.475
0.96 7.71

Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66

16 2 11.46 22.92 1.59 36.44 11.46

0.96 8.73
16 2 10.35 20.70 1.59 32.91
0.66
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12

0.96
16 1 12.00 12.00 1.59 19.08 11.04
0.66
16 1 4.56 4.56 1.59 7.25 2.94
0.96

16.5 Extra Bar Along Grid 1 1 25 4 3.65 14.60 3.86 56.36 0.15
1.29
4
1 25 4 4.30 17.20 3.86 66.39 0.15 0.15

3.5
1 25 4 3.80 15.20 3.86 58.67 0.15 0.15

16.6 Grid 2 & 3


Bottom Bar 2 20 4 3.39 27.08 2.47 66.89
0.475
1.71 1.2

20 4 9.00 72.00 2.47 177.84 9

20 4 11.70 93.60 2.47 231.19 1.2 10.5

0.475
20 4 9.39 75.08 2.47 185.45

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
1.2 7.71
0.94
1.2
Top Bar (end Bar) 20 4 10.75 43.00 2.47 106.21 8.61
0.94

20 4 11.70 46.80 2.47 115.60 11.7

20 4 10.75 43.00 2.47 106.21 1.2 8.61


0.94
3.06
middle bar 20 2 5.20 10.40 2.47 25.69 .1.2
0.94

20 2 12.00 24.00 2.47 59.28 10.8


1.2
20 2 12.00 24.00 2.47 59.28
12
1.2
20 2 5.20 10.40 2.47 25.69 3.06
0.94
2.21
16.7 Extra Bar Along Grid 1,2 &3 2 20 4 3.65 29.20 2.47 72.12 0.15
1.29
4
2 20 4 4.30 34.40 2.47 84.97 0.15 0.15

3.5
2 20 4 3.80 30.40 2.47 75.09 0.15 0.15

16.8 Torision bars along grid 1,2 &3


1st arrangement 3 16 1 3.69 11.07 1.59 17.60 3.69

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 4.11 12.33 1.59 19.60 4.11

2nd arrangement 3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 6.84 20.52 1.59 32.63 6.84

16.9 Secondry Beam


Along Grid A1,B1,D1 & E1
0.35 0.35
Bottom Bar 4 16 3 10.45 125.40 1.59 199.39
9.75

Top Bar 4 16 3 10.45 125.40 1.59 199.39 9.75


0.35 0.35

Grid 1a (end bottom bar) 2 16 2 2.94 11.74 1.59 18.67


0.35
1.625 0.96
0.35
2 16 2 10.85 43.40 1.59 69.01
10.5

middle bar 2 16 1 8.81 17.62 1.59 28.02


0.35
7.5 0.96
0.35
2 16 1 4.98 9.95 1.59 15.82
4.625
top bar (end bar) 2 16 2 4.06 16.22 1.59 25.79
2.645 0.96
0.45

2 16 2 10.55 42.20 1.59 67.10 9.605


0.45

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)

middle bar 2 16 1 4.06 8.11 1.59 12.89 2.645 0.96


0.45

2 16 1 10.06 20.11 1.59 31.97 9.605


0.45
grid 1b
bottom bar 1 12 4 5.45 21.80 0.89 19.40 0.35
0.35
4.75

4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45 0.45

16.10 Bent up Bar (hunch bar) 1 16 36 3.02 108.72 1.59 172.86 0.96 0.96

0.425 0.425
0.25

16.11 Stirriups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425

0.25
16.12 For Secondry Beam 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375

0.2

16.13 Beam under slab (250*150) 7.195


Near grid 1 2 12 4 9.09 72.68 0.89 64.69
1.89

7.215
2 12 4 8.41 67.28 0.89 59.88
1.64

7.195
2 12 4 9.09 72.68 0.89 64.69 1.89

6.325
2 12 4 7.97 63.72 0.89 56.71
1.64
10.15
Infront of Grid A & F 2 12 4 10.15 81.20 0.89 72.27

2 12 4 9.90 79.20 0.89 70.49 9.9

Infront of Grid 3 2 12 4 7.53 60.24 0.89 53.61 0.89

6.64
2 12 2 8.17 32.68 0.89 29.09 0.89
7.28

2 12 4 7.14 57.12 0.89 50.84 5.75


0.5
0.89

2 12 2 6.50 13.00 0.89 11.57 6.5

2 12 2 6.00 12.00 0.89 10.68 6

16.14 Stirriups( beam 250*150 ) 1 8 546 0.76 414.96 0.40 165.98


0.0 0.1
8
0.2

17 For Slab (Top Floor)


17.1 Main Bars

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
Along short span
straight bar 1 8 76 12.00 912.00 0.40 364.80 12

2.025 1.5 1.75


Cranked bar 1 8 76 11.66 886.16 0.40 354.46 0.08 0.08 0.08 0.08 0.08
1.25 1.075 1.75
0.08 0.08
1.75 1.45
1 8 76 1.45 110.20 0.40 44.08 0.08

17.2 Along Long Span (grid 1 to grid2) 0.525


Straight bar 1 8 37 9.96 368.34 0.40 147.33 0.08 9.35

1 8 37 4.53 167.61 0.40 67.04 4.45 0.08

0.525 0.95
cranked bar 1 8 36 4.04 145.26 0.40 58.10 0.08 0.08
2.4

0.95 1.5 1.5


1 8 36 4.75 170.82 0.40 68.33 0.08 1.5 0.08 0.08 0.08
1.5
0.08 0.08 2 0.08
1.5
17.3 along long span Grid 2 to 3
Straight bar 1 8 26 10.45 271.70 0.40 108.68 0.08 10.45

1 8 26 10.90 283.40 0.40 113.36 10.9


0.08
1 8 26 10.45 271.70 0.40 108.68 10.45

2 1.5 1.5
cranked bar 1 8 24 11.01 264.24 0.40 105.70 0.08 0.08 0.08 0.08 0.08
1.5 1.5
0.08 0.08 0.95
1.5
0.95 1.875 1.875
1 8 24 11.38 273.12 0.40 109.25 0.08 0.08 0.08 2.25 0.08
1.5
0.08 0.08 0.95
1.5
0.95 1.5 1.5
1 8 24 11.01 264.24 0.40 105.70 0.08 0.08 0.08 1.5 0.08
1.5 2
0.08 1.5 0.08 0.08

17.4 Infront of stair case 0.08 6.11 0.08


Straight bar 1 8 15 6.27 94.05 0.40 37.62
2.405 1.095 0.91
Cranked bar 1 8 13 6.69 86.91 0.40 34.76 0.08 0.08 0.08 0.08 0.08
1.1 0.695
17.5 Distribution bars
Between Grid 1 &1a
along x-axis 1 8 80 2.70 216.00 0.40 86.40 2.7
along y- axis 1 8 74 3.20 236.80 0.40 94.72 3.2

Between grid 1a & 2


along x axis 1 8 80 2.70 216.00 0.40 86.40 2.7
along y axis 1 8 80 3.20 256.00 0.40 102.40 3.2

Between grid 2 & 3


except infront of staircas 2.7
along x axis 1 8 64 2.70 172.80 0.40 69.12 2.2
along y axis 1 8 68 2.20 149.60 0.40 59.84
Between grid 1b & 2 infront of
staicase
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 1.28 23.04 0.40 9.22 1.29

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
between 2 & 3
along x axis 1 8 8 4.20 33.60 0.40 13.44 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2

Top near Grid 1( in bottom) 2 10 5 12.00 120.00 0.62 74.40 12


2 10 5 2.20 22.00 0.62 13.64 2.2

Top near Grid 1( on Top) 2 10 4 12.00 96.00 0.62 59.52 12


2 10 4 2.20 17.60 0.62 10.91 2.2

Top near grid A & F (in bottom) 2 10 5 12.00 120.00 0.62 74.40 12
Top near grid A & F (on top) 2 10 4 12.00 96.00 0.62 59.52 12

Top infront of grid 3 (in bottom) 2 10 5 11.98 119.80 0.62 74.28 11.98
Top infront of grid 3 (on top) 2 10 4 11.98 95.84 0.62 59.42 11.98

Top infront of staircase (in bottom) 1 10 6 8.24 49.44 0.62 30.65 8.24
1 10 5 8.24 41.20 0.62 25.54 8.24

17.6 Negative Bars


along Grid 1 2 8 36 2.43 174.96 0.40 69.98 2.43
along grid 1a 2 8 36 2.35 169.20 0.40 67.68 2.35
along grid 1b 1 8 14 1.08 15.12 0.40 6.05 1.08
along grid 2 (except infront of
stair case) 2 8 36 2.10 151.20 0.40 60.48 2.1
along grid 2 in front of
staircase 1 8 14 1.37 19.18 0.40 7.67 1.38
Along grid 3 (except infront of
stair case) 1 8 72 2.13 153.36 0.40 61.34 2.13
Along grid 3 ( infront of
stair case) 1 8 14 2.53 35.42 0.40 14.17 2.53

Along grid A & F 2 8 28 2.28 127.68 0.40 51.07 2.28


along grid a1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid b 1 8 28 2.10 58.80 0.40 23.52 2.1
along b1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid c&d 2 8 10 2.55 51.00 0.40 20.40 2.55
along grid d1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid e 1 8 28 2.10 58.80 0.40 23.52 2.1
along grid e1 1 8 28 2.05 57.40 0.40 22.96 2.05

Band Parapet Wall Top Floor 7.195


Near grid 1 2 10 2 9.09 36.34 0.62 22.53
1.89

7.215
2 10 2 8.41 33.64 0.62 20.86
1.64

7.195
2 10 2 9.09 36.34 0.62 22.53 1.89

6.325
2 10 2 7.97 31.86 0.62 19.75
1.64
10.15
Infront of Grid A & F 2 10 2 10.15 40.60 0.62 25.17

2 10 2 9.90 39.60 0.62 24.55 9.9

Infront of Grid 3 2 10 2 7.53 30.12 0.62 18.67 0.89

6.64
2 10 2 8.17 32.68 0.62 20.26 0.89
7.28

2 10 2 7.14 28.56 0.62 17.71 5.75


0.5
0.89

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)

2 10 2 6.50 13.00 0.62 8.06 6.5

2 10 2 6.00 12.00 0.62 7.44 6

Stirrups 2 8 540 0.30 162.00 0.40 64.80 0.06 0.06


0.18

18 Column ( Up to Roof Floor Level)


18.1 Grid 1 C 1
Main Bar 16 6 2.96 17.76 1.59 28.24 16mm
2.00

0.96

18.2 Grid 1 ( D ) 1
Main Bar 20 2 3.20 6.40 2.47 15.81
16 4 2.96 11.84 1.59 18.83 20mm 16mm
2 2

1.2 0.96

18.3 Grid 2 & 3 ( C &D) 4


20 2 3.20 25.60 2.47 63.23
16 4 2.96 47.36 1.59 75.30 2 20mm 2 16mm

1.2 0.96

18.4 Stirrups 6
For 6 columns 8 26 1.84 287.04 0.40 114.82 0.08
8 52 1.28 399.36 0.40 159.74 0.42 0.14 0.08
0.42
0.42
18.5 Band under wall (Grid C&D) 2 10 2 6.50 26.00 0.62 16.12 6.5
1 10 2 4.50 9.00 0.62 5.58 4.5
0.06 0.06
1 8 30 0.30 9.00 0.40 3.60 0.18
Stirrups 2 8 44 0.30 13.20 0.40 5.28 0.06 0.06
19 Slab Beam 0.18
19.1 Grid C & D
Bottom bar 2 20 2 10.87 43.48 2.47 107.40 0.475 0.475

9.92

0.475
0.475
2 16 1 10.87 21.74 1.59 34.57 9.92

Top Bar 2 20 2 11.80 47.20 2.47 116.58 0.94 9.92 0.94

2 16 1 11.24 22.48 1.59 35.74 0.66 9.92 0.66

19.2 Grid 1,2& 3 bottom bar


3 20 2 5.82 34.92 2.47 86.25 0.45 0.45
4.92

3 16 1 5.82 17.46 1.59 27.76 0.45 0.45

4.92
Top Bar
3 20 2 6.80 40.80 2.47 100.78 0.94 4.92 0.94

3 16 1 6.24 18.72 1.59 29.76 0.66 4.92 0.66

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
19.3 Secondry beam
Bottom bar along grid 1a 1 16 3 5.45 16.35 1.59 26.00 0.35 0.35
4.75

Top bar along grid 1a 1 16 3 5.65 16.95 1.59 26.95 0.35 4.75 0.45

19.4 Stirriups( For Main Beam) 1 10 180 1.65 297.00 0.62 184.14 0.10
0.425

0.25
19.5 For Secondry Beam 1 8 35 1.31 45.85 0.40 18.34
0.8
0.375

0.2

20 For Slab (Roof Floor)


20.1 Main Bars
Along long span
straight bar 1 8 14 11.62 162.68 0.40 65.07 0.08 11.46 0.08

1.605 1.5 1.75


Cranked bar 1 8 13 11.94 155.22 0.40 62.09 0.08 0.08 0.08 0.08
1.25 1.855 1.75
0.08 0.08
1.75
Along Short Span
straight bar 1 8 29 6.62 191.98 0.40 76.79 0.08 6.46 0.08

2.105 2.105
Cranked bar 1 8 28 6.48 181.44 0.40 72.58 0.08 0.08 0.08 0.08
1.95

20.2 Distribution bars


Between Grid 1 &1a
along x-axis 1 8 12 4.20 50.40 0.40 20.16 4.2
along y- axis 1 8 18 3.23 58.05 0.40 23.22 3.23

Between Grid 1a & 2


along x-axis 1 8 12 4.20 50.40 0.40 20.16 4.2
along y- axis 1 8 18 3.23 58.14 0.40 23.26 3.23

Between Grid 2 & 3


along x-axis 1 8 8 4.20 33.60 0.40 13.44 4.2
along y- axis 1 8 18 2.20 39.60 0.40 15.84 2.2

Top near grid 1 &3


bottom bar 2 8 5 6.46 64.60 0.40 25.84 6.46

Top Bar 2 8 4 6.46 51.68 0.40 20.67 6.46

Top in front of grid C & D


bottom bar 2 8 5 11.46 114.60 0.40 45.84 11.46

Top Bar 2 8 4 11.46 91.68 0.40 36.67 11.46

20.3 Negative Bars


along Grid 1 1 8 13 2.08 27.04 0.40 10.82 2.08
along grid 1a 1 8 13 2.35 30.55 0.40 12.22 2.35
along grid 2 1 8 13 2.10 27.30 0.40 10.92 2.1
along Grid 3 1 8 13 1.78 23.14 0.40 9.26 1.78
along grid C & D 2 8 26 2.48 128.96 0.40 51.58 2.48

21 Band (Roof Floor ) 5.95


Parapet Wall 2 10 2 7.15 28.60 0.62 17.73 0.6 0.6
2 10 2 11.95 47.80 0.62 29.64
11.95
Stirrups 2 8 238 0.30 71.40 0.40 28.56 0.06 0.06
Total 58049.18 kgs 0.18

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
Total 58.05 MT

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: 3-12Ms(F)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha

2-LaLiEC Total
S. No. Description Unit Remarks
GF FF SF TF Quantity
A Common Installation
1.1 Stand Alone 40 A DP MCB with Enclosure 1 1.00 No

2 Cables and Wires


2 Nos 10 Sq mm Multistranded Cu Wire + 1 No 6 Sq mm
2.1 Multistranded Cu wire 45 45.00 Rm
2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No 1.5 Sq mm
2.2 45 45.00 Rm
Multistranded Cu wire

B SCHOOL BLOCKS
1 DISTRIBUTION BOARDS
DB (DB-1) Incoming NEA: 1 x 40A DP MCB Incoming Solar:
1.2 1 x 16A DP MCB Outgoing NEA: 1 x 16 A DP MCB 2 x 25 A 1 1.00 No
DP MCB 2 x 16 A SP MCB 6 x 6 A SP MCB
DB ( DB-2) & DB ( DB-3) Incoming:
1.3 1 1.00 No
1 x 25A DP MCB
DB ( DB-3) Incoming NEA: 1 x 25A DP MCB Incoming Solar:
1.5 1 x 10A DP MCB 1 1.00 No

2 CABLES & WIRES


2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4 Sq mm
2.1 Multistranded Cu wire 2 2 2 6.00 Rm
2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5 Sq mm
2.2 Multistranded Cu wire 2 2 2 6.00 Rm
2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No 1.5 Sq mm
2.3 4 4 4 12.00 Rm
Multistranded Cu wire

3 General service light point wiring


3.1 One way light point 25 22 22 3 72.00 Pts
3.2 Two Way Light Point 1 1 2.00 Pts
4 6A Universal pin Light power point wiring 24 24 24 72.00 Pts

5 Switch Socket Outlets


5.1 6A Universal power Switch Socket 24 24 24 72.00 No

7 Light Fixtures/Luminaires & Accessories


7.3 18 W LED Surface Mounted Square type 16 16 16 48.00 Nos.
7.5 12 W LED Surface Mounted Cylindrical type 6 7 7 3 23.00 Nos.
7.7 LED Wall Light made 1 1.00 Nos.
8 Pull Box 3.00 No
9 External post top light pole 3.00 No
10 Post Top External Light Fixtures 3.00 No

11 Earthing and Lightning protection


11.1 11.1. Chemical Earhting 3.00 Nos.
11.2 Earthing Bar 3.00 Nos.
GI Strip/Cu wire Earthing
12.1 12.1. 25 x 3 mm GI Strip 63.00 Mtr.
12.2 12 SWG Cu wire 14.00 Mtr.
13 Earth Test link 1.00 No
14 Lightning Arrester 1.00 No.

C SOLAR PV SYSTEM
1. Solar PV Panel
1.1 1.1. 24V 250W PV Module 8.00 No
2. Tubular Deep cycle Battery
2.1 2.1. 12V, 200Ah@C10 Tubular Solar Battery 4.00 No
3 Hybrid Inverter 1.00 No

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: 3LaLiEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha

Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
1 EARTH WORKS
1.1 Site Clearance
Building 1 34.50 15.50 534.75
Soak Pit 1 15.90 Area 15.90
Total 550.65 sq.m

1.2 Earth Work Excavation


For Isolated Foundation
F1 2 2.80 2.80 1.50 23.52
F2 4 3.30 3.30 1.50 65.34
For Combined Foundation
CF1 3 2.10 5.30 1.50 50.09
CF2 1 3.30 5.30 1.50 26.24
CF3 2 3.10 5.30 1.50 49.29

Along Lower Tie Beam


Along Grid A & F 2 3.50 0.55 0.75 2.89
Along Grid B 1 3.30 0.55 0.75 1.36
Grid C & D 2 3.55 0.55 0.75 2.93
Along Grid E 1 3.25 0.55 0.75 1.34
Along Grid 1 1 12.50 0.55 0.75 5.16
Along Grid 2,3 2 15.10 0.55 0.75 12.46

Drain 1 29.00 0.60 0.05 0.87


Pavement Along Drain 1 29.00 0.75 0.15 3.26
External Steps 1 27.90 0.70 0.15 2.93

Ramp
For Slope 1 1.30 0.52 Area 0.67
Wall Along Grid B 1 0.50 0.45 0.45 0.10
Wall Parallel to Ramp 1 6.80 0.45 0.41 1.25
Total 249.69 cu.m

1.3 Earth Back Filling


Excavated Soil 249.69
Additional Quantities Required
Lab/ECD/Store/Pantry 4 6.70 5.70 0.18 26.73
Staircase 1 6.70 4.20 0.18 4.92
Corridor 4 5.70 2.20 0.18 8.78
1 4.20 2.20 0.18 1.62
Deductions 0.00
Boulder Soling -1 27.04 -27.04
PCC -1 15.19 -15.19
RCC -1 77.98 -77.98
Wall -1 0.40 -0.40
Total 171.13 cu.m

1.4 Boulder Soling


Footing
Isolated F1 2 2.50 2.50 0.20 2.50
Isolated F2 4 3.00 3.00 0.20 7.20
Combined CF1 3 1.80 5.00 0.20 5.40
Combined CF2 1 3.00 5.00 0.20 3.00
Combined CF3 2 2.80 5.00 0.20 5.60
Below Foundation Beam

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Along Grid A & F 2 3.50 0.55 0.75 2.89
Along Grid B 1 3.30 0.55 0.75 1.36
Grid C & D 2 3.55 0.55 0.75 2.93
Along Grid E 1 3.25 0.55 0.75 1.34
Along Grid 1 1 12.50 0.55 0.75 5.16
Along Grid 2,3 2 15.10 0.55 0.75 12.46

Pavement along Drain 1 29.00 1.00 0.10 2.90


Pebbels along Drain 1 29.00 0.60 0.05 0.87
External Steps 1 28.58 0.70 0.10 2.00
Ramp
Slopped Portion 1 1.30 1.36 Area 1.77
Wall Along Grid B 1 0.50 0.45 0.10 0.02
Wall Parallel to Ramp 1 6.80 0.45 0.10 0.31
Classroom
Lab/ECD/Store/Pantry 4 5.70 6.70 0.20 30.55
Corridor 4 5.70 2.20 0.20 10.03
1 4.20 2.20 0.20 1.85
Below Staircase 1 4.20 6.65 0.20 5.59
Inside of soak Pit 1 1.13 2.00 2.26
Total 107.98 cu.m

1.5 Sand Filling


Periphery ot Soak pit 1 2.07 Area 2.37 4.91
Total 4.91 cu.m

2 CONCRETE WORKS
2.1 P.C.C.
2.1.1 P.C.C.(1:3:6) Works
Footing
Isolated F1 2 2.50 2.50 0.10 1.25
Isolated F2 4 3.00 3.00 0.10 3.60
Combined CF1 3 1.80 5.00 0.10 2.70
Combined CF2 1 3.00 5.00 0.10 1.50
Combined CF3 2 2.80 5.00 0.10 2.80

Below Foundation Beam


Along Grid A,B,C,D,E,F/ 1-2 6 4.55 0.40 0.10 1.09
Along Grid 1 1 23.50 0.40 0.10 0.94
Along Grid 2,3 2 16.30 0.40 0.10 1.30
Total 15.19 cu.m

