Shree Chaturmala SS, Muchhok
Shree Chaturmala SS, Muchhok
Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract
GENERAL
1. MOBILIZATION AND DEMOBILIZATION
1 L.S. 1.00 500,000.00 500,000.00 1.00 500,000.00 0.50 250,000.00 0.50 250,000 100.00%
Mobilization of the construction by constructing
temporary
2. SITE OFFICE acomodation for labours and site staff with Per
ESTABLISHMENT
2 required 21.00 25,000.00 525,000.00 21.00 525,000.00 18.00 450,000.00 3.00 75,000 100.00%
Providingsuitable facilities andSite
and Maintaining keeping
Officetheofsame
two inRoomsgood Month
hygenic
having condition
total Area for sq.m
20 entireforproject
the use completion
of Clienttime. and
3. PROJECT INFORMATION BOARD
3 Demolition including
Consultant of the same and cleaning
Table, the site after
file nos. 1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 - - 100.00%
Providing and Fixing office of Projectchair,
Information Lockable
board with
completion
cabinet, of the Items
Stationery construction activities all complete.
approved
4. SAFETY Text
SIGN appropriate location including all1
in BOARD (Ink, Paper, Pen, Pencils etc.),
4 [Note: 50% and
Computer payment shallwith
1 Printer be made
all after completion
necessary set up. all of nos. 1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 - - 100.00%
required
Providingfixing
and and accessories
Fixing as per
of Safety drawing
Sign Board all complete.
with approved
mobilization
complete as per remaining
instruction 50%
of engineer.afterThecompletion
Specification of
Text
5.
works and
SAFETYas Sinage
per including required
MATERIALS
contract] & SITE fixing
SAFETY accessories as
5 of computer shall not be less than (19.5" led monitor with L.S. 1.00 100,000.00 100,000.00 1.00 100,000.00 0.95 95,000.00 0.05 5,000 100.00%
per drawing
Providing andallMaintaining
complete. Construction Safety Measures
Core i5, 7th Generation, 500 gb Hdd, 8gb ddr 4 ram),
in
6. Construction
LAB
Printer TEST(WATER
should Site with
function atTEST)proper
least Safety Scanning
of Printing, measuresand to
6 person and work areasize(Helmet, Shoes, Providing
First Aid Kit, job 1.00 - - - - - - - 0.00%
Testing
Photocopy and of Providing
A4 Lab Test Report
documents. for Quality andof
Clothing,
Water
Maintaining Glove,
in Water Guard
Stream
all above Rail
(Up and
items for edge protection,
Down Basis
on Rental streem) Safety
forlocated
entire
7. TEMPORARY TOILET
7 Net,
near Safety rope, Fall
bycompletion
Construction Protection
sitetoilet etc.) as required
before byafter
the nos. 2.00 150,000.00 300,000.00 2.00 300,000.00 2.00 300,000.00 - - 100.00%
project
Construction time.
of temporary with Starting
CGI Sheetand fixed to
Contract Clause
completion GCC 24 and
of construction work.Specification
Test division
This items has to be 1
Bamboo
8. ROAD support
REPAIR frame
AND and all necesary
MAINTENANCE including
8 "GENERAL
done to mark REQUIREMENT
the affect of CLAUSEwork
construction 8(C)".in The Km.
water 30.00 50,000.00 1,500,000.00 30.00 1,500,000.00 30.00 1,500,000.00 - - 100.00%
Septic pit, and
Providing Pipeline, Toilet Pan
Maintaining the etc. for
roads as entire
necessary projectto
number of Safety Materials Personal Protecting
stream.
completion
avoid blockage timeby all completeandasRockfall
Landslides per Instruction of
Equipments (PPE) shall be minimum but notfor regular
limited to - - - - - -
Engineer.
transport Rate
of shall include
construction all Material
materials and cost
site with fixing,
inspection
35 sets.
CIVIL Payment
WORKS- shall be
BUILDING made in Prorata Basis for entire - - - - - - -
construction
during charges and demolition & cleaning of the
durationoverall construction period. Rate shall include all
of project.
1 same
Material
EARTH after
costcompletion
WORKS with demolitionof thecharges,
construction activities
cleaning, fixing all
& - - - - - - -
complete. charges of the same after completion of the
construction
SITE CLEARANCE & MOBILIZATION:
1.1 construction
Clearing andactivities
grubbing the site for construction by sq.m
all complete. 1,211.02 100.00 121,102.00 1,284.25 128,424.61 587.77 58,776.75 696.48 69,648 106.05%
removing
1.2 EARTHWORK150mm thick top soil including: bushes, small
IN EXCAVATION
1.2 trees, leveling of undulated ground, shorting and cu.m 628.72 400.00 251,488.00 606.65 242,661.88 734.08 293,631.88 - 127.42 (50,970) 96.49%
Excavation in foundations in all type of soils for
stacking/storing
foundation, selected
trenches, top soilpits
footing, for reusetointhelandscaping
1.3 EARTH
works, BACK
disposing FILLING
unsuitable : etc.from
materials
required
1.3 depth
Back including
filling in dewatering
foundation andbysides
manual
of or site, etc., all
mechanical
foundation with
cu.m 376.45 300.00 112,935.00 378.36 113,509.01 343.34 103,000.72 35.03 10,508 100.51%
complete
means etc.asasper
per drawings,
specifications specifications
with all and instructions
contractor’s own
approved
1.4
of BOULDER
the soil obtained
Engineer. SOLING from
: the excavation at site and
machinery
1.4 stacked at and
site equipment's,
or brought providing
from crossing
outside in of track,
layer not cu.m 191.35 6,000.00 1,148,100.00 236.60 1,419,585.45 163.68 982,108.50 72.91 437,477 123.65%
Providing and laying uncoursed hand packed Dry Rubble
shoring, strutting,
exceeding 15 in timbering
cmfoundation,
thick (compacted andthickness)
buttressing with
Stone
1.5 SANDsolingFILLING : under floor plinth including
with out
appropriate materials
transportation
1.5 any of soil,of and all such
spreading measuresline
in required necessary
and level,to cu.m 5.44 6,000.00 32,640.00 9.62 57,695.40 - - 9.62 57,695 176.76%
specialand
Providing dressing
filling stone including allfilling interstices
retain in position
sprinkling water, thesand
ramming,
in soak
sides pit.foundation
of the
compacting
complete
withquarry pitas and
mechanical
per
with suitable
drawings, quarry
specifications waste andorinstruction
stone chipsof orthe Engineer.sand,
2. CONCRETE
including refilling
rammers, testing, WORKS
the excavated
etc., using
all completematerial with watering,
as permechanical
drawing,
2.1 watering, compacting appropriate cu.m 33.40 14,000.00 467,600.00 33.06 462,867.56 28.42 397,904.06 4.64 64,964 98.99%
2.1 P.C.C leveling
ramming,
specification the siteof the andEngineer.
disposing off the
compaction and meansinstructions
with all contractors materials,
2.1.1 P.C.C (1:3:6)earth to outside the construction
surplus/unusable
handling, placing etc. all complete as per drawings,
Providing
premises, etc.andall laying
complete machine mixed Plain
as per drawings, Cement
specifications
specifications and instruction of the Engineer. The
Concrete of nominal
and instructions of the mix 1:3:6 (1 cement : 3 sand : 6
Engineer.
complete item including all lead & lift.
coarse
Prepared by contractor aggregate ) for Checked by Consultant, DSC and
leveling course in foundations Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
under floor of building, etc. in all level with broken stone
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract
Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract
Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract
- - - - - -
C SOLAR PV SYSTEM - - - - - -
1. Solar PV Panel
1.1 1.1. 24V 250W PV Module No 8 26,000.00 208,000.00 8.00 208,000.00 - 8.00 208,000 100.00%
2. Tubular Deep cycle Battery
2.1 2.1. 12V, 200Ah@C10 Tubular Solar Battery No 4 30,000.00 120,000.00 4.00 120,000.00 - 4.00 120,000 100.00%
3 Hybrid Inverter No 1 100,000.00 100,000.00 1.00 100,000.00 - 1.00 100,000 100.00%
FIRE EXTINGUISHER
a) Supplying Fire extinguisher ABC stored Pressure
D 5.0kg size ABC stored pressure type Fire extinguisher. Nos. 6 8,000.00 48,000.00 6.00 48,000.00 - 6.00 48,000 100.00%
b) Dry Powder Fire Extinguisher Nos. 1.00 8,000.00 8,000.00 1.00 8,000.00 - 1.00 8,000 100.00%
- - - - - -
Bill No. 4 Sanitary Works - - - - - -
A Piping Works - - - - - -
1 WATER SUPPLY INSTALLATION - - - - - -
a CPVC pipes SDR-11 - - - - - -
50mm r.m 10.00 1,600.00 16,000.00 10.00 16,000.00 - 10.00 16,000 100.00%
40 mm r.m 190.00 700.00 133,000.00 185.00 129,500.00 - 185.00 129,500 97.37%
20mm r.m 26.00 500.00 13,000.00 25.00 12,500.00 - 25.00 12,500 96.15%
15mm r.m 2.00 1,500.00 3,000.00 1.50 2,250.00 - 1.50 2,250 75.00%
c CPVC Ball Valve - - - - - -
50mm nos. 1.00 2,000.00 2,000.00 1.00 2,000.00 - 1.00 2,000 100.00%
40 mm nos. 3.00 900.00 2,700.00 3.00 2,700.00 - 3.00 2,700 100.00%
25 mm nos. 2.00 400.00 800.00 2.00 800.00 - 2.00 800 100.00%
d 40mm dia Gun Metal Check Valve nos. 1.00 4,500.00 4,500.00 1.00 4,500.00 - 1.00 4,500 100.00%
e Electrical Centrifugal Water Pump nos. 1.00 12,500.00 12,500.00 1.00 12,500.00 - 1.00 12,500 100.00%
f 1000 litres Capacity Water Storage Tank nos. 2.00 3,400.00 6,800.00 2.00 6,800.00 - 2.00 6,800 100.00%
2 Sewer, Rain and Waste Water Installation - - - - - -
110 mm r.m 88.00 1,400.00 123,200.00 85.00 119,000.00 - 85.00 119,000 96.59%
75mm r.m 61.00 1,200.00 73,200.00 60.00 72,000.00 - 60.00 72,000 98.36%
50mm r.m 25.00 350.00 8,750.00 24.00 8,400.00 - 24.00 8,400 96.00%
- - - - - -
B School Blocks - - - - - -
1 Sanitary Installation - - - - - -
a Lab Sink set 5.00 30,000.00 150,000.00 5.00 150,000.00 - 5.00 150,000 100.00%
b Kitchen Sink set 1.00 35,000.00 35,000.00 1.00 35,000.00 - 1.00 35,000 100.00%
c PVC Multi Floor Trap nos. 1.00 600.00 600.00 1.00 600.00 - 1.00 600 100.00%
- - - - - -
2 Sanitary Installation - - - - - -
a Water Closet Set set 2.00 34,000.00 68,000.00 2.00 68,000.00 - 2.00 68,000 100.00%
b Orissa Pan set 6.00 3,100.00 18,600.00 6.00 18,600.00 - 6.00 18,600 100.00%
c Hand Wash Basin set 2.00 8,000.00 16,000.00 2.00 16,000.00 - 2.00 16,000 100.00%
d Ladies Urinal set 2.00 110,000.00 220,000.00 3.00 330,000.00 - 3.00 330,000 150.00%
e Self Closing Bib Cock nos. 14.00 4,000.00 56,000.00 14.00 56,000.00 - 14.00 56,000 100.00%
f CP Spreader in Urinal set 6.00 2,500.00 15,000.00 6.00 15,000.00 - 6.00 15,000 100.00%
g Toilet Paper Holder nos. 2.00 2,600.00 5,200.00 2.00 5,200.00 - 2.00 5,200 100.00%
h Commode Spray nos. 2.00 2,000.00 4,000.00 2.00 4,000.00 - 2.00 4,000 100.00%
i PVC Multi Floor Trap nos. 10.00 600.00 6,000.00 10.00 6,000.00 - 10.00 6,000 100.00%
j Waste Coupling and PVC Bottle Trap nos. 4.00 1,500.00 6,000.00 4.00 6,000.00 - 4.00 6,000 100.00%
k 40mm SS Grab Bar-Side nos. 2.00 4,500.00 9,000.00 2.00 9,000.00 - 2.00 9,000 100.00%
l 40mm SS Grab Bar-Rear nos. 2.00 4,500.00 9,000.00 2.00 9,000.00 - 2.00 9,000 100.00%
m CP Foldable Hinge nos. 4.00 5,500.00 22,000.00 4.00 22,000.00 - 4.00 22,000 100.00%
- - - - - -
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block, 3-LaLiEACCr(F)-A, 3-12C(MsF)