2.1.2 P.C.C.(1:2:4) Works


Pavement along Drain 1 29.00 1.00 0.05 1.45
Below External Steps 1 28.58 0.70 0.05 1.00
Above External Steps 1 27.08 0.90 0.05 1.22

Ramp
Sloped 1 1.30 0.51 Area 0.66
Wall Top 1 1.33 0.25 0.05 0.02
1 6.80 0.13 0.05 0.04
Lab/ECD/Store/Pantry 4 5.70 6.70 0.08 11.46
Corridor 4 5.70 2.20 0.08 3.76
1 4.20 2.20 0.08 0.69
Below Staircase 1 4.20 6.70 0.08 2.11
Total 22.41 cu.m

2.2 P.C.C For R.C.C. Works


A Foundation
Isolated F1 Base 2 2.50 2.50 0.25 3.13
Isolated F1 Slope 2 3.63 Area 0.35 2.54
Isolated F2 Base 4 3.00 3.00 0.25 9.00

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Isolated F2 Slope 4 5.00 Area 0.35 7.00
Combined CF1 3 1.80 5.00 0.60 16.20
Combined CF2 1 3.00 5.00 0.60 9.00
Combined CF3 2 2.80 5.00 0.60 16.80

B Beam
Foundation beam (300x400)
Along Grid A & F 2 3.50 0.30 0.40 0.84
Along Grid B 1 3.30 0.30 0.40 0.40
Grid C & D 2 3.55 0.30 0.40 0.85
Along Grid E 1 3.25 0.30 0.40 0.39
Along Grid 1 1 12.50 0.30 0.40 1.50
Along Grid 2,3 2 15.10 0.30 0.40 3.62

Plinth Tie beam(300x450)


Along grid 1,2,3 3 26.00 0.30 0.45 10.53
Along Grid A,B,C,D,E,F 6 8.50 0.30 0.45 6.89

First floor level (+3.00m Lvl)


Main beam
Along grid 1,2 & 3 3 26 0.3 0.4 9.36
Along grid A,B,C,D,E & F 6 8.5 0.3 0.4 6.12

Secondary beam
Along grid 1a 2 10.9 0.25 0.3 1.64
Along grid 1b 1 4.2 0.25 0.3 0.32
Along grid A1,B1,D1 & E1 4 8.9 0.25 0.3 2.67

Edge Beam(125x525)
Grid B,C 1 7.90 0.13 0.3 0.30

Second floor level (+6.00m Lvl)


Main beam
Along grid 1,2 & 3 3 26 0.3 0.4 9.36
Along grid A,B,C,D,E & F 6 8.5 0.3 0.4 6.12

Secondary beam
Along grid 1a 2 10.9 0.25 0.3 1.64
Along grid 1b 1 4.2 0.25 0.3 0.32
Along grid A1,B1,D1 & E1 4 8.9 0.25 0.3 2.67

Beam(Third floor level)


Main beam
Along grid 1,2 & 3 3 26 0.3 0.4 9.36
Along grid A,B,C,D,E & F 6 8.5 0.3 0.4 6.12

Secondary beam
Along grid 1a 2 10.9 0.25 0.3 1.64
Along grid 1b 1 4.2 0.25 0.3 0.32
Along grid A1,B1,D1 & E1 4 8.9 0.25 0.3 2.67

Beam(Roof level)
Main beam
Along grid 1,2 & 3 3 4 0.3 0.4 1.44
Along grid C & D 2 8.5 0.3 0.4 2.04

Secondary beam
Along grid 1a 1 4.2 0.25 0.3 0.32

C Column
Ground floor plan

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Total columns(500x500) 18 0.50 0.50 3.00 13.50

First floor plan


Total columns(500x500) 18 0.50 0.50 3.00 13.50

Second floor plan


Total columns(500x500) 18 0.50 0.50 3.00 13.50

Top Floor Plan


Total columns(500x500) 6 0.50 0.50 2.63 3.94

Column below Plinth level


Total columns(500x500) 18 0.50 0.50 1.05 4.73

D Slab
First floor level (+3.00m Lvl) 1 305.15 Area 0.13 38.14
Deduction
Column deduction -18 0.50 0.50 0.13 -0.56
Void deduction -1 4.78 4.20 0.13 -2.61
Projections
At Back 2 11.50 0.70 0.13 2.01
At Front 1 6.20 1.00 0.13 0.78

Slab(second floor level) 1 305.15 Area 0.13 38.14


Deduction
Column deduction -18 0.50 0.50 0.13 -0.56
Void deduction -1 4.78 4.20 0.13 -2.61
Projections
At Back 2 11.50 0.70 0.13 2.01

Slab(Third floor level) 1 305.15 Area 0.13 38.14


Cantilevered portion(back) 2 13.35 1.1 0.15 4.41
Cantievered portion(side) 2 9.7 1.1 0.15 3.20
Cantilevered portion(front) 1 31 1.1 0.15 5.12
Cantilever front(projection) 1 7 0.5 0.15 0.53

Roof floor level (+11.625m Lvl) 1 11.50 6.50 0.13 9.34


Column deduction -6 0.50 0.50 0.13 -0.19

E Staircase
Ground floor level
Bottom 1 2.07 2.00 0.20 0.83
Landing 1 2.20 2.00 0.20 0.88
1 2.00 2.10 0.20 0.84
Waist Slab 1 6.75 2.00 0.20 2.70
Steps 20 0.03 Area 2.00 1.20
Landing Beam 1 4.00 0.25 0.38 0.38

First floor level


Landing 1 2.20 2.00 0.20 0.88
1 2.00 2.10 0.20 0.84
External Slab 1 4.05 0.73 0.13 0.37
Waist Slab 1 6.75 2.00 0.21 2.77
Steps 20 0.03 Area 2.00 1.20
Landing Beam 1 4.05 0.25 0.38 0.38

Second floor level


Landing 1 2.20 2.00 0.20 0.88
1 2.00 2.10 0.20 0.84
External Slab 1 4.05 0.73 0.13 0.37
Waist Slab 1 6.75 2.00 0.21 2.77
Steps 20 0.03 Area 2.00 1.20

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Landing Beam 1 4.05 0.25 0.38 0.38
Projections 3 4.00 0.70 0.13 1.05

F Vertical support bands


Ground Floor level
Along Grid 2 7.00 0.08 0.23 2.48 0.30
First floor level
Along Grid 2 6.00 0.08 0.23 2.48 0.26
Second floor level
Along Grid 2 8.00 0.08 0.23 2.48 0.34

G Lintel Bands
Ground floor level
Short Span
Along grid A,C,D,E,F 5 6.50 0.23 0.08 0.56
Between B,C 1 4.70 0.125 0.08 0.04
1 2.05 0.23 0.08 0.04
Long Span
Along grid 1 1 22.20 0.23 0.08 0.38
Along grid 2 1 21.68 0.23 0.08 0.37

First floor level


Short Span
Along grid A,C,D,E,F 5 6.50 0.23 0.08 0.56
Between B,C 1 5.03 0.125 0.08 0.05
1 1.73 0.23 0.08 0.03
Long Span
Along grid 1 1 22.20 0.23 0.08 0.38
Along grid 2 1 21.75 0.23 0.08 0.38

Second floor level


Short Span
Along grid A,C,D,E,F 5 6.50 0.23 0.08 0.56
Between B,C 1 5.03 0.125 0.08 0.05
1 1.73 0.23 0.08 0.03
Long Span
Along grid 1 1 22.20 0.23 0.08 0.38
Along grid 2 1 21.75 0.23 0.08 0.38

Between Principal/Admin 1.00 1.50 0.23 0.08 0.03


1.00 4.25 0.13 0.08 0.04

Deduction of Doors/Windows for Lintels


Ground floor level
D1 -6 1.10 0.23 0.08 -0.11
D3 -1 1.00 0.23 0.08 -0.02
First floor level
D1 -6 1.10 0.23 0.08 -0.11
D3 -1 1.00 0.23 0.08 -0.02
Second floor level
D1 -8 1.10 0.23 0.08 -0.15
D3 -1 1.00 0.23 0.08 -0.02
G Sill Bands
Ground floor level
Short Span
Along grid A,C,D,E,F 5 6.50 0.23 0.08 0.56
Between B,C 1 2.05 0.23 0.08 0.04
1 4.70 0.125 0.08 0.04
Long Span
Along grid 1 1 26.20 0.23 0.08 0.45
Along grid 2 1 21.68 0.23 0.08 0.37

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Below staircase 1 4.23 0.125 0.08 0.04

First floor level


Short Span
Along grid A,C,D,E,F 5 6.50 0.23 0.08 0.56
Between B,C 1 5.03 0.125 0.08 0.05
1 1.73 0.23 0.08 0.03
Long Span
Along grid 1 1 26.20 0.23 0.08 0.45
Along grid 2 1 21.75 0.23 0.08 0.38

Second floor level


Short Span
Along grid A,C,D,E,F 5 6.50 0.23 0.08 0.56
Between B,C 1 5.03 0.125 0.08 0.05
1 1.73 0.23 0.08 0.03
Long Span
Along grid 1 1 26.20 0.23 0.08 0.45
Along grid 2 1 21.75 0.23 0.08 0.38

Between Principal/Admin 1.00 1.50 0.23 0.08 0.03


1.00 4.25 0.13 0.08 0.04
Top floor level
Along grid C,D 2.00 8.50 0.23 0.08 0.29
Along grid 1,3 2.00 4.00 0.23 0.08 0.14

Deduction of Doors For Sill


Ground floor level
D1 -6 1.10 0.23 0.08 -0.11
D3 -1 1.00 0.23 0.08 -0.02
D4 -1 1.00 0.125 0.08 -0.01
First floor level
D1 -6 1.10 0.23 0.08 -0.11
D3 -1 1.00 0.23 0.08 -0.02
Second floor level
D1 -8 1.10 0.23 0.08 -0.15
D3 -1 1.00 0.23 0.08 -0.02
Top floor level
D2 -2 1.10 0.23 0.08 -0.04

H Soak Pit
RCC slab 1 2.27 Area 0.15 0.34

I Pedestal
Base Block 14 0.50 0.25 0.25 0.44

J Parapet Wall
Top Floor 2.00 36.53 0.35 0.10 2.56
1.00 7.50 0.35 0.10 0.26
Roof Level 1.00 33.00 0.35 0.10 1.16

K Bench
Bench Top Slab 2 2.40 0.50 0.08 0.18
L Slab for In-built Furniture
Furniture Slab for Lab 4 1.80 0.90 0.10 0.65
Sink slab type-1 1 9.43 0.50 0.10 0.47
Sink slab type-2 1 5.75 0.50 0.10 0.29
Sink slab type-3 1 3.60 0.90 0.10 0.32
Furniture slab in preparation room 1 6.75 0.60 0.10 0.41
Sink Deduction
Sink slab type-1 -2 0.70 0.35 0.10 -0.05
Sink slab type-2 -2 0.70 0.35 0.10 -0.05

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Sink slab type-3 -1 0.70 0.35 0.10 -0.02
Total 374.40 cu.m

2.3 Silica Cement Admixture


10 Kg per cu.m. of R.C.C. M20 10 374.40 3,744.04
Total 3,744.04 Kg

2.5 Formworks
Formworks for RCC
A Foundation
Isolated footing
Isolated F1 2 10.00 0.25 5.00
Isolated F2 4 12.00 0.25 12.00
Combined footing
Combined CF1 3 13.60 0.60 24.48
Combined CF2 1 16.00 0.60 9.60
Combined CF3 2 15.60 0.60 18.72

B Beam
Foundation beam (300x400)
Along Grid A & F 2 3.50 0.80 5.60
Along Grid B 1 3.30 0.80 2.64
Grid C & D 2 3.55 0.80 5.68
Along Grid E 1 3.25 0.80 2.60
Along Grid 1 1 12.50 0.80 10.00
Along Grid 2,3 2 15.10 0.80 24.16
Along Grid 1 1 26.00 0.80 20.80
Along Grid 2,3 2 26.00 0.80 41.60

Plinth Tie beam(300x450)


Along grid 1,2,3 3 26.00 0.90 70.20
Along Grid A,B,C,D,E,F 6 8.50 0.90 45.90
Deduction
Along grid 2 -1 2.00 0.20 -0.40
First floor level (+3.00m Lvl)
Main beam(300x525)
Along grid 1 1 22.00 1.23 26.95
1 4.00 1.45 5.80
Along grid 2 1 26.00 1.10 28.60
Along grid 3 1 20.80 1.23 25.48
1 5.20 1.10 5.72
Along Grid A & F 2 8.50 1.23 20.83
Along Grid B & E 2 8.50 1.10 18.70
Along Grid C,D 2 4.50 1.10 9.90
2 4.75 1.23 11.64

Secondary beam(250x425)
Grid 1a 4 5.45 0.85 18.53
Grid 1b 1 4.20 0.70 2.94
Grid A1,B1,D1,E1 4 8.90 0.85 30.26

Edge Beam(125x525)
Grid B,C 1 7.90 1.05 8.30

Second floor level (+6.00m Lvl)


Main beam(300x525)
Along grid 1 1 22.00 1.23 26.95
1 4.00 1.45 5.80
Along grid 2 1 26.00 1.10 28.60
Along grid 3 1 26.00 1.23 31.85
Along Grid A & F 2 8.50 1.23 20.83
Along Grid B & E 2 8.50 1.10 18.70

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Along Grid C,D 2 3.75 1.10 8.25
2 4.75 1.23 11.64

Secondary beam(250x425)
Grid 1a 4 5.45 0.85 18.53
Grid 1b 1 4.20 0.70 2.94
Grid A1,B1,D1,E1 4 8.90 0.85 30.26

Top floor level (+9.00m Lvl)


Main beam(300x525)
Along grid 1 1 22.00 1.08 23.65
1 4.00 1.45 5.80
Along grid 2 1 26.00 1.10 28.60
Along grid 3 1 26.00 1.08 27.95
Along Grid A & F 2 8.50 1.08 18.28
Along Grid B & E 2 8.50 1.10 18.70
Along Grid C,D 2 3.75 1.10 8.25
2 4.75 1.23 11.64
Secondary beam(250x425)
Grid 1a 4 5.45 0.85 18.53
Grid 1b 1 4.20 0.70 2.94
Grid A1,B1,D1,E1 4 8.90 0.85 30.26

Roof floor level (+11.625m Lvl)


Main beam(300x525)
Along grid 1,2,3 3 4.00 1.10 13.20
Along Grid C,D 2 8.50 1.10 18.70

Secondary beam(250x425)
Grid 1a 1 4.20 0.85 3.57
Landing beam 3 0.85 4.00 10.20

C Column
Ground floor plan
Total columns(500x500) 18 2.00 2.88 103.50

First floor plan


Total columns(500x500) 18 2.00 2.88 103.50

Second floor plan


Total columns(500x500) 18 2.00 2.88 103.50

Top Floor Plan


Total columns(500x500) 6 2.00 2.50 30.00

Column below Plinth level


Total columns(500x500) 18 2.00 1.05 37.80

D Slab
First floor level (+3.00m Lvl) 1 28.80 9.80 282.24
Cantilever slab back side 2 11.75 0.70 16.45
Cantilever slab front side 1 6.15 1.00 6.15
Deduction
Void deduction -1 4.75 4.20 -19.95

Main beam(300x500)
Along grid 1,2,3 -3 26.00 0.30 -23.40
Along Grid A,B,E,F -4 8.50 0.30 -10.20
Along Grid C,D -2 9.25 0.30 -5.55

Secondary beam(250x425)
Grid 1a -4 5.45 0.25 -5.45

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Grid 1b -1 4.20 0.25 -1.05
Grid A1,B1,D1,E1 -4 8.90 0.25 -8.90

Edge Beam(125x525)
Grid B,C -1 7.90 0.13 -0.99

Second floor level (+6.00m Lvl) 1 28.80 9.80 282.24


Cantilever slab 2 11.75 0.70 16.45
Deduction
Void deduction -1 4.75 4.20 -19.95

Main beam(300x525)
Along grid 1,2,3 -3 26.00 0.30 -23.40
Along Grid A,B,E,F -4 8.50 0.30 -10.20
Along Grid C,D -2 8.50 0.30 -5.10

Secondary beam(250x425)
Grid 1a -4 5.45 0.25 -5.45
Grid 1b -1 4.20 0.25 -1.05
Grid A1,B1,D1,E1 -4 8.90 0.25 -8.90

Top floor level (+9.00m Lvl) 1 370.45 Area 370.45


Edge around slab 1 84.70 0.15 12.71
Deduction
Void deduction -1 4.75 4.20 -19.95

Main beam(300x525)
Along grid 1,2,3 -3 26.00 0.30 -23.40
Along Grid A,B,E,F -4 8.50 0.30 -10.20
Along Grid C,D -2 8.50 0.30 -5.10

Secondary beam(250x425)
Grid 1a -4 5.45 0.25 -5.45
Grid 1b -1 4.20 0.25 -1.05
Grid A1,B1,D1,E1 -4 8.90 0.25 -8.90

Roof floor level (+11.625m Lvl) 1 6.50 11.50 74.75


Slab Edge 1 36.00 0.13 4.50
Deduction
Main beam(300x525)
Along grid 1,2,3 -3 4.00 0.30 -3.60
Along Grid C,D -2 8.50 0.30 -5.10

Secondary beam(250x425)
Grid 1a -1 4.20 0.25 -1.05
E Staircase
Ground floor level
Bottom 1 2.07 0.20 0.41
Waist Slab 1 6.75 2.00 13.50
Side 1 6.75 0.20 1.35
Landing 1 2.20 1.65 3.64
1 2.00 2.15 4.29
Side 1 3.80 0.15 0.57
Riser 20 2.00 0.15 6.00
Landing Beam 1 4.00 0.86 3.44

First floor level


External Slab 1 4.25 0.83 3.51
Waist Slab 1 6.75 2.00 13.50
Side 1 6.75 0.20 1.35

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Landing 1 2.20 1.65 3.64
1 2.00 2.15 4.29
Side 1 3.80 0.15 0.57
Riser 20 2.00 0.15 6.00
Landing Beam 1 4.00 0.71 2.82

Second floor level


Top Floor Passage 1 2.20 0.13 0.28
Waist Slab 1 6.75 2.00 13.50
Side 1 6.75 0.20 1.35
Landing 1 2.20 1.65 3.64
1 2.00 2.15 4.29
Side 1 3.80 0.15 0.57
Riser 20 2.00 0.15 6.00
Landing Beam 1 4.00 0.71 2.82

F Vertical support bands


Ground Floor level
Along Grid 2 7.00 0.40 2.48 6.93
First floor level
Along Grid 2 6.00 0.40 2.48 5.94
Second floor level
Along Grid 2 8.00 0.40 2.48 7.92

G Lintel Bands
Ground floor level
Along grid A,C,D,E,F 5.00 6.50 0.15 4.88
Along grid 1 1.00 22.20 0.15 3.33
Along grid 2 1.00 21.68 0.15 3.25
Between B,C 1.00 4.70 0.15 0.71
1.00 2.05 0.15 0.31
First floor level
Along grid A,C,D,E,F 5.00 6.50 0.15 4.88
Along grid 1 1.00 22.20 0.15 3.33
Along grid 2 1.00 21.75 0.15 3.26
Between B,C 1.00 5.03 0.15 0.75
1.00 1.73 0.15 0.26
Second floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.15 5.85
Along grid 1 1.00 22.20 0.15 3.33
Along grid 2 1.00 21.60 0.15 3.24
Between Principal/Admin 1.00 1.50 0.15 0.23
1.00 4.25 0.15 0.64

Deduction of Doors/Windows for Lintels


Ground floor level
D1 -6 1.10 0.15 -0.99
D3 -1 1.00 0.15 -0.15
First floor level
D1 -6 1.10 0.15 -0.99
D3 -1 1.00 0.15 -0.15
Second floor level
D1 -8 1.10 0.15 -1.32
D3 -1 1.00 0.15 -0.15
H Sill Bands
Ground floor level
Along grid A,C,D,E,F 5.00 6.50 0.15 4.88
Along grid 1 1.00 26.20 0.15 3.93
Along grid 2 1.00 21.68 0.15 3.25
Between B,C 1.00 2.05 0.15 0.31
1.00 4.70 0.15 0.71

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Below staircase 1.00 4.23 0.15 0.63
First floor level
Along grid A,C,D,E,F 5.00 6.50 0.15 4.88
Along grid 1 1.00 26.20 0.15 3.93
Along grid 2 1.00 21.75 0.15 3.26
Between B,C 1.00 5.03 0.15 0.75
1.00 1.73 0.15 0.26
Second floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.15 5.85
Along grid 1 1.00 26.20 0.15 3.93
Along grid 2 1.00 21.60 0.15 3.24
Between Principal/Admin 1.00 1.50 0.15 0.23
1.00 4.25 0.15 0.64
Top floor level
Along grid C,D 2.00 8.50 0.15 2.55
Along grid 1,3 2.00 4.00 0.15 1.20

Deduction of Doors For Sill


Ground floor level
D1 -6 1.10 0.15 -0.99
D3 -1 1.00 0.15 -0.15
D4 -1 1.00 0.15 -0.15
First floor level
D1 -6 1.10 0.15 -0.99
D3 -1 1.00 0.15 -0.15
Second floor level
D1 -8 1.10 0.15 -1.32
D3 -1 1.00 0.15 -0.15
Top floor level
D2 -2 1.10 0.15 -0.33

I Pedestal
Base Block 14 1.25 0.25 4.38

J Parapet Wall
Top Floor 2.00 36.53 0.25 18.27
1.00 7.50 0.25 1.88
Roof Level 1.00 33.00 0.25 8.25
K Bench
Bench Top Slab 2 5.80 Perimeter 0.075 0.87
Bottom 2 5.80 0.60 6.96
Deduction -4 0.13 0.50 -0.25
L Slab For In-built Furniture
Furniture Slab for Lab 4 1.80 0.90 6.48
4 5.40 0.10 2.16
Sink slab type-1 1 9.43 0.50 4.71
1 10.43 0.10 1.04
2 2.10 0.10 0.42
Sink deduction -2 0.70 0.35 -0.49
Sink slab type-2 1 5.75 0.50 2.88
1 6.75 0.10 0.68
2 2.10 0.10 0.42
Sink Deduction -2 0.70 0.35 -0.49
Sink slab type-3 1 3.60 0.90 3.24
1 9.00 0.10 0.90
1 2.10 0.10 0.21
Sink deduction -1 0.70 0.35 -0.25
Furniture slab in preparation room 1 6.75 0.60 4.05
1 6.75 0.10 0.68

M Soak Pit
RCC slab 1.00 1.13 Area 1.13

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Along Sides 1.00 5.34 0.15 0.80
Total 2,433.42 sq.m

3.2 BRICK MASONRY WORKS ( 1 : 4 c/s )


Brick Works upto Plinth Beam
Along grid A,B,C,D,E,F 6 8.50 0.23 0.20 2.35
Along grid 1, 2, 3/A-F 3 26.20 0.23 0.20 3.62

Brick Works above Plinth Beam


Ground floor level
Short Span
Along grid A,C,D,E,F 6 6.50 0.23 2.33 20.86
Long Span
Along grid 1 1 26.20 0.23 2.33 14.01
Along grid 2 1 22.20 0.23 2.33 11.87
Below staircase 1 4.23 0.23 1.82 1.77

First floor level


Short Span
Along grid A,C,D,E,F 6 6.50 0.23 2.33 20.86
Long Span
Along grid 1 1 26.20 0.23 2.33 14.01
Along grid 2 1 22.20 0.23 2.33 11.87

Second floor level


Short Span
Along grid A,C,D,E,F 6 6.50 0.23 2.33 20.86
Long Span
Along grid 1 1 26.20 0.23 2.33 14.01
Along grid 2 1 22.20 0.23 2.33 11.87

Between Principal/Admin 1 1.50 0.23 2.73 0.94


Computer Lab 2 3.60 0.23 1.20 1.99
Deduction
D3 -1 1.00 0.23 1.95 -0.45

Top floor level


Along grid C,D 2 8.50 0.23 2.03 7.92
Along grid 1 1 4.00 0.23 2.03 1.86
Along grid 3 1 4.00 0.23 2.03 1.86

Parapet Wall
Top Floor 2.00 36.53 0.23 0.80 13.44
1.00 7.50 0.23 1.40 2.42
Roof Level 1.00 33.00 0.23 0.90 6.83

Outside
Steps 1 28.58 0.60 0.15 2.57
1 28.58 0.30 0.15 1.29
Ramp
Wall Along -B 1 1.33 0.25 Area 0.33
1 6.91 0.17 Area 1.19

Deduction for doors and windows


Ground floor level
W1 -18 1.10 0.23 1.13 -5.12
V1 -18 1.10 0.23 0.53 -2.39
W3 -1 1.50 0.23 0.37 -0.13
D1 -6 1.10 0.23 2.33 -3.53
First floor level
W1 -17 1.10 0.23 1.13 -4.84
V1 -17 1.10 0.23 0.53 -2.26

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
W2 -1 1.50 0.23 1.00 -0.35
D1 -7 1.10 0.23 2.33 -4.12

Second floor level


W1 -16 1.10 0.23 1.13 -4.55
V1 -16 1.10 0.23 0.53 -2.13
W2 -1 1.50 0.23 1.00 -0.35
D1 -8 1.10 0.23 2.33 -4.71
Top floor level
W2 -1 1.50 0.23 1.00 -0.35
D2 -2 1.10 0.23 1.83 -0.92
Total 154.40 cu.m

3.3 Half Brick (125 mm) Works (1:4c/s)


Ground floor
Partition Wall 1 4.70 2.73 12.81
Below Staircase(Store)
1 1.57 Area 1.57
1 1.42 Area 1.42
1 2.00 1.59 3.18
Deductions D4 -1 1.00 1.55 -1.55
First floor 1 5.03 2.73 13.69
Second floor 1 4.25 2.73 11.58
Ramp
Grid 3AB
1 1.40 0.22 0.31
1 5.12 0.22 1.13
Bench
Below external bench 8 0.50 0.43 1.70

For In-built Furniture


Below Sink slab type-1 1 2.98 0.65 1.93
1 0.33 0.65 0.21
Below Sink slab type-2 1 2.98 0.65 1.93
Below Sink slab type-3 1 0.75 0.65 0.49
Furniture slab in preparation room 1 1.58 0.65 1.02
Total 51.43 Sq.m

3.4 Honey Comb Brick (350 mm) Works (1:3c/s)


Soak Pit Brick work 1 1.71 1.88 3.21
Total 3.21 cu.m

4 DOORS & WINDOWS


4.1 Metal Frame
4.1.1 Doors Frame
Ground floor
D1 6 7.07 Perimeter 42.42
D3 1 5.20 Perimeter 5.20
D4 1 4.10 Perimeter 4.10
First floor
D1 7 7.07 Perimeter 49.49
D3 1 5.20 Perimeter 5.20
Second floor
D1 8 7.07 Perimeter 56.56
D3 1 5.20 Perimeter 5.20
Top floor
D2 2 4.90 Perimeter 9.80
Total 177.97 r.m

4.1.2 Windows Frame


Ground floor
W1 18 5.58 Perimeter 100.35

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
V1 18 3.25 Perimeter 58.50
First Floor
W1 17 5.58 Perimeter 94.78
W2 1 6.00 Perimeter 6.00
V1 17 3.25 Perimeter 55.25
Second Floor
W1 16 5.58 Perimeter 89.20
W2 1 6.00 Perimeter 6.00
V1 16 3.25 Perimeter 52.00
Top floor
W2 1 6.00 Perimeter 6.00
Total 468.08 r.m

4.2 Metal Shutter


4.2.1 Windows shutter
W1 51 1.10 1.13 63.11
W2 3 1.50 1.00 4.50
V1 51 1.10 0.53 29.45
Total 97.07 sq.m

4.3 Wooden Shutter


4.3.1 Door Shutter
D1 21 1.10 2.44 56.25
D2 2 1.10 1.90 4.18
D3 3 1.00 2.10 6.30
D4 1 1.00 1.55 1.55
Total 68.28 sq.m
4.4 Window Grill
Shutter Area of Window
W1 51 1.10 1.13 63.11
W2 3 1.50 1.00 4.50
W3 1 1.50 0.37 0.56
V1 51 1.10 0.53 29.45
Total 97.62 sq.m
4.5 Collapsable Gate
1.00 4.00 2.48 9.90
Total 9.90 Sq.m

5 FLOORING WORKS
5.1 Hardened Cement Concrete Flooring (40mm) With Neat Cement Punning
Ground floor plan
Laboratory 1.00 9.43 6.75 63.62
Store 1.00 2.23 6.75 15.02
Class Room/Store,Pantry 2.00 5.75 6.75 77.63
Corridor 1.00 28.80 2.37 68.26
1.00 4.20 2.37 9.95
Staircase Below 1.00 6.625 4.2 27.83

Staircase
Staircase Tread 18.00 0.30 2.00 10.80
Riser 20.00 0.15 2.00 6.00
Staircase landing 1.00 2.00 2.20 4.40
1.00 2.13 2.00 4.25

Ramp 1 6.52 1.30 8.48


Exterior Steps 1 28.58 1.05 30.00

First floor plan


Library 1.00 9.43 6.75 63.62

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Store 1.00 2.23 6.75 15.02
Class Rooms 2.00 5.78 6.75 77.96
Corridor 1.00 28.80 2.37 68.26
1.00 4.20 2.37 9.95
Staircase
Staircase Tread 18.00 0.30 2.00 10.80
Riser 20.00 0.15 2.00 6.00
Staircase landing 1.00 2.00 2.20 4.40
1.00 2.13 2.00 4.25
Second floor plan
Computer lab 1.00 5.75 6.75 38.81
Class Room/Teacher's Room 2.00 5.78 6.75 77.96
Principal 1.00 5.75 3.55 20.41
Admin 1.00 5.75 3.25 18.69
Corridor 1.00 28.80 2.37 68.26
1.00 4.20 2.37 9.95
Staircase
Staircase Tread 18.00 0.30 2.00 10.80
Riser 20.00 0.15 2.00 6.00
Staircase landing 1.00 2.00 2.20 4.40
1.00 2.13 2.00 4.25
Top floor plan
Corridor 1.00 4.45 4.20 18.69
Top Floor Slab 1.00 283.86 Area 283.86

Roof plan
Roof Floor Slab 1.00 5.50 10.50 57.75
Total 1206.32 sq.m

5.2 Neat Cement Skirting works


Ground floor plan
Laboratory 1.00 32.75 32.75
Store 1.00 17.95 17.95
Store/Pantry/ECD 2.00 25.35 50.70
Column 6.00 2.00 12.00
Corridor 1.00 30.23 30.23
Store Below Landing 1.00 17.00 17.00
1.00 4.00 4.00
Staircase/Landing 1.00 14.25 14.25
Staircase Waist Slab 1.00 3.00 3.00
Deduction
D1 -12.00 1.10 -13.20
D3 -2.00 1.00 -2.00
D4 -2.00 1.00 -2.00
First floor plan
Library 1.00 32.75
Store 1.00 17.95 17.95
Class Room 2.00 25.35 50.70
Corridor 1.00 30.23 30.23
Column 2.00 0.80 1.60
4.00 1.30 5.20
Staircase/Landing 1.00 14.25 14.25
Staircase Waist Slab 1.00 3.00 3.00
Deduction
D1 -14.00 1.10 -15.40
D3 -2.00 1.00 -2.00
Second floor plan
Computer lab 1.00 25.30 25.30
Class Room/Teacher's Room 2.00 25.35 50.70
Principal 1.00 18.60 18.60
Admin 1.00 17.65 17.65
Column 2.00 0.80 1.60

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
4.00 1.30 5.20
Corridor 1.00 30.23 30.23
Staircase/Landing 1.00 14.25 14.25
Staircase Waist Slab 1.00 3.00 3.00
Deduction
D1 -16.00 1.10 -17.60
D3 -2.00 1.00 -2.00
Top floor Plan
Corridor 1.00 13.80 13.80
Top Floor Outer wall 1.00 106.35 106.35
Deduction
D2 -4.00 1.10 -4.40
Roof Plan
Along Wall 1.00 32.00 32.00
Total 564.86 r.m

5.3 25mm Terrazo Finishing


For In-built Furniture
Furniture Slab for Lab 4 2.00 1.10 8.80
Sink slab type-1 1 9.43 0.60 5.66
Sink slab type-2 1 5.95 0.60 3.57
Sink slab type-3 1 3.80 1.10 4.18
Furniture slab in preparation room 1 6.75 0.60 4.05
Bench 2 2.40 0.50 2.40
Total 28.66 sq.m

7 PLASTER WORKS
7.1 Internal Cement Plaster
7.1.1 Internal Plaster on Wall (1:6)
Ground Floor
Laboratory 1 32.75 2.88 94.16
Store 1 17.95 2.88 51.61
Store/Pantry/ECD 2 25.35 2.88 145.76

Staircase 1.00 17.45 2.88 50.17


Store Below Landing 2.00 1.57 Area 3.13
2.00 0.45 1.30 1.17
1.00 1.42 Area 1.42
2.00 1.96 1.59 6.23
Column
Grid 1A, 1F 2.00 0.15 2.88 0.86
Grid 1B,1E 2.00 0.80 2.88 4.61
Grid 1C,1D 2.00 0.45 2.88 2.60
Grid 2A,2F 2.00 1.25 2.88 7.19
Grid 2C,2D 2.00 1.54 2.88 8.86
Grid 2B,2E 2.00 1.31 2.88 7.53

Deductions
W1 -18 1.10 1.13 -11.14
V1 -18 1.10 0.53 -5.20
W3 -1 1.50 0.37 -0.28
D1 -6 1.10 2.44 -8.04
D3 -2 1.00 2.10 -2.10
D4 -2 1.00 1.55 -1.55

For In-built Furniture


Furniture Slab for Bottom 4 1.80 0.90 6.48
-8 0.60 0.25 -1.20
Wall 8 1.70 0.65 8.84
Sink slab type-1 Bottom 1 9.43 0.60 5.66

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Deduct Sink -2 0.95 0.43 -0.81
-4 0.43 0.13 -0.21
Wall 6 0.98 0.65 3.80
2 0.55 0.65 0.72
Sink slab type-2 1 6.75 0.10 0.68
Bottom 1 5.75 0.50 2.88
Deduct Sink -2 0.95 0.43 -0.81
-3 0.43 0.13 -0.16
Wall 7 0.98 0.65 4.44
Sink slab type-3 1 9.00 0.10 0.90
Bottom 1 3.60 0.90 3.24
Deduct Sink -1 0.75 0.35 -0.26
-2 0.75 0.25 -0.38
-1 0.75 0.13 -0.09
Wall 1 5.75 0.65 3.74
Furniture slab in Store room 1 6.75 0.70 4.73
Deduct Wall -3 0.53 0.13 -0.20
Wall 3 1.18 0.65 2.29

First floor plan


Library 1 32.75 2.88 94.16
Store 1 17.95 2.88 51.61
Class Room 2 25.35 2.88 145.76
Staircase 1.00 17.45 2.88 50.17
Column
Grid 2C,2D 2.00 1.23 2.88 7.04
Grid 2B,2E 2.00 0.75 2.88 4.31
Grid 1A, 1F 2.00 0.15 2.88 0.86
Grid 1B,1E 2.00 0.80 2.88 4.61
Grid 1C,1D 2.00 0.45 2.88 2.60
Grid 2A,2F 2.00 1.25 2.88 7.19
Grid 2C,2D 2.00 1.54 2.88 8.86
Grid 2B,2E 2.00 1.31 2.88 7.53
Deductions
W1 -18 1.10 1.13 -11.14
V1 -18 1.10 0.53 -5.20
W2 -1 1.50 1.00 -0.75
D1 -6 1.10 2.44 -8.04
D3 -2 1.00 2.10 -2.10
Second Floor
Computer lab 1 25.30 2.88 72.74
1200mm High Brick Wall 2 7.45 1.20 17.88
2 3.60 0.25 1.80
Class Room/Teacher's Room 2 25.05 2.88 144.04
Principal 1 18.25 2.88 52.47
Admin 1 18.25 2.88 52.47
Staircase 1.00 17.45 2.88 50.17
Column
Grid 1A, 1F 2.00 0.15 2.88 0.86
Grid 1B,1E 2.00 0.60 2.88 3.46
Grid 1C,1D 2.00 0.45 2.88 2.60
Grid 2A,2F 2.00 1.25 2.88 7.19
Grid 2C,2D 2.00 1.54 2.88 8.86
Grid 2B,2E 2.00 1.31 2.88 7.53
Deductions
W1 -16 1.10 1.13 -9.90
V1 -16 1.10 0.53 -4.62
W2 -1 1.50 1.00 -0.75
D1 -8 1.10 2.44 -10.71
D3 -2 1.00 2.10 -2.10
Top Floor
Along Grid 1&3/ C-D 2.00 4.00 2.10 8.40

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Along Grid C&D/ 1-3 2.00 9.65 2.10 20.27
Deductions
W2 -1 1.50 1.00 -0.75
D2 -2 1.10 1.90 -2.09
Total 1,178.52 sq.m

7.1.2 Internal Plaster on Ceiling (1:4)


First Floor Level (+3.00m Lvl)
Laboratory 1 9.425 6.75 63.62
Store 1 2.225 6.75 15.02
Class Room/Store,Pantry 2 5.78 6.75 38.98
Corridor 1 28.80 2.63 37.80
1 2.07 4.20 4.35
Staircase 1 6.75 2.00 6.75
Staircase Landing 1 1.90 4.20 3.99

Main Beam (300x525)


Grid 1 4 5.50 0.95 20.90
1 4.00 0.95 3.80
Grid 2 4 5.50 0.95 20.90
1 4.00 1.10 2.20
Grid 3/A-F 4 5.55 1.23 13.60
1 4.00 1.23 2.45
Grid A,B,C,D,E,F /2-3 6 2.00 1.10 6.60
Grid B,C,D,E /1-2 4 6.50 1.10 14.30
Grid A,F /1-2 2 6.50 0.48 3.09
Canopy With Edge Beam 1 6.15 1.93 5.92
2 0.88 1.05 0.92
1 6.15 0.98 3.00
Secondary Beam (250x425)
Grid A1,B1,D1,E1 1 8.90 0.60 2.67
Grid 1a 1 18.20 0.60 5.46
Grid 1b 1 4.20 0.60 1.26

Second Floor Level (+6.00m Lvl)


Library 1 9.43 6.75 31.81
Store 1 2.23 6.75 7.51
Class Rooms 2 5.78 6.75 38.98
Corridor 1 28.80 2.63 37.80
1 2.07 4.20 4.35
Staircase 1 6.75 2.00 6.75
Staircase Landing 1 1.90 4.20 3.99

Main Beam (300x525)


Grid 1 4 5.50 0.95 20.90
1 4.00 0.95 3.80
Grid 2 4 5.50 0.95 20.90
1 4.00 1.10 2.20
Grid 3/A-F 4 5.55 1.23 13.60
1 4.00 1.23 2.45
Grid A,B,C,D,E,F /2-3 6 2.00 1.10 6.60
Grid B,C,D,E /1-2 4 6.50 1.10 14.30
Grid A,F /1-2 2 6.50 0.48 3.09
Secondary Beam (250x425)
Grid A1,B1,D1,E1 1 8.90 0.60 2.67
Grid 1a 1 18.20 0.60 5.46
Grid 1b 1 4.20 0.60 1.26

Top Floor Level (+9.00m Lvl)


Computer lab 1 5.75 6.75 38.81
Class Room/Teacher's Room 2 5.78 6.75 77.96
Principal 1 5.75 3.55 20.41

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Admin 1 5.75 3.075 17.68
Corridor 1 28.80 2.63 37.80
1 2.07 4.20 4.35
Staircase 1 6.75 2.00 6.75
Staircase Landing 1 1.90 4.20 3.99

Main Beam (300x525)


Grid 1 4 5.50 0.95 20.90
1 4.00 0.95 3.80
Grid 2 4 5.50 0.95 20.90
1 4.00 1.10 2.20
Grid 3/A-F 4 5.55 1.23 13.60
1 4.00 1.23 2.45
Grid A,B,C,D,E,F /2-3 6 2.00 1.10 6.60
Grid B,C,D,E /1-2 4 6.50 1.10 14.30
Grid A,F /1-2 2 6.50 0.48 3.09

Secondary Beam (250x425)


Grid A1,B1,D1,E1 1 8.90 0.60 2.67
Grid 1a 1 18.20 0.60 5.46
Grid 1b 1 4.20 0.60 1.26

Roof Floor Level (+11.625m Lvl)


Staircase with Corridor 1 4.20 9.25 19.43

Main Beam (300x525)


Grid 2/C-D 1 4.00 0.95 1.90

Secondary Beam (250x425)


Grid 1a/C-D 1 4.20 0.60 1.26
Total 833.56 sq.m

7.1.3 External Plaster


Beam Plaster
First Floor Level
Main Beam (300x525)
Along grid 1 1.00 26.20 0.53 13.76
Slab Extension 1.00 23.50 1.23 28.79
Landing Beam 1.00 4.00 0.56 2.24
Along grid A,F 2.00 6.50 0.53 6.83

Second Floor Level


Main Beam (300x525)
Along grid 1 1.00 26.20 0.53 13.76
Slab Extension 1.00 23.50 1.23 28.79
Landing Beam 1.00 4.00 0.81 3.24
Landing Beam Extension 1.00 4.00 1.23 4.90
Along grid A and F 2.00 6.50 0.53 6.83

Third Floor Level


Main Beam (300x525)
Along grid 1 1.00 26.20 0.53 13.76
Slab Extension (All Sides) 1.00 88.77 Area 88.77
Slab Extension (Top Side) 1.00 20.45 Area 20.45
Landing Beam 1.00 4.00 0.81 3.24
Landing Beam Extension 1.00 4.00 1.23 4.90
Along grid A and F 2.00 6.50 0.53 6.83

Roof Floor Level


Main Beam (300x525)
Along Perimeter 1.00 25.00 0.53 13.13
Slab Extension (All Sides) 1.00 28.30 Area 28.30

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Slab Extension (Top Side) 1.00 8.75 Area 8.75

Column Plaster
Ground Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 3
Grid 3A,3B,3C,3D,3E,3F 6.00 1.50 2.48 22.28
6.00 0.50 3.00 9.00
First Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 3
Grid 3A,3B,3C,3D,3E,3F 6.00 1.50 2.48 22.28
6.00 0.50 3.00 9.00
Second Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 3
Grid 3A,3B,3C,3D,3E,3F 6.00 1.50 2.48 22.28
6.00 0.50 3.00 9.00
Parapet Wall
Top Floor 2 35.90 0.80 57.44
1 7.50 1.40 10.50
Roof 1 32.00 0.90 28.80

On Outer walls
Ground floor level
Along grid A,F/1-2 2 6.50 2.48 32.18
Along grid 1 4 5.55 2.48 54.95
1 4.00 2.10 8.38
Along grid 2 4 5.55 2.48 54.95
First floor level
Along grid A,F/1-2 2 6.50 2.48 32.18
Along grid 1 4 5.55 2.48 54.95
1 4.00 2.10 8.38
Along grid 2 4 5.55 2.48 54.95
Second floor level
Along grid A,F/1-2 2 6.50 2.48 32.18
Along grid 1 4 5.55 2.48 54.95
1 4.00 2.10 8.38
Along grid 2 4 5.55 2.48 54.95
Top floor level
Along grid C,D/1-3 2 8.50 2.10 35.70
Along grid 1 1 4.00 2.10 8.40
Along grid 3 1 4.00 2.10 8.40

Deduction for doors and windows


Ground floor level
W1 -12 1.10 1.13 -14.85
V1 -12 1.10 0.53 -6.93
W3 -1 1.50 0.37 -0.56
First floor level
W1 -12 1.10 1.13 -14.85
V1 -12 1.10 0.53 -6.93
W2 -1 1.50 1.00 -1.50
Second floor level
W1 -12 1.10 1.13 -14.85