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha
Abstract of Cost
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
1 EARTH WORKS
1.1 Site Clearance 1 34.50 14.50 500.25
Total 500.25 sq.m
Ramp
For Slope 1 1.30 0.52 Area 0.67
Wall Along Grid B 1 0.50 0.45 0.45 0.10
Wall Parallel to Ramp 1 6.80 0.45 0.41 1.25
Total 249.69 cu.m
Filling in Floor
Classroom 4 6.70 5.70 0.18 26.73
Staircase 1 6.70 4.20 0.18 4.92
Corridor 4 5.70 2.20 0.18 8.78
1 4.20 2.20 0.18 1.62
Total 127.36 cu.m
Ramp
Slopped Portion 1 1.30 1.36 Area 1.77
Wall Along Grid B 1 0.50 0.45 0.10 0.02
Wall Parallel to Ramp 1 6.80 0.45 0.10 0.31
Classroom
Class Room 4 5.70 6.70 0.20 30.55
Corridor 4 5.70 2.20 0.20 10.03
1 4.20 2.20 0.20 1.85
Below Staircase 1 4.20 6.65 0.20 5.59
Total 105.72 cu.m
2 CONCRETE WORKS
2.1 P.C.C.
2.1.1 P.C.C.(1:3:6) Works
Footing
Isolated F1 2 2.50 2.50 0.10 1.25
Isolated F2 4 3.00 3.00 0.10 3.60
Combined CF1 3 1.80 5.00 0.10 2.70
Combined CF2 1 3.00 5.00 0.10 1.50
Combined CF3 2 2.80 5.00 0.10 2.80
Ramp
Sloped 1 1.30 0.51 Area 0.66
Wall Top 1 1.33 0.25 0.05 0.02
1 6.80 0.13 0.05 0.04
Beam
Foundation beam (300x400)
Along Grid A & F 2 3.50 0.30 0.40 0.84
Along Grid B 1 3.30 0.30 0.40 0.40
Grid C & D 2 3.55 0.30 0.40 0.85
Along Grid E 1 3.25 0.30 0.40 0.39
Along Grid 1 1 12.50 0.30 0.40 1.50
Along Grid 2,3 2 15.10 0.30 0.40 3.62
Secondary Beam
Along grid 1a 2 10.98 0.25 0.30 1.65
Along grid 1b 1 4.20 0.25 0.30 0.32
Along grid A1,B1,D1 & E1 4 8.65 0.25 0.30 2.60
Secondary Beam
Along grid 1a 2.00 10.98 0.25 0.30 1.65
Along grid 1b 1.00 4.20 0.25 0.30 0.32
Along grid A1,B1,D1 & E1 4.00 8.65 0.25 0.30 2.60
Secondary beam(250x425)
Grid 1a 1 4.20 0.25 0.30 0.32
Column
Column below Plinth level
Total columns(500x500) 18 0.50 0.50 1.05 4.73
Slab
First floor level (+3.00m Lvl) 1 305.15 Area 0.13 38.14
Deduction
Column deduction -18 0.50 0.50 0.13 -0.56
Staircase Void -1 4.78 4.20 0.13 -2.61
Projections
At Back 2 11.50 0.70 0.13 2.01
Projections
At Back 2 11.50 0.70 0.13 2.01
Projections
At Back 2 13.10 1.10 0.13 3.60
At Front 2 12.00 1.10 0.13 3.30
1 7.00 1.60 0.13 1.40
At Sides 2 9.80 1.10 0.13 2.70
Staircase
Ground floor level
Bottom 1 2.07 2.00 0.20 0.83
Landing 1 2.20 2.00 0.20 0.88
1 2.00 2.10 0.20 0.84
Waist Slab 1 6.75 2.00 0.20 2.70
Steps 20 0.03 Area 2.00 1.20
Landing Beam 1 4.00 0.25 0.38 0.38
Vertical Bands
Ground Floor level
Along Grid 2 8.00 0.08 0.23 2.48 0.34
First floor level
Along Grid 2 8.00 0.08 0.23 2.48 0.34
Second floor level
Along Grid 2 8.00 0.08 0.23 2.48 0.34
Lintel Bands
Ground floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.23 0.08 0.67
Along grid 1 1.00 22.20 0.23 0.08 0.38
Along grid 2 1.00 21.60 0.23 0.08 0.37
First floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.23 0.08 0.67
Along grid 1 1.00 22.20 0.23 0.08 0.38
Along grid 2 1.00 21.60 0.23 0.08 0.37
Sill Bands
Ground floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.23 0.08 0.67
Along grid 1 1.00 26.20 0.23 0.08 0.45
Along grid 2 1.00 21.60 0.23 0.08 0.37
Pedestal
Base Block 14 0.50 0.25 0.25 0.44
Parapet Wall
Top Floor 2.00 36.53 0.35 0.10 2.56
1.00 7.50 0.35 0.10 0.26
Roof Level 1.00 33.00 0.35 0.10 1.16
Bench
Bench Top Slab 2 2.40 0.50 0.08 0.18
Total 365.18 cu.m
2.4 Formworks
A Foundation
Isolated footing
Isolated F1 2 10.00 0.25 5.00
Isolated F2 4 12.00 0.25 12.00
Combined footing
Beam
Foundation beam (300x400)
Along Grid A & F 2 3.50 0.80 5.60
Along Grid B 1 3.30 0.80 2.64
Grid C & D 2 3.55 0.80 5.68
Along Grid E 1 3.25 0.80 2.60
Along Grid 1 1 12.50 0.80 10.00
Along Grid 2,3 2 15.10 0.80 24.16
Along Grid 1 1 26.00 0.80 20.80
Along Grid 2,3 2 26.00 0.80 41.60
Secondary beam(250x425)
Grid 1a 4 5.45 0.85 18.53
Grid 1b 1 4.20 0.70 2.94
Grid A1,B1,D1,E1 4 8.90 0.85 30.26
Edge Beam(125x525)
Grid B,C 1 7.90 1.05 8.30
Secondary beam(250x425)
Grid 1a 4 5.45 0.85 18.53
Grid 1b 1 4.20 0.70 2.94
Grid A1,B1,D1,E1 4 8.90 0.85 30.26
Secondary beam(250x425)
Grid 1a 4 5.45 0.85 18.53
Grid 1b 1 4.20 0.70 2.94
Secondary beam(250x425)
Grid 1a 1 4.20 0.85 3.57
Column
Column below Plinth level
Total columns(500x500) 18 2.00 2.88 103.50
Slab
First floor level (+3.00m Lvl) 1 28.80 9.80 282.24
Cantilever slab back side 2 11.75 0.70 16.45
Cantilever slab front side 1 6.15 1.00 6.15
Deduction
Void deduction -1 4.75 4.20 -19.95
Main beam(300x500)
Along grid 1,2,3 -3 26.00 0.30 -23.40
Along Grid A,B,E,F -4 8.50 0.30 -10.20
Along Grid C,D -2 9.25 0.30 -5.55
Secondary beam(250x425)
Grid 1a -4 5.45 0.25 -5.45
Grid 1b -1 4.20 0.25 -1.05
Grid A1,B1,D1,E1 -4 8.90 0.25 -8.90
Edge Beam(125x525)
Grid B,C -1 7.90 0.13 -0.99
Main beam(300x525)
Along grid 1,2,3 -3 26.00 0.30 -23.40
Along Grid A,B,E,F -4 8.50 0.30 -10.20
Along Grid C,D -2 8.50 0.30 -5.10
Secondary beam(250x425)
Grid 1a -4 5.45 0.25 -5.45
Grid 1b -1 4.20 0.25 -1.05
Grid A1,B1,D1,E1 -4 8.90 0.25 -8.90
Main beam(300x525)
Along grid 1,2,3 -3 26.00 0.30 -23.40
Along Grid A,B,E,F -4 8.50 0.30 -10.20
Along Grid C,D -2 8.50 0.30 -5.10
Secondary beam(250x425)
Grid 1a -4 5.45 0.25 -5.45
Grid 1b -1 4.20 0.25 -1.05
Grid A1,B1,D1,E1 -4 8.90 0.25 -8.90
Secondary beam(250x425)
Grid 1a -1 4.20 0.25 -1.05
Staircase
Ground floor level
Bottom 1 2.07 0.20 0.41
Waist Slab 1 6.75 2.00 13.50
Side 1 6.75 0.20 1.35
Landing 1 2.20 1.65 3.64
1 2.00 2.15 4.29
Side 1 3.80 0.15 0.57
Riser 20 2.00 0.15 6.00
Landing Beam 1 4.00 0.86 3.44
Lintel Bands
Ground floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.15 5.85
Along grid 1 1.00 22.20 0.15 3.33
Sill Bands
Ground floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.15 5.85
Along grid 1 1.00 26.20 0.15 3.93
Along grid 2 1.00 21.60 0.15 3.24
Below staircase 1.00 4.23 0.15 0.63
Pedestal
Base Block 14 1.25 0.25 4.38
Parapet Wall
Top Floor 2.00 36.53 0.25 18.27
1.00 7.50 0.25 1.88
Roof Level 1.00 33.00 0.25 8.25
Bench
Bench Top Slab 2 5.80 Perimeter 0.08 0.87
Bottom 2 5.80 0.60 6.96
Deduction -4 0.13 0.50 -0.25
Total 2484.56 sq.m
3 BRICK WORKS
3.2 Brick Masonary Works (1:4 c/s)
Parapet Wall
Top Floor 2.00 36.53 0.23 0.80 13.44
1.00 7.50 0.23 1.40 2.42
Roof Level 1.00 33.00 0.23 0.90 6.83
5 FLOORING WORKS
5.1 Hardened Cement Concrete Flooring (40mm) With Neat Cement Punning
Ground floor plan
Class Room 2 5.75 6.75 77.63
2 5.78 6.75 77.96
Corridor 1 24.30 2.53 61.36
1 4.50 2.53 11.36
Roof plan
Roof Floor Slab 1 5.50 10.50 57.75
Total 1219.24 sq.m
7 PLASTER/PAINTING WORKS
7.1 Cement Plaster
7.1.1 Internal Plaster on Wall (1:6)
Ground Floor
Classroom 2.00 25.35 2.88 145.76
2.00 25.30 2.88 145.48
Staircase 1.00 17.45 2.88 50.17
Column
Grid 2C,2D 2.00 1.23 2.88 7.04
Grid 2B,2E 2.00 0.75 2.88 4.31
Deductions
W1 -16.00 1.10 1.13 -19.80
V1 -16.00 1.10 0.53 -9.24
D1 -8.00 1.10 2.44 -21.43
W3 -1.00 1.50 0.37 -0.56
First Floor
Classroom 2.00 25.35 2.88 145.76
2.00 25.30 2.88 145.48
Staircase 1.00 17.45 2.88 50.17
Column
Grid 2C,2D 2.00 1.23 2.88 7.04
Grid 2B,2E 2.00 0.75 2.88 4.31