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
V1 -12 1.10 0.53 -6.93
W2 -1 1.50 1.00 -1.50
Top floor level
W2 -1 1.50 1.00 -1.50
D2 -2 1.10 1.83 -4.02
Total 966.72 sq.m

7.2 Painting Works


7.2.1 Distemper Painting Works
As per Internal plaster on wall 1.00 1178.52 Area 1,178.52
As per Internal plaster on ceiling 1.00 833.56 Area 833.56
Total 2,012.08 sq.m

7.2.2 Exterior Weather Coat Paint


External Plaster 1.00 966.72 Area 966.72
Total 966.72 sq.m

7.2.4 Enamel Painting


Doors Factor
Collapsable Gate 1.00 4.00 2.48 2.00 19.80
D1 21 1.10 2.44 2.00 112.50
D2 2 1.10 1.90 2.00 8.36
D3 3 1.00 2.10 2.00 12.60
D4 1 1.00 1.55 2.00 3.10
Window
W1 51 1.10 1.13 2.00 126.23
W2 3 1.50 1.00 2.00 9.00
V1 51 1.10 0.53 2.00 58.91
Window Grill
W1 51 1.10 1.13 2.00 126.23
W2 3 1.50 1.00 2.00 9.00
W3 1 1.50 0.37 2.00 1.11
V1 51 1.10 0.53 2.00 58.91
Total 545.73 sq.m

8 MISCELLANOUS
8.4 Railing
Total
Staircase Railing length Kg/m
Length
Horizontal ISNB 40M 1 22.818 22.82 3.56 81.23
Horizontal ISNB 40M (Top Floor) 1 2.125 2.13 3.56 7.57
Vertical 38mm Square Pipe 6 0.92 5.52 2.82 15.57
Vertical 38mm Square Pipe 20 0.95 19.00 2.82 53.58
Horizontal 25mm Square Pipe 4 22.818 91.27 0.85 77.58
Horizontal 25mm Square Pipe (Top Floor) 4 2.125 8.50 0.85 7.23
Balcony Railing
First Floor
Horizontal ISNB 40M 1 30.2 30.20 3.56 107.51
Horizontal ISNB 32M 2 30.2 60.40 3.10 187.24
Vertical ISNB 32M 23 1.14 26.22 3.10 81.28
Inclined ISNB 32M 23 0.134 3.08 3.10 9.55
Vertical 25mm Square Pipe 208 0.82 170.56 0.85 144.98

Second Floor
Horizontal ISNB 40M 1 30.2 30.20 3.56 107.51
Horizontal ISNB 32M 2 30.2 60.40 3.10 187.24
Vertical ISNB 32M 23 1.14 26.22 3.10 81.28
Inclined ISNB 32M 23 0.134 3.08 3.10 9.55
Vertical 25mm Square Pipe 208 0.82 170.56 0.85 144.98

Parapet Wall
ISNB 40M(Horizontal Bars) 2 36.53 73.06 3.56 260.09

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
ISNB 32M(Horizontal Bars) 2 36.53 73.06 3.10 226.49
Vertical ISNB 32M 60 0.40 24.00 3.10 74.40
Inclined ISNB 32M 60 0.134 8.04 3.10 24.92
Vertical 25mm Square Pipe 492 0.30 147.60 0.85 125.46

Pedestal
ISNB 40M Pedestal Bars 14 1.54 21.57 3.56 76.80
14 1.20 16.80 3.56 59.81
28 0.40 11.20 3.56 39.87
Base plate 185 0.00009375 0.02 7850 136.15
12 mm dia. Anchor Bolt, Nut 740 0.13 96.20
Total 2,424.07 k.g

8.5 Sewer, Rain and Waste Water Installation


- 110 mm 4 9.00 36.00
2 2.90 5.80
Total 41.80 R.m

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
1 For Footing
1.1 Footing (F1) 2
X- direction 16 17 2.60 88.40 1.59 140.56 0.1 2.4 0.1

Y- direction 16 17 2.60 88.40 1.59 140.56 0.1 2.4 0.1

1.2 Footing (F2) 4


X- direction 16 20 3.10 248.00 1.59 394.32 0.1 2..9 0.1

Y- direction 16 20 3.10 248.00 1.59 394.32 0.1 2.9 0.1

1.3 Combine Footing (CF1) 3


(BLL) 12 33 2.10 207.90 0.89 185.03 0.2 1.7 0.2

(BUL) 16 12 5.30 190.80 1.59 303.37 0.2 4.9 0.2

(TUL) 12 33 2.10 207.90 0.89 185.03 0.2 1.7 0.2

(TLL) 12 12 5.30 190.80 0.89 169.81 0.2 4.9 0.2

1.4 Stirrups 10 98 3.95 1161.30 0.62 720.01 1.375


0.1
0.5

1.5 Combine Footing (CF2) 1


(BLL) 12 33 3.30 108.90 0.89 96.92 0.2 2.9 0.2

(BUL) 16 20 5.30 106.00 1.59 168.54 0.2 4.9 0.2

(TLL) 16 20 5.30 106.00 1.59 168.54 0.2 4.9 0.2

(TUL) 12 33 3.30 108.90 0.89 96.92 0.2 2.9 0.2

1.6 Stirrups 10 98 5.15 504.70 0.62 312.91 1.975


0.1
0.5

1.7 Combine Footing (CF3) 2


(BLL) 12 33 3.10 204.60 0.89 182.09 0.2 2.7 0.2

(BUL) 16 19 5.30 201.40 1.59 320.23 0.2 4.9 0.2

(TLL) 12 19 5.30 201.40 0.89 179.25 0.2 2.7 0.2

(TUL) 12 33 3.10 102.30 0.89 91.05 0.2 4.9 0.2

1.8 Stirrups 10 98 5.10 999.60 0.62 619.75 0.1


0.5
1.95

2 Column
2.1 Grid 1 (A ,B,E &F) 4
Main Bar 16 6 3.59 86.11 1.59 136.92 16mm
16 6 6.59 158.11 1.59 251.40 6.18 3.18 16mm

0.10 0.1
0.31 0.31
2.2 Grid 1 ( C ) 1
Main Bar 20 4 4.07 16.27 2.47 40.19
16 2 3.59 7.18 1.59 11.41 20mm 16mm
16 6 6.59 39.53 1.59 62.85 16mm 6.18
3.42 3.18

0.12 0.1 0.1


0.53 0.31 0.31

2.3 Grid 1 ( D ) 1
Main Bar 20 6 4.07 24.42 2.47 60.32
20 6 7.07 42.41 2.47 104.75 20mm 20mm
6.42 3.42

0.12 0.12

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
0.53 0.53

2.4 Grid 2(A,B,E & F) 4


Main Bar 20 4 4.07 65.12 2.47 160.85
16 2 3.59 28.72 1.59 45.66 16mm
16 6 6.59 158.16 1.59 251.47 20mm 16mm 6.18
3.42 3.18

0.12 0.10 0.1


0.53 0.53 0.53

2.5 Grid 2 ( C &D) 2


20 6 4.07 48.84 2.47 120.63
20 6 7.07 84.82 2.47 209.50 20mm 20mm
3.42 6.42

0.12 0.12
0.53 0.53
2.6 Grid 3 (A,B,C,D,E & F) 6
Main Bar 20 6 4.07 146.52 2.47 361.90
20 6 7.26 261.23 2.47 645.23 20mm 20mm
3.42 6.42

0.12 0.12
0.53 0.53

2.7 Stirrups 18
For 18 columns 8 12 1.84 397.44 0.40 158.98 0.08
8 24 1.28 552.96 0.40 221.18 0.42 0.14 0.08
0.42
0.42
3 For Lower Tie Beam
3.1 Grid 1,2 & 3 3 8.73
Top Bar 16 2 10.04 60.24 1.59 95.78 0.96
0.35
End bar from both
direction
16 2 11.46 68.76 1.59 109.33 11.46
8.73
16 2 10.04 60.24 1.59 95.78 0.96
0.35
2.94
Middle bar 16 1 4.25 12.75 1.59 20.27 0.96
0.35

16 1 12.00 36.00 1.59 57.24


12

16 1 12.00 36.00 1.59 57.24


12
2.94
16 1 4.25 12.75 1.59 20.27 0.96
0.35
Bottom Bar
End bar from both direction 16 2 3.33 19.98 1.59 31.77
0.66
1.71 0.96

16 2 9.00 54.00 1.59 85.86 9

16 2 11.46 68.76 1.59 109.33 0.96 10.5

16 2 9.33 55.98 1.59 89.01


0.66
0.96 7.1

Middle Bar 16 1 5.37 16.11 1.59 25.61


0.66
3.75 0.96

16 1 11.84 35.51 1.59 56.45 11.835

16 1 10.55 31.64 1.59 50.30 9.585


0.96
0.66
16 1 5.37 16.11 1.59 25.61

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
0.96 3.75

3.2 Grid A,B,C, D,E & F 6


Top Bar 16 3 8.12 146.16 1.59 232.39 7.42
0.35 0.35

Bottom Bar 16 3 8.74 157.32 1.59 250.14


0.35 0.35
7.42

3.3 Stirrups (LTB)


1 8 1113 1.36 1513.68 0.40 605.47 0.8
0.35

0.25

4 Plinth tie beam


4.1 Grid 1,2 & 3 3 8.61 1.2
Top Bar 20 2 10.24 61.41 2.47 151.68
0.425
End bar from both
direction 20 2 11.70 70.20 2.47 173.39 11.7

8.61
20 2 10.24 61.41 2.47 151.68 1.2
0.425
2.94
Middle bar 16 1 4.33 12.98 1.59 20.63 0.96
0.425
16 1 12.00 36.00 1.59 57.24 12

16 1 12.00 36.00 1.59 57.24 12

2.94
16 1 4.33 12.98 1.59 20.63 0.96
0.425

Bottom Bar
End bar from both 20 2 11.65 69.90 2.47 172.65
0.94
direction 9.51 1.2

20 2 11.70 70.20 2.47 173.39 11.7

20 2 9.85 59.10 2.47 145.98


0.94
1.2 7.71

Middle Bar 16 1 9.33 27.99 1.59 44.50


0.66
7.71 0.96

16 1 11.46 34.38 1.59 54.66 11.46

0.66
16 1 11.37 34.11 1.59 54.23 0.96 9.75

4.2 Grid A,B,C,D,E & F 6


Top bar 20 2 11.17 134.04 2.47 331.08
9.92
0.625 0.625

16 1 11.17 67.02 1.59 106.56 9.92


0.625 0.625

Bottom bar 20 2 11.80 141.60 2.47 349.75


0.94 0.94
9.92

16 1 11.24 67.44 1.59 107.23


0.66 0.66
9.92

4.3 Stirrups 1 12 126 1.54 194.04 0.89 172.70 0.12 0.1


10 1113 1.50 1669.50 0.62 1035.09 0.4 0.4

0.25 0.25
5 Column ( Up To 1st Floor Level)
5.1 Grid 1 (A ,B,E & F) 4

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
Main Bar 16 6 6.96 167.04 1.59 265.59 16mm
6

0.96

5.2 Grid 1 ( C ) 1
Main Bar 20 4 7.20 28.80 2.47 71.14
16 2 6.96 13.92 1.59 22.13 20mm 16mm

0.12 0.96

5.3 Grid 1 ( D ) 1
Main Bar 20 6 7.20 43.20 2.47 106.70
6 20mm
2.47

1.2

5.4 Grid 2(A,B,E & F) 4


Main Bar 20 4 7.20 115.20 2.47 284.54
16 2 6.96 55.68 1.59 88.53 6 6.00 16mm
20mm

1.20 0.96

5.5 Grid 2 ( C &D) 2


20 6 7.20 86.40 2.47 213.41
20mm
6

1.2

5.6 Grid 3 (A,B,C,D,E & F) 6


Main Bar 20 6 7.20 259.20 2.47 640.22
20mm
6

1.20

5.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
1.59 0.42
0.42
6 For Staircase
(Plinth level to 1st floor level)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77 0.3

3.354
2.472
0.4

Bottom Bar 1 16 21 3.27 68.71 1.59 109.25

2.042 1.03
0.2

1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1

1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1 0.15

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)

1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1

Distribution Bar 1 10 23 4.16 95.68 0.62 59.32 4.16

Bar in middle of landing 1 16 4 1.84 7.34 1.59 11.67 1.8


(20cm gap)
1 10 65 1.96 127.40 0.62 78.99 1.96

Top Bar 1 16 21 8.13 170.81 1.59 271.59


1.54
0.4
3.397
2.497
0.3
Bottom Bar 1 16 21 3.30 69.24 1.59 110.09

1
2.147 0.15

1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2

1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1

Extra Bar 1 16 21 2.00 42.00 1.59 66.78 1


1

Distribution Bar 1 10 100 1.96 196.00 0.62 121.52 1.96

1 10 42 4.16 174.72 0.62 108.33 4.16


0.15 0.565 0.15
Nosing Ties(Plinth Level To 0.112 0.162 0.112
First Floor Level ) 0.15 0.15
First type 8 35 0.674 23.59 0.40 9.44 0.565 0.15
Second type 8 7 0.977 6.84 0.40 2.74 0.412
Third type 8 14 1.13 15.86 0.40 6.34 0.268 0.112
Forth type 8 7 0.83 5.81 0.40 2.32 0.15
Fifth type 8 7 0.674 4.72 0.40 1.89 0.268 0.15 0.15
0.262
0.15
Nosing Bar 2 10 10 1.96 39.20 0.62 24.30 1.96

4.92
6.1 Landing Beam 1 20 3 5.62 16.86 2.47 41.64 0.35 0.35

1 20 3 5.62 16.86 2.47 41.64 0.35 0.35


4.92
6.2 Sturriups 1 8 35 1.22 42.70 0.40 17.08
0.08
0.375

7 Main Beam (First Floor Level) 0.2

7.1 Grid A,B,C,D,E & F


Bottom bar (End Bar) 6 25 2 7.25 87.00 2.47 214.89 1.29

4.46 1.5

1.29
6 25 2 6.75 81.00 3.86 312.66 5.46

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)

Bottom Bar (mid-bars) 6 20 2 11.80 141.60 2.47 349.75


0.94
0.94
9.92

Top Bar 6 20 3 11.80 212.40 2.47 524.63 9.92


0.94
0.94

Extra Bar 6 25 2 6.50 78.00 3.86 301.08 5.06 0.15


1.29

6 25 2 4.00 48.00 3.86 185.28 2.56 0.15


1.29

Torsion Bars (T/O) 6 16 2 9.80 117.60 1.59 186.98 9.8

7.2 Grid 1
0.94
Bottom Bar (end bar) 1 20 2 5.65 11.30 2.47 27.91 1.2
3.51

20 2 11.40 22.80 2.47 56.32 10.2 1.2

20 2 7.50 15.00 2.47 37.05 7.5

0.94
20 2 9.85 19.70 2.47 48.66
1.2 7.71

Middle Bar 16 2 3.33 6.66 1.59 10.59


0.66
1.71 0.96
16 2 9.00 18.00 1.59 28.62
9

16 2 11.46 22.92 1.59 36.44 10.5


0.96

16 2 9.33 18.66 1.59 29.67


0.66
0.96 7.71

Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66

16 2 11.46 22.92 1.59 36.44 11.46

0.96 8.73
16 2 10.35 20.70 1.59 32.91
0.66
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12

0.96
16 1 12.00 12.00 1.59 19.08 11.04
0.66
16 1 4.56 4.56 1.59 7.25 2.94
0.96

7.3 Grid 2 & 3


Bottom Bar 2 20 4 5.65 22.60 2.47 55.82
0.94
3.51 1.2

20 4 11.40 45.60 2.47 112.63 10.2


1.2

20 4 7.50 30.00 2.47 74.10 7.5

0.94

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
0.94
20 4 9.85 39.40 2.47 97.32
1.2 7.71
0.94
Middle Bar 20 4 3.85 15.40 2.47 38.04
1.2 1.71
20 4 9.00 36.00 2.47 88.92
9

20 4 9.90 39.60 2.47 97.81 8.7


1.2
0.94
20 4 11.65 46.60 2.47 115.10
1.2 9.51
1.2
Top Bar 20 4 10.75 43.00 2.47 106.21 8.61
0.94

20 4 11.70 46.80 2.47 115.60 11.7

20 4 10.75 43.00 2.47 106.21 1.2 8.61


0.94
3.06
20 2 5.20 10.40 2.47 25.69 .1.2
0.94

20 2 12.00 24.00 2.47 59.28 10.8


1.2
20 2 12.00 24.00 2.47 59.28
12
1.2
20 2 5.20 10.40 2.47 25.69 3.06
0.94
2.21
7.4 Extra Bar Along Grid 1,2 &3 3 25 4 3.65 43.80 3.86 169.07 0.15
1.29
4
3 25 4 4.30 51.60 3.86 199.18 0.15 0.15

3.5
3 25 4 3.80 45.60 3.86 176.02 0.15 0.15

7.5 Torision bars along grid 1,2 &3


1st arrangement 3 16 1 3.69 11.07 1.59 17.60 3.69

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 4.11 12.33 1.59 19.60 4.11

2nd arrangement 3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 6.84 20.52 1.59 32.63 6.84

7.6 Secondry Beam


Along Grid A1,B1,D1 & E1
0.35 0.35
Bottom Bar 4 16 3 10.45 125.40 1.59 199.39
9.75

Top Bar 4 16 3 10.45 125.40 1.59 199.39 9.75


0.35 0.35

Grid 1a (end bottom bar) 2 16 2 2.94 11.74 1.59 18.67


0.35
1.625 0.96
0.35
2 16 2 10.85 43.40 1.59 69.01
10.5

middle bar 2 16 1 8.81 17.62 1.59 28.02


0.35
7.5 0.96

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)

0.35
2 16 1 4.98 9.95 1.59 15.82
4.625
top bar (end bar) 2 16 2 4.06 16.22 1.59 25.79
2.645 0.96
0.45

2 16 2 10.55 42.20 1.59 67.10 9.605


0.45

middle bar 2 16 1 4.06 8.11 1.59 12.89 2.645 0.96


0.45

2 16 1 10.06 20.11 1.59 31.97 9.605


0.45
grid 1b
bottom bar 1 12 4 5.45 21.80 0.89 19.40 0.35
0.35
4.75

4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45 0.45

7.7 Conceal Beam 2 20 6 1.61 19.32 0.89 17.19 1.21


0.4

7.8 Bent up Bar (hunch bar) 1 16 36 3.02 108.72 1.59 172.86


0.96 0.425 0.425 0.96

250

7.9 Stirriups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425

0.25
7.10 For Secondry Beam 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375

0.2

8 For Slab (First Floor)


8.1 Main Bars 0.375
Along short span 0.07
straight bar 1 8 76 10.93 830.30 0.40 332.12 10.48
0.375 1.5 1.75 1.705
Cranked bar 1 8 76 11.09 842.46 0.40 336.98 0.05
1.975 1.75 1.75
0.525
Along Long Span (grid 1 to grid2)
Straight bar 1 8 45 12.00 540.00 0.40 216.00 11.475
1 8 45 2.22 99.90 0.40 39.96 1.695 0.525
0.525 1.5 1.9
cranked bar 1 8 44 11.03 485.10 0.40 194.04 0.07 1.5
2.25 0.525
1 8 44 4.75 208.78 0.40 83.51 1.9 0.07
2.25
along long span Grid 2 to 3 0.525
Straight bar 1 8 7 12.00 84.00 0.40 33.60 11.475

1 8 7 12.00 84.00 0.40 33.60 12


0.525
1 8 7 7.20 50.40 0.40 20.16 6.675
0.525 1.5 1.15
cranked bar 1 8 7 10.38 72.63 0.40 29.05 1.5 1.5
2.35 1.5
1.15 1.875 1.875 1.15
1 8 7 11.72 82.04 0.40 32.82 1.5 2.25
1.5
1.15 1.5 0.525
1 8 7 10.38 72.63 0.40 29.05 1.5 1.5 1.5
2.35

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)

Infront of stair case


Straight bar 1 8 15 5.69 85.35 0.40 34.14 6.33
1.875 1.095 0.75
Cranked bar 1 8 13 5.97 77.61 0.40 31.04 1.125 0.845 0.07

8.2 Distribution bars


Between Grid 1 &1a
along x-axis 1 8 96 2.72 261.12 0.40 104.45 2.72
along y- axis 1 8 80 3.20 256.00 0.40 102.40 3.2

Between grid 1a & 2


along x axis 1 8 96 2.72 261.12 0.40 104.45 2.72
along y axis 1 8 84 3.20 268.80 0.40 107.52 3.2

Between grid 2 & 3


except infront of staircas 2.72
along x axis 1 8 64 2.72 174.08 0.40 69.63 2.2
along y axis 1 8 88 2.20 193.60 0.40 77.44
Between grid 1b & 2 infront of
staicase
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 1.29 23.22 0.40 9.29 1.29

between 2 & 3
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2

Cantilever Slab beyond grid 1


bottom bar 1 10 3 11.46 34.38 0.62 21.32 11.46
top bar 1 10 3 11.46 34.38 0.62 21.32 11.46

Cantilever slab at the front


top bar ( horizontal portion) 1 10 3 7.10 21.30 0.62 13.21 7.1
bottom bar 1 10 3 7.10 21.30 0.62 13.21 7.1

Vertical portion 1 10 4 7.86 31.44 0.62 19.49 7.86


1 10 4 7.86 31.44 0.62 19.49 7.86

8.3 Negative Bars


along Grid 1 2 8 35 2.05 143.50 0.40 57.40 2.05
along grid 1a 2 8 35 2.35 164.50 0.40 65.80 2.35
along grid 1b 1 8 7 1.08 7.56 0.40 3.02 1.08
along grid 2 (except infront of
stair case) 2 8 35 2.10 147.00 0.40 58.80 2.1
along grid 2 in front of
staircase 1 8 14 1.38 19.32 0.40 7.73 1.38
along grid a1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid b 1 8 28 2.10 58.80 0.40 23.52 2.1
along b1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid c&d 2 8 9 2.55 45.90 0.40 18.36 2.55
along grid d1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid e 1 8 28 2.10 58.80 0.40 23.52 2.1
along grid e1 1 8 28 2.05 57.40 0.40 22.96 2.05