Deductions
W1 -16.00 1.10 1.13 -19.80
V1 -16.00 1.10 0.53 -9.24
W2 -1.00 1.50 1.00 -1.50
D1 -8.00 1.10 2.44 -21.43
Second Floor
Class Room 2.00 25.30 2.88 145.48
2.00 25.35 2.88 145.76
Staircase 1.00 17.45 2.88 50.17
Column
Grid 2C,2D 2.00 1.23 2.88 7.04
Grid 2B,2E 2.00 0.75 2.88 4.31
Deductions
W1 -16.00 1.10 1.13 -19.80
V1 -16.00 1.10 0.53 -9.24
W2 -1.00 1.50 1.00 -1.50
D1 -8.00 1.10 2.44 -21.43
Top Floor
First Floor
Main Beam (300x525)
Along grid 1 1.00 26.20 0.53 13.76
Slab Extension 1.00 23.50 1.23 28.79
Landing Beam 1.00 4.00 0.81 3.24
Landing Beam Extension 1.00 4.00 1.23 4.90
Along grid A and F 2.00 6.50 0.53 6.83
Top Floor
Main Beam (300x525)
Along grid 1 1.00 26.20 0.53 13.76
Slab Extension (All Sides) 1.00 88.77 Area 88.77
Slab Extension (Top Side) 1.00 20.45 Area 20.45
Landing Beam 1.00 4.00 0.81 3.24
Landing Beam Extension 1.00 4.00 1.23 4.90
Along grid A and F 2.00 6.50 0.53 6.83
Column Plaster
Ground Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 3
Grid 3A,3B,3C,3D,3E,3F 2.00 0.80 2.50 4.00
6.00 1.20 2.50 18.00
Grid 3A,3B,3C,3D 2.00 1.20 3.00 7.20
6.00 0.80 3.00 14.40
First Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 2
Grid 2A,2F 2.00 1.25 3.00 7.50
Grid 2C,2D 2.00 1.23 2.50 6.13
Grid 2B,2E 2.00 0.75 2.50 3.75
Along grid 3
Grid 3A,3F 2.00 1.20 3.00 7.20
Grid 3B,3C,3D,3E 4.00 0.70 3.00 8.40
Grid 3A,3F 2.00 0.80 2.50 4.00
Grid 3B,3C,3D,3E 4.00 1.30 2.50 13.00
Second Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 2
Parapet Wall
Top Floor 2.00 35.90 0.80 57.44
1.00 7.50 1.40 10.50
Roof 1.00 32.00 0.90 28.80
Plaster on Walls
Ground floor level
Along grid A,B,C,D,E,F 6.00 6.50 2.48 96.53
Along grid 1 4.00 5.50 2.48 54.45
1.00 4.00 2.48 9.90
Along grid 2 4.00 5.50 2.48 54.45
First floor level
Along grid A,B,C,D,E,F 6.00 6.50 2.48 96.53
Along grid 1 4.00 5.50 2.48 54.45
1.00 4.00 2.48 9.90
Along grid 2 4.00 5.50 2.48 54.45
Second floor level
Along grid A,B,C,D,E,F 6.00 6.50 2.48 96.53
Along grid 1 4.00 5.50 2.48 54.45
1.00 4.00 2.48 9.90
Along grid 2 4.00 5.50 2.48 54.45
Parapet Wall
Top Floor 2.00 36.53 2.28 166.58
1.00 7.50 2.88 21.60
Roof Level 1.00 33.00 0.23 2.28 17.31
8 MISCELLANOUS
8.4 Railing
Total
Staircase Railing length Kg/m
Length
Horizontal ISNB 40M 1 22.82 22.82 3.56 81.23
Horizontal ISNB 40M (Top Floor) 1 2.13 2.13 3.56 7.57
Vertical 38mm Square Pipe 6 0.92 5.52 2.82 15.57
Vertical 38mm Square Pipe 20 0.95 19.00 2.82 53.58
Horizontal 25mm Square Pipe 4 22.82 91.27 0.85 77.58
Horizontal 25mm Square Pipe (Top Floor) 4 2.13 8.50 0.85 7.23
Base plate 21 0.00 0.00 7850.00 15.45
12 mm dia. Anchor Bolt, Nut 84 0.13 10.92
Balcony Railing
First Floor
Horizontal ISNB 40M 1 30.20 30.20 3.56 107.51
Horizontal ISNB 32M 2 30.20 60.40 3.10 187.24
Vertical ISNB 32M 23 1.14 26.22 3.10 81.28
Inclined ISNB 32M 23 0.13 3.08 3.10 9.55
Vertical 25mm Square Pipe 208 0.82 170.56 0.85 144.98
Base plate 33 0.00 0.00 7850.00 24.29
12 mm dia. Anchor Bolt, Nut 132 0.13 17.16
Second Floor
Horizontal ISNB 40M 1 30.20 30.20 3.56 107.51
Horizontal ISNB 32M 2 30.20 60.40 3.10 187.24
Vertical ISNB 32M 23 1.14 26.22 3.10 81.28
Inclined ISNB 32M 23 0.13 3.08 3.10 9.55
Vertical 25mm Square Pipe 208 0.82 170.56 0.85 144.98
Base plate 33 0.00 0.00 7850.00 24.29
12 mm dia. Anchor Bolt, Nut 132 0.13 17.16
Parapet Wall
ISNB 40M(Horizontal Bars) 2 36.53 73.06 3.56 260.09
ISNB 32M(Horizontal Bars) 2 36.53 73.06 3.10 226.49
Vertical ISNB 32M 60 0.40 24.00 3.10 74.40
Inclined ISNB 32M 60 0.13 8.04 3.10 24.92
Vertical 25mm Square Pipe 492 0.30 147.60 0.85 125.46
Base plate 62 0.00 0.01 7850.00 45.63
12 mm dia. Anchor Bolt, Nut 248 0.13 32.24
Pedestal
ISNB 40M Pedestal Bars 14 1.54 21.57 3.56 76.80
2 Column
2.1 Grid 1 (A ,B,E &F) 4
Main Bar 16 6 3.59 86.11 1.59 136.92 16mm
16 6 6.59 158.11 1.59 251.40 6.18 3.18 16mm
0.10 0.1
0.31 0.31
2.2 Grid 1 ( C ) 1
Main Bar 20 4 4.07 16.27 2.47 40.19
16 2 3.59 7.18 1.59 11.41 20mm 16mm
16 6 6.59 39.53 1.59 62.85 16mm 6.18
3.42 3.18
2.3 Grid 1 ( D ) 1
Main Bar 20 6 4.07 24.42 2.47 60.32
20 6 7.07 42.41 2.47 104.75 20mm 20mm
6.42 3.42
0.12 0.12
0.53 0.53
0.12 0.12
0.53 0.53
2.6 Grid 3 (A,B,C,D,E & F) 6
Main Bar 20 6 4.07 146.52 2.47 361.90
20 6 7.26 261.23 2.47 645.23 20mm 20mm
3.42 6.42
0.12 0.12
0.53 0.53
2.7 Stirrups 18
For 18 columns 8 12 1.84 397.44 0.40 158.98 0.08
8 24 1.28 552.96 0.40 221.18 0.42 0.14 0.08
0.42
0.42
3 For Lower Tie Beam
3.1 Grid 1,2 & 3 3 8.73
Top Bar 16 2 10.04 60.24 1.59 95.78 0.96
0.35
End bar from both
direction
16 2 11.46 68.76 1.59 109.33 11.46
8.73
16 2 10.04 60.24 1.59 95.78 0.96
0.35
2.94
Middle bar 16 1 4.25 12.75 1.59 20.27 0.96
0.35
0.25
8.61
20 2 10.24 61.41 2.47 151.68 1.2
0.425
2.94
Middle bar 16 1 4.33 12.98 1.59 20.63 0.96
0.425
16 1 12.00 36.00 1.59 57.24 12
2.94
16 1 4.33 12.98 1.59 20.63 0.96
0.425
Bottom Bar
End bar from both 20 2 11.65 69.90 2.47 172.65
0.94
direction 9.51 1.2
0.66
16 1 11.37 34.11 1.59 54.23 0.96 9.75
0.25 0.25
5 Column ( Up To 1st Floor Level)
5.1 Grid 1 (A ,B,E & F) 4
Main Bar 16 6 6.96 167.04 1.59 265.59 16mm
6
0.96
5.2 Grid 1 ( C ) 1
Main Bar 20 4 7.20 28.80 2.47 71.14
16 2 6.96 13.92 1.59 22.13 20mm 16mm
0.12 0.96
5.3 Grid 1 ( D ) 1
Main Bar 20 6 7.20 43.20 2.47 106.70
6 20mm
2.47
1.2
1.20 0.96
1.2
1.20
5.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
1.59 0.42
0.42
6 For Staircase
(Plinth level to 1st floor level)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77 0.3
3.354
2.472
0.4
2.042 1.03
0.2
1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1
1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1 0.15
1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1
1
2.147 0.15
1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2
1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1
4.92
6.1 Landing Beam 1 20 3 5.62 16.86 2.47 41.64 0.35 0.35
4.46 1.5
1.29
6 25 2 6.75 81.00 3.86 312.66 5.46
7.2 Grid 1
0.94
Bottom Bar (end bar) 1 20 2 5.65 11.30 2.47 27.91 1.2
3.51
0.94
20 2 9.85 19.70 2.47 48.66
1.2 7.71
Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66
0.96 8.73
16 2 10.35 20.70 1.59 32.91
0.66
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12
0.96
16 1 12.00 12.00 1.59 19.08 11.04
0.66
16 1 4.56 4.56 1.59 7.25 2.94
0.96
0.94
20 4 9.85 39.40 2.47 97.32
1.2 7.71
0.94
Middle Bar 20 4 3.85 15.40 2.47 38.04
1.2 1.71
20 4 9.00 36.00 2.47 88.92
9
3.5
3 25 4 3.80 45.60 3.86 176.02 0.15 0.15
4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45 0.45
250
7.9 Stirriups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425
0.25
7.10 For Secondry Beam 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375
0.2
between 2 & 3
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2
0.96
10.2 Grid 1 ( C ) 1
Main Bar 20 4 7.20 28.80 2.47 71.14
16 2 6.96 13.92 1.59 22.13 20mm 16mm
0.12 0.96
10.3 Grid 1 ( D ) 1
Main Bar 20 6 7.20 43.20 2.47 106.70
6 20mm
2.47
1.2
1.20 0.96
1.2
1.20
11 For Staircase