9 Bands
Ground Floor
9.1 Sill Bands 0.75 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.464 0.075 5.5 0.075
1 10 2 4.50 9.00 0.62 5.58 4.5
0.75 0.75
1 10 2 5.65 11.30 0.62 7.006 0.075 4 0.075

Grid 2 4 10 2 1.81 14.48 0.62 8.9776 1.81

Grid A,,C,D,E&F 5 10 2 8.15 81.50 0.62 50.53 0.75 6.5 0.75


0.075 0.075
Partition wall in Laoratory 1 10 2 0.75 1.50 0.62 0.93 0.75
1 10 2 5.00 10.00 0.62 6.2 5

9.2 Lintel Band 0.75 5.5 0.75


Grid 1 4 10 2 7.15 57.20 0.62 35.464 0.075 0.075

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
Grid 2 4 10 2 1.81 14.48 0.62 8.9776 0.75 1.81 0.75
Grid A,C,D,E&F 5 10 2 8.15 81.50 0.62 50.53 0.075 6.5 0.075
Partition wall in Laoratory 1 10 2 6.75 13.50 0.62 8.37
6.75

9.3 Vertical Band 6 10 2 4.13 49.50 0.62 30.69 0.75 0.75


0.075 2.475 0.075
9.4 Sturriups 1 8 950 0.30 285.00 0.40 34.20 0.06 0.06
0.18
9.5 Laboratary In -Built Furniture
Type 1 1 8 5 3.25 16.25 0.40 6.50
Main Bar 1 8 2 2.60 5.20 0.40 2.08 0.06 3.15 0.06

0.7
0.95 0.95
Distribution Bar 1 8 63 0.82 51.66 0.40 20.66 0.06 0.7 0.06

1 8 18 0.18 3.24 0.40 1.30 0.06 0.06 0.06


Type 2
Main Bar 4 8 6 1.82 10.92 0.40 4.37 0.06 1.7 0.06

Distribution Bar 1 8 12 0.92 11.04 0.40 4.42 0.06 0.8 0.06

Type3
Main Bar 1 8 5 6.82 34.10 0.40 13.64 0.06 6.7 0.06

Distribution Bar 1 8 46 0.62 28.52 0.40 11.41 0.06 0.5 0.06

Type 4
Main Bar 1 8 5 0.45 2.25 0.40 0.90 0.06 0.45 0.06

1 8 5 3.15 15.75 0.40 6.30 0.06 3.1 0.06

1 8 5 4.23 21.13 0.40 8.45 0.06 4.225 0.06

Distribution Bar 1 8 55 0.57 31.35 0.40 12.54 0.06 0.45 0.06

Type 5
Main Bar 1 8 5 0.86 4.30 0.40 1.72 0.06 0.74 0.06

1 8 5 1.39 6.93 0.40 2.77 0.06 1.265 0.06

1 8 5 3.19 15.93 0.40 6.37 0.06 3.065 0.06

Distribution Bar 1 8 37 0.57 21.09 0.40 8.44 0.06 0.45 0.06


10 Column ( Up To 2nd Floor Level)

10.1 Grid 1 (A ,B,E & F) 4


Main Bar 16 6 6.96 167.04 1.59 265.59 16mm
6

0.96

10.2 Grid 1 ( C ) 1
Main Bar 20 4 7.20 28.80 2.47 71.14
16 2 6.96 13.92 1.59 22.13 20mm 16mm

0.12 0.96

10.3 Grid 1 ( D ) 1
Main Bar 20 6 7.20 43.20 2.47 106.70
6 20mm
2.47

1.2

10.4 Grid 2(A,B,E & F) 4


Main Bar 20 4 7.20 115.20 2.47 284.54
16 2 6.96 55.68 1.59 88.53 6 6.00 16mm

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
20mm

1.20 0.96

10.5 Grid 2 ( C &D) 2


20 6 7.20 86.40 2.47 213.41
20mm
6

1.2

10.6 Grid 3 (A,B,C,D,E & F) 6


Main Bar 20 6 7.20 259.20 2.47 640.22
20mm
6

1.20

10.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
1.59 0.42
0.42

10.8 Band (First Floor)


Sill Bands 0.75 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.464 0.075 5.5 0.075
1 10 2 4.50 9.00 0.62 5.58 4.5
0.75 0.75
1 10 2 5.65 11.30 0.62 7.006 0.075 4 0.075

Grid 2 4 10 2 1.81 14.48 0.62 8.9776 1.81

Grid A,C,D,E&F 5 10 2 8.15 81.50 0.62 50.53 0.75 6.5 0.75


0.075 0.075
Partition wall in Library 1 10 2 0.75 1.50 0.62 0.93 0.75
1 10 2 5.00 10.00 0.62 6.2 5
Lintel Band 0.75 5.5 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.464 0.075 0.075
Grid 2 4 10 2 1.81 14.48 0.62 8.9776 0.75 1.81 0.75
Grid A,C,D,E&F 5 10 2 8.15 81.50 0.62 50.53 0.075 6.5 0.075
Partition wall in Library 1 10 2 6.75 13.50 0.62 8.37
6.75
Vertical Band 7 10 2 4.13 57.75 0.62 35.805 0.75 0.75
0.075 2.475 0.075

Sturriups 1 8 958 0.30 287.40 0.40 34.49 0.06 0.06


0.18

11 For Staircase
(1st Floor level to 2nd Floor Level)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77 0.3

3.354
2.472
0.4

Bottom Bar 1 16 21 3.27 68.71 1.59 109.25

2.042 1.03
0.2

1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1

1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1 0.15

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)

1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1

Distribution Bar 1 10 23 4.16 95.68 0.62 59.32 4.16

Bar in middle of landing 1 16 4 1.84 7.34 1.59 11.67 1.8


(20cm gap)
1 10 65 1.96 127.40 0.62 78.99 1.96

Landing Level to First Floor level


Top Bar 1 16 21 8.13 170.81 1.59 271.59
1.54
0.4
3.397
2.497
0.3
Bottom Bar 1 16 21 3.30 69.24 1.59 110.09

1
2.147 0.15

1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2

1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1

Extra Bar 1 16 21 2.00 42.00 1.59 66.78 1


1

Distribution Bar 1 10 100 1.96 196.00 0.62 121.52 1.96

1 10 42 4.16 174.72 0.62 108.33 4.16


0.15 0.565 0.15
Nosing Ties(Plinth Level To 0.112 0.162 0.112
First Floor Level ) 0.15 0.15
First type 8 35 0.674 23.59 0.40 9.44 0.565 0.15
Second type 8 7 0.977 6.84 0.40 2.74 0.412
Third type 8 14 1.13 15.86 0.40 6.34 0.268 0.112
Forth type 8 7 0.83 5.81 0.40 2.32 0.15
Fifth type 8 7 0.674 4.72 0.40 1.89 0.268 0.15 0.15
0.262
0.15
Nosing Bar 2 10 10 1.96 39.20 0.62 24.30 1.96

11.1 Beam 4.92


Landing Beam 1 20 3 5.62 16.86 2.47 41.64 0.35 0.35

1 20 3 5.62 16.86 2.47 41.64 0.35 0.35


4.92
Sturriups 1 8 35 1.22 42.70 0.40 17.08
0.08
0.375

0.2
12 Main Beam(Second Floor Level)
12.1 Grid A,B,C,D,E & F
Bottom bar (End Bar) 6 25 2 7.25 87.00 2.47 214.89 1.29

4.46 1.5

1.29
6 25 2 6.75 81.00 3.86 312.66 5.46

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)

Bottom Bar (mid-bars) 6 20 2 11.80 141.60 2.47 349.75


0.94
0.94
9.92

Top Bar 6 20 3 11.80 212.40 2.47 524.63 9.92


0.94
0.94

Extra Bar 6 25 2 6.50 78.00 3.86 301.08 5.06 0.15


1.29

6 25 2 4.00 48.00 3.86 185.28 2.56 0.15


1.29

Torsion Bars (T/O) 6 16 2 9.80 117.60 1.59 186.98 9.8

12.2 Grid 1
0.94
Bottom Bar (end bar) 1 20 2 5.65 11.30 2.47 27.91 1.2
3.51

20 2 11.40 22.80 2.47 56.32 10.2 1.2

20 2 7.50 15.00 2.47 37.05 7.5

0.94
20 2 9.85 19.70 2.47 48.66
1.2 7.71

Middle Bar 16 2 3.33 6.66 1.59 10.59


0.66
1.71 0.96
16 2 9.00 18.00 1.59 28.62
9

16 2 11.46 22.92 1.59 36.44 10.5


0.96

16 2 9.33 18.66 1.59 29.67


0.66
0.96 7.71

Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66

16 2 11.46 22.92 1.59 36.44 11.46

0.96 8.73
16 2 10.35 20.70 1.59 32.91
0.66
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12

0.96
16 1 12.00 12.00 1.59 19.08 11.04
0.66
16 1 4.56 4.56 1.59 7.25 2.94
0.96

12.3 Grid 2 & 3


Bottom Bar 2 20 4 5.65 22.60 2.47 55.82
0.94
3.51 1.2

20 4 11.40 45.60 2.47 112.63 10.2


1.2

20 4 7.50 30.00 2.47 74.10 7.5

0.94

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
0.94
20 4 9.85 39.40 2.47 97.32
1.2 7.71
0.94
Middle Bar 20 4 3.85 15.40 2.47 38.04
1.2 1.71
20 4 9.00 36.00 2.47 88.92
9

20 4 9.90 39.60 2.47 97.81 8.7


1.2
0.94
20 4 11.65 46.60 2.47 115.10
1.2 9.51
1.2
Top Bar 20 4 10.75 43.00 2.47 106.21 8.61
0.94

20 4 11.70 46.80 2.47 115.60 11.7

20 4 10.75 43.00 2.47 106.21 1.2 8.61


0.94
3.06
20 2 5.20 10.40 2.47 25.69 .1.2
0.94

20 2 12.00 24.00 2.47 59.28 10.8


1.2
20 2 12.00 24.00 2.47 59.28
12
1.2
20 2 5.20 10.40 2.47 25.69 3.06
0.94
2.21
12.4 Extra Bar Along Grid 1,2 &3 3 25 4 3.65 43.80 3.86 169.07 0.15
1.29
4
3 25 4 4.30 51.60 3.86 199.18 0.15 0.15

3.5
3 25 4 3.80 45.60 3.86 176.02 0.15 0.15

12.5 Torision bars along grid 1,2 &3


1st arrangement 3 16 1 3.69 11.07 1.59 17.60 3.69

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 4.11 12.33 1.59 19.60 4.11

2nd arrangement 3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 6.84 20.52 1.59 32.63 6.84

12.6 Secondry Beam


Along Grid A1,B1,D1 & E1
0.35 0.35
Bottom Bar 4 16 3 10.45 125.40 1.59 199.39
9.75

Top Bar 4 16 3 10.45 125.40 1.59 199.39 9.75


0.35 0.35

Grid 1a (end bottom bar) 2 16 2 2.94 11.74 1.59 18.67


0.35
1.625 0.96
0.35
2 16 2 10.85 43.40 1.59 69.01
10.5

middle bar 2 16 1 8.81 17.62 1.59 28.02


0.35
7.5 0.96

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)

0.35
2 16 1 4.98 9.95 1.59 15.82
4.625
top bar (end bar) 2 16 2 4.06 16.22 1.59 25.79
2.645 0.96
0.45

2 16 2 10.55 42.20 1.59 67.10 9.605


0.45

middle bar 2 16 1 4.06 8.11 1.59 12.89 2.645 0.96


0.45

2 16 1 10.06 20.11 1.59 31.97 9.605


0.45
grid 1b
bottom bar 1 12 4 5.45 21.80 0.89 19.40 0.35
0.35
4.75

4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45 0.45

12.7 Bent up Bar (hunch bar) 1 16 36 3.02 108.72 1.59 172.86


0.96 0.425 0.425 0.96

250

12.8 Stirrups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425

0.25
12.9 Stirrups ( For Secondry Beam) 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375

0.2

13 For Slab (2nd Floor Level)


Main Bars 0.375
Along short span 0.07
straight bar 1 8 76 10.93 830.30 0.40 332.12 10.48
0.375 1.5 1.75 1.705
Cranked bar 1 8 76 11.09 842.46 0.40 336.98 0.05
1.975 1.75 1.75
0.525
Along Long Span (grid 1 to grid2)
Straight bar 1 8 45 12.00 540.00 0.40 216.00 11.475
1 8 45 2.22 99.90 0.40 39.96 1.695 0.525
0.525 1.5 1.9
cranked bar 1 8 44 11.03 485.10 0.40 194.04 0.07 1.5
2.25 0.525
1 8 44 4.75 208.78 0.40 83.51 1.9 0.07
2.25
along long span Grid 2 to 3 0.525
Straight bar 1 8 7 12.00 84.00 0.40 33.60 11.475

1 8 7 12.00 84.00 0.40 33.60 12


0.525
1 8 7 7.20 50.40 0.40 20.16 6.675
0.525 1.5 1.15
cranked bar 1 8 7 10.38 72.63 0.40 29.05 1.5 1.5
2.35 1.5
1.15 1.875 1.875 1.15
1 8 7 11.72 82.04 0.40 32.82 1.5 2.25
1.5
1.15 1.5 0.525
1 8 7 10.38 72.63 0.40 29.05 1.5 1.5 1.5
2.35

0.375
Infront of stair case
Straight bar 1 8 15 4.92 73.80 0.40 29.52 4.92

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
0.375 1.065 0.75
Cranked bar 1 8 13 5.12 66.56 0.40 26.62 1.875 0.845 0.07

Distribution bars
Between Grid 1 &1a
along x-axis 1 8 96 2.72 261.12 0.40 104.45 2.72
along y- axis 1 8 80 3.20 256.00 0.40 102.40 3.2

Between grid 1a & 2


along x axis 1 8 96 2.72 261.12 0.40 104.45 2.72
along y axis 1 8 84 3.20 268.80 0.40 107.52 3.2

Between grid 2 & 3


except infront of staircas 2.72
along x axis 1 8 64 2.72 174.08 0.40 69.63 2.2
along y axis 1 8 88 2.20 193.60 0.40 77.44
Between grid 1b & 2 infront of
staicase
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 1.29 23.22 0.40 9.29 1.29

between 2 & 3
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2

Cantilever Slab beyond grid 1


bottom bar 1 10 3 11.46 34.38 0.62 21.32 11.46
top bar 1 10 3 11.46 34.38 0.62 21.32 11.46

Negative Bars
along Grid 1 2 8 35 2.05 143.50 0.40 57.40 2.05
along grid 1a 2 8 35 2.35 164.50 0.40 65.80 2.35
along grid 1b 1 8 7 1.08 7.56 0.40 3.02 1.08
along grid 2 (except infront of
stair case) 2 8 35 2.10 147.00 0.40 58.80 2.1
along grid 2 in front of
staircase 1 8 14 1.38 19.32 0.40 7.73 1.38
along grid a1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid b 1 8 28 2.10 58.80 0.40 23.52 2.1
along b1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid c&d 2 8 9 2.55 45.90 0.40 18.36 2.55
along grid d1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid e 1 8 28 2.10 58.80 0.40 23.52 2.1
along grid e1 1 8 28 2.05 57.40 0.40 22.96 2.05

14 Column ( Up to 3rd Floor Level)


14.1 Grid 1 (A ,B,E & F) 4
Main Bar 16 6 3.34 80.19 1.59 127.50 16mm
2.38

0.96

14.2 Grid 1 (C ) 1 16 6 5.97 35.82 1.59 56.95


5.00625 16mm

0.96

14.3 Grid 1 ( D ) 1
Main Bar 20 2 6.21 12.41 2.47 30.66
16 4 5.97 23.87 1.59 37.95 6 20mm 16mm
5.00625 5.00625

1.2 0.96

14.4 Grid 2(A,B,E & F) 4


Main bar 16 6 3.34 80.16 1.59 127.45 16mm
2.38

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)

0.96

14.5 Grid 2 ( C &D) 2


20 2 6.21 24.83 2.47 61.32
16 4 5.97 47.73 1.59 75.89 20mm 5.00625 16mm
5.00625

1.2 0.96

14.6 Grid 3 (A,B,C,D,E & F) 6


Main Bar 20 2 3.58 42.98 2.47 106.15
16 4 3.34 80.16 1.59 127.45 2.38 20mm 2.38
16mm

1.20 0.96

14.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
0.42
0.42
14.8 Band (Second Floor)
Sill Bands 0.75 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.464 0.075 5.5 0.075
1 10 2 4.50 9.00 0.62 5.58 4.5
0.75 0.75
1 10 2 5.65 11.30 0.62 7.006 0.075 4 0.075

Grid 2 4 10 2 1.81 14.48 0.62 8.9776 1.81


Partition wall between principal 1 10 2 4.50 9.00 0.62 5.58 4.5
and administration
Grid A,B,C,D,E&F 6 10 2 8.15 97.80 0.62 60.636 0.75 6.5 0.75
0.075 0.075
Lintel Band 0.75 5.5 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.464 0.075 0.075
Grid 2 4 10 2 1.81 14.48 0.62 8.9776 0.75 1.81 0.75
Partition wall between principal 1 10 2 4.50 9.00 0.62 5.58 4.5
and administration
Wall in computer Lab 2 10 2 3.60 14.40 0.62 8.928 3.6

Grid A,B,C,D,E&F 5 10 2 8.15 81.50 0.62 50.53 0.075 6.5 0.075


Vertical Band 8 10 2 4.13 66.00 0.62 40.92 0.75 0.75
0.075 2.475 0.075

Sturriups 1 8 1128 0.30 338.40 0.40 40.61 0.06 0.06


0.18

15 For Staircase
(2nd Floor to Top Foor)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77 0.3

3.354
2.472
0.4

Bottom Bar 1 16 21 3.27 68.71 1.59 109.25

2.042 1.03
0.2

1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1

1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1 0.15

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)

1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1

Distribution Bar 1 10 23 4.16 95.68 0.62 59.32 4.16

Bar in middle of landing 1 16 4 1.84 7.34 1.59 11.67 1.8


(20cm gap)
1 10 65 1.96 127.40 0.62 78.99 1.96

Landing Level to +9000 level


Top Bar 1 16 21 8.13 170.81 1.59 271.59
1.54
0.4
3.397
2.497
0.3
Bottom Bar 1 16 21 3.30 69.24 1.59 110.09

1
2.147 0.15

1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2

1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1

Extra Bar 1 16 21 2.00 42.00 1.59 66.78 1


1

Distribution Bar 1 10 100 1.96 196.00 0.62 121.52 1.96

1 10 42 4.16 174.72 0.62 108.33 4.16


0.15 0.565 0.15
Nosing Ties(Plinth Level To 0.112 0.162 0.112
First Floor Level ) 0.15 0.15
First type 8 35 0.674 23.59 0.40 9.44 0.565 0.15
Second type 8 7 0.977 6.84 0.40 2.74 0.412
Third type 8 14 1.13 15.86 0.40 6.34 0.268 0.112
Forth type 8 7 0.83 5.81 0.40 2.32 0.15
Fifth type 8 7 0.674 4.72 0.40 1.89 0.268 0.15 0.15
0.262
0.15
Nosing Bar 2 10 10 1.96 39.20 0.62 24.30 1.96

4.92
15.1 Landing Beam 1 20 3 5.62 16.86 2.47 41.64 0.35 0.35

1 20 3 5.62 16.86 2.47 41.64 0.35 0.35


4.92
15.2 Sturriups 1 8 35 1.22 42.70 0.40 17.08
0.08
0.375

0.2
16 Main Beam (Top Floor Level))
16.1 Grid A,B,E & F
Bottom bar (mid bar) 4 20 2 10.87 86.96 2.47 214.79 0.475 0.475

9.92

0.475
0.475
End Bar 4 25 2 10.87 86.96 3.86 335.67 9.92

Bottom bar along C & D 2 25 2 7.25 29.00 3.86 111.94


1.29

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
1.29
4.46 1.5

2 20 2 6.75 27.00 3.86 104.22


5.46 1.29

0.94 0.94
Bottom Bar along C & D 2 20 2 11.80 47.20 2.47 116.58 0.92

6 20 3 11.80 212.40 2.47 524.63 0.94 9.92 0.94

16.2 Extra Bar 6 25 2 6.50 78.00 3.86 301.08 5.06 0.15


1.29

6 25 2 4.00 48.00 3.86 185.28 2.56 0.15


1.29

16.3 Torsion Bars (T/O) 6 16 2 9.80 117.60 1.59 186.98 9.8

16.4 Grid 1
0.475
Bottom Bar (end bar) 1 20 2 3.39 6.77 2.47 16.72 1.2
1.71

20 2 9.00 18.00 2.47 44.46 9

20 2 11.70 23.40 2.47 57.80 1.2 10.5

0.475
20 2 9.39 18.77 2.47 46.36
1.2 7.71

Middle Bar 16 2 3.15 6.29 1.59 10.00


0.475
1.71 0.96
16 2 9.00 18.00 1.59 28.62
9

16 2 11.46 22.92 1.59 36.44 10.5


0.96

16 2 9.15 18.29 1.59 29.08


0.475
0.96 7.71

Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66

16 2 11.46 22.92 1.59 36.44 11.46

0.96 8.73
16 2 10.35 20.70 1.59 32.91
0.66
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12

0.96
16 1 12.00 12.00 1.59 19.08 11.04
0.66
16 1 4.56 4.56 1.59 7.25 2.94
0.96

16.5 Extra Bar Along Grid 1 1 25 4 3.65 14.60 3.86 56.36 0.15
1.29
4
1 25 4 4.30 17.20 3.86 66.39 0.15 0.15

3.5

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
1 25 4 3.80 15.20 3.86 58.67 0.15 0.15

16.6 Grid 2 & 3


Bottom Bar 2 20 4 3.39 27.08 2.47 66.89
0.475
1.71 1.2

20 4 9.00 72.00 2.47 177.84 9

20 4 11.70 93.60 2.47 231.19 1.2 10.5

0.475
20 4 9.39 75.08 2.47 185.45
1.2 7.71
0.94
1.2
Top Bar (end Bar) 20 4 10.75 43.00 2.47 106.21 8.61
0.94