(1st Floor level to 2nd Floor Level)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77 0.3
3.354
2.472
0.4
2.042 1.03
0.2
1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1
1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1 0.15
1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1
1
2.147 0.15
1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1
0.2
12 Main Beam(Second Floor Level)
12.1 Grid A,B,C,D,E & F
Bottom bar (End Bar) 6 25 2 7.25 87.00 2.47 214.89 1.29
4.46 1.5
1.29
6 25 2 6.75 81.00 3.86 312.66 5.46
12.2 Grid 1
0.94
Bottom Bar (end bar) 1 20 2 5.65 11.30 2.47 27.91 1.2
3.51
0.94
20 2 9.85 19.70 2.47 48.66
1.2 7.71
Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66
0.96 8.73
16 2 10.35 20.70 1.59 32.91
0.66
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12
0.96
16 1 12.00 12.00 1.59 19.08 11.04
0.66
16 1 4.56 4.56 1.59 7.25 2.94
0.96
0.94
20 4 9.85 39.40 2.47 97.32
1.2 7.71
0.94
Middle Bar 20 4 3.85 15.40 2.47 38.04
1.2 1.71
20 4 9.00 36.00 2.47 88.92
9
3.5
3 25 4 3.80 45.60 3.86 176.02 0.15 0.15
250
12.8 Stirrups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425
0.25
12.9 Stirrups ( For Secondry Beam) 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375
0.2
0.375
Infront of stair case
Straight bar 1 8 15 4.92 73.80 0.40 29.52 4.92
0.375 1.065 0.75
Cranked bar 1 8 13 5.12 66.56 0.40 26.62 1.875 0.845 0.07
Distribution bars
Between Grid 1 &1a
along x-axis 1 8 96 2.72 261.12 0.40 104.45 2.72
along y- axis 1 8 80 3.20 256.00 0.40 102.40 3.2
between 2 & 3
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2
Negative Bars
along Grid 1 2 8 35 2.05 143.50 0.40 57.40 2.05
along grid 1a 2 8 35 2.35 164.50 0.40 65.80 2.35
along grid 1b 1 8 7 1.08 7.56 0.40 3.02 1.08
along grid 2 (except infront of
stair case) 2 8 35 2.10 147.00 0.40 58.80 2.1
along grid 2 in front of
staircase 1 8 14 1.38 19.32 0.40 7.73 1.38
along grid a1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid b 1 8 28 2.10 58.80 0.40 23.52 2.1
along b1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid c&d 2 8 9 2.55 45.90 0.40 18.36 2.55
along grid d1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid e 1 8 28 2.10 58.80 0.40 23.52 2.1
along grid e1 1 8 28 2.05 57.40 0.40 22.96 2.05
0.96
0.96
14.3 Grid 1 ( D ) 1
Main Bar 20 2 6.21 12.41 2.47 30.66
16 4 5.97 23.87 1.59 37.95 6 20mm 16mm
5.00625 5.00625
1.2 0.96
0.96
1.2 0.96
1.20 0.96
14.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
0.42
0.42
14.8 Band (Second Floor)
Sill Bands 0.75 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.46 0.075 5.5 0.075
1 10 2 4.50 9.00 0.62 5.58 4.5
0.75 0.75
1 10 2 5.65 11.30 0.62 7.01 0.075 4 0.075
15 For Staircase
(2nd Floor to Top Foor)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77 0.3
3.354
2.472
0.4
2.042 1.03
0.2
1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1
1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1 0.15
1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1
1
2.147 0.15
1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2
1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1
4.92
15.1 Landing Beam 1 20 3 5.62 16.86 2.47 41.64 0.35 0.35
0.2
16 Main Beam (Top Floor Level))
16.1 Grid A,B,E & F
Bottom bar (mid bar) 4 20 2 10.87 86.96 2.47 214.79 0.475 0.475
9.92
0.475
0.475
End Bar 4 25 2 10.87 86.96 3.86 335.67 9.92
0.94 0.94
Bottom Bar along C & D 2 20 2 11.80 47.20 2.47 116.58 0.92
16.4 Grid 1
0.475
Bottom Bar (end bar) 1 20 2 3.39 6.77 2.47 16.72 1.2
1.71
0.475
20 2 9.39 18.77 2.47 46.36
1.2 7.71
Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66
0.96 8.73
16 2 10.35 20.70 1.59 32.91
0.66
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12
0.96
16 1 12.00 12.00 1.59 19.08 11.04
0.66
16 1 4.56 4.56 1.59 7.25 2.94
0.96
16.5 Extra Bar Along Grid 1 1 25 4 3.65 14.60 3.86 56.36 0.15
1.29
4
1 25 4 4.30 17.20 3.86 66.39 0.15 0.15
3.5
1 25 4 3.80 15.20 3.86 58.67 0.15 0.15
0.475
20 4 9.39 75.08 2.47 185.45
3.5
2 20 4 3.80 30.40 2.47 75.09 0.15 0.15
4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45 0.45
16.10 Bent up Bar (hunch bar) 1 16 36 3.02 108.72 1.59 172.86 0.96 0.96
0.425 0.425
0.25
16.11 Stirriups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425
0.25
16.12 For Secondry Beam 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375
0.2
7.215
2 12 4 8.41 67.28 0.89 59.88
1.64
7.195
2 12 4 9.09 72.68 0.89 64.69 1.89
6.325
2 12 4 7.97 63.72 0.89 56.71
1.64
10.15
Infront of Grid A & F 2 12 4 10.15 81.20 0.89 72.27
6.64
2 12 2 8.17 32.68 0.89 29.09 0.89
7.28
0.525 0.95
cranked bar 1 8 36 4.04 145.26 0.40 58.10 0.08 0.08
2.4
2 1.5 1.5
cranked bar 1 8 24 11.01 264.24 0.40 105.70 0.08 0.08 0.08 0.08 0.08
1.5 1.5
0.08 0.08 0.95
1.5
0.95 1.875 1.875
1 8 24 11.38 273.12 0.40 109.25 0.08 0.08 0.08 2.25 0.08
1.5
0.08 0.08 0.95
1.5
0.95 1.5 1.5
1 8 24 11.01 264.24 0.40 105.70 0.08 0.08 0.08 1.5 0.08
1.5 2
0.08 1.5 0.08 0.08
Top near grid A & F (in bottom) 2 10 5 12.00 120.00 0.62 74.40 12
Top near grid A & F (on top) 2 10 4 12.00 96.00 0.62 59.52 12
Top infront of grid 3 (in bottom) 2 10 5 11.98 119.80 0.62 74.28 11.98
Top infront of grid 3 (on top) 2 10 4 11.98 95.84 0.62 59.42 11.98
Top infront of staircase (in bottom) 1 10 6 8.24 49.44 0.62 30.65 8.24
1 10 5 8.24 41.20 0.62 25.54 8.24
7.215
2 10 2 8.41 33.64 0.62 20.86
1.64
7.195
2 10 2 9.09 36.34 0.62 22.53 1.89
6.325
2 10 2 7.97 31.86 0.62 19.75
1.64
10.15
Infront of Grid A & F 2 10 2 10.15 40.60 0.62 25.17
6.64
2 10 2 8.17 32.68 0.62 20.26 0.89
7.28
0.96
18.2 Grid 1 ( D ) 1
Main Bar 20 2 3.20 6.40 2.47 15.81
16 4 2.96 11.84 1.59 18.83 20mm 16mm
2 2
1.2 0.96
1.2 0.96
18.4 Stirrups 6
For 6 columns 8 26 1.84 287.04 0.40 114.82 0.08
8 52 1.28 399.36 0.40 159.74 0.42 0.14 0.08
0.42
0.42
18.5 Band under wall (Grid C&D) 2 10 2 6.50 26.00 0.62 16.12 6.5
1 10 2 4.50 9.00 0.62 5.58 4.5
0.06 0.06
1 8 30 0.30 9.00 0.40 3.60 0.18
Stirrups 2 8 44 0.30 13.20 0.40 5.28 0.06 0.06
19 Slab Beam 0.18
19.1 Grid C & D
Bottom bar 2 20 2 10.87 43.48 2.47 107.40 0.475 0.475
9.92
0.475
0.475
2 16 1 10.87 21.74 1.59 34.57 9.92
4.92
Top Bar
3 20 2 6.80 40.80 2.47 100.78 0.94 4.92 0.94
Top bar along grid 1a 1 16 3 5.65 16.95 1.59 26.95 0.35 4.75 0.45
19.4 Stirriups( For Main Beam) 1 10 180 1.65 297.00 0.62 184.14 0.10
0.425
0.25
19.5 For Secondry Beam 1 8 35 1.31 45.85 0.40 18.34
0.8
0.375
0.2
2.105 2.105
Cranked bar 1 8 28 6.48 181.44 0.40 72.58 0.08 0.08 0.08 0.08
1.95
2-LaLiEC Total
S. No. Description Unit Remarks
GF FF SF TF Quantity
A Common Installation
1.1 Stand Alone 40 A DP MCB with Enclosure 1 1.00 No
B SCHOOL BLOCKS
1 DISTRIBUTION BOARDS
DB (DB-1) Incoming NEA: 1 x 40A DP MCB Incoming Solar:
1.2 1 x 16A DP MCB Outgoing NEA: 1 x 16 A DP MCB 2 x 25 A 1 1.00 No
DP MCB 2 x 16 A SP MCB 6 x 6 A SP MCB
DB ( DB-2) & DB ( DB-3) Incoming:
1.3 1 1.00 No
1 x 25A DP MCB
DB ( DB-3) Incoming NEA: 1 x 25A DP MCB Incoming Solar:
1.5 1 x 10A DP MCB 1 1.00 No
C SOLAR PV SYSTEM
1. Solar PV Panel
1.1 1.1. 24V 250W PV Module 8.00 No
2. Tubular Deep cycle Battery
2.1 2.1. 12V, 200Ah@C10 Tubular Solar Battery 4.00 No
3 Hybrid Inverter 1.00 No
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
1 EARTH WORKS
1.1 Site Clearance
Building 1 34.50 15.50 534.75
Soak Pit 1 15.90 Area 15.90
Total 550.65 sq.m
Ramp
For Slope 1 1.30 0.52 Area 0.67
Wall Along Grid B 1 0.50 0.45 0.45 0.10
Wall Parallel to Ramp 1 6.80 0.45 0.41 1.25
Total 249.69 cu.m
2 CONCRETE WORKS
2.1 P.C.C.
2.1.1 P.C.C.(1:3:6) Works
Footing
Isolated F1 2 2.50 2.50 0.10 1.25
Isolated F2 4 3.00 3.00 0.10 3.60
Combined CF1 3 1.80 5.00 0.10 2.70
Combined CF2 1 3.00 5.00 0.10 1.50
Combined CF3 2 2.80 5.00 0.10 2.80
Ramp
Sloped 1 1.30 0.51 Area 0.66
Wall Top 1 1.33 0.25 0.05 0.02
1 6.80 0.13 0.05 0.04
Lab/ECD/Store/Pantry 4 5.70 6.70 0.08 11.46
Corridor 4 5.70 2.20 0.08 3.76
1 4.20 2.20 0.08 0.69
Below Staircase 1 4.20 6.70 0.08 2.11
Total 22.41 cu.m
B Beam
Foundation beam (300x400)
Along Grid A & F 2 3.50 0.30 0.40 0.84
Along Grid B 1 3.30 0.30 0.40 0.40
Grid C & D 2 3.55 0.30 0.40 0.85
Along Grid E 1 3.25 0.30 0.40 0.39
Along Grid 1 1 12.50 0.30 0.40 1.50
Along Grid 2,3 2 15.10 0.30 0.40 3.62
Secondary beam
Along grid 1a 2 10.9 0.25 0.3 1.64
Along grid 1b 1 4.2 0.25 0.3 0.32
Along grid A1,B1,D1 & E1 4 8.9 0.25 0.3 2.67
Edge Beam(125x525)
Grid B,C 1 7.90 0.13 0.3 0.30
Secondary beam
Along grid 1a 2 10.9 0.25 0.3 1.64
Along grid 1b 1 4.2 0.25 0.3 0.32
Along grid A1,B1,D1 & E1 4 8.9 0.25 0.3 2.67
Secondary beam
Along grid 1a 2 10.9 0.25 0.3 1.64
Along grid 1b 1 4.2 0.25 0.3 0.32
Along grid A1,B1,D1 & E1 4 8.9 0.25 0.3 2.67
Beam(Roof level)
Main beam
Along grid 1,2 & 3 3 4 0.3 0.4 1.44
Along grid C & D 2 8.5 0.3 0.4 2.04
Secondary beam
Along grid 1a 1 4.2 0.25 0.3 0.32
C Column
Ground floor plan
D Slab
First floor level (+3.00m Lvl) 1 305.15 Area 0.13 38.14
Deduction
Column deduction -18 0.50 0.50 0.13 -0.56
Void deduction -1 4.78 4.20 0.13 -2.61
Projections
At Back 2 11.50 0.70 0.13 2.01
At Front 1 6.20 1.00 0.13 0.78
E Staircase
Ground floor level
Bottom 1 2.07 2.00 0.20 0.83
Landing 1 2.20 2.00 0.20 0.88
1 2.00 2.10 0.20 0.84
Waist Slab 1 6.75 2.00 0.20 2.70
Steps 20 0.03 Area 2.00 1.20
Landing Beam 1 4.00 0.25 0.38 0.38
G Lintel Bands
Ground floor level
Short Span
Along grid A,C,D,E,F 5 6.50 0.23 0.08 0.56
Between B,C 1 4.70 0.125 0.08 0.04
1 2.05 0.23 0.08 0.04
Long Span
Along grid 1 1 22.20 0.23 0.08 0.38
Along grid 2 1 21.68 0.23 0.08 0.37
H Soak Pit
RCC slab 1 2.27 Area 0.15 0.34
I Pedestal
Base Block 14 0.50 0.25 0.25 0.44
J Parapet Wall
Top Floor 2.00 36.53 0.35 0.10 2.56
1.00 7.50 0.35 0.10 0.26
Roof Level 1.00 33.00 0.35 0.10 1.16
K Bench
Bench Top Slab 2 2.40 0.50 0.08 0.18
L Slab for In-built Furniture
Furniture Slab for Lab 4 1.80 0.90 0.10 0.65
Sink slab type-1 1 9.43 0.50 0.10 0.47
Sink slab type-2 1 5.75 0.50 0.10 0.29
Sink slab type-3 1 3.60 0.90 0.10 0.32
Furniture slab in preparation room 1 6.75 0.60 0.10 0.41
Sink Deduction
Sink slab type-1 -2 0.70 0.35 0.10 -0.05
Sink slab type-2 -2 0.70 0.35 0.10 -0.05
2.5 Formworks
Formworks for RCC
A Foundation
Isolated footing
Isolated F1 2 10.00 0.25 5.00
Isolated F2 4 12.00 0.25 12.00
Combined footing
Combined CF1 3 13.60 0.60 24.48
Combined CF2 1 16.00 0.60 9.60
Combined CF3 2 15.60 0.60 18.72
B Beam
Foundation beam (300x400)
Along Grid A & F 2 3.50 0.80 5.60
Along Grid B 1 3.30 0.80 2.64
Grid C & D 2 3.55 0.80 5.68
Along Grid E 1 3.25 0.80 2.60
Along Grid 1 1 12.50 0.80 10.00
Along Grid 2,3 2 15.10 0.80 24.16
Along Grid 1 1 26.00 0.80 20.80
Along Grid 2,3 2 26.00 0.80 41.60
Secondary beam(250x425)
Grid 1a 4 5.45 0.85 18.53
Grid 1b 1 4.20 0.70 2.94
Grid A1,B1,D1,E1 4 8.90 0.85 30.26
Edge Beam(125x525)
Grid B,C 1 7.90 1.05 8.30
Secondary beam(250x425)
Grid 1a 4 5.45 0.85 18.53
Grid 1b 1 4.20 0.70 2.94
Grid A1,B1,D1,E1 4 8.90 0.85 30.26
Secondary beam(250x425)
Grid 1a 1 4.20 0.85 3.57
Landing beam 3 0.85 4.00 10.20
C Column
Ground floor plan
Total columns(500x500) 18 2.00 2.88 103.50
D Slab
First floor level (+3.00m Lvl) 1 28.80 9.80 282.24
Cantilever slab back side 2 11.75 0.70 16.45
Cantilever slab front side 1 6.15 1.00 6.15
Deduction
Void deduction -1 4.75 4.20 -19.95
Main beam(300x500)
Along grid 1,2,3 -3 26.00 0.30 -23.40
Along Grid A,B,E,F -4 8.50 0.30 -10.20
Along Grid C,D -2 9.25 0.30 -5.55
Secondary beam(250x425)
Grid 1a -4 5.45 0.25 -5.45
Edge Beam(125x525)
Grid B,C -1 7.90 0.13 -0.99
Main beam(300x525)
Along grid 1,2,3 -3 26.00 0.30 -23.40
Along Grid A,B,E,F -4 8.50 0.30 -10.20
Along Grid C,D -2 8.50 0.30 -5.10
Secondary beam(250x425)
Grid 1a -4 5.45 0.25 -5.45
Grid 1b -1 4.20 0.25 -1.05
Grid A1,B1,D1,E1 -4 8.90 0.25 -8.90
Main beam(300x525)
Along grid 1,2,3 -3 26.00 0.30 -23.40
Along Grid A,B,E,F -4 8.50 0.30 -10.20
Along Grid C,D -2 8.50 0.30 -5.10
Secondary beam(250x425)
Grid 1a -4 5.45 0.25 -5.45
Grid 1b -1 4.20 0.25 -1.05
Grid A1,B1,D1,E1 -4 8.90 0.25 -8.90
Secondary beam(250x425)
Grid 1a -1 4.20 0.25 -1.05
E Staircase
Ground floor level
Bottom 1 2.07 0.20 0.41
Waist Slab 1 6.75 2.00 13.50
Side 1 6.75 0.20 1.35
Landing 1 2.20 1.65 3.64
1 2.00 2.15 4.29
Side 1 3.80 0.15 0.57
Riser 20 2.00 0.15 6.00
Landing Beam 1 4.00 0.86 3.44
G Lintel Bands
Ground floor level
Along grid A,C,D,E,F 5.00 6.50 0.15 4.88
Along grid 1 1.00 22.20 0.15 3.33
Along grid 2 1.00 21.68 0.15 3.25
Between B,C 1.00 4.70 0.15 0.71
1.00 2.05 0.15 0.31
First floor level
Along grid A,C,D,E,F 5.00 6.50 0.15 4.88
Along grid 1 1.00 22.20 0.15 3.33
Along grid 2 1.00 21.75 0.15 3.26
Between B,C 1.00 5.03 0.15 0.75
1.00 1.73 0.15 0.26
Second floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.15 5.85
Along grid 1 1.00 22.20 0.15 3.33
Along grid 2 1.00 21.60 0.15 3.24
Between Principal/Admin 1.00 1.50 0.15 0.23
1.00 4.25 0.15 0.64
I Pedestal
Base Block 14 1.25 0.25 4.38
J Parapet Wall
Top Floor 2.00 36.53 0.25 18.27
1.00 7.50 0.25 1.88
Roof Level 1.00 33.00 0.25 8.25
K Bench
Bench Top Slab 2 5.80 Perimeter 0.075 0.87
Bottom 2 5.80 0.60 6.96
Deduction -4 0.13 0.50 -0.25
L Slab For In-built Furniture
Furniture Slab for Lab 4 1.80 0.90 6.48
4 5.40 0.10 2.16
Sink slab type-1 1 9.43 0.50 4.71
1 10.43 0.10 1.04
2 2.10 0.10 0.42
Sink deduction -2 0.70 0.35 -0.49
Sink slab type-2 1 5.75 0.50 2.88
1 6.75 0.10 0.68
2 2.10 0.10 0.42
Sink Deduction -2 0.70 0.35 -0.49
Sink slab type-3 1 3.60 0.90 3.24
1 9.00 0.10 0.90
1 2.10 0.10 0.21
Sink deduction -1 0.70 0.35 -0.25
Furniture slab in preparation room 1 6.75 0.60 4.05
1 6.75 0.10 0.68
M Soak Pit
RCC slab 1.00 1.13 Area 1.13
Parapet Wall
Top Floor 2.00 36.53 0.23 0.80 13.44
1.00 7.50 0.23 1.40 2.42
Roof Level 1.00 33.00 0.23 0.90 6.83
Outside
Steps 1 28.58 0.60 0.15 2.57
1 28.58 0.30 0.15 1.29
Ramp
Wall Along -B 1 1.33 0.25 Area 0.33
1 6.91 0.17 Area 1.19
5 FLOORING WORKS
5.1 Hardened Cement Concrete Flooring (40mm) With Neat Cement Punning
Ground floor plan
Laboratory 1.00 9.43 6.75 63.62
Store 1.00 2.23 6.75 15.02
Class Room/Store,Pantry 2.00 5.75 6.75 77.63
Corridor 1.00 28.80 2.37 68.26
1.00 4.20 2.37 9.95
Staircase Below 1.00 6.625 4.2 27.83
Staircase
Staircase Tread 18.00 0.30 2.00 10.80
Riser 20.00 0.15 2.00 6.00
Staircase landing 1.00 2.00 2.20 4.40
1.00 2.13 2.00 4.25
Roof plan
Roof Floor Slab 1.00 5.50 10.50 57.75