20 4 11.70 46.80 2.47 115.60 11.7

20 4 10.75 43.00 2.47 106.21 1.2 8.61


0.94
3.06
middle bar 20 2 5.20 10.40 2.47 25.69 .1.2
0.94

20 2 12.00 24.00 2.47 59.28 10.8


1.2
20 2 12.00 24.00 2.47 59.28
12
1.2
20 2 5.20 10.40 2.47 25.69 3.06
0.94
2.21
16.7 Extra Bar Along Grid 1,2 &3 2 20 4 3.65 29.20 2.47 72.12 0.15
1.29
4
2 20 4 4.30 34.40 2.47 84.97 0.15 0.15

3.5
2 20 4 3.80 30.40 2.47 75.09 0.15 0.15

16.8 Torision bars along grid 1,2 &3


1st arrangement 3 16 1 3.69 11.07 1.59 17.60 3.69

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 4.11 12.33 1.59 19.60 4.11

2nd arrangement 3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 6.84 20.52 1.59 32.63 6.84

16.9 Secondry Beam


Along Grid A1,B1,D1 & E1
0.35 0.35
Bottom Bar 4 16 3 10.45 125.40 1.59 199.39
9.75

Top Bar 4 16 3 10.45 125.40 1.59 199.39 9.75


0.35 0.35

Grid 1a (end bottom bar) 2 16 2 2.94 11.74 1.59 18.67


0.35
1.625 0.96
0.35
2 16 2 10.85 43.40 1.59 69.01
10.5

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)

middle bar 2 16 1 8.81 17.62 1.59 28.02


0.35
7.5 0.96
0.35
2 16 1 4.98 9.95 1.59 15.82
4.625
top bar (end bar) 2 16 2 4.06 16.22 1.59 25.79
2.645 0.96
0.45

2 16 2 10.55 42.20 1.59 67.10 9.605


0.45

middle bar 2 16 1 4.06 8.11 1.59 12.89 2.645 0.96


0.45

2 16 1 10.06 20.11 1.59 31.97 9.605


0.45
grid 1b
bottom bar 1 12 4 5.45 21.80 0.89 19.40 0.35
0.35
4.75

4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45 0.45

16.10 Bent up Bar (hunch bar) 1 16 36 3.02 108.72 1.59 172.86 0.96 0.96

0.425 0.425
0.25

16.11 Stirriups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425

0.25
16.12 For Secondry Beam 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375

0.2

16.13 Beam under slab (250*150) 7.195


Near grid 1 2 12 4 9.09 72.68 0.89 64.69
1.89

7.215
2 12 4 8.41 67.28 0.89 59.88
1.64

7.195
2 12 4 9.09 72.68 0.89 64.69 1.89

6.325
2 12 4 7.97 63.72 0.89 56.71
1.64
10.15
Infront of Grid A & F 2 12 4 10.15 81.20 0.89 72.27

2 12 4 9.90 79.20 0.89 70.49 9.9

Infront of Grid 3 2 12 4 7.53 60.24 0.89 53.61 0.89

6.64
2 12 2 8.17 32.68 0.89 29.09 0.89
7.28

2 12 4 7.14 57.12 0.89 50.84 5.75


0.5
0.89

2 12 2 6.50 13.00 0.89 11.57 6.5

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)

2 12 2 6.00 12.00 0.89 10.68 6

16.14 Stirriups( beam 250*150 ) 1 8 546 0.76 414.96 0.40 165.98 0.0 0.1
8
0.2

17 For Slab (Top Floor)


17.1 Main Bars
Along short span
straight bar 1 8 76 12.00 912.00 0.40 364.80 12

2.025 1.5 1.75


Cranked bar 1 8 76 11.66 886.16 0.40 354.46 0.08 0.08 0.08 0.08 0.08
1.25 1.075 1.75
0.08 0.08
1.75 1.45
1 8 76 1.45 110.20 0.40 44.08 0.08

17.2 Along Long Span (grid 1 to grid2) 0.525


Straight bar 1 8 37 9.96 368.34 0.40 147.33 0.08 9.35

1 8 37 4.53 167.61 0.40 67.04 4.45 0.08

0.525 0.95
cranked bar 1 8 36 4.04 145.26 0.40 58.10 0.08 0.08
2.4

0.95 1.5 1.5


1 8 36 4.75 170.82 0.40 68.33 0.08 1.5 0.08 0.08 0.08
1.5
0.08 0.08 2 0.08
1.5
17.3 along long span Grid 2 to 3
Straight bar 1 8 26 10.45 271.70 0.40 108.68 0.08 10.45

1 8 26 10.90 283.40 0.40 113.36 10.9


0.08
1 8 26 10.45 271.70 0.40 108.68 10.45

2 1.5 1.5
cranked bar 1 8 24 11.01 264.24 0.40 105.70 0.08 0.08 0.08 0.08 0.08
1.5 1.5
0.08 0.08 0.95
1.5
0.95 1.875 1.875
1 8 24 11.38 273.12 0.40 109.25 0.08 0.08 0.08 2.25 0.08
1.5
0.08 0.08 0.95
1.5
0.95 1.5 1.5
1 8 24 11.01 264.24 0.40 105.70 0.08 0.08 0.08 1.5 0.08
1.5 2
0.08 1.5 0.08 0.08

17.4 Infront of stair case 0.08 6.11 0.08


Straight bar 1 8 15 6.27 94.05 0.40 37.62
2.405 1.095 0.91
Cranked bar 1 8 13 6.69 86.91 0.40 34.76 0.08 0.08 0.08 0.08 0.08
1.1 0.695
17.5 Distribution bars
Between Grid 1 &1a
along x-axis 1 8 80 2.70 216.00 0.40 86.40 2.7
along y- axis 1 8 74 3.20 236.80 0.40 94.72 3.2

Between grid 1a & 2


along x axis 1 8 80 2.70 216.00 0.40 86.40 2.7
along y axis 1 8 80 3.20 256.00 0.40 102.40 3.2

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
Between grid 2 & 3
except infront of staircas 2.7
along x axis 1 8 64 2.70 172.80 0.40 69.12 2.2
along y axis 1 8 68 2.20 149.60 0.40 59.84
Between grid 1b & 2 infront of
staicase
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 1.28 23.04 0.40 9.22 1.29

between 2 & 3
along x axis 1 8 8 4.20 33.60 0.40 13.44 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2

Top near Grid 1( in bottom) 2 10 5 12.00 120.00 0.62 74.40 12


2 10 5 2.20 22.00 0.62 13.64 2.2

Top near Grid 1( on Top) 2 10 4 12.00 96.00 0.62 59.52 12


2 10 4 2.20 17.60 0.62 10.91 2.2

Top near grid A & F (in bottom) 2 10 5 12.00 120.00 0.62 74.40 12
Top near grid A & F (on top) 2 10 4 12.00 96.00 0.62 59.52 12

Top infront of grid 3 (in bottom) 2 10 5 11.98 119.80 0.62 74.28 11.98
Top infront of grid 3 (on top) 2 10 4 11.98 95.84 0.62 59.42 11.98

Top infront of staircase (in bottom) 1 10 6 8.24 49.44 0.62 30.65 8.24
1 10 5 8.24 41.20 0.62 25.54 8.24

17.6 Negative Bars


along Grid 1 2 8 36 2.43 174.96 0.40 69.98 2.43
along grid 1a 2 8 36 2.35 169.20 0.40 67.68 2.35
along grid 1b 1 8 14 1.08 15.12 0.40 6.05 1.08
along grid 2 (except infront of
stair case) 2 8 36 2.10 151.20 0.40 60.48 2.1
along grid 2 in front of
staircase 1 8 14 1.37 19.18 0.40 7.67 1.38
Along grid 3 (except infront of
stair case) 1 8 72 2.13 153.36 0.40 61.34 2.13
Along grid 3 ( infront of
stair case) 1 8 14 2.53 35.42 0.40 14.17 2.53

Along grid A & F 2 8 28 2.28 127.68 0.40 51.07 2.28


along grid a1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid b 1 8 28 2.10 58.80 0.40 23.52 2.1
along b1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid c&d 2 8 10 2.55 51.00 0.40 20.40 2.55
along grid d1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid e 1 8 28 2.10 58.80 0.40 23.52 2.1
along grid e1 1 8 28 2.05 57.40 0.40 22.96 2.05

Band Parapet Wall Top Floor 7.195


Near grid 1 2 10 2 9.09 36.34 0.62 22.53
1.89

7.215
2 10 2 8.41 33.64 0.62 20.86
1.64

7.195
2 10 2 9.09 36.34 0.62 22.53 1.89

6.325
2 10 2 7.97 31.86 0.62 19.75
1.64
10.15
Infront of Grid A & F 2 10 2 10.15 40.60 0.62 25.17

2 10 2 9.90 39.60 0.62 24.55 9.9

Infront of Grid 3 2 10 2 7.53 30.12 0.62 18.67 0.89

6.64

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
2 10 2 8.17 32.68 0.62 20.26 0.89
7.28

2 10 2 7.14 28.56 0.62 17.71 5.75


0.5
0.89

2 10 2 6.50 13.00 0.62 8.06 6.5

2 10 2 6.00 12.00 0.62 7.44 6

Stirrups 2 8 540 0.30 162.00 0.40 64.80 0.06 0.06


0.18

18 Column ( Up to Roof Floor Level)


18.1 Grid 1 C 1
Main Bar 16 6 2.96 17.76 1.59 28.24 16mm
2.00

0.96

18.2 Grid 1 ( D ) 1
Main Bar 20 2 3.20 6.40 2.47 15.81
16 4 2.96 11.84 1.59 18.83 20mm 16mm
2 2

1.2 0.96

18.3 Grid 2 & 3 ( C &D) 4


20 2 3.20 25.60 2.47 63.23
16 4 2.96 47.36 1.59 75.30 2 20mm 2 16mm

1.2 0.96

18.4 Stirrups 6
For 6 columns 8 26 1.84 287.04 0.40 114.82 0.08
8 52 1.28 399.36 0.40 159.74 0.42 0.14 0.08
0.42
0.42
18.5 Band under wall (Grid C&D) 2 10 2 6.50 26.00 0.62 16.12 6.5
1 10 2 4.50 9.00 0.62 5.58 4.5
0.06 0.06
1 8 30 0.30 9.00 0.40 3.60 0.18
Stirrups 2 8 44 0.30 13.20 0.40 5.28 0.06 0.06
19 Slab Beam 0.18
19.1 Grid C & D
Bottom bar 2 20 2 10.87 43.48 2.47 107.40 0.475 0.475

9.92

0.475
0.475
2 16 1 10.87 21.74 1.59 34.57 9.92

Top Bar 2 20 2 11.80 47.20 2.47 116.58 0.94 9.92 0.94

2 16 1 11.24 22.48 1.59 35.74 0.66 9.92 0.66

19.2 Grid 1,2& 3 bottom bar


3 20 2 5.82 34.92 2.47 86.25 0.45 0.45
4.92

3 16 1 5.82 17.46 1.59 27.76 0.45 0.45

4.92
Top Bar

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
3 20 2 6.80 40.80 2.47 100.78 0.94 4.92 0.94

3 16 1 6.24 18.72 1.59 29.76 0.66 4.92 0.66

19.3 Secondry beam


Bottom bar along grid 1a 1 16 3 5.45 16.35 1.59 26.00 0.35 0.35
4.75

Top bar along grid 1a 1 16 3 5.65 16.95 1.59 26.95 0.35 4.75 0.45

19.4 Stirriups( For Main Beam) 1 10 180 1.65 297.00 0.62 184.14 0.10
0.425

0.25
19.5 For Secondry Beam 1 8 35 1.31 45.85 0.40 18.34
0.8
0.375

0.2

20 For Slab (Roof Floor)


20.1 Main Bars
Along long span
straight bar 1 8 14 11.62 162.68 0.40 65.07 0.08 11.46 0.08

1.605 1.5 1.75


Cranked bar 1 8 13 11.94 155.22 0.40 62.09 0.08 0.08 0.08 0.08
1.25 1.855 1.75
0.08 0.08
1.75
Along Short Span
straight bar 1 8 29 6.62 191.98 0.40 76.79 0.08 6.46 0.08

2.105 2.105
Cranked bar 1 8 28 6.48 181.44 0.40 72.58 0.08 0.08 0.08 0.08
1.95

20.2 Distribution bars


Between Grid 1 &1a
along x-axis 1 8 12 4.20 50.40 0.40 20.16 4.2
along y- axis 1 8 18 3.23 58.05 0.40 23.22 3.23

Between Grid 1a & 2


along x-axis 1 8 12 4.20 50.40 0.40 20.16 4.2
along y- axis 1 8 18 3.23 58.14 0.40 23.26 3.23

Between Grid 2 & 3


along x-axis 1 8 8 4.20 33.60 0.40 13.44 4.2
along y- axis 1 8 18 2.20 39.60 0.40 15.84 2.2

Top near grid 1 &3


bottom bar 2 8 5 6.46 64.60 0.40 25.84 6.46

Top Bar 2 8 4 6.46 51.68 0.40 20.67 6.46

Top in front of grid C & D


bottom bar 2 8 5 11.46 114.60 0.40 45.84 11.46

Top Bar 2 8 4 11.46 91.68 0.40 36.67 11.46

20.3 Negative Bars


along Grid 1 1 8 13 2.08 27.04 0.40 10.82 2.08
along grid 1a 1 8 13 2.35 30.55 0.40 12.22 2.35
along grid 2 1 8 13 2.10 27.30 0.40 10.92 2.1
along Grid 3 1 8 13 1.78 23.14 0.40 9.26 1.78
along grid C & D 2 8 26 2.48 128.96 0.40 51.58 2.48

21 Band (Roof Floor ) 5.95


Parapet Wall 2 10 2 7.15 28.6 0.62 17.732 0.6 0.6
2 10 2 11.95 47.8 0.62 29.636

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
11.95
Stirrups 2 8 238 0.30 71.40 0.40 28.56 0.06 0.06
Total 58147.14 kgs 0.18
58.15 MT

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: 3LaLiEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha

Site
S. No. Description G.F F.F S.F TF Quantity Unit Remarks
Development
A. Common Installation
1.1 Stand Alone 40 A DP MCB with Enclosure 1 1.00 nos.
2 CABLES & WIRES
2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded
2.1 49.00 r.m
copper conductor wires

2.2 2 Nos 2.5 Sq.mm mutistranded copper conductor 50.00 r.m


wires + 1 Nos. 1.5sq mm multistranded Cu wire
B School Blocks
1 DISTRIBUTION BOARDS 1 1 1 3.00 nos.
2 CABLES & WIRES
2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4
2.1 11.00 r.m
Sq mm Multistranded Cu wire
2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5
2.2 8.00 r.m
Sq mm Multistranded Cu wire
2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No
2.3 12.00 r.m
1.5 Sq mm Multistranded Cu wire
3 General Service Light Point Wiring
3.1 One Way Light Point 3 23 22 22 2 72.00 pts.
3.2 Two Way Light Point 1 1 2.00 pts.
3.3 Ceiling/Exhaust Fan Point wiring 0.00 pts.
4 6A Universal Pin Light Power Socket Wiring 22 20 55 97.00 pts.
5 Switch Socket Outlets
5.1 6A Universal Power Switch Socket 22 20 55 97.00 nos.
7 Light Fixtures/Luminaires & Accessories
7.1 24 W LED Surface Mounted Square type 6.00 6.00 12.00 no.
7.2 18 W LED Surface Mounted Square type 8.00 8.00 16.00 32.00 no.
7.3 12 W LED Surface Mounted Cylindrical type 8.00 9.00 7.00 3.00 27.00 no.
7.4 LED Wall Light 1.00 1.00 no.
8 Pull Box
Junction Box At External Post Top Light 3 3.00 nos.
9 External Post Top Light Pole 3 3.00 nos.
10 Post Top External Light Fixtures 3 3.00 nos.
11 Earthing & Lighting Protection
11.1 Chemical Earthing 3 3.00 no.
11.2 Earthing Bar 3 3.00 no.
12 Earthing Strip/Wires
12.3.1 25 x 3 mm GI strip 65 65.00 r.m
12.3.2 12 SWG Cu wire 15 15.00 r.m
13 Earth Test link 1 1.00 nos.
14 Lightning Arrester 1 1.00 nos.
D Fire Extinguisher
5.0kg Size ABC Stored Pressure Type Fire
A. 2 1 3 6.00 nos.
Extinguisher
B. Dry Powder Fire Extinguisher 1 1.00 nos.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha

Building: 3LaLiEACCr(F)-A
S.N Furniture Description Symbol Qty Unit Remarks
Classroom
1 ECD Student Desk (6 Seater) D-03 3 nos.
2 Student Desk G1-2 (3 Seater) D-02A 22 nos.
3 Student Bench G1-2 (3 Seater) B-02A 22 nos.
4 Student Desk G3-5 (3 Seater) D-02B 11 nos.
5 Student Bench G3-5 (3 Seater) B-02B 11 nos.
6 Teacher's Table T-01 6 nos.
7 Soft Board F-01 1 nos.
8 Book Shelf F-02 3 nos.
9 Teacher's Chair C-01 6 nos.
10 White Board F-03 6 nos.
Library
11 Student Bench 6-12 (3 Seater) B-02C 14 nos.
12 Library Table T-02 7 nos.
13 Library Shelf F-04 5 nos.
Computer nos.
14 Computer Table T-04 12 nos.
15 Computer Shelf C-02 24 nos.
16 White Board with Stand F-05 1 nos.
Laboratory
17 Equipment Shelf F-07 3
18 Lab Stool F-08 31
Office
19 Cabinet F-06 7 nos.
20 Office Table (2 sides Drawe Unit) T-05 1 nos.
21 Office Table (1 sides Drawe Unit) T-06 2 nos.
22 Office Table T-07 12 nos.
23 Office Chair C-03 16 nos.
24 Office Chair- Headmaster C-04 1 nos.
25 Office Visitor Chair C-05 19 nos.
26 Dinning Table T-09 2 nos.
Miscellaneous
27 Cusions F-16 18 nos.
28 Carpet 27.43 sq.m
29 Equipment Cabinet F-09 5 nos.
30 File Cabinet F-10 2 nos.
31 Notice Board F-14 1 nos.
Total 274 nos.

Building: 3-12C(MsF)
S.N Furniture Description Symbol Qty Unit Remarks
Classroom
1 Student Desk G3-5 (3 Seater) D-02B 22 nos.
2 Student Desk G6-12 (3 Seater) D-02C 44 nos.
3 Student Bench G3-5 (3 Seater) B-02B 22 nos.
4 Student Desk G6-12 (3 Seater) B-01C 44 nos.
5 Teacher's Table T-01 12 nos.
6 Teacher's Chair C-01 12 nos.
7 White Board F-03 12 nos.
Total 168 nos.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Toilet Block, Tc(M)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
Length Breadth Height
S. No. Description No. Qty Unit Remarks
(m) (m) (m)
1 EARTH WORKS
1.1 Site Clearance
Toilet Block 1 15.30 11.30 172.89
Septic Tank 1 9.35 4.95 46.28
Soak Pit 1 10.17 Area 10.17
Sewer Manhole (Rectangular) 4 2.00 2.00 4.00
233.35 sq.m

1.2 Earthwork in excavation


Footing
F1 9 1.30 1.30 1.20 18.25
Excavation for lower tie beam
Grid 1 2 4.70 0.60 0.7 3.95
Grid 2 2 4.70 0.50 0.7 3.29
Grid 3 2 4.70 0.60 0.7 3.95
Between grid 2 and 3 2 5.40 0.60 0.7 4.54
Grid A-12 , B-12 and C-12 3 2.20 0.60 0.7 2.77
Along grid A-23 and C-23 2 1.20 0.50 0.7 0.84
Along grid B-23 1 1.20 0.60 0.7 0.50
Ramp
For Slope 2 3.50 1.03 0.28 1.97
Drain 1 13.45 0.63 0.23 1.89
1 13.45 0.58 0.38 2.96
Outside Steps 2 1.20 0.68 0.15 0.24

Septic Tank 1 7.65 2.25 2.82 48.50


Soak Pit 1 6.60 Area 1.55 10.23
For Sewer Manhole (Rectangular) 4 1.30 1.30 0.50 3.38
107.28 sq.m

1.3 Earth Back filling


Total earthwork 107.28

Boulder soling -1 22.90 Vol. -22.90


PCC work -1 10.32 Vol. -10.32
RCC work -1 5.26 Vol. -5.26
Stone masonry wall -1 0.00 Vol. 0.00

Inside the room(Compacted) 2 5.70 3.20 0.18 6.57


Along lobby(Compacted) 2 5.70 2.20 0.18 4.51
79.88 sq.m

1.4 Boulder soling


For Footing
F1 9 1.00 1.00 0.20 1.80
For Lower Tie Beam
Grid 1 and Grid 3 2 11.40 0.45 0.10 1.03
Grid 2 2 5.70 0.35 0.10 0.40
Between grid 2 and 3 2 5.45 0.45 0.10 0.49
Along grid A-12,B-12 & C-12 3 3.20 0.45 0.10 0.43
Along grid A-23 & C-23 2 2.20 0.35 0.10 0.15
Along grid B-23 1 2.20 0.45 0.10 0.10
Toilet Floors 2 5.75 3.25 0.20 7.48
corridor Floors 2 5.75 0.88 0.20 2.01
Ramp
below ramp 2 6.77 1.03 0.20 2.78
For Outer Steps 2 1.20 0.60 0.1 0.14

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Drain 1 13.45 1.20 0.10 1.61
Septic tank 1 7.35 1.95 0.1 1.43
For Sewer Manhole (Rectangular) 4 1.00 1.00 0.1 0.40
Soak pit ( Boulder packing) 1 1.77 Area 1.50 2.65
22.90 Cu.m