Total 1206.32 sq.m
7 PLASTER WORKS
7.1 Internal Cement Plaster
7.1.1 Internal Plaster on Wall (1:6)
Ground Floor
Laboratory 1 32.75 2.88 94.16
Store 1 17.95 2.88 51.61
Store/Pantry/ECD 2 25.35 2.88 145.76
Deductions
W1 -18 1.10 1.13 -11.14
V1 -18 1.10 0.53 -5.20
W3 -1 1.50 0.37 -0.28
D1 -6 1.10 2.44 -8.04
D3 -2 1.00 2.10 -2.10
D4 -2 1.00 1.55 -1.55
Column Plaster
Ground Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 3
Grid 3A,3B,3C,3D,3E,3F 6.00 1.50 2.48 22.28
6.00 0.50 3.00 9.00
First Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 3
Grid 3A,3B,3C,3D,3E,3F 6.00 1.50 2.48 22.28
6.00 0.50 3.00 9.00
Second Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 3
Grid 3A,3B,3C,3D,3E,3F 6.00 1.50 2.48 22.28
6.00 0.50 3.00 9.00
Parapet Wall
Top Floor 2 35.90 0.80 57.44
1 7.50 1.40 10.50
Roof 1 32.00 0.90 28.80
On Outer walls
Ground floor level
Along grid A,F/1-2 2 6.50 2.48 32.18
Along grid 1 4 5.55 2.48 54.95
1 4.00 2.10 8.38
Along grid 2 4 5.55 2.48 54.95
First floor level
Along grid A,F/1-2 2 6.50 2.48 32.18
Along grid 1 4 5.55 2.48 54.95
1 4.00 2.10 8.38
Along grid 2 4 5.55 2.48 54.95
Second floor level
Along grid A,F/1-2 2 6.50 2.48 32.18
Along grid 1 4 5.55 2.48 54.95
1 4.00 2.10 8.38
Along grid 2 4 5.55 2.48 54.95
Top floor level
Along grid C,D/1-3 2 8.50 2.10 35.70
Along grid 1 1 4.00 2.10 8.40
Along grid 3 1 4.00 2.10 8.40
8 MISCELLANOUS
8.4 Railing
Total
Staircase Railing length Kg/m
Length
Horizontal ISNB 40M 1 22.818 22.82 3.56 81.23
Horizontal ISNB 40M (Top Floor) 1 2.125 2.13 3.56 7.57
Vertical 38mm Square Pipe 6 0.92 5.52 2.82 15.57
Vertical 38mm Square Pipe 20 0.95 19.00 2.82 53.58
Horizontal 25mm Square Pipe 4 22.818 91.27 0.85 77.58
Horizontal 25mm Square Pipe (Top Floor) 4 2.125 8.50 0.85 7.23
Balcony Railing
First Floor
Horizontal ISNB 40M 1 30.2 30.20 3.56 107.51
Horizontal ISNB 32M 2 30.2 60.40 3.10 187.24
Vertical ISNB 32M 23 1.14 26.22 3.10 81.28
Inclined ISNB 32M 23 0.134 3.08 3.10 9.55
Vertical 25mm Square Pipe 208 0.82 170.56 0.85 144.98
Second Floor
Horizontal ISNB 40M 1 30.2 30.20 3.56 107.51
Horizontal ISNB 32M 2 30.2 60.40 3.10 187.24
Vertical ISNB 32M 23 1.14 26.22 3.10 81.28
Inclined ISNB 32M 23 0.134 3.08 3.10 9.55
Vertical 25mm Square Pipe 208 0.82 170.56 0.85 144.98
Parapet Wall
ISNB 40M(Horizontal Bars) 2 36.53 73.06 3.56 260.09
Pedestal
ISNB 40M Pedestal Bars 14 1.54 21.57 3.56 76.80
14 1.20 16.80 3.56 59.81
28 0.40 11.20 3.56 39.87
Base plate 185 0.00009375 0.02 7850 136.15
12 mm dia. Anchor Bolt, Nut 740 0.13 96.20
Total 2,424.07 k.g
2 Column
2.1 Grid 1 (A ,B,E &F) 4
Main Bar 16 6 3.59 86.11 1.59 136.92 16mm
16 6 6.59 158.11 1.59 251.40 6.18 3.18 16mm
0.10 0.1
0.31 0.31
2.2 Grid 1 ( C ) 1
Main Bar 20 4 4.07 16.27 2.47 40.19
16 2 3.59 7.18 1.59 11.41 20mm 16mm
16 6 6.59 39.53 1.59 62.85 16mm 6.18
3.42 3.18
2.3 Grid 1 ( D ) 1
Main Bar 20 6 4.07 24.42 2.47 60.32
20 6 7.07 42.41 2.47 104.75 20mm 20mm
6.42 3.42
0.12 0.12
0.12 0.12
0.53 0.53
2.6 Grid 3 (A,B,C,D,E & F) 6
Main Bar 20 6 4.07 146.52 2.47 361.90
20 6 7.26 261.23 2.47 645.23 20mm 20mm
3.42 6.42
0.12 0.12
0.53 0.53
2.7 Stirrups 18
For 18 columns 8 12 1.84 397.44 0.40 158.98 0.08
8 24 1.28 552.96 0.40 221.18 0.42 0.14 0.08
0.42
0.42
3 For Lower Tie Beam
3.1 Grid 1,2 & 3 3 8.73
Top Bar 16 2 10.04 60.24 1.59 95.78 0.96
0.35
End bar from both
direction
16 2 11.46 68.76 1.59 109.33 11.46
8.73
16 2 10.04 60.24 1.59 95.78 0.96
0.35
2.94
Middle bar 16 1 4.25 12.75 1.59 20.27 0.96
0.35
0.25
8.61
20 2 10.24 61.41 2.47 151.68 1.2
0.425
2.94
Middle bar 16 1 4.33 12.98 1.59 20.63 0.96
0.425
16 1 12.00 36.00 1.59 57.24 12
2.94
16 1 4.33 12.98 1.59 20.63 0.96
0.425
Bottom Bar
End bar from both 20 2 11.65 69.90 2.47 172.65
0.94
direction 9.51 1.2
0.66
16 1 11.37 34.11 1.59 54.23 0.96 9.75
0.25 0.25
5 Column ( Up To 1st Floor Level)
5.1 Grid 1 (A ,B,E & F) 4
0.96
5.2 Grid 1 ( C ) 1
Main Bar 20 4 7.20 28.80 2.47 71.14
16 2 6.96 13.92 1.59 22.13 20mm 16mm
0.12 0.96
5.3 Grid 1 ( D ) 1
Main Bar 20 6 7.20 43.20 2.47 106.70
6 20mm
2.47
1.2
1.20 0.96
1.2
1.20
5.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
1.59 0.42
0.42
6 For Staircase
(Plinth level to 1st floor level)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77 0.3
3.354
2.472
0.4
2.042 1.03
0.2
1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1
1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1 0.15
1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1
1
2.147 0.15
1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2
1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1
4.92
6.1 Landing Beam 1 20 3 5.62 16.86 2.47 41.64 0.35 0.35
4.46 1.5
1.29
6 25 2 6.75 81.00 3.86 312.66 5.46
7.2 Grid 1
0.94
Bottom Bar (end bar) 1 20 2 5.65 11.30 2.47 27.91 1.2
3.51
0.94
20 2 9.85 19.70 2.47 48.66
1.2 7.71
Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66
0.96 8.73
16 2 10.35 20.70 1.59 32.91
0.66
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12
0.96
16 1 12.00 12.00 1.59 19.08 11.04
0.66
16 1 4.56 4.56 1.59 7.25 2.94
0.96
0.94
3.5
3 25 4 3.80 45.60 3.86 176.02 0.15 0.15
0.35
2 16 1 4.98 9.95 1.59 15.82
4.625
top bar (end bar) 2 16 2 4.06 16.22 1.59 25.79
2.645 0.96
0.45
4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45 0.45
250
7.9 Stirriups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425
0.25
7.10 For Secondry Beam 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375
0.2
between 2 & 3
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2
9 Bands
Ground Floor
9.1 Sill Bands 0.75 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.464 0.075 5.5 0.075
1 10 2 4.50 9.00 0.62 5.58 4.5
0.75 0.75
1 10 2 5.65 11.30 0.62 7.006 0.075 4 0.075
0.7
0.95 0.95
Distribution Bar 1 8 63 0.82 51.66 0.40 20.66 0.06 0.7 0.06
Type3
Main Bar 1 8 5 6.82 34.10 0.40 13.64 0.06 6.7 0.06
Type 4
Main Bar 1 8 5 0.45 2.25 0.40 0.90 0.06 0.45 0.06
Type 5
Main Bar 1 8 5 0.86 4.30 0.40 1.72 0.06 0.74 0.06
0.96
10.2 Grid 1 ( C ) 1
Main Bar 20 4 7.20 28.80 2.47 71.14
16 2 6.96 13.92 1.59 22.13 20mm 16mm
0.12 0.96
10.3 Grid 1 ( D ) 1
Main Bar 20 6 7.20 43.20 2.47 106.70
6 20mm
2.47
1.2
1.20 0.96
1.2
1.20
10.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
1.59 0.42
0.42
11 For Staircase
(1st Floor level to 2nd Floor Level)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77 0.3
3.354
2.472
0.4
2.042 1.03
0.2
1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1
1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1 0.15
1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1
1
2.147 0.15
1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2
1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1
0.2
12 Main Beam(Second Floor Level)
12.1 Grid A,B,C,D,E & F
Bottom bar (End Bar) 6 25 2 7.25 87.00 2.47 214.89 1.29
4.46 1.5
1.29
6 25 2 6.75 81.00 3.86 312.66 5.46
12.2 Grid 1
0.94
Bottom Bar (end bar) 1 20 2 5.65 11.30 2.47 27.91 1.2
3.51
0.94
20 2 9.85 19.70 2.47 48.66
1.2 7.71
Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66
0.96 8.73
16 2 10.35 20.70 1.59 32.91
0.66
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12
0.96
16 1 12.00 12.00 1.59 19.08 11.04
0.66
16 1 4.56 4.56 1.59 7.25 2.94
0.96
0.94
3.5
3 25 4 3.80 45.60 3.86 176.02 0.15 0.15
0.35
2 16 1 4.98 9.95 1.59 15.82
4.625
top bar (end bar) 2 16 2 4.06 16.22 1.59 25.79
2.645 0.96
0.45
4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45 0.45
250
12.8 Stirrups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425
0.25
12.9 Stirrups ( For Secondry Beam) 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375
0.2
0.375
Infront of stair case
Straight bar 1 8 15 4.92 73.80 0.40 29.52 4.92
Distribution bars
Between Grid 1 &1a
along x-axis 1 8 96 2.72 261.12 0.40 104.45 2.72
along y- axis 1 8 80 3.20 256.00 0.40 102.40 3.2
between 2 & 3
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2
Negative Bars
along Grid 1 2 8 35 2.05 143.50 0.40 57.40 2.05
along grid 1a 2 8 35 2.35 164.50 0.40 65.80 2.35
along grid 1b 1 8 7 1.08 7.56 0.40 3.02 1.08
along grid 2 (except infront of
stair case) 2 8 35 2.10 147.00 0.40 58.80 2.1
along grid 2 in front of
staircase 1 8 14 1.38 19.32 0.40 7.73 1.38
along grid a1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid b 1 8 28 2.10 58.80 0.40 23.52 2.1
along b1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid c&d 2 8 9 2.55 45.90 0.40 18.36 2.55
along grid d1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid e 1 8 28 2.10 58.80 0.40 23.52 2.1
along grid e1 1 8 28 2.05 57.40 0.40 22.96 2.05
0.96
0.96
14.3 Grid 1 ( D ) 1
Main Bar 20 2 6.21 12.41 2.47 30.66
16 4 5.97 23.87 1.59 37.95 6 20mm 16mm
5.00625 5.00625
1.2 0.96
0.96
1.2 0.96
1.20 0.96
14.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
0.42
0.42
14.8 Band (Second Floor)
Sill Bands 0.75 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.464 0.075 5.5 0.075
1 10 2 4.50 9.00 0.62 5.58 4.5
0.75 0.75
1 10 2 5.65 11.30 0.62 7.006 0.075 4 0.075
15 For Staircase
(2nd Floor to Top Foor)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77 0.3
3.354
2.472
0.4
2.042 1.03
0.2
1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1
1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1 0.15
1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1
1
2.147 0.15
1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2
1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1
4.92
15.1 Landing Beam 1 20 3 5.62 16.86 2.47 41.64 0.35 0.35
0.2
16 Main Beam (Top Floor Level))
16.1 Grid A,B,E & F
Bottom bar (mid bar) 4 20 2 10.87 86.96 2.47 214.79 0.475 0.475
9.92
0.475
0.475
End Bar 4 25 2 10.87 86.96 3.86 335.67 9.92
0.94 0.94
Bottom Bar along C & D 2 20 2 11.80 47.20 2.47 116.58 0.92
16.4 Grid 1
0.475
Bottom Bar (end bar) 1 20 2 3.39 6.77 2.47 16.72 1.2
1.71
0.475
20 2 9.39 18.77 2.47 46.36
1.2 7.71
Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66
0.96 8.73
16 2 10.35 20.70 1.59 32.91
0.66
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12
0.96
16 1 12.00 12.00 1.59 19.08 11.04
0.66
16 1 4.56 4.56 1.59 7.25 2.94
0.96
16.5 Extra Bar Along Grid 1 1 25 4 3.65 14.60 3.86 56.36 0.15
1.29
4
1 25 4 4.30 17.20 3.86 66.39 0.15 0.15
3.5
0.475
20 4 9.39 75.08 2.47 185.45
1.2 7.71
0.94
1.2
Top Bar (end Bar) 20 4 10.75 43.00 2.47 106.21 8.61
0.94
3.5
2 20 4 3.80 30.40 2.47 75.09 0.15 0.15
4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45 0.45
16.10 Bent up Bar (hunch bar) 1 16 36 3.02 108.72 1.59 172.86 0.96 0.96
0.425 0.425
0.25
16.11 Stirriups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425
0.25
16.12 For Secondry Beam 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375
0.2
7.215
2 12 4 8.41 67.28 0.89 59.88
1.64
7.195
2 12 4 9.09 72.68 0.89 64.69 1.89
6.325
2 12 4 7.97 63.72 0.89 56.71
1.64
10.15
Infront of Grid A & F 2 12 4 10.15 81.20 0.89 72.27
6.64
2 12 2 8.17 32.68 0.89 29.09 0.89
7.28
16.14 Stirriups( beam 250*150 ) 1 8 546 0.76 414.96 0.40 165.98 0.0 0.1
8
0.2
0.525 0.95
cranked bar 1 8 36 4.04 145.26 0.40 58.10 0.08 0.08
2.4
2 1.5 1.5
cranked bar 1 8 24 11.01 264.24 0.40 105.70 0.08 0.08 0.08 0.08 0.08
1.5 1.5
0.08 0.08 0.95
1.5
0.95 1.875 1.875
1 8 24 11.38 273.12 0.40 109.25 0.08 0.08 0.08 2.25 0.08
1.5
0.08 0.08 0.95
1.5
0.95 1.5 1.5
1 8 24 11.01 264.24 0.40 105.70 0.08 0.08 0.08 1.5 0.08
1.5 2
0.08 1.5 0.08 0.08
between 2 & 3
along x axis 1 8 8 4.20 33.60 0.40 13.44 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2
Top near grid A & F (in bottom) 2 10 5 12.00 120.00 0.62 74.40 12
Top near grid A & F (on top) 2 10 4 12.00 96.00 0.62 59.52 12
Top infront of grid 3 (in bottom) 2 10 5 11.98 119.80 0.62 74.28 11.98
Top infront of grid 3 (on top) 2 10 4 11.98 95.84 0.62 59.42 11.98
Top infront of staircase (in bottom) 1 10 6 8.24 49.44 0.62 30.65 8.24
1 10 5 8.24 41.20 0.62 25.54 8.24
7.215
2 10 2 8.41 33.64 0.62 20.86
1.64
7.195
2 10 2 9.09 36.34 0.62 22.53 1.89
6.325
2 10 2 7.97 31.86 0.62 19.75
1.64
10.15
Infront of Grid A & F 2 10 2 10.15 40.60 0.62 25.17
6.64
0.96
18.2 Grid 1 ( D ) 1
Main Bar 20 2 3.20 6.40 2.47 15.81
16 4 2.96 11.84 1.59 18.83 20mm 16mm
2 2
1.2 0.96
1.2 0.96
18.4 Stirrups 6
For 6 columns 8 26 1.84 287.04 0.40 114.82 0.08
8 52 1.28 399.36 0.40 159.74 0.42 0.14 0.08
0.42
0.42
18.5 Band under wall (Grid C&D) 2 10 2 6.50 26.00 0.62 16.12 6.5
1 10 2 4.50 9.00 0.62 5.58 4.5
0.06 0.06
1 8 30 0.30 9.00 0.40 3.60 0.18
Stirrups 2 8 44 0.30 13.20 0.40 5.28 0.06 0.06
19 Slab Beam 0.18
19.1 Grid C & D
Bottom bar 2 20 2 10.87 43.48 2.47 107.40 0.475 0.475
9.92
0.475
0.475
2 16 1 10.87 21.74 1.59 34.57 9.92
4.92
Top Bar
Top bar along grid 1a 1 16 3 5.65 16.95 1.59 26.95 0.35 4.75 0.45
19.4 Stirriups( For Main Beam) 1 10 180 1.65 297.00 0.62 184.14 0.10
0.425
0.25
19.5 For Secondry Beam 1 8 35 1.31 45.85 0.40 18.34
0.8
0.375
0.2
2.105 2.105
Cranked bar 1 8 28 6.48 181.44 0.40 72.58 0.08 0.08 0.08 0.08
1.95
Site
S. No. Description G.F F.F S.F TF Quantity Unit Remarks
Development
A. Common Installation
1.1 Stand Alone 40 A DP MCB with Enclosure 1 1.00 nos.
2 CABLES & WIRES
2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded
2.1 49.00 r.m
copper conductor wires
Building: 3LaLiEACCr(F)-A
S.N Furniture Description Symbol Qty Unit Remarks
Classroom
1 ECD Student Desk (6 Seater) D-03 3 nos.
2 Student Desk G1-2 (3 Seater) D-02A 22 nos.
3 Student Bench G1-2 (3 Seater) B-02A 22 nos.
4 Student Desk G3-5 (3 Seater) D-02B 11 nos.
5 Student Bench G3-5 (3 Seater) B-02B 11 nos.
6 Teacher's Table T-01 6 nos.
7 Soft Board F-01 1 nos.
8 Book Shelf F-02 3 nos.
9 Teacher's Chair C-01 6 nos.
10 White Board F-03 6 nos.
Library
11 Student Bench 6-12 (3 Seater) B-02C 14 nos.
12 Library Table T-02 7 nos.
13 Library Shelf F-04 5 nos.
Computer nos.
14 Computer Table T-04 12 nos.
15 Computer Shelf C-02 24 nos.
16 White Board with Stand F-05 1 nos.
Laboratory
17 Equipment Shelf F-07 3
18 Lab Stool F-08 31
Office
19 Cabinet F-06 7 nos.
20 Office Table (2 sides Drawe Unit) T-05 1 nos.
21 Office Table (1 sides Drawe Unit) T-06 2 nos.
22 Office Table T-07 12 nos.
23 Office Chair C-03 16 nos.
24 Office Chair- Headmaster C-04 1 nos.
25 Office Visitor Chair C-05 19 nos.
26 Dinning Table T-09 2 nos.
Miscellaneous
27 Cusions F-16 18 nos.
28 Carpet 27.43 sq.m
29 Equipment Cabinet F-09 5 nos.
30 File Cabinet F-10 2 nos.
31 Notice Board F-14 1 nos.
Total 274 nos.
Building: 3-12C(MsF)
S.N Furniture Description Symbol Qty Unit Remarks
Classroom
1 Student Desk G3-5 (3 Seater) D-02B 22 nos.
2 Student Desk G6-12 (3 Seater) D-02C 44 nos.
3 Student Bench G3-5 (3 Seater) B-02B 22 nos.
4 Student Desk G6-12 (3 Seater) B-01C 44 nos.
5 Teacher's Table T-01 12 nos.
6 Teacher's Chair C-01 12 nos.
7 White Board F-03 12 nos.
Total 168 nos.