1.6 Sand Filling


Periphery of Soak pit 1 3.04 Area 1.55 4.71
4.71 cu.m

2 CONCRETE WORKS
2.1 P.C.C.
2.1.1 P.C.C.(1:3:6) Works
For Footing
F1 9 1.00 1.00 0.10 0.90
For Lower Tie Beam
Grid 1 and Grid 3 2 11.40 0.45 0.05 0.51
Grid 2 2 5.70 0.35 0.05 0.20
Between grid 2 and 3 2 5.45 0.45 0.05 0.25
Along grid A-12,B-12 & C-12 3 3.20 0.45 0.05 0.22
Along grid A-23 & C-23 2 2.20 0.35 0.05 0.08
Along grid B-23 1 2.20 0.45 0.05 0.05
Septic Tank 1 0.83 1.45 0.08 0.09
Sewer Manhole (Rectangular)
Bottom 4 1.00 1.00 0.10 0.40
2.69 sq.m

2.1.2 P.C.C.(1:2:4) Works


Toilet floor. 2 5.75 3.25 0.08 2.80
Toilet corridor. 2 5.75 1.23 0.08 1.06
Ramp
Below Ramp 2 6.77 1.03 0.08 1.04
For Outer Steps 2 1.20 0.60 0.05 0.07
2 1.20 0.30 0.05 0.04
Drain 1 13.45 0.58 0.075 0.58
1 13.45 1.00 0.05 0.67
Below Plinth Tie Beam ( DAMP PCC)
Grid 1 and Grid 3 2 11.40 0.35 0.05 0.40
Along grid A-12,B-12 & C-12 3 3.20 0.35 0.05 0.17
Along grid B-23 1 2.20 0.35 0.05 0.04
6.87 sq.m

2.2 RCC Work 1:1.5:3


For Footing
F1 9
Square portion 1.00 1.00 0.20 1.80
Trapazoid portion Area 0.63 0.10 0.56
Lower Tie Beam
Grid 1,2,3 3 11.40 0.25 0.25 2.14
Grid A-12,C-12 2 3.20 0.25 0.25 0.40
Grid B-13 1 5.70 0.25 0.25 0.36
Plinth Tie Beam
Grid 1,2,3 3 11.40 0.25 0.30 2.57
Grid A-12,C-12 2 3.20 0.25 0.30 0.48
Grid A-23,C-23 2 2.20 0.25 0.51 0.56
Grid B-13 1 5.70 0.25 0.30 0.43
Column
From lower to plinth tie beam 9 0.30 0.30 1.00 0.81
From footing to Lower tie beam 1 0.30 0.30 2.00 0.18
Shear Wall
On both sides 2 0.50 0.25 2.00 0.50
Ground Floor Column 9 0.30 0.30 3.00 2.43
Truss Beam

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Grid 1-2-3 3 11.40 0.25 0.45 3.85
Grid A-12,B-12,C-12 3 3.20 0.25 0.40 0.96
Grid A-23,B-23,C-23 3 2.20 0.25 0.45 0.74
Slab
Corridor Slab 2 5.75 2.25 0.150 3.88
Lintel Bands,
Ground floor level
Grid 1,2,3 3 11.40 0.23 0.13 0.98
Grid A& C 2 3.20 0.23 0.13 0.18
Grid B 1 5.40 0.23 0.13 0.16
Partition Wall
Partition Wall for disable toilet 2 3.27 0.23 0.125 0.19
Partition wall for toilet short wall 4 1.32 0.23 0.125 0.15
Partition wall for toilet long wall 2 3.50 0.23 0.125 0.20
Sill Bands
Ground floor level
Grid 1,2,3 3 11.40 0.43 0.08 1.09
Grid A& C 2 3.20 0.23 0.08 0.11
Grid B 1 5.40 0.23 0.08 0.09
Partition Wall
Partition Wall for disable toilet 2 3.27 0.23 0.075 0.11
Partition wall for toilet short wall 4 1.32 0.23 0.075 0.09
Partition wall for toilet long wall 2 3.50 0.23 0.075 0.12
Along the incinerator 3 1.95 0.13 0.08 0.05
Deduction of Doors For Sill
Ground floor level
D1 -2 1.00 0.230 0.075 -0.03
D2 -2 0.90 0.230 0.075 -0.03
D3 -6 0.75 0.230 0.075 -0.08
Along the water trough 2 3.75 0.60 0.10 0.45
Water trough edge 2 5.40 0.20 0.10 0.22
at both end 2 0.48 0.20 0.10 0.02
at Center 1 0.50 0.20 0.10 0.01
Incinerators Slab 1 0.83 1.05 0.08 0.06
Septic Tank
At Bottom 1 6.53 2.25 0.15 2.20
Concealed Beam CB1 1 1.95 0.25 0.12 0.06
Concealed Beam CB 1 2.25 0.15 0.12 0.04
Top Cover 1 5.75 1.95 0.12 1.35
Deduction of Manhole -2 0.60 0.60 0.12 -0.09
Manhole Cover Slab 2 0.60 0.60 0.15 0.11
Manhole Cover Slab 1 0.75 0.75 0.15 0.08
Soak Pit
RCC slab 1 5.31 Area 0.13 0.66
Manhole/Waste Chamber
Top Cover 4 1.00 1.00 0.15 0.60
31.81 sq.m

2.3 Silica Cement admixture


10Kg per cum RCC Works 10 31.81 318.11
318.11 Kg

2.4 Form Work


For Footing
F1 9 4.00 0.20 7.20
Lower Tie Beam
Grid 1,2,3 3 11.40 0.50 17.10
Grid A-12,C-12 2 3.20 0.50 3.20
Grid B-13 1 5.70 0.50 2.85
Pedestal column 9 1.20 1.00 10.80
From footing to Lower tie beam 1 1.20 2.00 2.40
Deduction1 at beam and column junction -24 0.25 0.25 -1.50
at LTB

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Deduction1 at beam and column junction -24 0.25 0.30 -1.80
at UTB
Plinth Tie Beam
Grid 1,2,3 3 11.40 0.60 20.52
Grid A-12,C-12 2 3.20 0.60 3.84
Grid A-23,C-23 2 2.20 1.00 4.41
Grid B-13 1 5.70 0.60 3.42
Ground Floor Column 9 1.20 3.00 32.40
Deduction for Beam opening part -24 0.25 0.45 -2.70
Truss Beam
Grid 1-2-3 3 11.40 1.15 39.33
Grid A-12,B-12,C-12 3 3.20 1.05 10.08
Grid A-23,B-23,C-23 3 2.20 1.15 7.59
Slab
Corridor Slab 2 5.75 2.25 25.88
Lintel Bands,
Ground floor level
Grid 1,2,3 3 11.40 0.25 8.55
Grid A& C 2 3.20 0.25 1.60
Grid B 1 5.40 0.25 1.35
Partition Wall
Partition Wall for disable toilet 2 3.27 0.25 1.64
Partition wall for toilet short wall 4 1.32 0.25 1.32
Partition wall for toilet long wall 2 3.50 0.25 1.75
Sill Bands
Ground floor level
Grid 1,2,3 3 11.40 0.15 5.13
Grid A& C 2 3.20 0.15 0.96
Grid B 1 5.40 0.15 0.81
Partition Wall
Partition Wall for disable toilet 2 3.27 0.15 0.98
Partition wall for toilet short wall 4 1.32 0.15 0.79
Partition wall for toilet long wall 2 3.50 0.15 1.05
Deduction of Doors For Sill
Ground floor level
D1 -2 1.00 0.075 -0.15
D2 -2 0.90 0.075 -0.14
D3 -6 0.75 0.075 -0.34
Along the water trough
Along the water trough 2 3.75 0.60 4.50
Water trough edge 2 3.75 0.50 3.75
at both end 2 0.48 0.50 0.48
at Center 1 0.50 0.50 0.25
Incinerators Slab 1 0.53 0.90 0.47
1 2.70 0.08 0.20
Septic Tank
At Bottom 1 17.56 0.15 2.63
Concealed Beam CB1 1 1.95 0.49 0.96
Concealed Beam CB 1 2.25 0.24 0.54
Top Cover 1 5.75 1.95 11.21
1 15.40 0.12 1.85
Deduction of Manhole -2 2.40 0.12 -0.58
Manhole Cover Slab 2 2.40 0.15 0.72
Manhole Cover Slab 1 3.00 0.15 0.45
Side Formwork for void 2 2.40 0.15 0.72
Soak Pit
RCC slab 1 5.31 Area 5.31
1 8.16 0.13 1.02
Manhole/Waste Chamber 0.00
Top Cover 4 4.00 0.15 2.40
247.20 sq.m

3 BRICK WORKS

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
3.2 Full Brick (250 mm) Works (1:4c/s)
Below plinth tie beam
Grid 1,2,3 3 11.40 0.23 0.40 3.15
Grid A-12, B-12 & C-12 3 3.20 0.23 0.40 0.88
Grid B-23 1 2.20 0.23 0.40 0.20
Along the ramp 2 5.70 0.23 0.68 1.77

Brick Work above Tie Beam


Ground floor
Grid A-12, B-12& C-12 3 3.20 0.23 2.40 5.30
Grid B-23 1 2.20 0.23 2.35 1.19
Grid 1&2 2 11.40 0.23 2.35 12.32
Grid 3 1 11.40 0.23 1.30 3.41
Partition Wall for disable toilet 2 3.27 0.23 2.80 4.21
Cross wall at Water trough 2 0.58 0.23 0.30 0.08
2 0.58 0.23 0.45 0.12
Drain 1 13.45 0.25 0.20 0.67
Outer Steps 2 1.20 0.60 0.15 0.22
2 1.20 0.30 0.15 0.11
Deduction for doors and windows
Ground floor
D1 -2 1.00 0.23 2.10 -0.97
D2 -2 0.90 0.23 2.10 -0.87
V1 -2 3.48 0.23 0.38 -0.60
V2 -2 3.48 0.23 0.33 -0.52
V3 -2 1.98 0.23 0.38 -0.34
V4 -2 1.98 0.23 0.33 -0.30
Incinerators 2 0.65 0.23 0.30 0.09
1 0.65 0.23 0.30 0.04
Septic Tank
Outer Wall 2 6.60 0.38 2.82 13.95
1 1.20 0.38 2.82 1.29
1 1.20 0.38 1.80 0.82
1 1.20 0.25 1.02 0.31
2 0.50 0.25 1.02 0.26
Baffle wall 1 1.20 0.25 2.82 0.85
Deduct openings -1 1.20 0.25 0.45 -0.14
Soak Pit 1 1.37 Area 0.55 0.76
48.25 Cu.m

3.3 Half brick work (1:4 c/s)


Toilet Room
Partition wall for toilet short wall 4 1.32 2.80 7.39
Partition wall for toilet long wall 2 3.50 2.80 19.60
Low wall Beside Urinal 2 0.60 1.20 1.44
Cross wall at Water trough 2 0.30 0.58 0.35
Incinerators 1 1.95 1.20 2.34
Drain 1 13.45 0.20 2.69
Deduction for doors and windows
D3 -6 0.75 2.10 -9.45
Septic Tank
Inlet wall 1 0.70 1.17 0.82
Manhole Cover wall 2 1.20 0.35 0.84
Manhole/Waste Chamber
Rectangular 4 4.00 0.60 9.60
35.61 Sq.m.

3.4 Honey Comb Brick (350 mm) Works (1:3c/s)


Soak pit 1 1.37 Area 1.50 2.06
2.06 Cu.m.

4 DOORS & WINDOWS


4.4 UPVC Doors

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
UPVC Door Shutter
D1 2 1.00 2.10 4.20
D2 2 0.90 2.10 3.78
D3 6 0.75 2.10 9.45
17.43 sq.m

4.5 Window Grill


Ventilation
V1 2 3.48 0.38 2.61
V2 2 3.48 0.33 2.26
V3 2 1.98 0.38 1.48
V4 2 1.98 0.33 1.28
7.63 sq.m

5 FLOORING WORKS
5.1 Cement Concrete Flooring (40mm) With Neat Cement Punning
Toilet Floors 2 5.75 3.25 37.38
Corridor Floors 2 5.75 1.27 14.61
Outside Staircase 2 1.20 1.05 2.52
Ramp
Slanted Portion 1 5.45 1.03 5.59
Horizontal Portion 1 1.20 1.03 1.23
Drain 1 13.45 1.48 19.91
Along the terrace 2 5.75 2.25 25.88
Water Trough 2 0.60 3.75 4.50
111.60 sq.m

5.2 Neat Cement Skirting


2 12.32 24.64
-2 1.90 -3.80
20.84 r.m

5.3 Terrazzo dado Tile on Walls


Along grid 1 2 5.84 1.20 14.02
Along grid 2 2 5.84 1.20 14.02
Deduction
D1 -2 1.00 1.20 -2.40
D2 -2 0.90 1.20 -2.16
Along grid A 1 3.34 1.20 4.01
Along grid B 2 3.34 1.20 8.02
Along grid C 1 3.34 1.20 4.01
Partition Wall for disable toilet 4 3.27 1.20 15.70
Partition wall for toilet short wall 8 1.32 1.20 12.67
Partition wall for toilet long wall 4 3.50 1.20 16.80
Deduction
D3 -6 0.75 1.20 -5.40
Water trough 2 1.83 0.900 3.29
2 1.83 0.750 2.74
85.29 sq.m

6 ROOFING/ TERRACING WORKS


6.1 Metal Works 1 1163.75 1,163.75
1,163.75 k.g

6.2 CGI Sheet Roofing


Sheet Area 2 14.10 2.63 74.14
74.14 sq.m

6.3 CGI Sheet Roofing Ridge


Top Ridge cover 1 14.10 14.10
14.10 r.m

6.4 GI facia (Eaves) Volume Density

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Front and back sides 2 0.007 7850 115.11
Sides 4 0.001 7850 42.93
158.04 k.g

6.5 Cement Board False Ceiling


Inside portion 1 11.40 3.20 36.48
Outside portion 1 14.10 0.79 11.12
2 4.87 0.90 8.77
56.38 sq.m

7 PLASTER/PAINTING WORKS
7.1 Cement Plaster
7.1.1 Internal Plaster on Wall (1:6)
Grid 1 & Grid 2 2 11.40 1.20 27.36
Grid 2 1 11.40 2.40 27.36
Grid 3 1 11.40 1.50 17.10
Grid A-12, B-12& C-12 3 3.20 1.40 13.44
Grid B-23 2 2.20 2.55 11.22
Partition Wall for disable toilet 4 3.27 1.80 23.54
Partition wall for toilet short wall 8 1.32 1.80 19.01
Partition wall for toilet long wall 4 3.50 1.80 25.20
Cross wall at Water trough 4 0.58 0.30 0.69
4 0.58 0.45 1.04
4 0.30 0.58 0.69
Deduction
D1 -2 1.00 2.10 -2.10
D2 -2 0.90 2.10 -1.89
V1 -2 3.48 0.38 -1.30
V2 -2 3.48 0.33 -1.13
V3 -2 1.98 0.38 -0.74
V4 -2 1.98 0.33 -0.64
158.84 Sq.m.

7.1.2 Internal Plaster on Ceiling (1:4)


Truss Beam
Grid 1 & Grid 2 2 11.40 0.45 10.26
Grid A-12, B-12& C-12 3 3.20 0.40 3.84
Slab
Corridor Slab 1 11.50 2.20 25.30
Column Copla 8 0.05 3.00 1.20
40.60 Sq.m.

7.1.3 External Plaster


7.1.3.1 External Plaster on Walls/Beam/Column
Grid 1 1 11.40 2.60 29.64
Grid 3 1 11.40 1.50 17.10
Grid A-12 & C-12 2 3.20 1.85 11.84
Plinth Beam
Grid 1 & Grid 3 2 11.40 0.45 10.26
Grid A-12 & C-12 2 3.20 0.45 2.88
Main Beam Outer
Grid 1 1 11.40 0.45 5.13
Grid 2 1 11.40 0.55 6.27
Grid 3 1 11.40 1.00 11.40
Grid A-12 & C-12 2 3.20 0.40 2.56
Grid A-23 & C-23 2 2.20 1.00 4.40
Grid B-23 1 2.20 0.85 1.87
Column Outer
Grid 1 2 0.60 3.00 3.60
1 0.30 3.00 0.90
Grid 2 3 0.60 3.00 5.40
Grid 3 2 0.90 3.00 5.40
1 0.30 3.00 0.90

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Column Copla 12 0.07 3.00 1.26
120.81 Sq.m.

7.1.4 Internal Plaster on Wall (1:4) with Cement Punning


Inside Septic Tank Wall 1.00 14.70 2.67 39.22
Inner Wall of manhole 2.00 2.40 0.23 1.09
Inner Wall of Inlet 1.00 2.55 0.69 1.75
1.00 1.05 1.02 1.07
Baffle wall 2.00 1.50 1.75 5.25
2.00 0.25 1.50 0.75
Inside Sewer Manhole 2.00 3.00 0.30 1.80
Waste Water Chamber 2.00 3.00 0.30 1.80
52.74 Sq.m

7.2 Painting Works


7.2.1 Distemper painting Works
As Per Internal Plaster on Ceilings 1.00 40.60 40.60
As Per Internal Plaster on Walls 1.00 158.84 158.84
199.44 sq.m

7.2.2 Exterior Weather Coat Paint


AS per External Plaster 1.00 120.81 120.81
120.81 sq.m

7.2.4 Enamel paint on Doors and Windows Factor


V1 2 3.48 0.38 2.00 5.21
V2 2 3.48 0.33 2.00 4.52
V3 2 1.98 0.38 2.00 2.96
V4 2 1.98 0.33 2.00 2.57
15.26 sq.m

8 MISCELLANOUS
8.2 Cement Board Wall
For Partition
Gabel wall 2 1.09 Area 2.17
2.18 sq.m

8.3 Pump Shed


1 1 1
1.00 Nos.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Tc(M)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
Tc(M) Truss
Length Breadth Height
S.N Material Description Nos Quantity Units kg/unit Quantity(kg)
(m) (m) (m)

1 Truss
10mm thick plate Base Plate 12 0.3 0.3 0.01 0.011 cu.m. 7,850 84.78
10mm thick plate Truss stiffener 12 0.3 0.05 0.01 0.002 cu.m. 7,850 14.13
10mm thick plate 12 0.3 0.0865 0.01 0.003 cu.m. 7,850 24.44
10mm thick plate 12 0.05 0.085 0.01 0.001 cu.m. 7,850 4.00

16mm dia rod Anchor bolt 24 0.45 10.800 r.m. 1.58 17.07
16mm dia nut nut 24 24.000 no. 0.03 0.75

NB 40(M) Bottom Chord 5 3.9 19.500 r.m. 3.61 70.40


NB 40(M) Verticle Struts 5 0.561 2.805 r.m. 3.61 10.13
NB 40(M) Runner 1 12 12.000 r.m. 3.61 43.32

NB 50(M) Top Chord 5 2.036 10.180 r.m. 5.10 51.92


NB 50(M) 5 2.629 13.145 r.m. 5.10 67.04

NB 32(M) Inclined Struts 10 0.912 9.120 r.m. 3.15 28.73

NB65 (M) Purlins 6 14.1 84.600 r.m. 6.53 552.44

10mm thick plate Top chord cleat 30 0.2 0.09 0.01 0.005 cu.m. 7,850.00 42.39
10mm thick plate Purlin Cleat 60 0.2 0.09 0.01 0.011 cu.m. 7,850.00 84.78

10mm dia nut bolt (50mm) nut bolt 60 60.000 no. 0.05 2.91

10mm thick plate Runner plate 16 0.175 0.07 0.01 0.002 cu.m. 7,850.00 15.39
10mm thick plate Runner box 32 0.175 0.07 0.01 0.004 cu.m. 7,850.00 30.77
10mm thick plate 32 0.08 0.07 0.01 0.002 cu.m. 7,850.00 14.07

16mm dia nut bolt (50mm) Runner box 32 32.000 no. 0.13 4.30

Total Truss 1,163.75

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building:Toilet Tc(M)
School Name : Shree Chaturmala Secondary School
Location : Muchhok, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
A Foundation for footing
Footing (F1) 9
X- direction 12 7 1.10 69.30 0.89 61.68 0.1 0.9 0.1

Y- direction 12 7 1.10 69.30 0.89 61.68 0.1 0.9 0.1

B Column 0.42
Grid 1,2,3 9
Main Bar 12 8 5.14 370.08 0.89 329.37 12mm
12 8 5.14 370.08 0.89 329.37 4.32

0.10
0.30

Stirrups 9
For 9 columns 8 44 1.04 411.84 0.40 164.74 0.08 0.08
8 44 1.04 411.84 0.40 164.74 0.22 0.16

0.22 0.16

C For Lower Tie Beam


Grid 1,2 & 3 3 8.75
Top Bar 12 3 9.70 87.26 0.89 77.66 0.72
0.225

3.47
12 3 3.70 33.26 0.89 29.60
0.225

Bottom Bar
3 12 3 2.79 25.11 0.89 22.35
0.46

1.61 0.72

12 3 11.07 99.63 0.89 88.67


0.46

10.61

Grid A,B,C
Top bar along grid A&C 2 12 3 4.17 25.02 0.89 22.27 3.72
0.225 0.225

Top bar along grid B 1 12 3 6.67 20.01 0.89 17.81 6.22


0.225 0.225

Bottom along Grid A,C 2 12 3 4.64 27.84 0.89 24.78


0.46 0.46
3.72

Bottom along Grid B 1 12 3 7.14 21.42 0.89 19.06 0.46 0.46


6.22

Stirrups (LTB)
1 8 397 0.96 381.12 0.40 152.45 0.08
0.2

0.2

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building:Toilet Tc(M)
School Name : Shree Chaturmala Secondary School
Location : Muchhok, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)

D Plinth tie beam


Grid 1,2 & 3 3 8.75 0.72
Top Bar 12 3 9.93 89.37 0.89 79.54
0.46

12 3 3.93 35.37 0.89 31.48 3.47

0.46

Bottom Bar 12 3 2.79 25.11 0.89 22.35


0.46
0.72
1.61

0.46
12 3 11.07 99.63 0.89 88.67
10.61
Bottom Bar along Grid A-2,C-2 2 12 3 4.64 27.84 0.89 24.78
0.46
0.46
3.72