2 CONCRETE WORKS
2.1 P.C.C.
2.1.1 P.C.C.(1:3:6) Works
For Footing
F1 9 1.00 1.00 0.10 0.90
For Lower Tie Beam
Grid 1 and Grid 3 2 11.40 0.45 0.05 0.51
Grid 2 2 5.70 0.35 0.05 0.20
Between grid 2 and 3 2 5.45 0.45 0.05 0.25
Along grid A-12,B-12 & C-12 3 3.20 0.45 0.05 0.22
Along grid A-23 & C-23 2 2.20 0.35 0.05 0.08
Along grid B-23 1 2.20 0.45 0.05 0.05
Septic Tank 1 0.83 1.45 0.08 0.09
Sewer Manhole (Rectangular)
Bottom 4 1.00 1.00 0.10 0.40
2.69 sq.m
3 BRICK WORKS
5 FLOORING WORKS
5.1 Cement Concrete Flooring (40mm) With Neat Cement Punning
Toilet Floors 2 5.75 3.25 37.38
Corridor Floors 2 5.75 1.27 14.61
Outside Staircase 2 1.20 1.05 2.52
Ramp
Slanted Portion 1 5.45 1.03 5.59
Horizontal Portion 1 1.20 1.03 1.23
Drain 1 13.45 1.48 19.91
Along the terrace 2 5.75 2.25 25.88
Water Trough 2 0.60 3.75 4.50
111.60 sq.m
7 PLASTER/PAINTING WORKS
7.1 Cement Plaster
7.1.1 Internal Plaster on Wall (1:6)
Grid 1 & Grid 2 2 11.40 1.20 27.36
Grid 2 1 11.40 2.40 27.36
Grid 3 1 11.40 1.50 17.10
Grid A-12, B-12& C-12 3 3.20 1.40 13.44
Grid B-23 2 2.20 2.55 11.22
Partition Wall for disable toilet 4 3.27 1.80 23.54
Partition wall for toilet short wall 8 1.32 1.80 19.01
Partition wall for toilet long wall 4 3.50 1.80 25.20
Cross wall at Water trough 4 0.58 0.30 0.69
4 0.58 0.45 1.04
4 0.30 0.58 0.69
Deduction
D1 -2 1.00 2.10 -2.10
D2 -2 0.90 2.10 -1.89
V1 -2 3.48 0.38 -1.30
V2 -2 3.48 0.33 -1.13
V3 -2 1.98 0.38 -0.74
V4 -2 1.98 0.33 -0.64
158.84 Sq.m.
8 MISCELLANOUS
8.2 Cement Board Wall
For Partition
Gabel wall 2 1.09 Area 2.17
2.18 sq.m
1 Truss
10mm thick plate Base Plate 12 0.3 0.3 0.01 0.011 cu.m. 7,850 84.78
10mm thick plate Truss stiffener 12 0.3 0.05 0.01 0.002 cu.m. 7,850 14.13
10mm thick plate 12 0.3 0.0865 0.01 0.003 cu.m. 7,850 24.44
10mm thick plate 12 0.05 0.085 0.01 0.001 cu.m. 7,850 4.00
16mm dia rod Anchor bolt 24 0.45 10.800 r.m. 1.58 17.07
16mm dia nut nut 24 24.000 no. 0.03 0.75
10mm thick plate Top chord cleat 30 0.2 0.09 0.01 0.005 cu.m. 7,850.00 42.39
10mm thick plate Purlin Cleat 60 0.2 0.09 0.01 0.011 cu.m. 7,850.00 84.78
10mm dia nut bolt (50mm) nut bolt 60 60.000 no. 0.05 2.91
10mm thick plate Runner plate 16 0.175 0.07 0.01 0.002 cu.m. 7,850.00 15.39
10mm thick plate Runner box 32 0.175 0.07 0.01 0.004 cu.m. 7,850.00 30.77
10mm thick plate 32 0.08 0.07 0.01 0.002 cu.m. 7,850.00 14.07
16mm dia nut bolt (50mm) Runner box 32 32.000 no. 0.13 4.30
B Column 0.42
Grid 1,2,3 9
Main Bar 12 8 5.14 370.08 0.89 329.37 12mm
12 8 5.14 370.08 0.89 329.37 4.32
0.10
0.30
Stirrups 9
For 9 columns 8 44 1.04 411.84 0.40 164.74 0.08 0.08
8 44 1.04 411.84 0.40 164.74 0.22 0.16
0.22 0.16
3.47
12 3 3.70 33.26 0.89 29.60
0.225
Bottom Bar
3 12 3 2.79 25.11 0.89 22.35
0.46
1.61 0.72
10.61
Grid A,B,C
Top bar along grid A&C 2 12 3 4.17 25.02 0.89 22.27 3.72
0.225 0.225
Stirrups (LTB)
1 8 397 0.96 381.12 0.40 152.45 0.08
0.2
0.2
0.46
0.46
12 3 11.07 99.63 0.89 88.67
10.61
Bottom Bar along Grid A-2,C-2 2 12 3 4.64 27.84 0.89 24.78
0.46
0.46
3.72
6.22
Bottom Bar Along A2-A3,C2-C3 2 16 2 4.12 16.48 1.59 26.20 0.7 0.7
2.72
Top Bar along Grid A-2,C-2 2 12 3 4.64 27.84 0.89 24.78 3.72
0.46 0.46
0.2 0.2
E Slab Beam
Grid 1,2 & 3 3 2.63 0.96
0.7
0.37
12 2 10.98 65.88 0.89 58.63
10.61
0.37
16 2 10.98 65.88 1.59 104.75
10.61
Top Bar Along ABC 1 12 3 7.44 22.32 0.89 19.86 0.46 6.52 0.46
6.51
1.72 1.9
4.61
0.845 0.845
5.7
distribution bar 4 8 3 5.70 68.40 0.40 27.36
G Water Trough
Right Side 2
Main Bar 8 5 2.38 23.75 0.40 9.50 0.25
0.25
1.875
Left Side 2
Main Bar 8 5 2.38 23.75 0.40 9.50 0.25
0.25
1.875
H Band
1 Sill Band 0.75 0.75
Grid 1 2 10 2 7.35 29.40 0.62 18.228 0.075 5.7 0.075
0.75
Grid 2 2 10 2 3.38 6.75 0.62 4.185 2.55 0.075
0.75 0.75
Grid 3 2 10 2 7.30 29.20 0.62 18.104 0.075 5.65 0.075
0.075 3.2
1.2
0.75
Grid 2 2 10 2 3.38 6.75 0.62 4.185 2.55 0.075
0.075 3.2
1.2
I Septic Tank 1
Bottom Bar
Main Bar 8 12 7.65 91.80 0.40 36.72 7.65
Top Bar
Main Bar 8 12 7.65 91.80 0.40 36.72 7.65
0.2 0.1
1.53
J Septic Tank Cover Slab 1 0.05 0.07 6.12
Main Bar Both Sides 8 13 7.77 101.01 0.40 40.40
0.59
Distribution Bar 8 44 2.02 88.88 0.40 35.55 0.07
0.05 1.31
1.32
Total
S. No. Description Tc(S) Unit Remarks
Quantity
A. Common Installation
1.2 Stand Alone 6 A DP MCB with Enclosure 2 2.00 nos.
B School Blocks
1 DISTRIBUTION BOARDS
1.5 6A DP MCB with Enclosure 2.00 2.00 nos.
3 General Service Light Point Wiring
3.1 One Way Light Point 14 14.00 pts.
3.3 Ceiling and Exhaust Fan Point 4 4.00 pts.
6 Sweep Ceiling/ Exhaust Fan/Wall Fan
6.2 225mm dia M/D exhaust Fan 4 4.00 nos.
7 Light Fixtures/Luminaires & Accessories
7.6 LED Wall Light 2 2.00 nos.
7.7 9 W LED Surface Mounted Cylindrical type 2 2.00 nos.
7.8 6 W LED Recessed Circular type 8 8.00 nos.
7.9 7 W LED T5 Slim Mirror Light 2 2.00 nos.
B School Blocks
1 Sanitary Installation
a Lab Sink 5 5.00 set
b Kitchen Sink 1 1.00 set
c PVC Multi Floor Trap 1 1.00 nos.
2 Sanitary Installation
a Water Closet Set 2 2.00 set
b Orissa Pan 6 6.00 set
c Hand Wash Basin 2 2.00 set
d Ladies Urinal 3 3.00 set
e Self Closing Bib Cock 14 14.00 nos.
f CP Spreader in Urinal 6 6.00 set
g Toilet Paper Holder 2 2.00 nos.
h Commode Spray 2 2.00 nos.
i PVC Multi Floor Trap 10 10.00 nos.
j Waste Coupling and PVC Bottle Trap 4 4.00 nos.
k 40mm SS Grab Bar-Side 2 2.00 nos.
l 40mm SS Grab Bar-Rear 2 2.00 nos.
m CP Foldable Hinge 4 4.00 nos.
Length Breadth
S.No Description No. Height (m) Qty. Unit Remarks
(m) (m)
1 Site Clearance
Column 2 0.90 0.90 1.62
Concrete Pavement
Infront of 3LaLiEACCr(F)-A & 3-12(MsF) 1 66.70 2.50 166.75
Deduction
Ramp -2 6.70 1.33 -17.76
4 Boulder Soling
Concrete Pavement
Infront of 3LaLiEACCr(F)-A & 3-12(MsF) 1 66.70 2.50 0.15 25.01
Deduction
Ramp -2 6.70 1.33 0.15 -2.66
B Column
Gate Column 2 0.30 0.30 2.95 0.53
Top RCC Coping 2 0.59 0.59 0.05 0.03
2 0.175 0.05 0.02
8 Steel Reinforcement
For gate 1 106.90 106.9
Total 106.90 Kg
0.11 Tons
10 Formworks
A Entrance Gate-Foundation 2 3.60 0.35 2.52
Gate Column 2 1.20 3.15 7.56
Flag Pole Steps 2 0.25 0.80 0.4
Flag Pole Masonry Top Surface 1 1.70 0.50 0.85
Total 11.33 sq.m
17 External Plaster
Column Inside face 4 0.54 1.64 3.54
Column Outside face 2 1.2 0.20 0.48
4 0.54 1.70 3.67
Deduct -2 0.3 1.40 -0.84
19 Flag Pole
75 Dia GI Pipe 2.00 1 2.00
Total 2.00 nos
Size Spacing c/c Structure Rebar Length/pc. Total Weight Per Total Weight
SN Description Shape Remarks
(mm) (mm) Nos Nos (mm) Length (m) Meter (Kg) (Kg)
1 Entrance Gate-Column
75 75
a 900*900 Foundation Mesh 850 10 150 2 12 1000 24 0.62 14.82
220
8 mm dia at 150 c/c for column
c 7
220 8 150 2 26 1030 53.56 0.40 21.16
stirrups-Outer 5
1
7
7 3
8 mm dia at 150 c/c for column 5
d 8 150 2 26 842 43.784 0.40 17.3
stirrups-Outer
1.915 1.915
3.02
1.915 1.915
3.29
1.884 1.884
0.05
0.49 0.49
1.884 1.884
0.05
0.49 0.49
0.592
0.592 0.6 0.6
D. Horizontal Bars(outer 4
0.3 0.3
1 Shorter Span 10 20 3.62 289.6 0.62 179.552
3.02 3.02
0.3 0.3
3.27 3.27
0.3 0.3
E. Base Slab bar 4
1 Shorter Span 10 32 3.14 401.92 0.62 249.19 3.045
0.05 0.05