Bottom Bar Along B 1 12 3 7.14 21.42 0.89 19.06 0.46 0.46

6.22

Bottom Bar Along A2-A3,C2-C3 2 16 2 4.12 16.48 1.59 26.20 0.7 0.7

2.72

Top Bar along Grid A-2,C-2 2 12 3 4.64 27.84 0.89 24.78 3.72
0.46 0.46

Bottom Bar Along B 1 12 3 7.14 21.42 0.89 19.06 3.72


0.46 0.46

Bottom Bar Along A2-A3,C2-C3 2 16 2 3.27 13.08 1.59 20.80 2.72


0.275 0.275

Stirrups (UTB) 1 8 397 1.06 420.82 0.40 168.33 0.08 0.08

8 44 1.46 64.33 0.40 25.73 0.25 0.451

0.2 0.2

E Slab Beam
Grid 1,2 & 3 3 2.63 0.96

Top Bar 16 3 4.29 38.61 1.59 61.39


0.7

16 3 10.29 92.61 1.59 147.25 9.59

0.7

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building:Toilet Tc(M)
School Name : Shree Chaturmala Secondary School
Location : Muchhok, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
Bottom Bar 12 2 2.70 16.20 0.89 14.42
0.37
1.61 0.72

0.37
12 2 10.98 65.88 0.89 58.63
10.61

Bottom Bar 16 2 2.94 17.64 1.59 28.05


0.37
0.96
1.61

0.37
16 2 10.98 65.88 1.59 104.75
10.61

Bottom Bar along Grid A,B,C 3 12 4 7.26 87.12 0.89 77.54


0.37
0.37
6.52

Top Bar Along ABC 1 12 3 7.44 22.32 0.89 19.86 0.46 6.52 0.46

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building:Toilet Tc(M)
School Name : Shree Chaturmala Secondary School
Location : Muchhok, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)

F Slab (main bar) 1.72


Straight Bar 1 10 8 8.33 66.64 0.62 41.32 0.1
6.51
1.72

10 8 8.33 66.64 0.62 41.32 0.1

6.51
1.72 1.9

cranked bar 10 7 8.42 58.94 0.62 36.54 0.1 0.1


4.61
1.9 1.72

10 7 8.42 58.94 0.62 36.54 0.1 0.1

4.61

0.845 0.845

Short span main bar 2 10 39 4.39 342.42 0.62 212.30 0.1


0.1
2.5

negative bar 1 8 7 3.85 26.95 0.40 10.78 3.85

5.7
distribution bar 4 8 3 5.70 68.40 0.40 27.36

4 8 10 2.20 88.00 0.40 35.20 2.2

G Water Trough
Right Side 2
Main Bar 8 5 2.38 23.75 0.40 9.50 0.25
0.25
1.875

8 3 3.03 18.15 0.40 7.26 0.575 1.875 0.575

Distribution Bar 8 13 0.85 22.10 0.40 8.84 0.55 0.25


0.05

Left Side 2
Main Bar 8 5 2.38 23.75 0.40 9.50 0.25
0.25
1.875

8 3 3.03 18.15 0.40 7.26 0.575 1.875 0.575

Distribution Bar 8 13 0.85 22.10 0.40 8.84 0.55 0.25


0.05

H Band
1 Sill Band 0.75 0.75
Grid 1 2 10 2 7.35 29.40 0.62 18.228 0.075 5.7 0.075

0.75
Grid 2 2 10 2 3.38 6.75 0.62 4.185 2.55 0.075
0.75 0.75
Grid 3 2 10 2 7.30 29.20 0.62 18.104 0.075 5.65 0.075

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building:Toilet Tc(M)
School Name : Shree Chaturmala Secondary School
Location : Muchhok, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
0.75 0.75
2 10 2 7.30 29.20 0.62 18.104 0.075 5.65 0.075

Grid A& C 2 10 2 4.80 19.20 0.62 11.904 0.75 3.15 0.75


0.075 0.075

Grid B 1 10 2 4.80 9.60 0.62 5.952 0.75 3.15 0.75


0.075 0.075

1 10 2 3.85 7.70 0.62 4.774 0.75 2.2 0.75


0.075 0.075

Between gridA-B & B-C 2 10 2 5.23 20.90 0.62 12.958 0.75

0.075 3.2
1.2

2 Lintel Band 0.75 0.75


Grid 1 2 10 2 7.35 29.40 0.62 18.228 0.075 5.7 0.075

0.75
Grid 2 2 10 2 3.38 6.75 0.62 4.185 2.55 0.075

Grid A& C 2 10 2 4.80 19.20 0.62 11.904 0.75 3.15 0.75


0.075 0.075

Grid B 1 10 2 4.80 9.60 0.62 5.952 0.75 3.15 0.75


0.075 0.075

1 10 2 3.85 7.70 0.62 4.774 0.75 2.2 0.75


0.075 0.075

Between gridA-B & B-C 2 10 2 5.23 20.90 0.62 12.958 0.75

0.075 3.2
1.2

Sturriups 1 8 342 0.30 102.60 0.40 12.31 0.06


0.06
0.18

I Septic Tank 1
Bottom Bar
Main Bar 8 12 7.65 91.80 0.40 36.72 7.65

Distribution Bar 8 12 2.20 26.40 0.40 10.56 2.2

Top Bar
Main Bar 8 12 7.65 91.80 0.40 36.72 7.65

Distribution Bar 8 12 2.20 26.40 0.40 10.56 2.2

CB1 1 10 4 1.90 7.60 0.62 4.71 1.9

CB 1 10 4 2.20 8.80 0.62 5.46 0.75


0.7
0.75

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building:Toilet Tc(M)
School Name : Shree Chaturmala Secondary School
Location : Muchhok, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
Stirrups 1 8 13 0.54 7.02 0.40 2.81
8 15 0.34 5.10 0.40 2.04 0.07 0.07

0.2 0.1

1.53
J Septic Tank Cover Slab 1 0.05 0.07 6.12
Main Bar Both Sides 8 13 7.77 101.01 0.40 40.40
0.59
Distribution Bar 8 44 2.02 88.88 0.40 35.55 0.07
0.05 1.31

1.32

Negative bar 8 7 1.42 9.94 0.40 3.98 0.05 0.05

Negative bar 8 10 1.75 17.50 0.40 7.00 1.65 0.05


0.05

Corner Bar 10 30 0.50 15.00 0.62 9.30 0.5

Grand Total Weight 3.49 M.T

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Tc(S)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha

Total
S. No. Description Tc(S) Unit Remarks
Quantity
A. Common Installation
1.2 Stand Alone 6 A DP MCB with Enclosure 2 2.00 nos.
B School Blocks
1 DISTRIBUTION BOARDS
1.5 6A DP MCB with Enclosure 2.00 2.00 nos.
3 General Service Light Point Wiring
3.1 One Way Light Point 14 14.00 pts.
3.3 Ceiling and Exhaust Fan Point 4 4.00 pts.
6 Sweep Ceiling/ Exhaust Fan/Wall Fan
6.2 225mm dia M/D exhaust Fan 4 4.00 nos.
7 Light Fixtures/Luminaires & Accessories
7.6 LED Wall Light 2 2.00 nos.
7.7 9 W LED Surface Mounted Cylindrical type 2 2.00 nos.
7.8 6 W LED Recessed Circular type 8 8.00 nos.
7.9 7 W LED T5 Slim Mirror Light 2 2.00 nos.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Toilet Block,Tc(M)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
Length
S. No. Description No. Quantity Unit Remarks
(m)
1 WATER SUPPLY INSTALLATION
a CPVC pipes SDR-11
50mm 1 10 10.00 r.m
40 mm 1 185 185.00 r.m
20mm 1 25 25.00 r.m
15mm 1 1.5 1.50 r.m
c CPVC Ball Valve
50mm 1 1.00 nos.
40 mm 3 3.00 nos.
20mm 2 2.00 nos.
d 40mm dia Gun Metal Check Valve 1 1.00 nos.
e Electrical Centrifugal Water Pump 1 1.00 nos.
f 1000 litres Capacity Water Storage Tank 2 2.00 nos.
2 Sewer, Rain and Waste Water Installation
110 mm 1 85 85.00 r.m
75mm 1 60 60.00 r.m
50mm 1 24 24.00 r.m

B School Blocks
1 Sanitary Installation
a Lab Sink 5 5.00 set
b Kitchen Sink 1 1.00 set
c PVC Multi Floor Trap 1 1.00 nos.

2 Sanitary Installation
a Water Closet Set 2 2.00 set
b Orissa Pan 6 6.00 set
c Hand Wash Basin 2 2.00 set
d Ladies Urinal 3 3.00 set
e Self Closing Bib Cock 14 14.00 nos.
f CP Spreader in Urinal 6 6.00 set
g Toilet Paper Holder 2 2.00 nos.
h Commode Spray 2 2.00 nos.
i PVC Multi Floor Trap 10 10.00 nos.
j Waste Coupling and PVC Bottle Trap 4 4.00 nos.
k 40mm SS Grab Bar-Side 2 2.00 nos.
l 40mm SS Grab Bar-Rear 2 2.00 nos.
m CP Foldable Hinge 4 4.00 nos.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Job: Site Development
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha

Length Breadth
S.No Description No. Height (m) Qty. Unit Remarks
(m) (m)
1 Site Clearance
Column 2 0.90 0.90 1.62
Concrete Pavement
Infront of 3LaLiEACCr(F)-A & 3-12(MsF) 1 66.70 2.50 166.75
Deduction
Ramp -2 6.70 1.33 -17.76

Side of 3-LaLiEACCr(F)-A 1 3.85 1.50 5.78


Betn of 3LaLiEACCr(F)-A & 3-12(MsF) 1 2.50 3.00 7.50
Betn of 3-12(MsF) & Toilet 1 3.00 3.00 9.00
1 2.50 1.50 3.75
Infront of Toilet 1 14.00 1.50 21.00
Side of Toilet 1 6.50 1.50 9.75

1 6.70 1.50 10.05


At Gate 1 12.00 4.00 48.00
Total 265.44 sq.m

2 Earth Work Excavation


Concrete Pavement
Infront of 3LaLiEACCr(F)-A & 3-12(MsF) 1 66.70 2.50 0.15 25.01
Deduction
Ramp -2 6.70 1.33 0.15 -2.66

Side of 3-LaLiEACCr(F)-A 1 3.85 1.50 0.15 0.87


Betn of 3LaLiEACCr(F)-A & 3-12(MsF) 1 2.50 3.00 0.15 1.13
Betn of 3-12(MsF) & Toilet 1 3.00 3.00 0.15 1.35
1 2.50 1.50 0.15 0.56
Infront of Toilet 1 14.00 1.50 0.15 3.15
Side of Toilet 1 6.50 1.50 0.15 1.46

1 6.70 1.50 0.15 1.51


At Gate 1 12.00 4.00 0.15 7.20

Excavation For Boundary Wall


Chain Link Fence 132 0.15 0.15 0.60 1.78
Excavation For Gate Column
Column 2 1.20 1.20 1.50 4.32
Excavation For Flag Pole
Flag Pole 2 0.60 0.60 1.00 0.72
2 1.10 0.50 0.15 0.17
2 1.60 0.25 0.15 0.12
1 0.60 0.40 0.15 0.04
Total 46.72 cu.m

3 Earth Back Filling


Total Excavation (Retaining Wall) 1.00 46.72 46.72
Deduction
Soling -1.00 0.33 Volume -0.33
PCC -1.00 0.54 Volume -0.54

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Length Breadth
S.No Description No. Height (m) Qty. Unit Remarks
(m) (m)
Total 45.85 cu.m

4 Boulder Soling
Concrete Pavement
Infront of 3LaLiEACCr(F)-A & 3-12(MsF) 1 66.70 2.50 0.15 25.01
Deduction
Ramp -2 6.70 1.33 0.15 -2.66

Side of 3-LaLiEACCr(F)-A 1 3.85 1.50 0.15 0.87


Betn of 3LaLiEACCr(F)-A & 3-12(MsF) 1 2.50 3.00 0.15 1.13
Betn of 3-12(MsF) & Toilet 1 3.00 3.00 0.15 1.35
1 2.50 1.50 0.15 0.56
Infront of Toilet 1 14.00 1.50 0.15 3.15
Side of Toilet 1 6.50 1.50 0.15 1.46

1 6.70 1.50 0.15 1.51


At Gate 1 12.00 4.00 0.15 7.20

Column 2 0.90 0.90 0.15 0.24


Stone Soling for Flag Pole 1 0.70 0.80 0.15 0.08
Total 39.90 cu.m
5 P.C.C.(1:3:6) Works
PCC For Gate Column
Column 2 0.90 0.90 0.08 0.12
PCC For Flag Pole
Flag Pole 2 0.30 0.30 1.20 0.22
1 2.40 0.80 0.10 0.19
2 0.30 0.30 0.08 0.01
Total 0.54 cu.m
6 P.C.C.(1:2:4) Works
Concrete Pavement
Infront of 3LaLiEACCr(F)-A & 3-12(MsF) 1 66.70 2.50 0.08 12.51
Deduction
Ramp -2 6.70 1.33 0.08 -1.33

Side of 3-LaLiEACCr(F)-A 1 3.85 1.50 0.08 0.43


Betn of 3LaLiEACCr(F)-A & 3-12(MsF) 1 2.50 3.00 0.08 0.56
Betn of 3-12(MsF) & Toilet 1 3.00 3.00 0.08 0.68
1 2.50 1.50 0.08 0.28
Infront of Toilet 1 14.00 1.50 0.08 1.58
Side of Toilet 1 6.50 1.50 0.08 0.73

1 6.70 1.50 0.08 0.75


At Gate 1 12.00 4.00 0.08 3.60
Total 19.79 cu.m

7 P.C.C For R.C.C. Works


R.C.C. Works M20
A Foundation
Gate Column Footing
Footing 2 0.90 0.90 0.25 0.41

B Column
Gate Column 2 0.30 0.30 2.95 0.53
Top RCC Coping 2 0.59 0.59 0.05 0.03
2 0.175 0.05 0.02

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Length Breadth
S.No Description No. Height (m) Qty. Unit Remarks
(m) (m)
Total 0.99 cu.m

8 Steel Reinforcement
For gate 1 106.90 106.9
Total 106.90 Kg
0.11 Tons

9 Silica Cement Admixture


10 Kg per cu.m. of R.C.C. M20 10.00 0.98831 9.88
Total 9.88 Kg

10 Formworks
A Entrance Gate-Foundation 2 3.60 0.35 2.52
Gate Column 2 1.20 3.15 7.56
Flag Pole Steps 2 0.25 0.80 0.4
Flag Pole Masonry Top Surface 1 1.70 0.50 0.85
Total 11.33 sq.m

12 Full Brick (230 mm) Works (1:4c/s)


Gate Column 2 0.54 0.23 1.85 0.46
2 0.30 0.23 0.45 0.06
Flag Pole Base 2 0.80 0.23 0.55 0.20
Total 0.72 cu.m

13 Neat Cement Skirting works


Gate Column 2 2.20 4.40
Total 4.40 r.m

14 Metal Works (Fence)


Total
Description Nos length Kg/m Total
Length
Chain Link Fence
ISA 40x40x4mm 2 328 656.00 2.40 1,574.40
ISA 50x50x5mm 132 1.90 250.80 3.80 953.04
Bracing ISA 50x50x5mm 26 2.00 52.80 3.80 200.64
Incinerator Vent Pipe 1 2.416 17.5 42.28 M=17.5
Kg/m
Total 2,770.36 k.g

15 Metal work (Entrance Gate)


Metal Gate
50mm Dia MS Pipe 2 7.13 14.26 3.61 51.48
25mm Dia MS Pipe 56 0.7 39.2 1.58 61.94
Middle sheet 1 0.74 0.0012 7850 6.97
Hole Fast 4 0.45 1.8 3.61 2.92
Total 123.31 k.g

16 Chain Link Fence(50x50 Mesh)


Fencing 1.00 328 1.20 393.60
Total 393.60 sq.m

17 External Plaster
Column Inside face 4 0.54 1.64 3.54
Column Outside face 2 1.2 0.20 0.48
4 0.54 1.70 3.67
Deduct -2 0.3 1.40 -0.84

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Length Breadth
S.No Description No. Height (m) Qty. Unit Remarks
(m) (m)
Top Coping 2 2.36 0.05 0.24
4 0.59 0.30 0.71
Total 7.80 sq.m

18 Exterior Weather Coat Paint


As per Outside Plaster 1 7.8 7.80
Gate Column Skirting 2 2.36 0.10 0.47
Total 8.27 sq.m

19 Flag Pole
75 Dia GI Pipe 2.00 1 2.00
Total 2.00 nos

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Site Development
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha

Size Spacing c/c Structure Rebar Length/pc. Total Weight Per Total Weight
SN Description Shape Remarks
(mm) (mm) Nos Nos (mm) Length (m) Meter (Kg) (Kg)

1 Entrance Gate-Column
75 75
a 900*900 Foundation Mesh 850 10 150 2 12 1000 24 0.62 14.82

b 8-12 dia Column Reinforcement 12 2 8 3770 60.32 0.89 53.62


3050+Ld

220
8 mm dia at 150 c/c for column
c 7
220 8 150 2 26 1030 53.56 0.40 21.16
stirrups-Outer 5

1
7
7 3
8 mm dia at 150 c/c for column 5
d 8 150 2 26 842 43.784 0.40 17.3
stirrups-Outer

Total of Reinforcement Work 106.90 Kg


0.11 Mt.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Job : Reservoir Water Tank
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha

Description Length Breadth Height


S. No. No. Quantity Unit Remarks
(m) (m) (m)
1 Earthworks
1.1 Site Clearance & Mobilization
For Water Tank 1 4.85 4.6 22.31
Total 22.31 sq.m

1.2 Earthwork in excavation


For Water Tank 1 3.65 3.40 1.98 24.57
Total 24.57 Cu.m.

1.3 Earthback Filling


Total Earthwork Excavated 24.57
Water Tank Volume -1 3.35 3.1 1.98 -20.56
Total 4.01 Cu.m.

1.4 Boulder soling


Below Water Tank 1 3.35 3.1 0.2 2.077
Total 2.08 Cu.m.
2 Concrete Works
2.1 PCC
2.1.1 PCC Work (1:3:6)
Below Water Tank 1 3.35 3.1 0.075 0.78
Total 0.78 Cu.m.

2.2 PCC for RCC Work 1:1.5:3


For Base Slab 1 3.35 3.10 0.18 1.82
For Water Tank Wall
Long Wall 2 3.35 0.18 1.68 1.96
Short Wall 2 2.75 0.18 1.68 1.61
Trianagle Portion
Long Wall 2 3.00 0.05 Area 0.27
Short Wall 2 2.75 0.05 Area 0.25
Slab 1 3.35 3.1 0.15 1.56
Manhole openings -1 0.6 0.6 0.15 -0.05
Total 7.41 Cu.m.

2.3 Silica Admixture


10 Kg per cu.m. of R.C.C. M20 10 7.41 74.15
Total 74.15 kg

2.5 Form works


For Base Slab 1 12.9 0.18 2.26
For Water Tank Wall
Outer Side
Long Wall 2 3.35 1.83 12.23 23.18

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Description Length Breadth Height
S. No. No. Quantity Unit Remarks
(m) (m) (m)
Short Wall 2 3.00 1.83 10.95
Inside wall
Long Wall 2 3.00 1.53 9.15
Short Wall 2 2.75 1.53 8.39
Trianagle Portion
Long Wall 2 3.00 0.30 1.80
Short Wall 2 2.75 0.30 1.65
Slab 1 3 2.75 8.25
Side for Manhole openings 1 2.4 0.15 0.36
Deduct Manhole openings -1 0.6 0.60 -0.36
Total 54.67 Sq.m.

3 PLASTERING WALL FINISHING WORKS


3.1.1 CEMENT PLASTER WORKS WITH PUNNING
Base Slab 1 2.30 2.13 4.90
For Water Tank Wall
Long Wall 2 3.05 1.37 8.36
Short Wall 2 2.78 1.37 7.62
Triangle Portion
Long Wall 2 3.00 0.42 2.54
Short Wall 2 2.78 0.42 2.36
Top Slab 1 3.00 2.75 8.25
Deduct Manhole openings -1 0.6 0.60 -0.36
Total 33.66 Sq.m.

4 Water Proof Coating


Inside Water tank 1 33.66
Total 33.66 sq.m

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Job : Reservoir Water Tank
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
Bar Bending Schedule
Cut Total
Dia. of No. of Wt/m Weight
S. No. Description No. Length Length Bar Shape
Bar (mm) Bars (Kg) (Kg)
(m) (m)
A Outer Vertical Bars 1
1 Shorter Span 10 33 7.01 231.33 0.62 143.42 0.083 0.083

1.915 1.915

3.02

2 Longer span 10 28 7.286 204.008 0.62 126.48


0.083 0.083

1.915 1.915

3.29

B Inner Vertical Bars 2


1 Shorter Span 10 33 2.503 165.198 0.62 102.4228 0.079 0.079

1.884 1.884

0.05
0.49 0.49

2 Longer Span 10 28 2.503 170.204 0.62 105.5265 0.079 0.079

1.884 1.884

0.05
0.49 0.49

C. Extra Bars 2 10 62 1.79 221.96 0.62 137.62 0.6 0.6

0.592
0.592 0.6 0.6

D. Horizontal Bars(outer 4
0.3 0.3
1 Shorter Span 10 20 3.62 289.6 0.62 179.552

3.02 3.02

0.3 0.3

2 Longer Span 10 20 3.87 309.6 0.62 191.952 0.3 0.3

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Cut Total
Dia. of No. of Wt/m Weight
S. No. Description No. Length Length Bar Shape
Bar (mm) Bars (Kg) (Kg)
(m) (m)

3.27 3.27

0.3 0.3
E. Base Slab bar 4
1 Shorter Span 10 32 3.14 401.92 0.62 249.19 3.045
0.05 0.05

2 Longer Span 10 28 3.42 383.04 0.62 237.48 3.32


0.05 0.05
1473.65 Kg
1.47 Mt.

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer